DrillScan services catalog / Special Services 35
Earliest result delivery within 1 day after reception of full and usable set of data
Delivery of final PowerPoint® or written report within 1 week, intermediate reports on demand
Result support from our most experienced Drilling Champions, upon request
Result presentation in client’s office (optional)
Deliverables and Timing
Well planning recommendations based on customised criteria including, but not limited to:
Kick-off depth vs. rock strength, build rate vs. casing & completion stiffness
Build & drop rates vs. casing wear, drilling section length & inclination range vs. hole cleaning
Casing shoe-track vs. section TD doglegs, Horizontal landing strategy vs. target reservoir TVD
Wellbore tortuosity vs. T&D&B, Target sizing vs. wellbore surveying technical limits
Includes
Complex project development: Congested multi-well platforms
Anticipate risks and difficulties for all planned drilling sections, find fit for purpose solutions
Obtain rationalized wellbore trajectories meeting the data acquisition and production objectives
Have robust wells specs and project scope of work for Rig & Services Contract Call for Tenders
Identify the right directional bit-BHA driving systems for the most challenging drilling sections
Optimise and meet the development project drilling & completion CAPEX budget
Pre-WellBenefits /
Rank well trajectory proposals based on criteria customised to the specific development campaign
Benchmark trajectory proposals based on historical data
Identify most challenging well’s drilling sections based on weighted and fit for purpose criteria
Recommendations to reduce the directional objectives difficulties and meet the wells objectives
Create a composite perspective out of the most challenging drilling sections for modelling purpose
Objectives
Ref: SS02