+ All Categories
Home > Documents > WFDS Case Study

WFDS Case Study

Date post: 10-Jan-2016
Category:
Upload: akterroky
View: 215 times
Download: 0 times
Share this document with a friend
Description:
WFDS Case Study

of 22

Transcript
  • WFDS-SOLUTIONFor In-building Wireless Services

    July, 2009

  • 2 Confidential Information

    We have just introduced its brilliant, We have just introduced its brilliant, excellent solution excellent solution

    WFDS-TM

  • 3 Confidential Information

    WFDS has a versatile and scalable WFDS has a versatile and scalable architecturearchitecture

  • 4 Confidential Information

    With WFDS, mobile users can be reached With WFDS, mobile users can be reached anywhere in the buildinganywhere in the building

    MU

    EU RU

    Fiber

  • 5 Confidential Information

    Solution: MultiSolution: Multi--system and Installation system and Installation ChallengeChallenge

    The WFDS solution Designed for the Multi-System coexistence and highest possible data rate

    Different system (2G/3G/WLAN/LTE/WiMax/FTTH) can share the same DAS (Future - proof)

    No need change DAS when add new system Limited need for space (no footprint)

    Standard 19UnitsOften co located in the IT rack

    Small low power base stationsSave power(1kW) and temperature load

    No footprint, installed on the wall

    Light Fiber cablingUses standard Fiber cabling

    WFDS Installation, Wall Rack

    BTS Installation, Wall Rack

  • 6 Confidential Information

    The Challenges: MultiThe Challenges: Multi--system system Coexistence & Installation ComplexityCoexistence & Installation Complexity

    Specific challenges using the traditional passive DAS design

    Each System has different signal requirement, difficult to share the traditional passive DAS, no future-proof consideration

    System upgrade and new service added difficult Large footprint for base station, typical 3 x 19rack per operator Need dedicated room and high Thermal and Power load (10-20kW) Load of cable installation and high impact installation

  • 7 Confidential Information

    WFDS will have outstanding application WFDS will have outstanding application advantage at such fieldsadvantage at such fields

    In-Building wireless solution trend Guarantee the Communication Anywhere, Anytime and Anyone

    Urban Areas

    Shopping malls Convention centers

    Private Facilities

    Businesses Campuses Hotels Hospitals

    Public Venues

    Subways Airports Stadiums Government offices

  • 8 Confidential Information

    .

    Coverage and Capacity for

    Beijing OlympicsWFDS Case Study

  • 9 Confidential Information

    BTS Hotel ConceptBTS Hotel Concept

    z Single Equipment Room for BTSz Feeds the sporting venues;z Feeds outdoor picocells;

    z Advantagesz BTS Hotel located outside secure zone

    easy and faster access BTS Hotel;z Reduced BTS count sharing capacity; z Trunking Efficiency for GSM - less handovers gives more

    capacity;z Dynamic resectorization possible - move capacity to where it

    is needed most; z Build-out less complex - air-conditioning, power and

    equipment space is simplified;

  • 10 Confidential Information

    WFDS Delivering the HighWFDS Delivering the High--Tech Edge forTech Edge forstadium coveragestadium coverage

    Venue / SectorBTS Hotel

    1800 GSM

    800 CDMA

    2100 UMTS

    900 GSM SMF

    Power Supplier Fiber

    WFD

    S Main U

    nits

    EU

    EU

  • 11 Confidential Information

    Olympic Sports Stadium DesignOlympic Sports Stadium Design

    z CDMA has different requirements than GSMz CDMA requires a higher quality RF

    environment to achieve higher capacity

    z CDMA Requires:z Low Ec/IOz Low Mobile Transmit Power to reduce interference

    (means loss of capacity)

    z Minimized soft handover (increases capacity)z Sector isolation (increases capacity)

  • 12 Confidential Information

    Olympic Sports StadiumOlympic Sports StadiumCDMA Design CDMA Design 6 Sector Design6 Sector Design

  • 13 Confidential Information

    Olympic Sports StadiumOlympic Sports StadiumCDMA Design CDMA Design -- Soft Handover AreasSoft Handover Areas

  • 14 Confidential Information

    Olympic Sports Center Stadium DesignOlympic Sports Center Stadium Design

    z With isolated sectors and correct design, cost efficient, high capacity CDMA designs can be achieved

    z Dynamic resectorization makes it possible to allocate capacity as needed, lowering the overall cost

    z Low cost coverage solutions often result in excessive use of base stations and poor performance

  • 15 Confidential Information

    Capacity Management with a BTS Hotel

    z Capacity can be dynamically allocated based on traffic demands and BTS availability

    z Several sectors can be combined during low usage to better utilize BTS resources

    How Do We Manage Capacity

  • 16 Confidential Information

    Olympic Sports Stadium SixOlympic Sports Stadium Six--Sector DesignSector DesignNative Six Sectors Native Six Sectors High TrafficHigh Traffic

  • 17 Confidential Information

    Olympic Sports Stadium DesignOlympic Sports Stadium DesignConversion to a ThreeConversion to a Three--Sector Design Sector Design Medium TrafficMedium Traffic

  • 18 Confidential Information

    Olympic Stadium DesignOlympic Stadium DesignConversion to a One Sector Design Conversion to a One Sector Design Low TrafficLow Traffic

  • 19 Confidential Information

    Summary Summary WFDS WFDS AdvantageAdvantages vs Other solutionss vs Other solutions

    z Better call performancez More capacityz Flexibility to change

    sectorsz BTS in 1 locationz Dynamic capacity

    z Cost recovery after Olympics

    z Full alarming and monitoring

    1% v 20% 20%-30% greater Hours vs days

    Save 30% BTS

    Reuse 50% after Olympics

    Faster fault repairs

  • 20 Confidential Information

    WFDS Design WFDS Design Olympic Sports StadiumOlympic Sports Stadium

    China Handicapped Athlete Training BaseTotal Area: 120,000 M2

    Include Athlete Dorm, Scientific research

    building, Gate ball gym, Ground track

    Field, Swim gym, Synthetical training gym;

    Total Equipments used:

    Main Unit 4 sets;

    Extend Unit 16 sets;

    Remote Unit 98 sets;

  • 21 Confidential Information

    Award CupCertification of

    Honor

    Certification of Honor

    Letter of commendation

    Awards from China Mobile Beijing for Olympic projects

  • 22 Confidential Information

    Award Cup Certification of Honor

    Awards from China Mobile Tianjin for Olympic projects


Recommended