+ All Categories
Home > Documents > Winter Presentation

Winter Presentation

Date post: 31-Jan-2016
Category:
Upload: coyne
View: 38 times
Download: 0 times
Share this document with a friend
Description:
Winter Presentation. Island 2000. Introducing ISLAND 2000. Renee Elsdon. Jonathan Wong. Group Presentation March 10, 2000. Michael Hughes. Jonghoon Kim. ISLAND 2000. Project Overview :. - PowerPoint PPT Presentation
Popular Tags:
112
inter Presentation Island 2000
Transcript
Page 1: Winter Presentation

Winter Presentation

Island 2000

Page 2: Winter Presentation

Introducing

ISLAND 2000

Page 3: Winter Presentation

Jonathan Wong

Michael Hughes

Renee Elsdon

Jonghoon Kim

Group PresentationMarch 10, 2000

Page 4: Winter Presentation

ISLA

ND

20

00

Project Overview:

Design a new engineering center to replace an existing 3 story building at Island University, Florida.

Page 5: Winter Presentation

ISLA

ND

20

00

Project Overview:

One building has a square footprint and one has an L-

shaped footprint.

Page 6: Winter Presentation

ISLA

ND

20

00

Project Overview:

Requirement: The palm tree grove must be preserved, and

some internal spaces must have views to the grove.

Page 7: Winter Presentation

ISLA

ND

20

00

Project Overview:

Requirement: Interior organization is based upon the affinity table.

Page 8: Winter Presentation

The AFFINITY TABLE

Auditorium

FacultyLounge

Tech.supportComputer

Room

Secretaries

FacultyOffices

Chair’sOffice

SeniorAdmin.

Storage

Instructional Lab

StudentOffices

SmallClass

Seminar

Large Classrooms

* Size of bubble directly relates to required size of each room

Page 9: Winter Presentation

TH

E

PR

OC

ES

S

architect

Aesthetics

Page 10: Winter Presentation

A local site was selected

to authenticate the project

and aid in the architectural design process

A local site was selected

Page 11: Winter Presentation

A local site was selected

That had a sandy, semi-populated beach

And offered a sense of serenity

Page 12: Winter Presentation

San Francisco Bay

Page 13: Winter Presentation

ANGEL ISLAND

Page 14: Winter Presentation

Quarry Beach

Page 15: Winter Presentation

Site Contours

OtherUniversityBuildings

And Site Model

Page 16: Winter Presentation

ISLA

ND

20

00

Other “University” Buildings….

Page 17: Winter Presentation

Don’t you want to be there?

Page 18: Winter Presentation

ISLA

ND

20

00

Qualities of the site:

Strong visual attraction to specific points on the horizon

Page 19: Winter Presentation

Tilden Park/Berkeley

Treasure Island/Bay Bridge

Chevron/San Rafael Bridge

ISLA

ND

20

00

Qualities of the site:

Page 20: Winter Presentation

Nature of cove and hill forms gives the site a strong directional quality

ISLA

ND

20

00

Qualities of the site:

Page 21: Winter Presentation

ISLA

ND

20

00

Cove form: radial directional

quality

ISLA

ND

20

00

Qualities of the site:

Page 22: Winter Presentation

Qualities of the site:

Hill Form: Sloping

directional quality

Beach/Bay Form: endless horizontal directional quality

ISLA

ND

20

00

Page 23: Winter Presentation

ISLA

ND

20

00

Sense of seclusion; other campus buildings are located out of sight

Qualities of the site:

Page 24: Winter Presentation

Structural engineer

TH

E

PR

OC

ES

S

architect

Aesthetics

Structure

Page 25: Winter Presentation

ISLA

ND

20

00

No seismic consideration

Qualities of the site:

Page 26: Winter Presentation

ISLA

ND

20

00

Building needs to be designed for 110 mph wind

Qualities of the site:

Page 27: Winter Presentation

Advantages of Material Selection

R/C Beams R/C with composites

Timber Timber w/ composites

Strength

Weight

Weather

Resistant

Cost

Effective

Ductile

Failure

Page 28: Winter Presentation

Construction Manager

owner

Iterations between the members

Structural engineer

TH

E

PR

OC

ES

S

architect

Aesthetics

Structure

Planning

Chooses

Page 29: Winter Presentation

Construction Manager

Structural engineer

architect

owner

TH

E

PR

OC

ES

S

Iterations between the members

Page 30: Winter Presentation

Page 31: Winter Presentation

A plan with

symmetry:

And organized

around the

auditorium

Page 32: Winter Presentation

“”

Page 33: Winter Presentation

Iteration Process

Page 34: Winter Presentation

Iteration Process

Page 35: Winter Presentation

“”

Components

Page 36: Winter Presentation

Components

Page 37: Winter Presentation

Page 38: Winter Presentation

Page 39: Winter Presentation

Page 40: Winter Presentation

Auditorium is central elementAuditorium is curvilinear in all dimensions

Wall installed to support auditorium at the request of E-C

Page 41: Winter Presentation

Page 42: Winter Presentation

EN

GIN

EER

Page 43: Winter Presentation

””

EN

GIN

EER

Page 44: Winter Presentation

Issues

CO

NSTR

UC

TIO

N

Page 45: Winter Presentation

Page 46: Winter Presentation

Page 47: Winter Presentation

Page 48: Winter Presentation

Page 49: Winter Presentation

Page 50: Winter Presentation

Page 51: Winter Presentation

Page 52: Winter Presentation

Page 53: Winter Presentation

Page 54: Winter Presentation

Page 55: Winter Presentation

Page 56: Winter Presentation

Page 57: Winter Presentation

Page 58: Winter Presentation

Page 59: Winter Presentation

Page 60: Winter Presentation

EN

GIN

EER

””

””

Page 61: Winter Presentation

–EN

GIN

EER

Page 62: Winter Presentation

””

EN

GIN

EER

Page 63: Winter Presentation

CO

NSTR

UC

TIO

N–

Page 64: Winter Presentation
Page 65: Winter Presentation

Establish Lines of Importance

San

Rafa

el B

ridg

eBerkeley

Treasure Island

Page 66: Winter Presentation

Plan View

Page 67: Winter Presentation
Page 68: Winter Presentation
Page 69: Winter Presentation

Circular Stairwell at intersection of circulation zones

Radial Circulation

Regions

Page 70: Winter Presentation

auditorium

Large Class

Small class

Student Off.Seminar

lab

Tech support

Computer

Secretary

Chair’s Office

Senior Admin

Faculty

LoungeStorage

Interior organization

Page 71: Winter Presentation

Section Cut Along an Axis

Page 72: Winter Presentation

EN

GIN

EER

Page 73: Winter Presentation

EN

GIN

EER

Page 74: Winter Presentation

CO

NSTR

UC

TIO

N

Page 75: Winter Presentation

Page 76: Winter Presentation

Roof inspired by palm tree fronds

Want to achieve a curved, light roof

Page 77: Winter Presentation

Page 78: Winter Presentation

Page 79: Winter Presentation

Page 80: Winter Presentation

Auditorium has access from both the first and second floor. Second floor walkways are visible from the interior of the auditorium.

Page 81: Winter Presentation

EN

GIN

EER

Page 82: Winter Presentation

EN

GIN

EER

””

Page 83: Winter Presentation

EN

GIN

EER

Page 84: Winter Presentation

A-E-C Discussions

Will a glass wall hold up in a hurricane?

Glass wall is expensive.

Cloth roof will not allow MEP system to be located in roof, as

typically done.

Are wooden columns available

in 2’ diameter?

Page 85: Winter Presentation

How Much Will These Alternatives Cost?

Page 86: Winter Presentation

0%

20%

40%

60%

80%

100%

Site Work

Special Construction

Electrical

Mechanical

Conveying

Interior Construction

Roofing

Exterior Closure

Superstructure

Substructure

Foundations

Cost Breakdown Comparison

Page 87: Winter Presentation

Cost Estimates

18%

1%

12%

8%1%

16%1%

23%

14%3% 3%

Foundations

Substructure

Superstructure

Exterior Closure

Roofing

Interior Construction

Conveying

Mechanical

Electrical

Special Construction

Site Work

18%

1%

12%

8%1%

17%1%

23%

14%2% 3%

Foundations

Substructure

Superstructure

Exterior Closure

Roofing

Interior Construction

Conveying

Mechanical

Electrical

Special Construction

Site Work

19%

1%

9%

8%

1%17%1%

24%

14%

3% 3%Foundations

Substructure

Superstructure

Exterior Closure

Roofing

Interior Construction

Conveying

Mechanical

Electrical

Special Construction

Site Work

0

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

$ (Millions)

R/C withComposite

Reinforcement

R/C Steel R/C withComposite

Reinforcement

R/C Steel

Cost

Budget

Budget = $ 4.33 MCost = $ 4.7-4.9 M

Page 88: Winter Presentation

Cost Estimates

12%1%

13%

8%

1%

17%2%

25%

15%

3% 3%Foundations

Substructure

Superstructure

Exterior Closure

Roofing

Interior Construction

Conveying

Mechanical

Electrical

Special Construction

Site Work

12%1%

15%

8%

1%

17%2%

24%

14%

3% 3%Foundations

Substructure

Superstructure

Exterior Closure

Roofing

Interior Construction

Conveying

Mechanical

Electrical

Special Construction

Site Work

12%1%

12%

8%

1%

18%2%

24%

15%

4% 3%Foundations

Substructure

Superstructure

Exterior Closure

Roofing

Interior Construction

Conveying

Mechanical

Electrical

Special Construction

Site Work

0

0.5

1

1.5

2

2.5

3

3.5

4

4.5

$ (Millions)

R/C Wallswith

CompositeReinforced

Timber

R/C R/C withTimber

Framing

R/C Wallswith

CompositeReinforced

Timber

R/C R/C withTimber

Framing

Cost

Budget

Cost = $ 3.7-3.8 MBudget = $ 4.33 M

Page 89: Winter Presentation

Cost Estimates

16%

1%

13%

12%

1%16%1%

21%

13%3% 3%

Foundations

Substructure

Superstructure

Exterior Closure

Roofing

Interior Construction

Conveying

Mechanical

Electrical

Special Construction

Site Work

17%

1%

10%

13%

1%16%

2%

21%

13%3% 3%

Foundations

Substructure

Superstructure

Exterior Closure

Roofing

Interior Construction

Conveying

Mechanical

Electrical

Special Construction

Site Work

0

0.5

1

1.5

2

2.5

3

3.5

4

4.5

$ (Millions)

R/C Walls withComposite Reinforced

Concrete

R/C Walls with SteelFraming

R/C Walls withComposite Reinforced

Concrete

R/C Walls with SteelFraming

Cost

Budget

Cost = $ 4.3-4.4 MBudget = $ 4.33 M

Page 90: Winter Presentation

Cost Estimates

5% 1%

14%

12%

2%

18%2%

25%

15%

3% 3%Foundations

Substructure

Superstructure

Exterior Closure

Roofing

Interior Construction

Conveying

Mechanical

Electrical

Special Construction

Site Work

5% 1%

17%

12%

2%

17%2%

24%

14%

3% 3%Foundations

Substructure

Superstructure

Exterior Closure

Roofing

Interior Construction

Conveying

Mechanical

Electrical

Special Construction

Site Work

0

0.5

1

1.5

2

2.5

3

3.5

4

4.5

$ (Millions)

R/C Walls with SteelFraming

Timber Walls withTimber Framing

R/C Walls with SteelFraming

Timber Walls withTimber Framing

Cost

Budget

Cost = $ 3.6-3.8 MBudget = $ 4.33 M

Page 91: Winter Presentation

Site Layout

Page 92: Winter Presentation

Palm Grove

Existing Parking Lots and Roadways

Page 93: Winter Presentation

Job Trailers

Mat’ls Laydown

Temporary Easement

Mobile Crane

Page 94: Winter Presentation

Job Trailers Mat’ls Laydown

Temp. Easement

Mobile Crane

Page 95: Winter Presentation

How Long Will It Take?

Page 96: Winter Presentation

• Wood structure

• R/C in auditorium:

Sequence coordination

• Pile foundation

Page 97: Winter Presentation

Quantity

Daily Output

• RS Means Data

Page 98: Winter Presentation

• Based on Wood

Structure• 9.5 month

Page 99: Winter Presentation

8.5 9 9.5 10 10.5 11

R/C

Wood Structure

Page 100: Winter Presentation

• R/C structure• Pile foundation• Hillside excavation: 3 times backfill after

retaining wall

Page 101: Winter Presentation

• Based on R/C• 12 month

Page 102: Winter Presentation

0 2 4 6 8 10 12

R/C

Steel Framing

Page 103: Winter Presentation

• Steel structure• Glass wall in 1st floor• Spiral stair• Skylight

Page 104: Winter Presentation

• Based on steel

structure• 11.5 month

Page 105: Winter Presentation

10.5 11 11.5 12 12.5 13

Steel Structure

R/C

Page 106: Winter Presentation

• Steel truss• Canvas roof: vyl.

coated polyester fabric shell

Page 107: Winter Presentation

• Based on wood structure, canvas roof

• 9 month

Page 108: Winter Presentation

7.5 8 8.5 9

Wood Structure

Steel Structure

Page 109: Winter Presentation

Does it meet affinity requirements?

Safe?View requirements?

Meet Budget?

OP

TIO

N C

OM

PA

RIS

ON

S

Exciting Statement?

Complexity

Best Choice

Page 110: Winter Presentation

Our Choice

Page 111: Winter Presentation

ISLA

ND

20

00

Reasons

• Owner preferred modern look for school

• Cost is Right Around Budget (Challenge)

• Easier Site Access

• Its OUR Design

Page 112: Winter Presentation

Any Questions?

Thank You For Your Time


Recommended