+ All Categories
Home > Documents > Well 30 Modeling. Model Grid and Setup Well 30 Well 31 Well 27 Well UC-H2.

Well 30 Modeling. Model Grid and Setup Well 30 Well 31 Well 27 Well UC-H2.

Date post: 21-Jan-2016
Category:
Upload: jocelyn-sharp
View: 215 times
Download: 0 times
Share this document with a friend
Popular Tags:
20
Well 30 Modeling
Transcript
Page 1: Well 30 Modeling. Model Grid and Setup Well 30 Well 31 Well 27 Well UC-H2.

Well 30 Modeling

Page 2: Well 30 Modeling. Model Grid and Setup Well 30 Well 31 Well 27 Well UC-H2.

Model Grid and Setup

Well 30

Well 31

Well 27

Well UC-H2

Page 3: Well 30 Modeling. Model Grid and Setup Well 30 Well 31 Well 27 Well UC-H2.

Boundaries

Constant Head

GeneralHead

Page 4: Well 30 Modeling. Model Grid and Setup Well 30 Well 31 Well 27 Well UC-H2.

Model Parameters

• 1 layer• Unconfined• Only pumping Wells

– Well 30– Well 31– Well 27

• Boundaries– Constant Head

• Top and Left Side of Model

– General Head• Bottom and Right Side

of Model

Page 5: Well 30 Modeling. Model Grid and Setup Well 30 Well 31 Well 27 Well UC-H2.

Layer Properties

• Conductivity

• Kx = 0.012 cm/sec

• Ky = 0.012 cm/sec

• Kz = 0.0012 cm/sec

• Vx = 130 ft/yr

• Gradient of 0.003

• Storage

• Ss = 0.0002 (1/ft)

• Sy = 0.2

• Effective Porosity = 30%• Total Porosity = 35 %

Page 6: Well 30 Modeling. Model Grid and Setup Well 30 Well 31 Well 27 Well UC-H2.

Initial Conditions

• Water Levels– 1974 Groundwater

contours from Kaiser Steel Corp Report, 1986.

• TDS Concentrations– 2000 model results

from Kaiser Steel Corp Report, 1986.

Page 7: Well 30 Modeling. Model Grid and Setup Well 30 Well 31 Well 27 Well UC-H2.

Well 30: TDS value 254 mg/l (no pumping from year 2000 – 2003)

Page 8: Well 30 Modeling. Model Grid and Setup Well 30 Well 31 Well 27 Well UC-H2.

Well 30: TDS 480 mg/l (with pumping from 2000 – 2003; 2500 gpm)

Page 9: Well 30 Modeling. Model Grid and Setup Well 30 Well 31 Well 27 Well UC-H2.

Well 30 TDS Impact vs. Pumping

Well 30 - TDS Over Timeat various pumping scenarios

0

100

200

300

400

500

600

700

800

0 365 730 1095 1460 1825 2190 2555 2920 3285 3650

Days

TD

S C

on

cen

tra

tio

ns

(m

g/L

)

2500 GPM

2000 GPM

1500 GPM

1000 GPM

No Pumping

Page 10: Well 30 Modeling. Model Grid and Setup Well 30 Well 31 Well 27 Well UC-H2.

Pumping rate 2500 gpm

Well 30 - 2500 GPM

0

100

200

300

400

500

600

700

800

0 365 730 1095 1460 1825 2190 2555 2920 3285 3650

Days

TD

S C

on

cen

tra

tio

ns

(m

g/L

)

2500 GPM

Page 11: Well 30 Modeling. Model Grid and Setup Well 30 Well 31 Well 27 Well UC-H2.

Well 30 (Pumping Rate 0 gpm, 3650 days)

Well 30 Turned Off

0

100

200

300

400

500

600

700

800

0 365 730 1095 1460 1825 2190 2555 2920 3285 3650

Days

TD

S C

on

cen

tra

tio

n (

mg

/L)

No Pumping

Page 12: Well 30 Modeling. Model Grid and Setup Well 30 Well 31 Well 27 Well UC-H2.

Well 30 (Pumping Rate 0 gpm, 3650 days)

Page 13: Well 30 Modeling. Model Grid and Setup Well 30 Well 31 Well 27 Well UC-H2.

Well 30 (Pumping Rate 1000 gpm, 3650 days)

Page 14: Well 30 Modeling. Model Grid and Setup Well 30 Well 31 Well 27 Well UC-H2.

Well 30 (Pumping Rate 1500 gpm, 3650 days)

Page 15: Well 30 Modeling. Model Grid and Setup Well 30 Well 31 Well 27 Well UC-H2.

Well 30 (Pumping Rate 2000 gpm, 3650 days)

Page 16: Well 30 Modeling. Model Grid and Setup Well 30 Well 31 Well 27 Well UC-H2.

Well 30 (Pumping Rate 2500 gpm, 3650 days)

Page 17: Well 30 Modeling. Model Grid and Setup Well 30 Well 31 Well 27 Well UC-H2.

Union Carbide – Particle Tracking 5 years

Page 18: Well 30 Modeling. Model Grid and Setup Well 30 Well 31 Well 27 Well UC-H2.

Union Carbide – Particle Tracking 10 years

Page 19: Well 30 Modeling. Model Grid and Setup Well 30 Well 31 Well 27 Well UC-H2.

Union Carbide – Particle Tracking 15 years

Page 20: Well 30 Modeling. Model Grid and Setup Well 30 Well 31 Well 27 Well UC-H2.

Recommended