20
FINAL VISION PLAN AND PRIORITY PROJECTS | December, 2018 LA VÍA VERDE DE WESTWOOD | WESTWOOD VIA VERDE A VISION FOR MULTI-MODAL ACCESS AND GREEN INFRASTRUCTURE FOR WESTWOOD Munroe Elem. School Castro Elem. School MORRISON RD. Gareld Lake Park Westwood Park Kepner Middle School Campus Pascual LeDoux Academy Knapp Elem. School Wier Gulch S SHERIDAN BLVD. FEDERAL BLVD. S IRVING ST. S WOLFF ST. W EXPOSITION AVE. W WALSH PL. S KNOX CT. Cuatro Vientos Park
Transcript
Page 1: Westwood Via Verde - denvergov.org · • Opportunity for GSI demonstration garden with educational signs. WAY-FINDING PLAN • Community-driven logo development • Pavement marking

FINAL VISION PLAN AND PRIORITY PROJECTS | December, 2018

LA VÍA VERDE DE WESTWOOD | WESTWOOD VIA VERDEA VISION FOR MULTI-MODAL ACCESS AND GREEN INFRASTRUCTURE FOR WESTWOOD

Munroe Elem. School

CastroElem. School

MORRISON RD.

Garfi eld Lake Park

Westwood Park

Kepner Middle School Campus

Pascual LeDoux Academy

KnappElem. School

Wier Gulch

S S

HER

IDA

N B

LVD

.

FED

ERA

L BL

VD

.

S IR

VIN

G S

T.

S W

OLF

F ST

.

W EXPOSITION AVE.

W WALSH PL.

S K

NO

X C

T.

Cuatro Vientos Park

Page 2: Westwood Via Verde - denvergov.org · • Opportunity for GSI demonstration garden with educational signs. WAY-FINDING PLAN • Community-driven logo development • Pavement marking

FINAL VISION PLAN AND PRIORITY PROJECTS | December, 2018

LA VÍA VERDE DE WESTWOOD | WESTWOOD VIA VERDEEXISTING CONDITIONS

Existing right-of-way (ROW) conditions in the Westwood area vary, creating challenges in providing comfortable and safe walking or cycling options for community members traveling from home, work, or other services through the neighborhood. Sidewalks are narrow and almost always a ttached to the roadway, and have limited or no adjacent treelawns and shade for users.

The above condition is typical for the Westwood neighborhood: the a ttached sidewalk is too narrow for two people to walk side-by-side safely. Additionally, a consistent tree canopy adjacent to the sidewalk is lacking, which would provide shade for pedestrians.

Page 3: Westwood Via Verde - denvergov.org · • Opportunity for GSI demonstration garden with educational signs. WAY-FINDING PLAN • Community-driven logo development • Pavement marking

FINAL VISION PLAN AND PRIORITY PROJECTS | December, 2018

LA VÍA VERDE DE WESTWOOD | WESTWOOD VIA VERDECONDICIONES ACTUALES | EXISTING CONDITIONS

Page 4: Westwood Via Verde - denvergov.org · • Opportunity for GSI demonstration garden with educational signs. WAY-FINDING PLAN • Community-driven logo development • Pavement marking

FINAL VISION PLAN AND PRIORITY PROJECTS | December, 2018

LA VÍA VERDE DE WESTWOOD | WESTWOOD VIA VERDECONDICIONES ACTUALES | EXISTING CONDITIONS

Page 5: Westwood Via Verde - denvergov.org · • Opportunity for GSI demonstration garden with educational signs. WAY-FINDING PLAN • Community-driven logo development • Pavement marking

FINAL VISION PLAN AND PRIORITY PROJECTS | December, 2018

LA VÍA VERDE DE WESTWOOD | WESTWOOD VIA VERDECONDICIONES ACTUALES | EXISTING CONDITIONS

Page 6: Westwood Via Verde - denvergov.org · • Opportunity for GSI demonstration garden with educational signs. WAY-FINDING PLAN • Community-driven logo development • Pavement marking

FINAL VISION PLAN AND PRIORITY PROJECTS | December, 2018

LA VÍA VERDE DE WESTWOOD | WESTWOOD VIA VERDECONDICIONES ACTUALES | EXISTING CONDITIONS

Page 7: Westwood Via Verde - denvergov.org · • Opportunity for GSI demonstration garden with educational signs. WAY-FINDING PLAN • Community-driven logo development • Pavement marking

FINAL VISION PLAN AND PRIORITY PROJECTS | December, 2018

LA VÍA VERDE DE WESTWOOD | WESTWOOD VIA VERDECONDICIONES ACTUALES | EXISTING CONDITIONS

Page 8: Westwood Via Verde - denvergov.org · • Opportunity for GSI demonstration garden with educational signs. WAY-FINDING PLAN • Community-driven logo development • Pavement marking

FINAL VISION PLAN AND PRIORITY PROJECTS | December, 2018

LA VÍA VERDE DE WESTWOOD | WESTWOOD VIA VERDEIDEAL CONFIGURATIONS

The “ideal” condition for a connected multi-modal circulation system through the neighborhood would provide widened sidewalks, adequate tree lawns with trees and Green Stormwater Infrastructure (GSI), adequate parallel parking along residential and collector streets, and either dedicated or shared use travel lanes that accomodate cars and bikes. Intersections would be built to have shorter pedestrian crossing distances, integrated GSI, and more visible crossings.

This “ideal” condition diagram shows shared use lanes, parallel parking, widened sidewalks and tree lawns.

This “ideal” condition diagram emphasizes integrated Green Stormwater Infrastructure and shorter pedestrian crossings.

Page 9: Westwood Via Verde - denvergov.org · • Opportunity for GSI demonstration garden with educational signs. WAY-FINDING PLAN • Community-driven logo development • Pavement marking

FINAL VISION PLAN AND PRIORITY PROJECTS | December, 2018

LA VÍA VERDE DE WESTWOOD | WESTWOOD VIA VERDE

Design considerations:

• Existing site conditions• Above and below ground utilities• Usable Right-of-Way

• Condiciones actuales del sitio • Servicios públicos por encima y por debajo del suelo• Derecho de paso utilizable

Consideraciones del diseño:

CONFIGURACIÓN IDEALES | IDEAL CONFIGURATIONSPERSONAJE O ESTILO DE LA CALLESTREET CHARACTER Each side of the street should include:

1 Widened sidewalks2 Adequate tree lawns (with trees and GSI where

appropriate)3 Parallel parking4 Shared use travel lane (cars and bikes)

• In some cases cross section may include bike lane based on community vision from Denver Moves: Bicycles

Cada lado de la calle debe incluir:

Aceras amplias Los árboles adecuados para el césped o el pasto (con árboles y GSI donde sea apropiado)Estacionamiento en paraleloCarril de uso compartido (coches y bicicletas).• En algunos casos, el diseño puede incluir carril bici como se ilustra en el plan “Movimientos de Denver: Bicicletas”

12

34

1

2

3

4

Page 10: Westwood Via Verde - denvergov.org · • Opportunity for GSI demonstration garden with educational signs. WAY-FINDING PLAN • Community-driven logo development • Pavement marking

FINAL VISION PLAN AND PRIORITY PROJECTS | December, 2018

LA VÍA VERDE DE WESTWOOD | WESTWOOD VIA VERDECONFIGURACIÓN IDEALES | IDEAL CONFIGURATIONSPERSONAJE O ESTILO DE LA INTERSECCIÓN INTERSECTION CHARACTER

1

• por ejemplo: murales de pavimento

• Bump-outs (con infraestructura de aguas pluviales verdes donde sea apropiado)

• Cruces más visibles

• La distancia de cruce más corto

Cada intersección debe incluir:

1

2

Infraestructura de aguas pluviales verdes = GSI

día claro clear day

Green Stormwater Infrastructure = GSI

12

día lluvioso rainy day

12

2

Each intersection should include:

1• Shorter crossing distance

• Bump-outs (with Green Stormwater Infrastructurewhere appropriate)

2• More visible crossings

• i.e. pavement murals

Page 11: Westwood Via Verde - denvergov.org · • Opportunity for GSI demonstration garden with educational signs. WAY-FINDING PLAN • Community-driven logo development • Pavement marking

FINAL VISION PLAN AND PRIORITY PROJECTS | December, 2018

LA VÍA VERDE DE WESTWOOD | WESTWOOD VIA VERDETHE VIA VERDE ROUTE

The Via Verde route has been designated using a “Primary Route” with additional connections that may integrate Public Works projects, community-led e fforts, private partnerships, and connections to other neighborhoods. The route is designed to provide equitable access - and safer, pleasant routes to neighborhood destinations and services including: health and medical facilities, food providers, schools, cultural organizations, entertainment, and recreation.

Munroe Elem. School

CastroElem. School

MORRISON RD.

Garfi eld Lake Park

Westwood Park

Kepner Middle School Campus

Pascual LeDoux Academy

KnappElem. School

Wier Gulch

S S

HER

IDA

N B

LVD

.

FED

ERA

L BL

VD

.

S IR

VIN

G S

T.

S W

OLF

F ST

.

W EXPOSITION AVE.

W WALSH PL.

S K

NO

X C

T.

Cuatro Vientos Park

Ruta primaria propuestaLEYENDA

Conexiones adicionales propuestasConexiones adicionales de los vecindariosConexiones experimentalesDerecho de vía no asignado

Área de prioridad del proyecto liderado por la comunidad Área de proyecto de implementación prioritariaProyectos próximos por otros

Proposed Primary RouteLEGEND

Proposed Additional ConnectionsAdditional Neighborhood ConnectionsExperiential ConnectionsNon-Designated Right-of-Way

Priority Implementation Project AreaProximate Projects by Others

Priority Community-led Project Area

Page 12: Westwood Via Verde - denvergov.org · • Opportunity for GSI demonstration garden with educational signs. WAY-FINDING PLAN • Community-driven logo development • Pavement marking

FINAL VISION PLAN AND PRIORITY PROJECTS | December, 2018

LA VÍA VERDE DE WESTWOOD | WESTWOOD VIA VERDE

Munroe Elem. School

CastroElem. School

MORRISON RD.

KEY

MA

P

CLA

VE

DEL

MA

PA

Garfi eld Lake Park

Westwood Park

Kepner Middle School Campus

Pascual LeDoux Academy

KnappElem. School

Wier Gulch

S S

HER

IDA

N B

LVD

.

FED

ERA

L BL

VD

.

S IR

VIN

G S

T.

S W

OLF

F ST

.

W EXPOSITION AVE.

W WALSH PL.

S K

NO

X C

T.

Cuatro Vientos Park

W Tennessee Ave.

Ruta primaria propuestaLEYENDA

Conexiones adicionales propuestasConexiones adicionales de los vecindariosConexiones experimentalesDerecho de vía no asignado

Denver Health: Westwood Family Health CenterA

H

B Westwood Food Cooperative & La CasitaC Paloma VillasD Denver Indian CenterE DHA Westwood HomesF Boys & Girls Club

El próximo parque pequeñoG

Destinos del vecindario

Biblioteca de Westwood y Southwest Improvement Council

Mejoras de intersecciones propuestas por otros(Morrison Road Implementation Plan)

Área de prioridad del proyecto liderado por la comunidad Área de proyecto de implementación prioritariaProyectos próximos por otros

Proposed Primary RouteLEGEND

Proposed Additional ConnectionsAdditional Neighborhood ConnectionsExperiential ConnectionsNon-Designated Right-of-Way

Priority Implementation Project AreaProximate Projects by Others

Priority Community-led Project Area

Proposed Intersections Improvements by Others(Morrison Road Implementation Plan)

Denver Health: Westwood Family Health CenterA

Neighborhood Destinations

B Westwood Food Cooperative & La CasitaC Paloma VillasD Denver Indian CenterE DHA Westwood HomesF Boys & Girls ClubG Westwood Library & Southwest Improvement CouncilH Future Pocket Park

AAA

BBBB

CCCC

DDDDDDDDD

EE

FF

GGGGG

HHH

DD

BBBB

LA RUTA DE VIA VERDE | THE VIA VERDE ROUTE

Page 13: Westwood Via Verde - denvergov.org · • Opportunity for GSI demonstration garden with educational signs. WAY-FINDING PLAN • Community-driven logo development • Pavement marking

FINAL VISION PLAN AND PRIORITY PROJECTS | December, 2018

LA VÍA VERDE DE WESTWOOD | WESTWOOD VIA VERDEPRIORITY PROJECTS

Upon completion of the overall vision for the entire Via Verde Route, several priority projects were identi fied in order to provide guidance for shorter-term implementation of projects by partnerships with the City, non-pro fit organizations, and community-led groups with the intent to provide continued progress and excitement around the Via Verde. Priority projects were identifi ed using a variety of factors that consider the alignment of public and private resources, community goals, City planning goals, and a feasible time-frame. These initial priority projects intentionally address circulation and GSI opportunities in a focused area where the impacts of improvements could have a higher impact near schools (identi fied by the community as a high-priority for the safety of children).

Page 14: Westwood Via Verde - denvergov.org · • Opportunity for GSI demonstration garden with educational signs. WAY-FINDING PLAN • Community-driven logo development • Pavement marking

FINAL VISION PLAN AND PRIORITY PROJECTS | December, 2018

LA VÍA VERDE DE WESTWOOD | WESTWOOD VIA VERDEPROYECTO DE PRIORIDAD 1 | PRIORITY PROJECT 1 W Kentucky Ave. from Morrison Rd. to S Perry St.

CastroElem. School

Kepner

School Campus

W Tennessee Ave.

Clave del mapa Key Map

Acera mas amplia en el lado sur de Kentucky Ave. Nuevas líneas para indicar espacios de estacionamiento y carriles compartidos para coches y bicicletas.

1 Widened sidewalk on south side of Kentucky Ave. 2 New striping to indicate parking spaces and shared lanes for cars and bikes

Alternative A medium term | moderate intensity

Alternativa A A medio plazo | intensidad moderada

Alternative Blong term | high intensity

Alternativa BA largo plazo | intensidad mas alta

W KENTUCKY AVE W KENTUCKY AVE

S PE

RRY

ST

MORRISON RD

1

1 1

12

2 2

2

Page 15: Westwood Via Verde - denvergov.org · • Opportunity for GSI demonstration garden with educational signs. WAY-FINDING PLAN • Community-driven logo development • Pavement marking

FINAL VISION PLAN AND PRIORITY PROJECTS | December, 2018

LA VÍA VERDE DE WESTWOOD | WESTWOOD VIA VERDECastroElem. School

Kepner

School Campus

W Tennessee Ave.

Clave del mapa Key Map

PROYECTO DE PRIORIDAD 2 | PRIORITY PROJECT 2 Tennessee Xcel Easement from Library/SWIC to S Irving St.

S IR

VING

ST

S KI

NG S

T

W FORD PL W FORD PL

W TENNESSEE AVE W TENNESSEE AVE

1

1

23

2 3

Mejora del cruce en King St. y Tennessee Ave. a la servidumbre de Xcel Camino amplio por el espacio de la servidumbre Plantadores de infraestructura de aguas pluviales verdes Mejora del cruce en la Tennessee Ave y la Irving St. con bump-outs

1234

1 Improved crossing at King St. and Tennessee Ave. to Xcel easement 2 Wide path through easement 3 Green Stormwater Infrastructure planters 4 Improved crossing at Tennessee Ave. and Irving St. with bump-outs

3 4

Page 16: Westwood Via Verde - denvergov.org · • Opportunity for GSI demonstration garden with educational signs. WAY-FINDING PLAN • Community-driven logo development • Pavement marking

FINAL VISION PLAN AND PRIORITY PROJECTS | December, 2018

LA VÍA VERDE DE WESTWOOD | WESTWOOD VIA VERDECastroElem. School

Kepner

School Campus

W Tennessee Ave.

Clave del mapa Key Map

PROYECTO DE PRIORIDAD 3 | PRIORITY PROJECT 3 W Kentucky Ave. at S Knox Ct. and S Irving St.

W KENTUCKY AVEW KENTUCKY AVE

S IR

VING

ST

S KN

OX C

T

1

1

1

1

Mejoras de los cruces en Irving y Kentucky La distancia de cruce más corto (Bump-outs con infraestructura de aguas pluviales verdes donde sea apropiado) Cruces más visibles con murales de pavimento

1

2

Mejoras de los cruces en Knox y Kentucky La distancia de cruce más corto (Bump-outs con infraestructura de aguas pluviales verdes donde sea apropiado) Cruces más visibles

1

2

Improved crossings at Irving and Kentucky 1 Shorte cr rossin dg istance w b/ ump-out (s with Gree Sn tormwater

Infrastructure where appropriate) 2 More visible crossings w/ pavement murals

Improved crossings at Knox and Kentucky 1 Shorte cr rossin dg istance w b/ ump-out (s with Gree Sn tormwater

Infrastructure where appropriate) 2 More visible crossings

2 222

Page 17: Westwood Via Verde - denvergov.org · • Opportunity for GSI demonstration garden with educational signs. WAY-FINDING PLAN • Community-driven logo development • Pavement marking

FINAL VISION PLAN AND PRIORITY PROJECTS | December, 2018

LA VÍA VERDE DE WESTWOOD | WESTWOOD VIA VERDECastroElem. School

Kepner

School Campus

W Tennessee Ave.

Clave del mapa Key Map

PROYECTO DE PRIORIDAD 4 | PRIORITY PROJECT 4yGreen Alley at Castro Elementar

VDL

BL T

WEL X

C

OS

L

S KN

O

1

1

1

1 Green S tormwater I nfrastructure - permeable pavers to allow for stormwater i fin ltration/water quality improvements

2 Community-led enhancements/alley b eautifi cation

Infraestructura de aguas pluviales verdes - pavimentadas permeables para permitir la infi ltración de aguas pluviales / mejoras en la calidad del agua Mejoras lideradas por la comunidad / embellecimiento de callejones

1

2

2

2

2

Page 18: Westwood Via Verde - denvergov.org · • Opportunity for GSI demonstration garden with educational signs. WAY-FINDING PLAN • Community-driven logo development • Pavement marking

FINAL VISION PLAN AND PRIORITY PROJECTS | December, 2018

LA VÍA VERDE DE WESTWOOD | WESTWOOD VIA VERDE

EMBELLECIMIENTO DE CALLEJONES ALLEY BEAUTIFICATION• Decorate/paint murals on fences• Sculptural gateways•Maintenance and cleanup

EMBELLECIMIENTO DEL PAISAJE EN LA BIBLIOTECA/SWIC LANDSCAPE BEAUTIFICATION AT LIBRARY/SWIC• Clean up the planter areas•Maintain & supplement plants and mulch• Opportunity for GSI demonstration garden with educational signs

WAY-FINDING PLAN• Community-driven logo development• Pavement marking • Signage• Sculpture/gateways/icons

PROJECTOS DE PRIORIDAD DIRIJIDOS POR LA COMUNIDAD | COMMUNITY-LED PRIORITY PROJECTS

• Decorar y pintar los murales y barandales• Puertas esculturales •Mantenimiento y limpieza

• Desarrollo de logos impulsado por la comunidad•Marcado de pavimento • Señalización• Escultura / pasarelas / iconos

• Limpieza de las áreas de los planteros•Mantenimiento y suplemento de las plantas y el mantillo• Oportunidad demostración de jardín de GSI con letreros educativos

PLAN DE ENCONTRAR EL CAMINO

Page 19: Westwood Via Verde - denvergov.org · • Opportunity for GSI demonstration garden with educational signs. WAY-FINDING PLAN • Community-driven logo development • Pavement marking

FINAL VISION PLAN AND PRIORITY PROJECTS | December, 2018

LA VÍA VERDE DE WESTWOOD | WESTWOOD VIA VERDEIMPLEMENTACIÓN DE PROYECTOSIMPLEMENTATION OF PROJECTS

PROJECT PARTNERS

CITY OF DENVER OTHERS

IMPLEMENTATION STAGES

LANDSCAPE BEAUTIFICATION AT LIBRARY/SWIC

KNAPP ALLEY

GREEN ALLEY AT CASTRO ELEMENTARY

ALLEY BEAUTIFICATION

W KENTUCKY AVE. AT S KNOX CT. AND S IRVING ST.

TENNESSEE XCEL EASEMENT FROM LIBRARY/SWIC TO S IRVING ST.

W KENTUCKY AVE. FROM MORRISON RD. TO S PERRY ST.

WAY-FINDING PLAN

1

7

8

6

5

4

3

2

• LOWER COSTS AND COMPLEXITY• LESS TIME TO IMPLEMENT (1-2 YEARS)• CAN INTEGRATE COMMUNITY/ VOLUNTEER EFFORTS

• BAJOS COSTOS Y COMPLEJIDAD• MENOS TIEMPO PARA IMPLEMENTAR (1-2 AÑOS)• PUEDE INTEGRAR COMUNIDADES / ESFUERZOS

VOLUNTARIOS

• HIGHER COSTS AND COMPLEXITY• MORE TIME TO IMPLEMENT (2-5 YEARS)

• COSTES MÁS ALTOS Y COMPLEJIDAD • MÁS TIEMPO PARA IMPLEMENTAR (2-5 AÑOS)

• HIGHEST COST AND COMPLEXITY• LONG TIME TO IMPLEMENT (10+YEARS)

• ALTO COSTO Y COMPLEJIDAD• LARGO TIEMPO PARA IMPLEMENTAR (10 + AÑOS)

SHORT TERM

CORTO PLAZO

LOW INTENSITYINTENSIDAD BAJA

MEDIUM TERM

A MEDIO PLAZO

MODERATE INTENSITYINTENSIDAD MODERADA

LONG TERM

A LARGO PLAZO

HIGH INTENSITYINTENSIDAD MAS ALTA

Page 20: Westwood Via Verde - denvergov.org · • Opportunity for GSI demonstration garden with educational signs. WAY-FINDING PLAN • Community-driven logo development • Pavement marking

FINAL VISION PLAN AND PRIORITY PROJECTS | December, 2018

LA VÍA VERDE DE WESTWOOD | WESTWOOD VIA VERDE¡PRÓXIMOS PASOS - ESTANCIA INVOLUCRADO! | NEXT STEPS: STAY INVOLVED!

NEXT STEPS FOR PRIORITY PROJECTS• TPL will carry way- finding plan forward• DPW will pursue funding for the mobility and green infrastructure projects• DPR park and tree elements (trees in the ROW)• Community-led enhancements -Westwood Unidos to lead alley beauti fication projects and help implement the Wayfi nding Plan -Groundwork will organize SWIC/Library landscape beautifi cation

FUNDING OPPORTUNITIESGrants• The Trust for Public Land has allocated 60K of their program funding from the Gates Family Foundation to implement projects related to the Via Verde in 2019. We will dedicate these funds to projects like way finding signs, artistic crosswalks, and tactical urbanism ideas such as painted route finding on streets. • The Trust for Public Land is also looking for additional dollars to complete a way finding plan that will help us work with the community on the look and feel of these elements. We anticipate this will include the development of a standard color pale tte, font, logo, and the design of signs.• Safe Routes to Parks ($12,500)-Application submi tted by Westwood Unidos.• Many grant possibilities for non-pro fits and the City to pursue

-Great Outdoors Colorado (GOCO) ° Grants for trails and parks improvements -The Colorado Health Foundation

City funding possibilities• Capital infrastructure program -Annual competitive funding source for projects from multiple departments within the City -Denver Public works and/or Denver Parks and Rec Annual Funds, maintenance programs -Future Denver Bond Program -Wastewater Enterprise Fund

Local/regional funding • DRCOG TIP funding -Serves as a short-range implementation tool to address the goals of the regional long-range transportation plan. Identi fies and prioritizes federally funded transportation projects recommended for implementation over a six-year period. -Support from Morrison Road BID’ - Assessment of fees on properties and businesses in defi ned areas which can be used on infrastructure and programming

STAY INVOLVEDCool Connected Westwood meets every month • Every second Thursday at 2:30-4:00• 2019 meetings will provide monthly updates on the Via Verde and other neighborhood eff orts -Sign up if you want to be a part of the Core Team for CCW!

Check the website www.denvergov.org/greeninfrastructure• Scroll down to projects > Westwood Via Verde

Advocate for priority projects through your City Council Member’s Of fice (Council District 3; current representative is Paul López)

PRÓXIMOS PASOS PARA PROYECTOS PRIORITARIOS

OPORTUNIDADES PARA FONDOS

INVOLÚCRESE

Subsidios

Posibilidades de fi nanciación de la ciudad

Financiamiento local / regional

www.denvergov.org/greeninfrastructureVisite el sitio de red

Abogar para proyectos de prioridad a través de la ofi cina de su consejo municipal (distrito del consejo; representante actual Paul López)

• TPL llevará adelante el plan para “way-fi nding” búsqueda de camino• DPW buscará fi nanciación para proyectos de movilidad e infraestructura verde.• DPR elementos de parque y árboles (árboles en ROW)• Mejoras dirigidas por la comunidad -Westwood Unidos va a dirigir los proyectos de embellecimiento de callejones y ayudará a implementar el Plan Wayfi nding -Groundwork organizará SWIC / Library embellecimiento del paisaje

• El Trust for Public Land ha asignado 60K de su fi nanciamiento del programa de Gates Family Foundation para implementar proyectos relacionados con la Vía Verde en 2019. Dedicaremos estos fondos a los proyectos como las señales, cruces de caminos artísticos e ideas de urbanismo táctico como una ruta pintada en las calles.• El Trust for Public Land también está buscando dólares adicionales para completar un plan de wayfi nding que nos ayudará a trabajar con la comunidad en la apariencia de estos elementos. Anticipamos que esto incluirá el desarrollo de colores, fuente, logotipo y diseño de signos.• Rutas seguras a los parques ($ 12,500): solicitud presentada por Westwood Unidos.• Muchas posibilidades de subsidios para las organizaciones no lucrativas y la Ciudad para perseguir

-Colorado Al Aire Libre (GOCO) ° Subsidios para mejoras de senderos y parques. -La Fundación de Salud de Colorado

• Programa de infraestructura de capital -Fuente de fi nanciamiento competitiva anual para proyectos de múltiples departamentos dentro de la Ciudad -Denver Public Works y / o Denver Parks and Rec fondos anuales, programas de mantenimiento. -Futuro programa de bonos de Denver -Fondo Empresarial de Aguas Residuales

• Financiación DRCOG TIP -Sirve como una herramienta de implementación de corto alcance para abordar los objetivos del plan de transporte regional de largo

plazo. Este identifi ca y prioriza los proyectos de transporte fi nanciados con fondos federales recomendados para su implementación durante un período de seis años. -Apoyar la propuesta de Morrison Road: evaluación de tarifas en propiedades y negocios en áreas defi nidas que se pueden usar en infraestructura y programación

• Desplácese a proyectos> Westwood Vía Verde

Reuniones mensuales en Westwood con Cool Connected• Cada Segundo jueves de 2:30 – 4 p.m.• Reuniones del 2019 proveerán actualizaciones mensuales en los esfuerzos de Vía Verde y otros vecindarios -Inscríbase si usted quiere ser parte del equipo para CCW


Recommended