SCIENCE: 4,648 SF Additional Space

MUSIC: 4,596 SF Additional Space

AUDITORIUM: 4,142 SF Additional Space

PHYSICAL Ed: 5,725 SF Additional Space

TECHNOLOGY: ED -974 SF Space

EDUCATIONAL SPECIFICATIONS – Program Analysis

WETHERSFIELD HIGH SCHOOL - Additions and Renovations – “As New ”

BUILDING / PROJECT DESIGN CRITERIA1. Educational Specifications2. Address Code Deficiencies, ADA & OCR Violations3. Energy Conservation and infrastructure Update.4. Cost Effective Solutions

EXISTINGCLASSROOMS

EXISTINGAREA / SF

Page 4: Wethersfield High School Renovation Referendum Information

Bus Drop-Off Community Entrance

Main Entrance

KEY PROGRAM ELEMENTS

BUILDING ADDITIONSMusic - AMedia Center - BGymnasium - C

SITE IMPROVEMENTS

TRAFFIC PATTERNS PARKINGSeparation of Bus , Parent and Student Parking & CirculationScreened Service w/ Loading Dock

PARKINGExisting 410 Total SpacesProposed 535 Total SpacesIncreased parking HC 10 SpacesStaff 160 SpacesStudent 315 SpacesVisitors 35 SpacesAdministrators 15 Spaces

ADA / OCRAccessibility to all Site Facilities

GENERAL IMPROVEMENTSUpgrade Track and Tennis CourtsReplace BleachersPavement ResurfacingBuilding Access

PROPOSED DESIGN CONCEPT – Site Plan

WETHERSFIELD HIGH SCHOOL - Additions and Renovations – “As New ”

Service

Teacher Parking

Parent Drop-Off

Teacher Parking

FOLLY BROOK BLVD

Administratorand VisitorParking

Student Parking

Student Parking

WOLCOTT HILL ROAD

JAY STREET

CHURCH STREET

NORTH

A

B

C

Emergency Access

WESTWAY

WINTERGREEN LANE

HAROLD STREET

WOLCOTT HILL ROADWELLS ROAD - 175

Future CR Expansion

Page 5: Wethersfield High School Renovation Referendum Information

KEY PROGRAM ELEMENTSFLOOR LEVEL - 100

BUILDING ADDITIONSMusicMedia CenterGymnasium

MUSICElectronic Music Recording Studio

ART & TECHNOLOGYShared Graphics LabShared Lecture Space & Gallery

PHYSICAL EDUACATIONAccessibility to all Site Facilities

Title IX – Impacts Locker & Team Rooms

SPECIAL EDUCATIONAddress Program DeficienciesADA / OCR

BUSINESSMulti Purpose SpacesTechnology in All Classrooms

ADMINISTRATIONGuidance & Admin Offices

CAFETERIA

COMMUNITY ENTRANCE

MAINENTRANCE

ARTCOURTYARD

POOL

COURTYARD

ACADEMIC WING

MEDIA CENTER

GYM - B

GYM - A

TECHNOLOGY Ed & ART

GUIDANCE

AUDITORIUM

MUSIC

ADMIN

LOBBY

READINGCOURTYARD

FCS

SOCIAL STUDIES

WETHERSFIELD HIGH SCHOOL - Additions and Renovations – “As New ”

PROPOSED DESIGN CONCEPT – Building Plan – Level 100 / 200

SP. EDUCATION & BUSINESS

SERVICE

STUDENT ENTRANCE

Page 6: Wethersfield High School Renovation Referendum Information

WETHERSFIELD HIGH SCHOOL - Additions and Renovations – “As New ”

STUDENT ENTRANCE

MAIN ENTRANCE

COMMUNITY ENTRANCE

Page 7: Wethersfield High School Renovation Referendum Information

CAFETERIA

COMMUNITY ENTRANCE

MAINENTRANCE

ART & CAFECOURTYARD

POOL

COURTYARD

BUSINESS

MEDIA CENTER

GYM - B

GYM - A

TECHNOLOGY Ed & ART

GUIDANCE

AUDITORIUM

MUSIC

ADMIN

LOBBY

READINGCOURTYARD

FCS

SOCIAL STUDIES

SP EDUCATION

KEY PROGRAM ELEMENTS

PHYSICAL EDUCATIONAddress Program DeficienciesADA / OCRTitle IXStorage

SERVICE

PROPOSED DESIGN CONCEPT – Building Plan – Level 100 PE

WETHERSFIELD HIGH SCHOOL - Additions and Renovations – “As New ”

STUDENT ENTRANCE

ACADEMIC WING

LOCKER RM

Page 8: Wethersfield High School Renovation Referendum Information

Natural LightExpanded SeatingAccessible & Safe

Community Access

PROPOSED DESIGN CONCEPT – Gymnasium

WETHERSFIELD HIGH SCHOOL - Additions and Renovations – “As New ”

Page 9: Wethersfield High School Renovation Referendum Information

AUDITORIUMCAFETERIA

COMMUNITY ENTRANCE

MAINENTRANCE

ART COURTYARD

GREEN ROOM

POOL

S

COURTYARD

ACADEMIC WING

MEDIA CTR

GYM - B

GYM - A

TECHNOLOGY Ed & ART

GUIDANCE

STAGEMUSIC

ADMIN

MEZZANINE 125 SEATS

STAGE

LOBBY

FCS

KEY PROGRAM ELEMENTS

AUDITORIUMMezzanineStage DepthGreen Room (Shared Space)Seating Capacity 825 - 850

WETHERSFIELD HIGH SCHOOL - Additions and Renovations – “As New ”

PROPOSED DESIGN CONCEPT – Building Plan – Level 100 Auditorium

SP. EDUCATION & BUSINESS

Page 10: Wethersfield High School Renovation Referendum Information

WETHERSFIELD HIGH SCHOOL - Additions and Renovations – “As New ”

PROPOSED DESIGN CONCEPT – Community Lobby

Page 11: Wethersfield High School Renovation Referendum Information

Acoustical CurtainsMezzanine SeatingStage Accessibility

PROPOSED DESIGN CONCEPT – Auditorium view from Stage

WETHERSFIELD HIGH SCHOOL - Additions and Renovations – “As New ”

Page 12: Wethersfield High School Renovation Referendum Information

CAFETERIA

COMMUNITY ENTRANCE

MAINENTRANCE

ART & CAFECOURTYARD

POOL

COURTYARD

MEDIA CENTER

GYM - B

GYM - ATECHNOLOGY Ed & ART

GUIDANCE

AUDITORIUM

MUSIC

ADMIN

LOBBY

READINGCOURTYARD

FCS

SOCIAL STUDIES

KEY PROGRAM ELEMENTS

ART COURTYARD AND STUDENT ACCESSSeparation of Vehicular TrafficNew Service & Loading DockSafe AccessADA / OCRIntegration & Sharing of Classrooms

SERVICE

STUDENT ENTRANCE

PROPOSED DESIGN CONCEPT – Building Plan

WETHERSFIELD HIGH SCHOOL - Additions and Renovations – “As New ”

ACADEMIC WING

SP. EDUCATION & BUSINESS

Page 13: Wethersfield High School Renovation Referendum Information

Natural LightSeparation of TrafficStudent Friendly

PROPOSED DESIGN CONCEPT – Student Entrance & Art Courtyard

WETHERSFIELD HIGH SCHOOL - Additions and Renovations – “As New ”

Page 14: Wethersfield High School Renovation Referendum Information

CAFETERIA

COMMUNITY ENTRANCE

MAINENTRANCE

ART & CAFECOURTYARD

POOL

COURTYARD

MEDIA CENTER

GYM - B

TECHNOLOGY Ed & ART

GUIDANCE

AUDITORIUM

MUSIC

ADMINISTRATION

LOBBY

FCS

SERVICE

CENTRAL STAIR

WETHERSFIELD HIGH SCHOOL - Additions and Renovations – “As New ”

PROPOSED DESIGN CONCEPT – Building Plan – Level 100 thru 500STUDENTPARKINGENTRANCE

KEY PROGRAM ELEMENTS

CIRCULATIONNatural LightStudent Friendly SpaceClear Simple CirculationSecurity & Administrative Presence

ACADEMIC WING

SP. EDUCATION & BUSINESS

Page 15: Wethersfield High School Renovation Referendum Information

Natural LightStudent FriendlySimplified CirculationSecurity & Control

PROPOSED DESIGN CONCEPT – Central Stair view from Cafeteria

WETHERSFIELD HIGH SCHOOL - Additions and Renovations – “As New ”

Page 16: Wethersfield High School Renovation Referendum Information

COMMUNITY ENTRANCE

MAINENTRANCE

COURTYARD

MEDIA CENTER

GYM - A

MUSIC

READINGCOURTYARD

WORLD LANGUAGE

SP EDENGLISH

EXISTING BUILDING

KEY PROGRAM ELEMENTS

ENGLISHLarger Classrooms Shared workroomFlexible Instructional Spaces

WORLD LANGUAGENew Language LabDedicated Storage

SWING SPACE – 6 Classrooms

WR

S

S

WETHERSFIELD HIGH SCHOOL - Additions and Renovations – “As New ”

PROPOSED DESIGN CONCEPT – Building Plan – Level 300 Classrooms

Page 17: Wethersfield High School Renovation Referendum Information

COMMUNITY ENTRANCE

MAINENTRANCE

ARTCOURTYARD

COURTYARD

MEDIA CENTER

MUSIC

READINGCOURTYARD

SCIENCEPhotovoltaic Array

Green Roof

Green House

GREEN ROOF

PHOTOVOLTAIC ARRAY

KEY PROGRAM ELEMENTS

SCIENCEClab-RoomsShared Storage & Prep RoomsGreenhouse - ghGreen RoofAccess to Sustainable Systems

WETHERSFIELD HIGH SCHOOL - Additions and Renovations – “As New ”

PROPOSED DESIGN CONCEPT – Building Plan – Level 400 Science

Biology

Botany

Physics

BiologyBiology

Biology

Integrated Science

IS Lab

IS

ISPhysics

Page 18: Wethersfield High School Renovation Referendum Information

WETHERSFIELD HIGH SCHOOL - Additions and Renovations – “As New ”

PROPOSED DESIGN CONCEPT – Science Clabroom Images

PHYSICSCLAB-ROOM GREEN HOUSE ENVIRONMENTAL SCIENCE

BOTANY CLAB-ROOM

PHOTOVOLTAICPANELS

GREEN ROOF

WHS - EXISTING SCIENCE LABORATORY

Page 19: Wethersfield High School Renovation Referendum Information

MECHANICAL ROOM

MAINENTRANCE

EXISTING BUILDING

FOOTPRINT

PHYSICAL ED ADDITION

MEDIA CTR ADDITION

MUSIC ADDITION

EXISTING STORAGE

MAINTENANCE

ELEC RM

MECHANICAL ROOM - POOL

NEW STORAGE

PHYS ED STRENGTH TRAINING

NEW MECHANICAL SYSTEMS PLANT

KEY PROGRAM ELEMENTSBASEMENT & LOWER LEVELS

MPE & FP SystemsNew Boiler PlantNew Emergency GeneratorAdditional StorageNew Building Infrastructure

ENERGY CONSERVATION High Efficiency Boiler sCo- GenerationBuilding Envelope - InsulationNew Windows & Doors

Building Envelope and Energy Efficient Infrastructure…85% Alternative Energy…………………………………………………….15%

WETHERSFIELD HIGH SCHOOL - Additions and Renovations – “As New ”

PROPOSED DESIGN CONCEPT – Building Infrastructure & Systems

Page 20: Wethersfield High School Renovation Referendum Information

Building Envelope and Energy Efficient Infrastructure……85% - ApproximatelyAlternative Energy…………………………………………………….….15% - Approximately

OPTIONS EVALUATED 2008 – PRESENT

Geothermal technology (sometimes called ground source heating and cooling or geoexchange) is a simple, well proven, reliable and safe technology that uses the earth's renewable energy to provide high-efficiency heating and cooling. In winter, the system draws heat from the ground and transfers it to your home. In summer, it extracts heat from your home and transfers it to the ground. Hardware consists only of a heat pump connected to a water source such as a well or a series of small-diameter pipes buried underground. Well water or a water-based solution circulating through the pipes carries heat between the ground and the heat pump. The network of pipes can be hidden under your lawn, a garden, even your driveway.

Co-Generation - Gas engine CHP plants use a reciprocating gas engine which is generally more competitive than a gas turbine up to about 5 MW. The gaseous fuel used is normally natural gas. These plants are generally manufactured as fully packaged units that can be installed within a plantroom or external plant compound with simple connections to the site's gas supply and electrical distribution and heating systems.

A fuel cell is an electrochemical device that combines hydrogen fuel and oxygen from the air to produce electricity, and useable heat and water. Fuel cells produce Direct Current (DC) electricity without the conventional combustion reaction. Carbonate fuel cell power plants can utilize many fuel sources, including:Natural gas - Industrial and municipal wastewater treatment gas - Propane - Coal gas

Photovoltaics (PV) is a method of generating electrical power by converting solar radiation into direct current electricity using semiconductors that exhibit the photovoltaic effect. Photovoltaic power generation employs solar panels composed of a number of solar cells containing a photovoltaic material. Materials presently used for photovoltaics include monocrystalline silicon, polycrystalline silicon, amorphous silicon, cadmium telluride, and copper indium gallium selenide/sulfide.

GEO-THERMAL

WETHERSFIELD HIGH SCHOOL - Additions and Renovations – “As New ”

PROPOSED DESIGN CONCEPT – Building Energy Systems

CO-GENERATION

FUEL CELL

PHOTOVOLTAICS

Page 21: Wethersfield High School Renovation Referendum Information

PHASE ONEJuly 2013 - August 2014Site

North ParkingBuilding

New GymnasiumStrength TrainingBoys & Girls Locker RoomsTeam Rooms / Storage / LobbyNew Entrance CanopyNew Media CenterNew Band Room & StorageBoiler Plant

Renovations

Addition

BoilerPlant

WETHERSFIELD HIGH SCHOOL - Additions and Renovations – “As New ”

PROPOSED DESIGN CONCEPT – Construction Phase One

Page 22: Wethersfield High School Renovation Referendum Information

PHASE TWOJune 2014 - August 2014Site

South ParkingBuilding

Chemistry Labs – 500 LevelGym Lobby & OfficesChorus Rehearsal RoomFCS & HealthClassrooms / Swing Space - 300 LevelClassrooms - 100 LevelTechnology EducationBoiler Plant

LEVEL 500

LEVEL 300

WETHERSFIELD HIGH SCHOOL - Additions and Renovations – “As New ”

PROPOSED DESIGN CONCEPT – Construction Phase Two

Page 23: Wethersfield High School Renovation Referendum Information

PHASE THREESeptember 2014 - December 2014

BuildingMain Entry Canopy – 200 LevelScience Labs – Level 400Classrooms – Level 400

PHASE FOURJanuary 2015 - May 2015

BuildingAuditorium – 100 Level

PHASE FOURJanuary 2015 - May 2015

BuildingAuditorium – Mezzanine

PHASE FOURJanuary 2015 - May 2015

BuildingAuditorium – 100 LevelClassrooms – 300 Level

WETHERSFIELD HIGH SCHOOL - Additions and Renovations – “As New ”

PROPOSED DESIGN CONCEPT – Construction Phase Two

Page 24: Wethersfield High School Renovation Referendum Information

Estimated Project Cost $74.82 MillionEstimated State Reimbursement $30.21 MillionCost to Town of Wethersfield $44.61 Million

Space Standard Waiver 15,000 SF = $1.75 Million Potential Additional SavingsReimbursable Contingency Funds = $0.75 Million Potential Additional Savings

WETHERSFIELD HIGH SCHOOL - Additions and Renovations – “As New ”

FINANCIAL EVALUATION – Preliminary Budget Estimate

Page 25: Wethersfield High School Renovation Referendum Information

TOWN OF WETHERSFIELD DEBT SERVICE FISCAL YEAR 2012 - 2030TOWN OF WETHERSFIELD DEBT SERVICE FISCAL YEAR 2012 - 2030

FISCAL YEARFISCAL YEAR

WETHERSFIELD HIGH SCHOOLIMPACT ON TAX-PAYERS

Page 26: Wethersfield High School Renovation Referendum Information

WETHERSFIELD HIGH SCHOOLIMPACT ON TAX-PAYERS

WETHERSFIELD HIGH SCHOOL - Additions and Renovations – “As New ”