1 E XADATA XADATA C ONSOLIDATION SUCCESS ONSOLIDATION SUCCESS S TORY TORY Karl Arao, Enkitec ABSTRACT In today’s competitive business climate companies are under constant pressure to reduce costs without sacrificing quality. Many companies see database and server consolidation as the key to meeting this goal. Since its introduction, Exadata has become the obvious choice for database and server consolidation projects. It is the next step in the evolutionary process. But managing highly consolidated environments is difficult, especially for mixed workload environments. If not done properly the quality of service suffers. In this paper we will touch on how to do accurate provisioning and capacity planning and the tools you’ll need to ensure that your consolidation story has a happy ending. TARGET AUDIENCE Target audiences are DBAs, Architects, Performance Engineers, and Capacity Planners Learner will be able to: Describe the provisioning process and implementation challenges Apply the tools and methodology to successfully migrate on an Exadata platform Develop a resource management model (CPU instance caging & IORM) – detailed on the presentation BACKGROUND The whole consolidation workflow relies on the basic capacity planning formula Utilization = Requirements / Capacity Capacity planning plays a very important role to ensure proper resources are available and be able to handle expected and unexpected workloads. And Exadata is not really a different animal when it comes to provisioning, although it has an intelligent storage the database servers still has limited capacity. The primary principle is to ensure the application workload requirements will fit into the available capacity of the database server. A SIMPLE CONSOLIDATION SCENARIO Let’s say we have a half rack Exadata. That would consist of four (4) database servers and seven (7) storage cells. Each database server has a total CPU capacity of 24 Logical CPUs (cat /proc/cpuinfo) and then multiply that to the number of nodes (4) you’ll get the total CPU capacity for the whole cluster (96 CPUs). When we migrate and consolidate these databases on Exadata, each database has a CPU requirement. For now treat the “CPU requirement” as the amount of CPUs it needs to run on Exadata. We would like to have a good balance between the CPU requirements of the databases and the available CPU capacity across the database nodes, and also making sure that we don’t max out the CPU capacity on any of the nodes.
Transcript
Page 1: Whitepaper: Exadata Consolidation Success Story

1

EE XADATA XADATA CC ONSOLIDATION SUCCESSONSOLIDATION SUCCESS SS TORYTORY

Karl Arao, Enkitec

ABSTRACT In today’s competitive business climate companies are under constant pressure to reduce costs without sacrificing quality. Many companies see database and server consolidation as the key to meeting this goal. Since its introduction, Exadata has become the obvious choice for database and server consolidation projects. It is the next step in the evolutionary process. But managing highly consolidated environments is difficult, especially for mixed workload environments. If not done properly the quality of service suffers. In this paper we will touch on how to do accurate provisioning and capacity planning and the tools you’ll need to ensure that your consolidation story has a happy ending.

TARGET AUDIENCE Target audiences are DBAs, Architects, Performance Engineers, and Capacity Planners Learner will be able to:

• Describe the provisioning process and implementation challenges • Apply the tools and methodology to successfully migrate on an Exadata platform • Develop a resource management model (CPU instance caging & IORM) – detailed on the presentation

BACKGROUND The whole consolidation workflow relies on the basic capacity planning formula Utilization = Requirements / Capacity Capacity planning plays a very important role to ensure proper resources are available and be able to handle expected and unexpected workloads. And Exadata is not really a different animal when it comes to provisioning, although it has an intelligent storage the database servers still has limited capacity. The primary principle is to ensure the application workload requirements will fit into the available capacity of the database server.

A SIMPLE CONSOLIDATION SCENARIO

Let’s say we have a half rack Exadata. That would consist of four (4) database servers and seven (7) storage cells. Each database server has a total CPU capacity of 24 Logical CPUs (cat /proc/cpuinfo) and then multiply that to the number of nodes (4) you’ll get the total CPU capacity for the whole cluster (96 CPUs).

When we migrate and consolidate these databases on Exadata, each database has a CPU requirement. For now treat the “CPU requirement” as the amount of CPUs it needs to run on Exadata. We would like to have a good balance between the CPU requirements of the databases and the available CPU capacity across the database nodes, and also making sure that we don’t max out the CPU capacity on any of the nodes.

Page 2: Whitepaper: Exadata Consolidation Success Story

2

Let’s say we have the following databases to migrate on Exadata:

On the above diagram each database (A to G) has a requirement of four (4) CPUs and will run on two nodes. The first row will be read as “Database A has a CPU requirement of 4, and will run on nodes 1 and 2”. Each of the databases is essentially a two node RAC that is spread out across four database servers. On a RAC environment the users will be load balanced between the available RAC instances, so if a database running on two node RAC has a CPU requirement of 4 given that the load is equally distributed across the nodes then they get 50/50 percent share of CPU requirement.

On the bottom part is the grand total of CPU requirement for all the databases, which is 28 CPUs. We can then say that out of 96 Total CPUs across four nodes, we are only using 29%. Well that is correct, but we also want to know how each server is utilized that is depicted by the red circles across the same node numbers because we may be having a node that’s 80% utilized where the rest of the nodes are on the 10% range and an equal balance of utilization is critical to capacity planning.

Here’s another view of the node layout where we distribute the CPUs of the instances based on their node assignments.

Page 3: Whitepaper: Exadata Consolidation Success Story

3

Each block on the right side is one CPU. That’s a total of 24 Logical CPUs which accounts the number of CPU threads on the server which is based on the CPU_COUNT database parameter and /proc/cpuinfo. We also set or take the number of CPUs from CPU_COUNT whenever we do instance caging and we are using this metric just to be consistent with the monitoring of OEM and AWR.

From the image above the cluster level utilization it’s 29.2% while on the per compute node they are still below the 70% threshold which is the ideal utilization we want for the compute nodes.

Now what we don’t want to happen is to have an unbalanced utilization if we change the node layout and assign more instances on node 2 and still make use of the same number of CPU requirement across the databases.

Page 4: Whitepaper: Exadata Consolidation Success Story

4

On the cluster level it will be the same utilization but on the per compute node we end up having node2 with 83% utilization while the rest are pretty much idle.

THE PROVISIONING WORKSHEET Enkitec has developed a tool called Provisioning Worksheet that is mainly used for sizing and consolidation of databases. The sections below describes the overall workflow of the tool.

General Tour and Workflow

The Provisioning Worksheet has four main tabs that also represent the workflow of the whole provisioning project.

Below you’ll see the mind map and the overview of the 4-step process:

• Data gathering o The “System & DB Detail” tab on the worksheet. It’s the section that we send to the customers to fill out.

The sheet will contain all the important information of the databases that will be migrated to the destination (target) server.

• Define the target server o The “Exadata Capacity” tab on the worksheet, the default capacity will be a half rack Exadata. But depending

on the customer capacity requirements the default values may not be enough so a review of the end resource

Page 5: Whitepaper: Exadata Consolidation Success Story

5

utilization is a must. At the end of the provisioning process there will be a section where the minimum “Recommended Hardware” capacity will be shown and should be matched.

• Create a provisioning plan o The “Exadata Layout” tab on the worksheet. This is where we input the final list of databases that will be

migrated to the target server. The instance mapping where we spread out the instances if they’ll be running as two or four node RAC and the failure scenarios will also be done here.

• Review resource utilization o The “Summary & Graphs” tab on the worksheet. Once everything is finalized this section will give you the

visualization and summary report of the end utilization of the target server. A red highlight on the utilization number on any of the resources means there’s not enough capacity and the “Exadata Capacity” section should be revisited and add more resources.

Page 6: Whitepaper: Exadata Consolidation Success Story

6

Page 7: Whitepaper: Exadata Consolidation Success Story

7

Data gathering

The first step on the provisioning process is getting all the capacity requirements. This section of the worksheet is extracted and saved on a separate excel file then sent to the customers for them to fill out. And once the customer sent this back we can now start grouping the servers according to platform or workload type and also get started with the migration planning with the customer. Ultimately this sheet serves as a scratchpad and you are free to add more columns to help with the categorization of the environments that will be migrated.

Below is a sample output:

The data gathering sheet is divided into four parts:

Host details CPU Memory Storage

• DB Name • DB Version • App Type/Front

End • Workload Type

(OLTP/DW/Mix) • Node count (single

instance/RAC) • Hostname • Server Make &

Model • OS

• Cpu Type • CPU Speed • # of Logical CPUs • CPU Utilization

Avg/Peak

• Physical Memory (GB)

• SGA Size (GB) • PGA Size (GB)

• Storage Make & Model

• Disk RAID Level • # of IO Channels • Database Size (GB) • Backup Size (GB) • Peak R + W IOPS • Peak R IOPS • Peak W IOPS • Peak R + W MB/s • Peak R MB/s • Peak W MB/s • Peak R/W Ratio

The gathered raw data points will then be feed to the provisioning plan and will be accounted to the available capacity.

Page 8: Whitepaper: Exadata Consolidation Success Story

8

Define the target server

This is the section of the provisioning worksheet where we input the capacity of the Exadata that the customer currently have or the hardware that they have in mind. What we input here is just the initial hardware capacity where the requirements will be accounted and at the end of the provisioning process we can go back here and add more resources if there are any exceptions (red highlight) on the utilization summary report.

• Node Count

o On the node count you put 2,4, or 8 which is equivalent to quarter, half, full rack of Exadata • Exadata Speed (SPEC)

o Then get the SPECint_rate equivalent of the Exadata processor so we will be able to compare the SPEED of the Exadata CPU against the source servers

o See the section CPU -> The “Speed SPEC” or the “SPECint_rate2006/core” of the Appendix B for more details on how to get the value for a particular server.

• Exadata CPUs/node o The number of Logical CPUs which is equivalent to the CPU_COUNT parameter or /proc/cpuinfo

• Exadata Mem/node (G) o Each node has 96GB of memory on an Exadata

• Exadata Storage (G) o Disk space is dependent on ASM redundancy and DATA/RECO allocation. Input the raw GB space

capacity. • Backup Factor

o The backup factor is usually set to 1, which means we want to have a space for at least 1 full backup of the database

• Table Compression Factor o The table compression factor lets us gain more disk space as we compress the big tables. I usually set this to

zero for a conservative sizing. • Offload Factor

o The OFFLOAD FACTOR which is the amount of CPU resources that will be offloaded to the storage cells. I usually set this to zero for a conservative sizing.

Page 9: Whitepaper: Exadata Consolidation Success Story

9

Create a provisioning plan

This is the section where we input the data points from the Data Gathering (“System & DB Detail” tab). Then we play around with the node layout where we spread out the instances across the compute nodes according to the customer’s preferences and what transpired from the migration planning. There’s an underlying capacity planning math that’s processing the data points of each of the database according to their node layout which will be accounted to the overall and node level capacity. (See Appendix B for the formulas)

The node layout

There are three values for the node layout: • P = preferred node (green)

o primary node o accepts client connections

• F = failover node (red) o secondary node o does not accept client connections o instance is down and does not consume resources

• A = available node (blue)

Page 10: Whitepaper: Exadata Consolidation Success Story

10

o secondary node o client connections are just pre-connected, sessions will failover only when the preferred node

fails/shutdown o instance is up and running and have provisioned resources

Here’s how to interpret the image above: o The DBFS database runs across 4 nodes o hcm2tst only runs on node1 and has a failover instance on node2 o bi2tst runs on node3 and has a pre-connect instance on node4

Above the node layout are node level utilization reports which contains the following: • The number of instances running on that node • CPU utilization • Memory utilization • Recommended minimum Huge Pages allocation

o The value shown has 10% allowance for SGA growth/resize o To convert the GB to actual Huge Pages settings make use of the following formula

§ (HPages GB * 1024) / 2

Most of the columns came from the Data Gathering (“System & DB Detail” tab) sheet but there’s a Host Speed (SPEC) column which represents the “SPECint_rate2006/core” value of the source server. See the section CPU -> The “Speed SPEC” or the “SPECint_rate2006/core” of the Appendix B for more details on how to get the value for a particular server.

Node failure scenario

The node layout will also depend on the failure scenarios where let’s say if one node goes down the end resource utilization of the remaining nodes should still be on an acceptable range (80% below).

Below you’ll see a scenario that when the node1 goes down (changed from P to F) the remaining preferred nodes will catch all the failed over sessions and will cause an increase in resource utilization in terms of CPU and memory. Here the CPU is at the critical level which is at 120% utilization when this scenario happens.

Page 11: Whitepaper: Exadata Consolidation Success Story

11

The node failure scenario is essential to the availability planning of the whole cluster. This is the part where we do trial and error until we get to the sweet spot of the node layout where we have already failed each of the node and the end utilization of the remaining nodes are on an acceptable utilization range (80% below).

Review resource utilization

As we change the node layout we can quickly check on the “Summary & Graphs” tab to see the effects of the layout change. The graphs will be rendered in a split second and we’ll be able to visually check the allocation of resources and quickly see any imbalance on the provisioning plan in terms of CPU, memory, and storage. On the top section of the sheet are the Overall Utilization and the Recommended Hardware.

Page 12: Whitepaper: Exadata Consolidation Success Story

12

Overall Utilization

While the node layout section has the “per node” utilization which quickly alerts us on any resource imbalance between nodes the “Overall Utilization” is very useful for monitoring the resource allocation on a cluster level. Here are some important points about this summary section:

• It has a conditional formatting where it will have a “red highlight” for any resource component that reaches 75% and above

• A “red highlight” means revisiting the provisioning plan (removing databases or reducing allocations) or adding more resources to the capacity which could be as follows:

o Additional compute nodes o Memory upgrade o Additional storage o All of the above

• The goal is to get rid of the “red highlight”

Recommended Hardware

All the data points gathered translates to resource requirements and then to the amount or size of hardware it needs to run smoothly. This section is very helpful for validating if the hardware that we currently have or planning on buying is enough to run all the databases that will be migrated or consolidated. Here are some important points about this summary section:

• The Equivalent compute nodes has 35% allowance on the CPUs, which means if the Total CPU used is 64.15 which

translates to 2.67 compute nodes (divide by 24 Logical CPUs) with the 35% allowance it will be 86.6 which translates to 3.6 compute nodes. This allowance for any workload growth/spikes or any unforeseen CPU workload profile change that could be caused by the migration (plan change, etc.).

• The Equivalent compute nodes only accounts for the CPU • On the example below, the 3.6 nodes satisfies the minimum required number of nodes to run the 64.15 CPU

requirement and still be at below 75% overall CPU utilization. But for the memory it’s not the case, so we either have to upgrade to more compute nodes or upgrade the memory from 96GB to 128GB. These resource capacity values can be modified on the “Exadata Capacity” tab.

Page 13: Whitepaper: Exadata Consolidation Success Story

13


Recommended