Date post: | 29-Mar-2015 |
Category: |
Documents |
Upload: | emilie-nadler |
View: | 222 times |
Download: | 2 times |
WELCOMES YOU
Company Profile
RDS Project Ltd. is a company promoted by professional
builders with 50 years experience in construction field.
The Company was incorporated during 1992 with its
Head Office at Delhi.
Board of Directors
Shri M.L. Goyal - Managing Director. (A Leading Builder)
Shri Sumit Goyal - Chartered Accountant
Col. (Retd.) John K Manavalan - Chartered Engineer
Shri Ravindra Nath Goyal - Builder
Shri Amit Goyal - Builder
Financials
Year Capital (Rupees In Lakhs) Turnover Profit/Loss (Rupees In Lakhs)
Paid up Reserve & Surplus Before Tax After Tax
2002-03 707.23 516.27 4796.69 234.56 148.03
2003-04 707.23 646.20 5699.41 202.48 129.92
2004-05 707.23 854.23 7849.76 330.66 208.03
Bank Facilities:Cash Credit / Overdraft
Bank GuaranteeLetter of Credit
Total
Rupees In Lakhs1,650.005,350.00400.007.400.00
Activities of the Company
LUXURIOUS RESIDENTIAL APARTMENTS
BUILDINGS WORKS
PILING
ROADS & AIRPORTS
MARINE WORKS & BRIDGES
ELECTRIFICATION WORKS
LUXURIOUS RESIDENTIAL APARTMENTS
PAUL ABRAO RESIDENCY is a 13 storied luxury apartment
project in Chittoor Road, Cochin in 80 cents plot was completed
in 19 months time. This complex with all modern amenities is
considered to be one of the best complexes in Cochin.
PAUL ABRAO RESIDENCY
LUXURIOUS RESIDENTIAL APARTMENTS
NEDUNGADAN RESIDENCY is a 14 storied apartment building at Chittoor Road in
92 cents of land has 4 and 3 bedrooms flats with all modern amenities and a total
built up area of 1,15,000 sq. ft. Work was started in March 1994 and was completed
in December 1996. This complex also is a very prestigious address in Cochin.
NEDUNGADAN RESIDENCY
LUXURIOUS RESIDENTIAL APARTMENTS
AVENUE ONE is a 15 storied apartment building at Panampilly Nagar in 70
cents of land has 3 bedrooms flats with all modern amenities and a total
built up area of 1,12,950 sq. ft. . Work was started in December 2004 and is
scheduled to be completed in March 2007.
AVENUE ONE – In Progress
LUXURIOUS RESIDENTIAL APARTMENTS
OASIS is a 13 storied apartment building at Jawahar Nagar in 70 cents of
land has 3 bedrooms flats with all modern amenities and a total built up
area of 1,22,958 sq. ft. Work was started in October 2005 and is scheduled
to be completed in March 2008.
OASIS – Up Coming
BUILDING WORKS
NILA - SOFTWARE WORKSHOP
Start Date End Date SPECS Location Cost (Crores)
1995 1997
TOTAL BUILT UP AREA IS 4,25,000 SQ. FT.
TECHNO PARK CAMPUS,
TRIVANDRUM7
COMPLETED IN RECORD 24 MONTHS TIMES
WAS INAGURATED BY THE CHIEF MINISTER OF KERALA IN 1997
BUILDING WORKS
NATIONAL PHYSICAL OCEANOGRAPHY LIMITED
Start Date End Date SPECS Location Cost (Crores)
2001 2004
SIZE OF THE TANK: 50 M X 20 M X 18 M
NPOL, COCHIN
25
CAPACITY: 18 MILLION LITRES OR 43 LAKHS GALLON OF WATER
SIDE WALL OF TANKS TO CARRY MOVING PLATFORMS OF 20 TONS EACH
ON RECORD: 2ND LARGEST ACCOUSTIC TANK IN ASIA - PACIFIC REGION
BUILDING WORKS
Name of the Project Period Location Cost (Crores)
TEJASWINI (On Going) 2005TECHNO PARK CAMPUS, TRIVANDRUM
44.49
CONSTRUCTION OF CADET MESS & CADET ACCOMODATION
2005 NAVAL ACADEMY, EZHIMALA 38.00
AIRPORT TERMINAL BUILDING 2000 PORT BLAIR 10.00
HEAD QUARTER BUILDING FOR DIRECTOR GENERAL, BORDER ROADS
1998 NEW DELHI 6.6
ADMINSTRATIVE BLOCK FOR RAJIV GANDHI CENTRE FOR BIOTECHNOLOGY
2002 AIR FORCE, TRIVANDRUM 7.00
PILING WORKS
Name of the Project Period Location Cost (Crores)
PROVISION OF BERTHING FACILITY 2003 NAVAL WHARF, PORT BLAIR 20.00
PROVISION OF BERTHING FACILITY 2002 COAST GUARD, PORT BLAIR 11.00
AIRCRAFT REPAIR WORKSHOP 1999 COCHIN 2.00
PROVISION OF ACCOUSTIC TANK & TRANSDUCER COMPLEX
2004 NPOL, COCHIN 1.5
PROVISION OF WATER SUPPLY OF CAPACITY 3.3MLD
1999 INFO PARK, COCHIN 2.4
PILING WORKS
Name of the Project Period Location Cost (Crores)
PEGASUS ENGINE TEST BED BUILDING 1999 HAL, NAVAL BASE, COCHIN 2.1
PROVISION OF PILE FOUNDATION FOR A BUILDING
1997 CIFNET, COCHIN 1.82
PROVISION OF PILE FOUNDATION FOR BUILDINGS
1997 NAVAL BASE, COCHIN 1.77
CONSTRUCTION OF TECHNICAL BUILDING 2002 INS GARUDA, COCHIN 1.5
PROVISION OF PILE FOUNDATION FOR A BUILDING
1997EPF STAFF QUARTERS, COCHIN
1.1
ROADS AND AIRPORTS
WORLD BANK FUNDED ROAD PROJECTS
Name of the Project Period Distance Cost (Crores)
VATTAVDA - TOP STATION - MUNNAR ROAD 2004-05 44 KMS 19.2
VYPPIN - PALLIPPURAM ROAD WORK 2003-04 30 KMS 11.00
SULTAN BATHERY – PULLPALLY 2002-03 30 KMS 10.00
PALA - ERATTUPETTAH ROAD 2005-06 12 KMS 5.35
PERUMPAYIL - KOZHIKODE ROAD 2004-05 11 KMS 4.06
ROADS AND AIRPORTS
AIRPORT WORKS
Name of the Project Period Location Cost (Crores)
RESURFACING OF RUNWAY 2003-04KALAIKUNDA, WEST BENGAL
21.85
PROVISION OF PARELLEL TAXI TRACK 2004-05AIR FORCE, CARNICOBAR
20.87
EXTENSION OF AIRPORT RUNWAY 2001BAGDOGRA, WEST BENGAL
14.5
PROVISION OF RIGID HARDSTANDING 2004-05 CARNICOBAR 7.00
OVERLAY WORK OF AIRPORT 1996 PORT BLAIR 6.1
MARINE WORKS & BRIDGES
MARINE WORKS
Name of the Project Period Location Cost (Crores)
MARINE - CHOULDARI DAM 1996-2002 Port Blair, Andaman & Nicobar Islands 3.1
MARINE - SEA WALL 2003-04ENNORE EXPRESS WAY, CHENNAI, TAMIL NADU
24.57
MARINE – JETTY 2000-03NAVAL WHARF JETTY AT PORT BLAIR, ANDAMAN & NICOBAR ISLANDS
30.00
CONSTRUCTION OF MUS BREAKWATER
2002 ANDAMAN ISLANDS 40.00
PROVISION OF BERTHING FACILITIES 2002 COAST GUARDS, PORT BLAIR 16.00
MARINE WORKS & BRIDGES
BRIDGES
Name of the Project Period Location Cost (Crores)
RAILWAY OVERBRIDGE 2000-01ACROSS RIVER POORAPUZHA AT PARAPPANGADI, CALICUT
1.7
ROAD OVERBRIDGE 2003-04S.N. JUNCTION, THRIPUNITHURA, COCHIN
2.87
ELECTRIFICATION
Name of the Project SPEC Location Cost (Crores)
PROJECT ASHOK
HT /LT TRANSFORMERS, ELECTRICAL PANELS, TRANSMISSION LINES, GENERATORS & CONSTRUCTION OF BUILDING
GARRISON ENGINEERS PROJECT, KOCHI
9
AUGMENTATION OF EXTERNAL ELECTRIFICATION
SUPPLY, INSTALLATION OF 2000 KVA GENSET WITH TRANSFORMER , HT / LT PANELS & REQUIRED CABLING & CONSTRUCTION OF SUBSTATION BUILDING ON PILE FOUNDATION
CARNICOBAR 4.18
LAND DEVELOPMENT WORK
Name of the Project Period Location Cost (Crores)
LAND DEVELOPMENT WORK INCLUDING EARTHWORK FORMATIONS FOR EMBANKMENTS, ROADS, ETC
1996-98INFO PARK (KINFRA), COCHIN
13.12
Quality Policy
We are committed to deliver Quality Products and Services to the utmost
satisfaction of our clients by continually improving our Services through Innovative
Changes. Our Policy is to achieve our commitments by adopting Total Quality
Management through Quality Planning, Quality Control and Quality Improvement
RDS Project Ltd
Alpha Plaza, 6th Floor,
K.P. Vallon Road, Kadavanthara, Cochin – 20.
Phone : (0484)2316950/ 2321254
Fax (0484) 2323012
T H A N K Y O U