Page 1: Why Lean Initiative Fail-Is It Resistance...? Let’s Start VSM
Page 2: Why Lean Initiative Fail-Is It Resistance...? Let’s Start VSM

What is Lean…?

It is explained in various ways in various languages, ultimately deriving only one goal of removing waste in the

production. This is nothing but a systematic and well-thought methodology for improvement of

performance/productivity by removing wastes and reducing variation. This is a collaborative team effort for waste

minimization without compromising the quality and productivity. In late 80s and early 90s, this concept was

introduced to the world by Japanese manufacturing industry.

Page 3: Why Lean Initiative Fail-Is It Resistance...? Let’s Start VSM

Leanand

5 Principles

5 Principles

Create Pull

Analyze Flow

Value Stream Map

Identify Customer Value

Seek Perfection

Page 4: Why Lean Initiative Fail-Is It Resistance...? Let’s Start VSM

1. Identify Customer Value:

Mahatma Gandhi once told “A customer is the most important visitor on our premises.” Lean begin with

identifying customer needs. He pays only for the Value he is getting. If the requirements of the customer are not

understood, it can lead to resource waste, reworking, time waste and ultimately the end goals are not achieved.

This phase is to define the value of the product.

Page 5: Why Lean Initiative Fail-Is It Resistance...? Let’s Start VSM

2. Make VSM (Value Stream Map)

So, what is value stream map...? The most important step to achieve final goal of improvement in the process.

The value ‘product’ is processed from raw stage to the product deliverable stage. There are multiple steps and

process fragments involved which create a systematic process structure which can be termed as ‘stream’.

Mapping all the steps and activities in the stream from customer demand till product delivery is called value

stream mapping.

Page 6: Why Lean Initiative Fail-Is It Resistance...? Let’s Start VSM

3. Analyze Flow:

After identifying value added and non-value added processes, wastes are removed, loop holes are

eliminated. Process flow is analyzed and all the processes are arranged tightly to make sure that process

has smooth flow. This reduces waiting times, gaps in the process and chances of errors. This phase

achieves fluidity to the process by creating continues flow.

Page 7: Why Lean Initiative Fail-Is It Resistance...? Let’s Start VSM

4. Create Pull

In current market pattern the customer demand increases suddenly. To meet the customer expectations for

increased production with quality adherence, a pull is created. By following and inculcating first 3 principles now

waste is removed and there is reduction in the production time. This production line can now cater the customer

demands without any bottleneck at any point

Page 8: Why Lean Initiative Fail-Is It Resistance...? Let’s Start VSM

5. Seek Perfection:

Pursuit of perfection is achieved through continuous improvement. This phase is nothing but a pause for

analysis and to start over the lean cycle again. ‘Plan-do-check-act’. This results in Kaizen. Continuous

improvement is carried out until stage of perfection is achieved and waste is eliminated.

Page 9: Why Lean Initiative Fail-Is It Resistance...? Let’s Start VSM

Benefits of Application of Lean

The takt time calculation and improvement in this time by reducing the waste, increases the

production.

The production cycle time is reduced.

Operations are smooth.

Reduce operation cost by reducing inventory, motion waste and overproduction cost.

Gain more capabilities to handle increased customer demands and increase creditability.

Overall impact on quality of the output.

Page 10: Why Lean Initiative Fail-Is It Resistance...? Let’s Start VSM

Lean Implementation Faces Resistance:

Despite of all the benefits lean implementation faces resistance from the industry. It is very difficult for many

industry experts to change the set pathways. Resistance also comes from a fear of exposing process and

problems.

Reducing the resource for achieving productivity is not the approach. Systematic implementation of the lean

principles and thereby reducing the waste can prevent expenses and increase profit.

Of course, complete mapping of the process and changing it accordingly can be a bold step, time consuming

and may not give desired outcomes. Stepwise approach and systematic implementation of lean can be the

solution for it.

Page 11: Why Lean Initiative Fail-Is It Resistance...? Let’s Start VSM

Strategic Implementation of VSM Lean:

Value stream mapping can be practiced for a segment/department in the process initially.

Improvement can be assessed by eliminating wastes in only marked area to achieve perfection for the

section.

Once this is achieved can be implemented to other processes/fragments slowly and systematically, which

could finally cover the whole process and the goal of practicing lean culture for the whole process is

achieved.

Page 12: Why Lean Initiative Fail-Is It Resistance...? Let’s Start VSM

Scope of VSM:

It is very true ‘If you have a product, you have a value stream’. VSM can be applied to:

a. Any manufacturing industry.

b. Any work site situations

c. Any office environment

d. Any activity.

e. Any job shop

f. Any culture or work station.

Page 13: Why Lean Initiative Fail-Is It Resistance...? Let’s Start VSM

Conclusion:

Built on the principles of lean and following the VSM culture, ITCube BPO has always caters

the customer satisfaction. This is achieved via continuous improvement in productivity and

maintaining the quality standards.

Page 14: Why Lean Initiative Fail-Is It Resistance...? Let’s Start VSM

Contact Us -

ITCube BPO Solution,

Email- [email protected]

Phone- +1 (614) 434-2376

10999 Reed Hartman Highway,

Suite # 134, Cincinnati,

Ohio - 45242, USA

www.itcubebpo.com


Recommended