+ All Categories
Home > Documents > Western Railway Presentation Edited

Western Railway Presentation Edited

Date post: 07-Apr-2015
Category:
Upload: govind-gupta
View: 208 times
Download: 4 times
Share this document with a friend
39
Transcript
Page 1: Western Railway Presentation Edited
Page 2: Western Railway Presentation Edited
Page 3: Western Railway Presentation Edited

INDIAN RAILWAYS Indian Railways is more than150 year old

It is largest railway system in world under one management

It is a lifeline of country

It is biggest civilian employer in the world

No strike in last 30 years in spite of 17 lakh workers

Page 4: Western Railway Presentation Edited

GENERAL

Indian Railways covers 64000 of route km along length & width of the country

It runs 12000 trains every day

it carry 1.5 crore passengers & 17 lakh tonnes of goods every day

It is fuel efficient system

Page 5: Western Railway Presentation Edited

SALIENT FEATURES OF INDIAN RAILWAYS

World’s third largest railway network Prime movers to the nation. IR owns a fleet of 2,22,379 wagons, 42,441 coaches and 7,910

locomotives. It runs 16,0251 trains, including 9,550 passenger trains, carrying

about 1.6 million tonnes of freight and about 15 million passengers daily.

7000 stations & about 500 computerized passenger reservation centers

15 lakh employee(10 lakh in Group C) including 10000 officers and

6 lakh staff Qrs

Page 6: Western Railway Presentation Edited

Prime infrastructural sector.

Perform the dual role1. Commercial Organization2. Vehicle for fulfillment of social obligations

Part and parcel of the total receipts and expenditure of the Government of India

Biggest township Kharagpur has 12000 qrs

Page 7: Western Railway Presentation Edited

1853 First railway train journeyed distance of 22 miles between Bombay and Thana.

Originally, operated by private companies Englishmen.

1925-1950 GOI took over the all the private railway companies.

INDIAN RAILWAYS have now become a largest unified State-enterprise.

ORIGIN & DEVELOPMENT

Page 8: Western Railway Presentation Edited

1947 Post partition 21 railway systems----10 owned by the

GOI and balance by princely states. Total integration of princely state railways completed by first April 1950

1951 Southern, Central and Western Railways SR, CR&WR created

1952 Northern, Eastern and North Eastern Railways, NR,ER&NER created

1955 South Eastern Railways, SER created 1958 North East Frontier Railways, NFR created 1966 South Central Railways, SCR created 2002 East

Central & North Western Railways created in October 2003 South Western , West Central, North Central, South

Eastern Central & East Coast Railway, SWR, WCR, NCR, SECR and ECoR created in April 2003

Page 9: Western Railway Presentation Edited

Summer Training Report On

Test RoomNetwork SectionTelephone ExchangeUHF Section

Page 10: Western Railway Presentation Edited

12 May 200912 May 2009 Western RailwayWestern Railway 1010

Network used In Railway

Page 11: Western Railway Presentation Edited

12 May 200912 May 2009 Western RailwayWestern Railway 1111

Networking Used in RailwayRail net

Railnet is also providing internet also for the communication purpose as a facility of the main server of this internet in rajkot railway junction is in test-room.There is 64 kbps internet connection is provided in test-room.

FOISThere is also freight operated information system

(FOIS) for goods information in railway.

Page 12: Western Railway Presentation Edited

12 May 200912 May 2009 Western RailwayWestern Railway 1212

Block Diagram

Page 13: Western Railway Presentation Edited

12 May 200912 May 2009 Western RailwayWestern Railway 1313

Rail Net ComponentsServer:

Server is a super-computer that stores the data and provides network services to clients.

Router: A router, is a networking device whose software and

hardware are usually tailored to the tasks of routing and forwarding information.

Modem:It is device that modulate-demodulate the data.

The goal is to produce a signal that can be transmitted easily and decoded to reproduce the original digital data.

Page 14: Western Railway Presentation Edited

12 May 200912 May 2009 Western RailwayWestern Railway 1414

Rail Net ComponentsSwitch:

A network switch is a computer networking device that connects network segments.

Switch work at the Data Link layer (layer 2) of the OSI model. The switch plays an integral part in most Ethernet local area networks or LANs. Hub:

A network hub or repeater hub is a device for connecting multiple twisted pair or fiber optic Ethernet devices together and thus making them act as a single network segment.

Hubs work at the physical layer (layer 1) of the OSI model.

Page 15: Western Railway Presentation Edited

12 May 200912 May 2009 Western RailwayWestern Railway 1515

AdvantagesIt is used for communication purpose.

Rail net is used to transmit the data or get information from source to destination.

Rail net is used to book the railway tickets.

Rail net is used to test the line-cable.

Future Expansion2mbps can be transferred.

Design & Development of MIS, Data Ware House & Data Mining capabilities:

Page 16: Western Railway Presentation Edited

12 May 200912 May 2009 Western RailwayWestern Railway 1616

FOIS FREIGHT OPERATING INFORMATION SYSTEM (FOIS)

FOIS enables freight customers to have instant access to information regarding the current status of their consignments in transit, for just in time inventory. It is a system for management and control of freight movement that also assists managers to optimize asset utilization.

Page 17: Western Railway Presentation Edited

FOIS

Page 18: Western Railway Presentation Edited

12 May 200912 May 2009 Western RailwayWestern Railway 1818

EfftronicsData network establish for Getting the updates

through the data Packets Online.For the Relay Room Management.For online Signal Failure & Fault Finding.Information of Each & Every Stations & All

types of the Train per Second.We can also find if the any small problem to

make the Track Points through Relay Signaling

Thus, we get all kind of Electrical Information.

Page 19: Western Railway Presentation Edited

Advantages

Fault finding is become very faster.By the use of Relay Signaling,we catch the track points are properly adjusted or not.Accidents can be avoided in the Railways.We can see the trains where they are exactly on the which route.Save the time because the network is already established far any kind of information.

Page 20: Western Railway Presentation Edited

12 May 200912 May 2009 Western RailwayWestern Railway 2020

Control Room

Page 21: Western Railway Presentation Edited

12 May 200912 May 2009 Western RailwayWestern Railway 2121

Control Room

Control room is required in any railway junction. Here in RAJKOT section there are two control rooms for separate routes. one room is for OKHA section & the other is for VIRAMGAM section. Here in control room there are charts on which the train routes are to be drawn out constantly in which there is time versus distance axis are there. one person is continuously drawing the chart for this.They got the information at regular interval of 15 minutes on their phone & updates that information on computers.

Page 22: Western Railway Presentation Edited

12 May 200912 May 2009 Western RailwayWestern Railway 2222

Repeater

A repeater is an electronic device that receives a signal and retransmits it at a higher level and/or higher power, or onto the other side of an obstruction, so that the signal can cover longer distances without degradation.

Page 23: Western Railway Presentation Edited

12 May 200912 May 2009 Western RailwayWestern Railway 2323

Repeater Block Diagram

Page 24: Western Railway Presentation Edited

12 May 200912 May 2009 Western RailwayWestern Railway 2424

TelephoneExchange

Page 25: Western Railway Presentation Edited

12 May 200912 May 2009 Western RailwayWestern Railway 2525

Telecom Exchange

Telephone exchange at railway at Rajkot is using Integrated Digital Exchange (IDX) manufactured by TATA.

Basically the main purpose of exchange equipment is to provide cross-connection for every channel & join link as per requirement.

Page 26: Western Railway Presentation Edited

12 May 200912 May 2009 Western RailwayWestern Railway 2626

Exchange Cards

Controller Card:It is having processor for decision making & controlling

purpose of whole equipment.Line Card:

A line card is a circuit pack which sends signals from the Central Office to equipment used on the customer's premises.Miscellaneous card:

It is providing power supply for the whole IDX system & they are responsible for fulfillment of power requirement.

Page 27: Western Railway Presentation Edited

12 May 200912 May 2009 Western RailwayWestern Railway 2727

Trouble Shooting

system power problems:

Booting problem:

MAC problem:

Page 28: Western Railway Presentation Edited

12 May 200912 May 2009 Western RailwayWestern Railway 2828

UHFSection

Page 29: Western Railway Presentation Edited

Main Parts

MDF (Main distribution Frame) Multiplexer Radio Equipment Power Supply

12 May 200912 May 2009 Western RailwayWestern Railway 2929

Page 30: Western Railway Presentation Edited

12 May 200912 May 2009 Western RailwayWestern Railway 3030

M D F

In a Main Distribution Frame (MDF or Main Frame) is a signal distribution frame for connecting equipment (inside plant) to cables and subscriber carrier equipment (outside plant).

Page 31: Western Railway Presentation Edited

12 May 200912 May 2009 Western RailwayWestern Railway 3131

Multiplexer

This instrument also has to perform reverse operation and it has to demultiplexer the channels from received signal and to connect them to channel board.

Page 32: Western Railway Presentation Edited

12 May 200912 May 2009 Western RailwayWestern Railway 3232

UHF SectionIn this UHF structure MELTRON and

NEC equipments are RADIO equipments. MDS digital unit is also providing Radio link but it is having information in digital form.

The other communication equipment is OPTICAL FIBER CABLE (OFC) which is not yet used at much proportion. DTL MUX is multiplexer and demultiplexer for the purpose of using full channel capacity.

Page 33: Western Railway Presentation Edited

12 May 200912 May 2009 Western RailwayWestern Railway 3333

Radio Equipment

Through-connection in repeater stations in the baseband level allows flexible drop and insertion of channels or group of channels.

Page 34: Western Railway Presentation Edited

12 May 200912 May 2009 Western RailwayWestern Railway 3434

O F C

An optical fiber (or fibre) is a glass or plastic fiber that carries light along its length. Fiber optics is the overlap of applied science and engineering concerned with the design and application of optical fibers.

Page 35: Western Railway Presentation Edited

Light is kept in the core of optical fiber by total internal reflection.

SMF MMF

12 May 200912 May 2009 Western RailwayWestern Railway 3535

Page 36: Western Railway Presentation Edited

DTL Railway purchase DTL from Punjab comm. to

improve SNR. Conventional system DTL uses a single card that is modem card.

12 May 200912 May 2009 Western RailwayWestern Railway 3636

Page 37: Western Railway Presentation Edited

12 May 200912 May 2009 Western RailwayWestern Railway 3737

Power SupplyHere power supply section is providing

power for all sections so in this way we can say that this is the main and foremost part of all sections. Here only two different voltages are required -24V and -48V for every instrument to be in working position.

Now we are providing voltages to every equipment by battery, why not directly from AC supply by using rectifier and filters?

Page 38: Western Railway Presentation Edited

12 May 200912 May 2009 Western RailwayWestern Railway 3838

Use in all Section

The main advantages of using battery are:

Less RF feed from other sources

Noise from power supply is removed

Uninterrupted backup of power.

Test Room: Networking Section: Regular 240 V AC 50 HZ Control Room: 12 V DC Telecom Exchange: 24 V DC UHF Section: 48 V DC

Page 39: Western Railway Presentation Edited

Thank You….

12 May 200912 May 2009 Western RailwayWestern Railway 3939


Recommended