Welcome! We Will Begin Momentarily Please submit all questions and comments via the chat room. If you have called into this meeting and wish to submit questions or comments please email [email protected] . If we do not respond to your question/comments tonight, it will be responded to within 30 days of receipt. Your question and answer will then be posted on www.DART.org/SilverLine Thank You
Transcript
Page 1: Welcome! We Will Begin Momentarily€¦ · Silver Line Project Update 7 • The design-build status for Silver Line is 59% complete as of June 30, 2020. • The Silver Line vehicle

0

Welcome!We Will Begin Momentarily

Please submit all questions and comments via the chat room.

If you have called into this meeting and wish to submit questions or comments please

email [email protected].

If we do not respond to your question/comments tonight,it will be responded to within 30 days of receipt.

Your question and answer will then be posted on www.DART.org/SilverLine

Thank You

Page 2: Welcome! We Will Begin Momentarily€¦ · Silver Line Project Update 7 • The design-build status for Silver Line is 59% complete as of June 30, 2020. • The Silver Line vehicle

1

City of Dallas | Group 4 - Neighborhoods 5 & 6Betterments Workshop #4Wednesday, July 29, 2020

Dallas Area Rapid Transit (DART)Silver Line Regional Rail Project

Page 3: Welcome! We Will Begin Momentarily€¦ · Silver Line Project Update 7 • The design-build status for Silver Line is 59% complete as of June 30, 2020. • The Silver Line vehicle

2

NOTICE

Audio and Video Recording In Progress

PLEASE SUBMIT QUESTIONS OR COMMENTS VIA THE CHAT ROOM, OR HOLD ALL QUESTIONS AND COMMENTS TO THE END OF THE PRESENTATION

Page 4: Welcome! We Will Begin Momentarily€¦ · Silver Line Project Update 7 • The design-build status for Silver Line is 59% complete as of June 30, 2020. • The Silver Line vehicle

DART Community Engagement Representative

3

Page 5: Welcome! We Will Begin Momentarily€¦ · Silver Line Project Update 7 • The design-build status for Silver Line is 59% complete as of June 30, 2020. • The Silver Line vehicle

COVID-19 Update

4

Due to the current pandemic, all public involvement sessions will take place via video conference.

DART urges you to follow the guidelines from the Centers for Disease Control and Prevention (CDC) to keep your

family healthy and safe.

Stay up to date by attending public involvement sessions online, signing up for construction alerts, visiting DART.org/SilverLine or calling 214-749-2543.

Page 6: Welcome! We Will Begin Momentarily€¦ · Silver Line Project Update 7 • The design-build status for Silver Line is 59% complete as of June 30, 2020. • The Silver Line vehicle

How To Stay Informed

5

Attend meetings virtually

Page 7: Welcome! We Will Begin Momentarily€¦ · Silver Line Project Update 7 • The design-build status for Silver Line is 59% complete as of June 30, 2020. • The Silver Line vehicle

Questions and Answers

6

Please submit all questions and comments via the chat room. Questions about Betterments will be reviewed by our Team and a

response will be prepared for the end of the presentation.

If a more detailed response is required, or it is anon-Betterment question, it will be responded to within 30 days of

receipt.

If you have called into this meeting and wish to submit questions or comments please email [email protected].

Thank You

Page 8: Welcome! We Will Begin Momentarily€¦ · Silver Line Project Update 7 • The design-build status for Silver Line is 59% complete as of June 30, 2020. • The Silver Line vehicle

Silver Line Project Update

7

• The design-build status for Silver Line is 59% complete as of June 30, 2020.

• The Silver Line vehicle design is 85% complete as of June 30, 2020.

• The Equipment Maintenance Facility design is at 65% complete as of June 30, 2020.

• As of July 1, 2020 active construction in DFW International Airport, Coppell, Carrollton, and Addison.

• There is no current construction in the Dallas area. DART and the City of Dallas are still working on the required ILA (Interlocal Agreement). You will be notified prior to construction beginning in your area.

Page 9: Welcome! We Will Begin Momentarily€¦ · Silver Line Project Update 7 • The design-build status for Silver Line is 59% complete as of June 30, 2020. • The Silver Line vehicle

Purpose of the Meeting

8

1. Review Results of the Previous Betterments Workshops

2. Review Recommendations from DART for Color and Finish of Sound and Betterment Walls and Vegetation Options

3. Obtain Input from Residential Adjacent Property Owners on Color and Finish of Sound and Betterment Walls and Vegetation Options

Page 10: Welcome! We Will Begin Momentarily€¦ · Silver Line Project Update 7 • The design-build status for Silver Line is 59% complete as of June 30, 2020. • The Silver Line vehicle

Betterments Workshops Recap

9

Group 4 | Neighborhoods 5 & 6 –

Previous Betterment Workshops were held on the following dates:

• Kickoff – March 21, 2019

• Workshop #1 – May 23, 2019 & June 20, 2019

• Workshop #2 – July 25, 2019

• Workshop #3 – August 28, 2019

• Workshop #4 – July 29, 2020

Page 11: Welcome! We Will Begin Momentarily€¦ · Silver Line Project Update 7 • The design-build status for Silver Line is 59% complete as of June 30, 2020. • The Silver Line vehicle

Group 4 | Neighborhoods 5 & 6 Consensus Results are as follows:

Willow Greene Condos29 out of 29 Votes Received- 15' Betterment Wall

Home | Dickerson Street0 out of 1 Votes Received- 15' Betterment Wall (Default)

Betterments Consensus Results - Dallas

10

Page 12: Welcome! We Will Begin Momentarily€¦ · Silver Line Project Update 7 • The design-build status for Silver Line is 59% complete as of June 30, 2020. • The Silver Line vehicle

Betterments Consensus Results

11

Page 13: Welcome! We Will Begin Momentarily€¦ · Silver Line Project Update 7 • The design-build status for Silver Line is 59% complete as of June 30, 2020. • The Silver Line vehicle

Betterments Consensus Results

12

Page 14: Welcome! We Will Begin Momentarily€¦ · Silver Line Project Update 7 • The design-build status for Silver Line is 59% complete as of June 30, 2020. • The Silver Line vehicle

Wall Color Options

13

(DEFAULT)

Page 15: Welcome! We Will Begin Momentarily€¦ · Silver Line Project Update 7 • The design-build status for Silver Line is 59% complete as of June 30, 2020. • The Silver Line vehicle

Wall Finish Options

BUSH HAMMER (DEFAULT)

ROLLED BRICKROLLED DRYSTACK

ROLLED ASHLAR

14

Page 16: Welcome! We Will Begin Momentarily€¦ · Silver Line Project Update 7 • The design-build status for Silver Line is 59% complete as of June 30, 2020. • The Silver Line vehicle

TracksideTan Color and Bush Hammer Finish

15

* Posts will not be painted or have cladding.

Page 17: Welcome! We Will Begin Momentarily€¦ · Silver Line Project Update 7 • The design-build status for Silver Line is 59% complete as of June 30, 2020. • The Silver Line vehicle

Neighborhood ViewTan Color and Bush Hammer Finish

16

* Posts will not be painted or have cladding.

Page 18: Welcome! We Will Begin Momentarily€¦ · Silver Line Project Update 7 • The design-build status for Silver Line is 59% complete as of June 30, 2020. • The Silver Line vehicle

Bush Hammer Finish

17

* Posts will not be painted or have cladding.

Page 19: Welcome! We Will Begin Momentarily€¦ · Silver Line Project Update 7 • The design-build status for Silver Line is 59% complete as of June 30, 2020. • The Silver Line vehicle

Rolled Ashlar Finish

18

* Posts will not be painted or have cladding.

Page 20: Welcome! We Will Begin Momentarily€¦ · Silver Line Project Update 7 • The design-build status for Silver Line is 59% complete as of June 30, 2020. • The Silver Line vehicle

Rolled Drystack Finish

19

* Posts will not be painted or have cladding.

Page 21: Welcome! We Will Begin Momentarily€¦ · Silver Line Project Update 7 • The design-build status for Silver Line is 59% complete as of June 30, 2020. • The Silver Line vehicle

Rolled Brick Finish

20

* Posts will not be painted or have cladding.

Page 22: Welcome! We Will Begin Momentarily€¦ · Silver Line Project Update 7 • The design-build status for Silver Line is 59% complete as of June 30, 2020. • The Silver Line vehicle

Shade Tree Vegetation Options

21

Honey Locust Chinese PistacheLace Bark Elm

* City of Dallas may change vegetation choices in the future.

Page 23: Welcome! We Will Begin Momentarily€¦ · Silver Line Project Update 7 • The design-build status for Silver Line is 59% complete as of June 30, 2020. • The Silver Line vehicle

Ornamental Tree Vegetation Options

22

Little Gem Magnolia Eve's NecklaceDesert Willow

* City of Dallas may change vegetation choices in the future.

Page 24: Welcome! We Will Begin Momentarily€¦ · Silver Line Project Update 7 • The design-build status for Silver Line is 59% complete as of June 30, 2020. • The Silver Line vehicle

Large Shrub Vegetation Options

23

Texas Sage Dwarf Wax MyrtleIndian Hawthorn

* City of Dallas may change vegetation choices in the future.

Page 25: Welcome! We Will Begin Momentarily€¦ · Silver Line Project Update 7 • The design-build status for Silver Line is 59% complete as of June 30, 2020. • The Silver Line vehicle

Utility Approved Large Shrub Vegetation Options

24

Dwarf Yaupon HollyAmerican Beautyberry

* City of Dallas may change vegetation choices in the future.

Page 26: Welcome! We Will Begin Momentarily€¦ · Silver Line Project Update 7 • The design-build status for Silver Line is 59% complete as of June 30, 2020. • The Silver Line vehicle

Small Shrub Vegetation Options

25

Red BarberrySoft Leaf Yucca Red Yucca

* City of Dallas may change vegetation choices in the future.

Page 27: Welcome! We Will Begin Momentarily€¦ · Silver Line Project Update 7 • The design-build status for Silver Line is 59% complete as of June 30, 2020. • The Silver Line vehicle

Utility Approved Small ShrubVegetation Options

26

Dwarf Indian HawthornDwarf Chinese Holly Red Barberry Boxwood

* City of Dallas may change vegetation choices in the future.

Page 28: Welcome! We Will Begin Momentarily€¦ · Silver Line Project Update 7 • The design-build status for Silver Line is 59% complete as of June 30, 2020. • The Silver Line vehicle

Ground Cover Vegetation Options

27

Asian JasmineVincaPurple Winter Creeper

* City of Dallas may change vegetation choices in the future.

Page 29: Welcome! We Will Begin Momentarily€¦ · Silver Line Project Update 7 • The design-build status for Silver Line is 59% complete as of June 30, 2020. • The Silver Line vehicle

Utility Approved Ground CoverVegetation Options

28

Asian JasmineLiriopeCreeping Juniper

* City of Dallas may change vegetation choices in the future.

Page 30: Welcome! We Will Begin Momentarily€¦ · Silver Line Project Update 7 • The design-build status for Silver Line is 59% complete as of June 30, 2020. • The Silver Line vehicle

Vine Vegetation Options

29

Virginia CreeperTrumpet VineCoral Honey Suckle

* City of Dallas may change vegetation choices in the future.

Page 31: Welcome! We Will Begin Momentarily€¦ · Silver Line Project Update 7 • The design-build status for Silver Line is 59% complete as of June 30, 2020. • The Silver Line vehicle

What To Expect Next

30

You will be receiving a letter confirming consensus for your area along with a ballot to choose wall color, finish and

vegetation. We ask that you complete the ballot and submit it by the enclosed date specified.

As we continue to progress with the project, DART will contact you for any further needs to complete the project. We strongly encourage you to sign up online to get project and construction

updates at www.DART.org/SilverLine.

Page 32: Welcome! We Will Begin Momentarily€¦ · Silver Line Project Update 7 • The design-build status for Silver Line is 59% complete as of June 30, 2020. • The Silver Line vehicle

31

31Thank You For Joining Us!

If you still have questions or comments, please submit them [email protected]

We will respond to you question or comment within 30 days of receipt.

Your question and answer will then be posted on www.DART.org/SilverLine

Page 33: Welcome! We Will Begin Momentarily€¦ · Silver Line Project Update 7 • The design-build status for Silver Line is 59% complete as of June 30, 2020. • The Silver Line vehicle

32

32

This Meeting Has Concluded