+ All Categories
Home > Documents > WELL DRILLING AND CONSTRUCTION Ken Bousfield, P.E. Utah Division of Drinking Water.

WELL DRILLING AND CONSTRUCTION Ken Bousfield, P.E. Utah Division of Drinking Water.

Date post: 03-Jan-2016
Category:
Upload: jessie-marshall
View: 223 times
Download: 0 times
Share this document with a friend
Popular Tags:
16
WELL DRILLING AND CONSTRUCTION Ken Bousfield, P.E. Utah Division of Drinking Water
Transcript
Page 1: WELL DRILLING AND CONSTRUCTION Ken Bousfield, P.E. Utah Division of Drinking Water.

WELL DRILLING AND CONSTRUCTION

Ken Bousfield, P.E.

Utah Division of Drinking Water

Page 2: WELL DRILLING AND CONSTRUCTION Ken Bousfield, P.E. Utah Division of Drinking Water.

BASIS FOR RULES:

–Same as for springs: Plan review (Primacy)Engineering principlesExperience

Page 3: WELL DRILLING AND CONSTRUCTION Ken Bousfield, P.E. Utah Division of Drinking Water.

PLAN REVIEW PROCESS:

– Prior to Drilling Drilling Specifications

– After DrillingChemical AnalysisSource CapacitySource ProtectionEquipping Specifications

Page 4: WELL DRILLING AND CONSTRUCTION Ken Bousfield, P.E. Utah Division of Drinking Water.

WELL DRILLING SPECS:

– Drilling Method– Surface Seal – Plumbness and Alignment– Construction Materials

Page 5: WELL DRILLING AND CONSTRUCTION Ken Bousfield, P.E. Utah Division of Drinking Water.

WELL EQUIPPING:

– Type of Pumps– Pitless Adaptors– Pump Capacity– Appurtenant Equipping– Well House Construction

Page 6: WELL DRILLING AND CONSTRUCTION Ken Bousfield, P.E. Utah Division of Drinking Water.

Well SystemINCOMING POWER

DISCONNECT

MOTOR

STORAGERESERVOIR

PUMP BOWLS- BELOW PUMPING LEVEL

CONE OF DEPRESSION

CONCRETESANITARYSEAL

WATER BEARING SAND

WELL CASING

WELL GROUT100 FT/MINIMUM

PUMPING LEVEL

IMPERVIOUS FORMATION (ROCK,CLAY,OTHER DENSE MATERIAL)

DRAWDOWN

STATIC WATER LEVEL- WATER TABLE

SCREEN

SPIDER,BEARING,& COUPLING

IMPELLERS

RADIUS OFINFLUENCE

STUFFING BOXSHAFT SLEEVEPACKING OR MECHANICAL SEALPACKING GLANDPACKING ADJUSTMENT NUTSSEAL WATERLANTERN RING

FLOW TO WASTE

DISCHARGE LINE

VALVES

DESANDER

FLOOR DRAIN TO DAYLIGHT

AIR VAC W/#14 MESH SCREEN& TURNED DOWN

LUBRICATION-FOOD GRADE MINERAL OIL AND FOOD GRADE GREASE

PSI GAUGE

CHECK VALVE

OILER

WELL VENTW/#14 MESH

Page 7: WELL DRILLING AND CONSTRUCTION Ken Bousfield, P.E. Utah Division of Drinking Water.

WELL GROUTING:

Page 8: WELL DRILLING AND CONSTRUCTION Ken Bousfield, P.E. Utah Division of Drinking Water.

SUBMERGED WELL:

Page 9: WELL DRILLING AND CONSTRUCTION Ken Bousfield, P.E. Utah Division of Drinking Water.

PITLESS ADAPTOR:

Page 10: WELL DRILLING AND CONSTRUCTION Ken Bousfield, P.E. Utah Division of Drinking Water.

PITLESS ADAPTOR:

Page 11: WELL DRILLING AND CONSTRUCTION Ken Bousfield, P.E. Utah Division of Drinking Water.

CONVERTED SUBMERGED WELL:

Page 12: WELL DRILLING AND CONSTRUCTION Ken Bousfield, P.E. Utah Division of Drinking Water.

WELL HOUSE PIPING:

Page 13: WELL DRILLING AND CONSTRUCTION Ken Bousfield, P.E. Utah Division of Drinking Water.

WELL HOUSE PIPING:

Page 14: WELL DRILLING AND CONSTRUCTION Ken Bousfield, P.E. Utah Division of Drinking Water.

WELL HOUSE CONSTRUCTION:

– Heating– Ventilation– Drainage– Treatment

Page 15: WELL DRILLING AND CONSTRUCTION Ken Bousfield, P.E. Utah Division of Drinking Water.

STORAGE CAPACITY ISSUES:

– Average Day Use in gallons (gal)Residence: 400galPicnic/Park: 5gal/personVisitor’s Center: 5gal/personCampground Hydrant: 35gal/person

– ADD FIRE FLOW TO VOLUMES

Page 16: WELL DRILLING AND CONSTRUCTION Ken Bousfield, P.E. Utah Division of Drinking Water.

DISTRIBUTION CAPACITY ISSUES:

– Peak Instantaneous UseEngineering Hydraulic Network

Analysis20 psi minimum pressure under all

conditions


Recommended