Date post: | 26-Mar-2016 |
Category: |
Documents |
Upload: | maett-wharton |
View: | 236 times |
Download: | 1 times |
IntroductionWe are a principal building contractor based in Darlington and work throughout the
North East of England.
Established in 1984, we have developed over the years to successfully deliver
increasingly challenging and rewarding projects that have strengthened our
reputation as a quality building contractor.
We strive to offer a best value and personal service to clients by understanding and
adhering to their requirements. Projects are completed on time and within budget
through efficient and effective project management.
Key to our success is our highly-skilled and loyal workforce. We encourage
promotion within our organisation and have continuous training procedures in place
to ensure that everyone has the correct skills to excel at their job.
Health and safety is of paramount importance within our business and all activities
are carefully planned and supported by safe methods of work.
We support sustainable construction and put into practice procedures and
techniques that enable us to carry out our activities with minimum disturbance to the
surrounding environment.
The aim of this brochure is to introduce our business and give an insight into
our values, what it is we do and to develop new working relationships with local
businesses.
Market Cross, Barnard Castle
Award winning refurbishment of a Grade I listed building.
QualityWe have developed a quality focused culture within the company that can be seen
in everything that we do, from procurement through to the contract completion. We
understand what our clients require and go the extra mile to ensure their satisfaction.
We strive to consistently deliver projects with zero defects and achieve this through
continuous improvement, the skill of our workforce and the support of our
supply chain.
Our commitment to delivering quality to our clients can be seen by looking at the
projects we have completed, the praise that we receive and the ensuing contracts
that our clients’ award.
Health and SafetyHealth and Safety is of utmost importance within our organisation. We ensure that
activities are completed in a safe manner and with a minimum of risk.
Wharton Construction’s management lead by example and set the standard and
targets that all employees adhere to.
Our site operatives have passed an external health and safety assessment and
receive regular training to ensure that they can complete tasks safely.
The EnvironmentThe way we manage waste, the materials we select and the activities that we
undertake all affect the environment.
We have developed a robust Environmental Management System to the standard of
ISO 14001 that ensures that we minimise our impact on the environment.
We are committed to WRAP (Waste Resources Action Plan) – We monitor the amount
of waste going to landfill and have targets and systems in place that enable us to
reduce the amount going to landfill year-on-year. We re-use our discarded materials
and where this is not possible we recycle.
Our primary waste partner utilises an innovative Mechanical Biological Treatment
Plant that further reduces the volume of waste that goes to landfill.Cross Lanes Eco Farm Shop, Barnard Castle
Construction of a sustainable building that features:
Green roof, straw bale insulation, lime plaster, air source
heat pumps, rainwater harvesting and solar panels.
The Bowes Museum, Barnard Castle
Alterations and refurbishment of the main picture galleries and
public facilities to a renowned Grade I listed building.
Client: The Bowes Museum
Clients Representative: The Bowes Museum
Hotel Bannatyne, Darlington
40 bedroom extension with function suite to a grade II listed
building, including internal refurbishment to the existing hotel.
Client: The Bannatyne Group
Clients Representative: Arran Design Services
Our Projects
Acklam Rugby Club, Middlesbrough
Demolition of the existing, and construction of a new club house
including changing rooms with showers, bar, function suite,
spectators terrace and glazed entrance area.
Client: Acklam Park LLP
Clients Representative: DKS Architects
Beaumont House, Darlington
Extensions and refurbishment to a redundant town centre building
to create an iconic 4 storey office block.
Client: Tompkins UK
Clients Representative: Niven Architects
Clervaux Bakery, Darlington
St. Peter’s & St. Paul’s Church, Stainton
Our Projects
Refurbishment and alterations to a Grade II listed building to create
a stylish café with a glazed atrium, training facilities and office
space.
Sympathetic alterations and extensions to a historic Grade II* listed
building.
Client: The Clervaux Trust
Clients Representative: AP King Architects
Client: St. Peter’s & St. Paul’s Church
Clients Representative: Stringer & Jones
Hambleton House, Norton
Demolition of a redundant terrace property to create 9 luxury
apartments on Norton High Street. The development received
praise from neighbours and the local media.
Client: PPG (NE)
Clients Representative: _Space Architecture
DKS Architects & Towergate Insurance, Stokesley
Construction of 2 individually designed office buildings at
Stokesley Business Park.
Client: DKS Architects & Towergate Insurance
Clients Representative: DKS Architects
Testimonials“It is excellent to see such a positive, open approach to
contracting and this is the type of relationship that we would
hope to foster on all of our projects.”
Stockton Borough Council
“We are keen that you are informed of the very high quality of
service and workmanship we have witnessed in every aspect of
the building project.”
Salvation Army
“The Wharton Construction team worked in a very pro-active
manner. The client has been extremely pleased with the end
result.”
Niven Architects
“We would like to say how impressed we have been with your
company and employees during the development next door. All
concerned have been professional, courteous and efficient.”
Dr. Langford
“The client is delighted with the building and we look forward to
hopefully working with you on future projects.”
Stockton Borough Council
Contact UsIf you would like to know more about our company, please don’t
hesitate to get in touch:
Peter Wharton
Managing Director
Jeff Cutting
Commercial Director
T: 01325 288742
F: 01325 352566
Wharton Construction Ltd
Kellaw Road
Yarm Road Business Park
Darlington
DL1 4YA
www.whartonconstructionltd.co.uk
www.facebook/whartonconstruction
www.twitter.com/WCLimited
We are privileged to have worked with varied and reputable clients, such as:
Our Clients
Thornaby Central Library, Thornaby
Internal alterations and refurbishment of Thornaby Library.
Kellaw Road, Yarm Road Business Park,
Darlington, Co Durham, DL1 4YA
Tel: (01325) 288742 Fax: (01325) 352566
www.whartonconstructionltd.co.uk