Objectives
Production and
production process
Welspun syntex limited
Asphra textiles limited
Raw materials
Production process
Comparative analysis
To understand the production process.
To accept a unique opportunity to gain an insight into a working environment related to a subject area.
To examine text book knowledge with the practical environment.
To gain first hand information regarding functioning of the Industry.
To become aware of the role of different people in an organization.
WELSPUN SYNTEX LIMITED
Incorporated : 31 Mar.'83 as Kothari Leasing Kothari Polyesters on 15 Mar.'91 Welspun Syntex (WSL) on 26 Jul.'91.Type : Public (BSE: 508933)Industry : Textile processingHeadquarters : MumbaiKey people : BK Goenka (MD), BA Kale Director & CEO)
Parent : Welspun GroupPlant : Silvassa and PalgharTurnover : Rs 3, 6113 lacs (2009-10).
PALGHAR PLANTPalghar, a small town 80kms north of Mumbai. Welspun started its first manufacturing activity. Today, Palghar Plant houses one of the most advanced dyeing plants of polyester, nylon yarns in India. Palghar plant enjoys the advantages of ideal geographical location to efficiently handle all the logistics to facilitate prompt shipments to the Indian and overseas customers. The product range and process parameters are designed to optimize the production capacity and minimize the cost of production without compromising on quality and offers the best value for money.
ASHPRA TEXTILES PVT. LTD.
An profit making dyed yarn manufacturing company.Manufactures -texured synthetic and cotton dyed yarnEstablished -1998Location -Mumbai and Palghar. Market position - The Company has dominant presence in India with its own sales brandConsuming centers -Bangalore, Mumbai, Bhilwara & Panipat.
PRODUCTION PROCESS
Mechanical or chemical steps used to create an object, usually repeated to create multiple units of the same item. Generally involves the use of raw materials, machinery and manpower to create a product.
RAW MATERIALS
Polyester Filament
Cotton Filament
Dyes
The raw materials used are as follows
YARN MAKING PROCESSConning
Combing
Spinning
Twisting
Hydro-wash
Hydro-extract
Drying
Rewinding
Checking
Packaging
Conning
In this stage the filament is transferred from paper cones to iron cones fixed in the machine.
Combing
Combing provides more extensive cleaning. Combing
provides more extensive cleaning.
The purpose of combing is to remove short fibers, neps and
trash so that the resulting sliver is very clean and
lustrous.
Spinning
Polyester Partially Oriented Yarn, commonly known as Polyester POY is the primary form of Polyester yarn. It is the first form of yarn made directly by spinning Polyester PET Chips/Flakes.
Spinning is the single most costly step in converting fibre to yarn.
The filaments are twisted to add stretch and elasticity which produces the polyester yarn.
Twisting
ydro wash
Dyeing is the process of adding color to textile products like fibers, yarns, and fabrics. Dyeing is normally done in a special solution containing dyes and particular chemical material. The temperature and time controlling are two key factors in dyeing.
After dyeing
Hydro extractor
The dyed yarn packages are put in Hydro Extractor which removes moisture by the centrifugal process.
Drying
Rewinding
Dyed yarn is taken up for rewinding on paper cones ,which also has a facility of waxing as the optional
facility for the Customer.
Checking
Dyed yarn on paper cones is again conditioned and then finally each individual cone is checked for any
quality defects by visual inspection under light and then it is packed for
shipment
Packaging
Final productThe so formed POY is then exported to countries like Malaysia, Sri lanka, brazil middle east.
WAREHOUSE A warehouse is a commercial building for storage of
goods.
Comparative Analysis
Welspun Syntex limited
Asphra textiles limited
Scale of production
Large scale i.e. 1400 tons a month Small scale i.e. 70 -80 tons a month0
Works for 24 hours Works for 12 hours a diurnal
1000+ workers 120 workers
Production system
Process production Batch production
Plant layout
Process layout Product layout
Maintenance system
Total productive maintenance Preventive maintenance
Product design
Process layout Customized
Conclusion
Queries