WGISS/CEOS in Support of GEOSS
Pakorn ApaphantSep 28, 2009
WGISS 28Pretoria, South Africa
WGISS Contribution
WGISS participates in 7 CEOS/GEO actions Leading 4 actions Support WGCV 1 action Support Health SBA 2 actions
Regularly update at Monthly Telecons
Plan for GEO IV Demo
Topics
Current status of WGISS/CEOS actions in support of GEO Tasks
Anticipated WGISS involvement CEOS Demo at GEO IV and CEOS plenary
Plan for 2010 WGISS/CEOS in support of GEO
Guidance to subgroups
4
AR-09-02a_30: Virtual Constellations
Identify requirements and implement a prototype ACC portal for evaluation and eventual use by the ACC, GEOSS and other AC user communities
POC: Stefan Falke/NASA
PlannedDeliverable
s
15 Sep 09: ACC portal prototype.18 Nov 09: GEO-6 demo of prototype31 Dec 09: Plans for portal governance / maintenance
Current Status
(1) COMPLETE: The AC portal provides access, tools and guidance to both the atmospheric scientists, and the value-added organizations in using remote EO in Atmospheric Composition data, information and services. Presented the AC Portal concept at the ACC Workshop on Air Quality in Frascati, Italy on 15 June, 2009.(2) On schedule for Initial Capability Demo at WGISS 28 to demonstrate interoperability of data and services among DLR, Giovanni, and DataFed(3) On schedule for Demonstration and Presentation at GEO-VI and an air quality side meeting
5
DA-09-01b_2: Data, Metadata, and Products Harmonization
Establish a WGISS project to focus its contributions to the subject task and to generate those contributions. The first deliverable of the GEO task is an Assessment of Current Capabilities
POC: Ken Mc Donald/NOAA
Planned Deliverables:
June, 2009: Develop assignments for assessmentsSept. 2009: Complete draft inputs to Assessment Report
Current Status: - A WGISS Project was formed at WGISS-27 in May (WGISS Architecture and Data Contributions) to generate the WGISS input to DA-09-01b and other related GEO tasks.- Reviewed the GCI functionality and contents and developing recommendations on data discovery and data search requirements and criteria.- In developing the concept, design and implementation options for a GCI clearinghouse of remotely-sensed data collections that would include the distributed search of the large inventories of satellite data products.
6
DA-09-03d_3: Global DEM
Update ICEDS information server to provide OGC-compliant access to ASTER 30m DEM data (when it becomes available), together with localized validation DEM data and associated quality information (e.g. gap locations; number of ASTER observations per pixel, etc.)
POC: JP Muller (Wyn Culip for WGISS)
Planned Deliverables:
Update ICEDS information server to provide OGC-compliant access to ASTER 30m DEM data (when it becomes available), together with localized validation DEM data and associated quality information
Current Status(from
WGCV/NASA/METI)
-METI and NASA have formally agreed to release the ASTER GDEM that may be downloaded from June 29, 2009 onwards. -The "ASTER GDEM Validation Summary Report." is available.-Space agencies also be requested to provide DEM data that will fill in gaps or areas that are identified as being of poor resolution
Issues BNSC funding fiscal year 2009/10 has not yet been determined. Commitments are dependant on the securing of appropriate funding.
7
DI-06-09_7: Use of Satellite for Risk Management
Analyze the response by WGISS members to supply near real-time data to the response agency. Develop a working process model to integrate and make use of existing technologies within WGISS/CEOS. Implement a prototype to demonstrate use of these integrated technologies for the process model for the earthquake scenario.
POC: Lorant Czaran/Pakorn Apaphant
Planned Deliverables:
June 30, 2009 –Testing the modelSeptember 30, 2009 – Working Process defined at WGISS 28November 2009 –Document and include in WGISS Report at the CEOS plenary
Current Status: -Not much Progress-Coordinated to get support for Indonesia Earthquake in September.
Issue -This activity is recommended to be restructured after the GEO Caribbean Flood Pilot project-Comment s on overlap activities with International Charter-Recommended to revise its activities
8
DA-09-01a_10: GEOSS Quality Assurance Quality
Quality Assurance Framework for Earth Observation (QA4EO) Implementation
POC: Pascal Lecomte/Gregory Stensaas (?? WGISS)
Planned Deliverables:
May 09: Work with CEOS WGISS on Cal/Val data access Jun 09: Develop and initiate an implementation plan for QA4EO Sep 09: Organize a community workshop to address implementation of QA4EO Nov 09: Establish outreach activities to promote QA4EO within the user community
Current Status: WGISS will support QA4EO for Data Access tool,Further Coordination with WGCV is required
9
HE-09-01_1: Information System for Health
Develop a long-term plan to support critical space-based imagery to support modeling, forecasting and monitoring of health issues.
POC: Stephan Falke/NASA
Planned Deliverables:
Jul 7-9, 2009: Workshop at WMO in Geneva, Prepare a plan of implementationNov 2010: Earth Observation Handbook for health
Current Status Both a "Health Data" and a "Health Data Services" portal have been designed and populated by NASA. Additions to these portals will continue to be made as new health data sets and services are identified and information is made available to enter these into the directory.
Note This action is offered to support by NASA/AC team
10
HE-09-01_2: Information System for Health
Demonstrate a global smoke plume and dust forecasting product (IDEA) using multiple satellites and trajectory models for air quality health hazards
POC: Jack Fishman (??? For WGISS)
Deliverables: IN PROGRESS - 48hr automated aerosol forecasts have been archived for statistical analysis. Aeronet aerosol optical depth measurements have been acquired for forecast verification.
Current Status: ???
Note Continue ???
Anticipated WGISS involvement in CEOS Demo at GEO IV and CEOS plenary
GEO-VI plenary
EVENT DATE DEMONSTRATION/ ACTIVITIES CEOS Representation
GEO-VI Plenary The Ronald Reagan Building and International Trade Center, Washington DC
17th-18th Nov 2009
Demonstration• LSI Portal• Climate Diagnostics
Portal• ACC portal• Forest Carbon
Portal• Disaster Response
Management Demo• CEOS VDOPlenary• Statement from CEOS
ChairMaterials• 2008 CEOS Brochure• 2008 EO Handbook• CEOS Flyer
CEOS Chair, SIT Chair, CEO, GISTDA, 2007-9 SIT(NOAA), SEO, NASA, ESA, FCT
Exhibition:
Information A 10ft x 10ft CEOS booth is arranged in
front of the entrance of exhibition room NOAA and NASA provide financial
support for equipment rental and etc. Internet Access/two plasma screens CEOS Exhibition: 3 Portals/3
Demos/CEOS VDOs/Materials One screen for Portals and Demo, the
other for CEOS VDOs
Exhibition: Demonstration on the 1st plasma
LSI Portal: FCT Application Demonstration Leader: LSI Co Lead (USGS, ISRO) Presenter: FCT team
AC Portal Demonstration Leader: ACC Co Lead (NASA/ESA) Presenter: NASA/DLR
Climate Diagnostics Portal Demonstration Leader: Climate SBA Lead (NOAA) Presenter: NOAA/WGISS/NASA
Sensor Web for Disaster Response Demonstration Leader: WGISS Presenter: NASA
Exhibition: Demonstration on the 2nd plasma
CEOS Database Demonstration Leader: ESA/SEO Presenter: SEO
COVE Demonstration Leader: WGCV/SEO Presenter: SEO
Exhibition: VDO on the 2nd plasma CEOS Dataset, Workshops, etc. slide
Leader: SIT Team Data Democracy slides
Prepared by: 2009 Troika CEOS FCT VDO Clip
Prepared by CEO CEOS VDO
Stephen Ward
Note: All slides and VDO will be compiled by SEO
Copenhagen
23rd CEOS Plenary
EVENT DATE DEMONSTRATION/ ACTIVITY CEOS Representation
23rd CEOS Plenary, Phuket, Thailand
3rd – 5th Nov 2009Demonstration/
ExhibitionCEOS Members
Exhibition
Portal Demos are welcome, please confirm ASAP
Possible Demonstrations LSI Portal: FCT Application Demonstration AC Portal Demonstration Climate Diagnostics Portal Demonstration Sensor Web for Disaster Response
Demonstration CEOS Database Demonstration COVE Demonstration
Plan for 2010 WGISS/CEOS in support of GEO
2010 Working Group’s Anticipated Goal Session, 23rd CEOS Plenary WGs’ Anticipated Goals Discussion Preparation telecon –next week Subgroups to identify the GEO Tasks
which WGISS plan to support GEO Ministerial is in 2010
Any Demos from WGISS???
CEOS Leadership Transition CEOS Chair: GISTDA INPE SIT Chair: NOAA JAXA CEOS still continues strongly support
GEO but the working process may be different
no. of actions and monthly telecons can be reduced
WGISS will need to follow CEOS policy and direction
Meeting Schedule of Key events CEO Plenary/GEO Plenary –Nov 09 CEOS-GEO Remapping –Dec 09, if still
any SIT 25 –Apr 10 WGISS 29 –May 10
May 2010 is too late to start planning, we need to start planning now
GEO Tasks/Demo we will support in 2010 Description/Deliverables/Leading Agencies
or IG will be therefore expected from this WGISS meeting
VC (ACC, LSI, etc.), Health, Disaster, Data Harmonization, Data Democracy, GCI, etc…
WGISS Exec will start our monthly telecon in Jan so that we will be ready to report to SIT in
April and start working in May Subgroup telecons/email exchange during
Jan-Mar is therefore encouraged to discuss on our support GEO
Example of new Anticipated task Given the current relative low number of
GEOSS registered resources, the number of records returned, as results of a query from a GEO Web Portal user, is quite low.
On the contrary the IDN contains a fantastic database of EO information that would be so useful to the GEO Community.
Ivan suggested that it is a unique opportunity for WGISS to play a major role in GEO through IDN.
There is still some work to do to properly interface the IDN with the main GCI elements and would be a strong signal fromWGISS as well as a major achievement .
Guidance to subgroups
Guidance to subgroups
Provide WGISS Plenary with Progress/Update for all CEOS/GEO
Actions Anticipated Demonstration at CEOS
Plenary and GEO-IV Plan for 2010 WGISS/GEO Activities
- List of the GEO Tasks WGISS will support with some description, leader and expected deliverables