Date post: | 04-Jan-2016 |
Category: |
Documents |
Upload: | sabrina-floyd |
View: | 213 times |
Download: | 0 times |
WHERE THE BRAHMAPUTRA MEETS THE MISSISSIPPIRGVN experiences
WHERE THE BRAHMAPUTRA MEETS THE MISSISSIPPI – ASSAM 2014
ADOPTION OF 2 VILLAGES FOR HOLISTIC DEVELOPMENT
GARAMSUNG VILLAGEDIGHELI VILLAGEFeatures:Empowerment of women through:Yarn BanksTraining on SHG and LeadershipFinancial InclusionLivelihood facilitation
YARN BANKSPresently in two placesRangia in Kamrup district and Digheli
in Nalbari districtUsed by 200 weaversEasy availability of various types of
quality yarn.Credit facilities for yarn.Situated in the village vicinity.Availability of Yarn at wholesale rate
priceIntroduction of Warping drum and
jacquard machine.
OPENING DAY AT GARAMSUNG
Traditional Method of weaving
Traditional Method /Weaving through Jacquard Machine
AFNA -RGVN YARN BANK WITH WEAVING AND MUSTARD CRUSHING MACHINE PROJECT
Women Empowerment
• Training of Self help Groups.
• Leadership training
• Awareness on Rights and Entitlements
• Financial Literacy and Inclusion
LIVELIHOOD PROJECT – MUSTARD PRESSING MACHINE
Recently 2500 USD has been given in Garamsung village as Revolving Fund for mustard pressing machine
About 1000 farmer HH in the area grow mustard in the winter season and are dependant on the crop
Due to a shortage of mustard pressing machines in the area, the machine will help boost livelihood
The machine is operated by paddy husk which is easily available
Expenditure incurred till nowIn Project
Sl no Expenditure head Amount( Rs)
A. Funds fromF.Y 2012-2013
15,000
Received in 2013-14 301036
B. Expenditure incurred during this F.Y ( i.e: Upto 07-04-2014)
1 Honorarium to volunteer 14,000.00
2 House rent 4,500.00
3. Training & accessories 59,504.00
4 Publicity 1,800.00
5 Purchase of assets 18000.00
6 Recurring costs 30000.00
6 Yarn Bank related costs 15074.00
7 Travelling Expenses 19,738.00
8 Prof. fee for resource person 4,500.00
9 Mustard Crushing Machine, for Gramya Unnayan Mancha
1,50,000.00
Total amount expended Up to April 2014 317116.00
-1080
Item Unit Cost
In Rs Rationale
Extension of yarn Bank to 2 more areas
35,000 70,000.00 2 places have been surveyed and found suitable for yarn bank - Diya Foundation, Loharghat (Kamrup) and SBKSS, Tilana, Nalbari
Construction of 30 low cost toilets in Deghali (Nalbari)
12,000 3,60,000.00 Dehali village has complete open defecation – no toilets are found there
Design workshop and intervention
2 Workshops @ 15,000 each
30,000.00 Necessary for improvement of design
Exposure to bazaars and exhibitions
lumpsum
50,000.00 For exposure and to boost sales
Women awareness and leadership programmes
4 prog. @ 5000 each
20,000.00 For empowerment of women in the areas
Total 5,30,000
RGVN’s ContributionMandays spent :At least 5 - 7
days a month by personnelInclusion under RGVN’s other
programmesFinancial literacy programmes for
the community
A VERY SPECIAL Thank You!!