SEPTEMBER 24th, 2019
COMMUNITY OPEN HOUSEWEST CAMPUS
T H E O H I O S T A T E U N I V E R S I T Y
T H E O H I O S T A T E U N I V E R S I T Y
JURISDICTIONSOSU WEST CAMPUS
F R A M EW OR K 2 . 0 1 1
LaneAve
SR 315
10thAve
Cann
on D
r
King Ave
Framework 2.0 Long-Term Plan
T H E O H I O S T A T E U N I V E R S I T Y
EXISTING CONDITIONSOSU WEST CAMPUS
EXISTING ZONING OSU WEST CAMPUS
T H E O H I O S T A T E U N I V E R S I T Y
PROPOSED ZONING OSU WEST CAMPUS
T H E O H I O S T A T E U N I V E R S I T Y
• Preliminary Traffic Study has been completed• Limited impacts to North Star• Vast majority of traffic can be expected from the north on Kenny
Road and from the east on Lane Avenue and Kinnear Road given their connections with SR 315 and Olentangy River Road
• Traffic Impact Studies (TIS) will be required by City of Columbus prior to development.
• Phase I TIS is underway now.
TRAFFICOSU WEST CAMPUS
T H E O H I O S T A T E U N I V E R S I T Y
Arlington Gateway (not an OSU project)
MASTER PLAN PHASE IOSU WEST CAMPUS
T H E O H I O S T A T E U N I V E R S I T Y
Garage
SEPTEMBER 24th, 2019
COMMUNITY OPEN HOUSEWEST CAMPUS
T H E O H I O S T A T E U N I V E R S I T Y