GOVERNMENT OF BERMUDA Drawings and Reference Documents Ministry of Public Works Project No. 90-05-76 Works and Engineering Winton Hill Railway Trail Rock Cut Stabilization Winton Hill Railway Trail Rock Cut Stabilization Bermuda Annex D Drawings and Reference Documents Date: September 13, 2017 Project No. 90-05-76
Transcript
Page 1: Winton Hill Railway Trail Rock Cut Stabilization D...GOVERNMENT OF BERMUDA Drawings and Reference Documents Ministry of Public Works Project No. 90-05-76 Works and Engineering Winton

GOVERNMENT OF BERMUDA

Drawings and Reference Documents

Ministry of Public Works Project No. 90-05-76 Works and Engineering Winton Hill Railway Trail Rock Cut Stabilization

Winton Hill Railway Trail

Rock Cut Stabilization

Bermuda

Annex D Drawings and Reference Documents

Date: September 13, 2017

Project No. 90-05-76

Page 2: Winton Hill Railway Trail Rock Cut Stabilization D...GOVERNMENT OF BERMUDA Drawings and Reference Documents Ministry of Public Works Project No. 90-05-76 Works and Engineering Winton
mmurphy
Polygon
mmurphy
Callout
Work Area Both Sides of Railway Trail, West from the Concrete wall to the Parish Marker on the East, from the top of the slope to the bottom of the slope.
mmurphy
Line
mmurphy
Line
mmurphy
Callout
Block wall to remain or to be replaced if it disturbed
mmurphy
Callout
Existing Cess Pit with possible seepage into sand pocket on rock cut face
mmurphy
Line
Page 3: Winton Hill Railway Trail Rock Cut Stabilization D...GOVERNMENT OF BERMUDA Drawings and Reference Documents Ministry of Public Works Project No. 90-05-76 Works and Engineering Winton

FIGURE 1GOOGLE EARTH AERIAL PHOTO - WINTON HILL AREA

ROCK CUT HAZARD AREA(~ 100 m long)

Page 4: Winton Hill Railway Trail Rock Cut Stabilization D...GOVERNMENT OF BERMUDA Drawings and Reference Documents Ministry of Public Works Project No. 90-05-76 Works and Engineering Winton

FIGURE 2SITE PHOTO - WINTON HILL SITE - LOOKING WEST

SITE PHOTO LOOKING WESTILLUSTRATING AREA OF CONCERN

ROCK AND DEBRIS AT TOE OF SLOPE BEHIND CHAIN-LINK FENCE FROM HISTORICAL FAILURES

PHOTO DATE:APRIL 10, 2017

Page 5: Winton Hill Railway Trail Rock Cut Stabilization D...GOVERNMENT OF BERMUDA Drawings and Reference Documents Ministry of Public Works Project No. 90-05-76 Works and Engineering Winton

FIGURE 3SITE PHOTO - LOOKING SOUTH

PANORAMIC PHOTO OF SITE LOOKING SOUTHILLUSTRATING KARSTIC CAVE FEATURES

PHOTO DATE:APRIL 10, 2017

Page 6: Winton Hill Railway Trail Rock Cut Stabilization D...GOVERNMENT OF BERMUDA Drawings and Reference Documents Ministry of Public Works Project No. 90-05-76 Works and Engineering Winton

FIGURE 4SITE PHOTO - LOOKING WEST

PHOTO HIGHLIGHTING POTENTIALLY UNSTABLE ROCK

ORIGINAL PHOTO(LOOKING WEST)

PHOTO DATE:APRIL 10, 2017

Page 7: Winton Hill Railway Trail Rock Cut Stabilization D...GOVERNMENT OF BERMUDA Drawings and Reference Documents Ministry of Public Works Project No. 90-05-76 Works and Engineering Winton

FIGURE 5SITE PHOTO - LOOKING EAST

PHOTO HIGHLIGHTING POTENTIALLY UNSTABLE ROCK

ORIGINAL PHOTO(LOOKING EAST)

PHOTO DATE:APRIL 10, 2017

Page 8: Winton Hill Railway Trail Rock Cut Stabilization D...GOVERNMENT OF BERMUDA Drawings and Reference Documents Ministry of Public Works Project No. 90-05-76 Works and Engineering Winton

FIGURE 6SITE PHOTO - LOOKING EAST

ORIGINAL PHOTO(LOOKING EAST)

SITE PHOTO LOOKING EASTILLUSTRATING AREA OF CONCERN

ROCK AND DEBRIS AT TOE FROM HISTORICAL FAILURES

PHOTO DATE:APRIL 27, 2017

Page 9: Winton Hill Railway Trail Rock Cut Stabilization D...GOVERNMENT OF BERMUDA Drawings and Reference Documents Ministry of Public Works Project No. 90-05-76 Works and Engineering Winton

FIGURE 7SITE PHOTO - LOOKING SOUTH

PANORAMIC PHOTO OF WESTERN SECTION OF SITE LOOKING SOUTH

ILLUSTRATING KARSTIC CAVE FEATURES

PHOTO DATE:APRIL 27, 2017

KARST CAVE EXTENDING HORIZONTALLY INTO SLOPE

Page 10: Winton Hill Railway Trail Rock Cut Stabilization D...GOVERNMENT OF BERMUDA Drawings and Reference Documents Ministry of Public Works Project No. 90-05-76 Works and Engineering Winton

FIGURE 8SITE PHOTO - LOOKING WEST

PHOTO HIGHLIGHTING POTENTIALLY UNSTABLE ROCK

ORIGINAL PHOTO(LOOKING WEST)

PHOTO DATE:APRIL 27, 2017

Page 11: Winton Hill Railway Trail Rock Cut Stabilization D...GOVERNMENT OF BERMUDA Drawings and Reference Documents Ministry of Public Works Project No. 90-05-76 Works and Engineering Winton

FIGURE 9SITE PHOTO - LOOKING WEST

PHOTO HIGHLIGHTING POTENTIALLY UNSTABLE ROCK

ORIGINAL PHOTO(LOOKING WEST)

PHOTO DATE:APRIL 27, 2017

Page 12: Winton Hill Railway Trail Rock Cut Stabilization D...GOVERNMENT OF BERMUDA Drawings and Reference Documents Ministry of Public Works Project No. 90-05-76 Works and Engineering Winton
jonichols
Line
jonichols
Line
jonichols
Text Box
Section 1
jonichols
Text Box
Section 2
Page 13: Winton Hill Railway Trail Rock Cut Stabilization D...GOVERNMENT OF BERMUDA Drawings and Reference Documents Ministry of Public Works Project No. 90-05-76 Works and Engineering Winton

ELEV

ATIO

N (m

)

ELEV

ATIO

N (m

)

DISTANCE (m)SECTION 1

0

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

0

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 3636

BUILDING No. 21BLOCK R WALL

RAILWAY TRAIL

THIS DRAWING ILLUSTRATES SUPPORTING INFORMATION SPECIFIC TO A STANTEC CONSULTING LTD. REPORT AND MUST NOT BE USED FOR OTHER PURPOSES.

Client: GOVERNMENT OF BERMUDA - MINISTRY OF WORKS AND ENGINEERING

SECTION 1 (LOOKING NORTH EAST)ROCK SLOPE STABILITY ASSESSMENT WINTON HILL, REVISION 1, HAMILTON PARISH, BERMUDA

V:\1216\active\1276585786\1_cad\MODEL FILES\Survey 523800602-MODIFIED.dwg

Job No.:

Scale:

Date:

Dwn. By:

App'd By:

Dwg. No.:12765857861 : 2002017 06 19JLJN

SEC-1

Page 14: Winton Hill Railway Trail Rock Cut Stabilization D...GOVERNMENT OF BERMUDA Drawings and Reference Documents Ministry of Public Works Project No. 90-05-76 Works and Engineering Winton

ELEV

ATIO

N (m

)

ELEV

ATIO

N (m

)

DISTANCE (m)SECTION 2

0

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

0

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36

BLOCK R WALL

BUILDING No. 19 LIMITS(NORTH EAST OF SECTION)

~0.3 m~3 m

VOID AS SHOWN ON FIGURE 7.MEASURED IN THE FIELD ON MAY 27, 2017.APPROXIMATE MEASUREMENTS SHOWN ON DRAWING.

RAILWAY TRAIL

THIS DRAWING ILLUSTRATES SUPPORTING INFORMATION SPECIFIC TO A STANTEC CONSULTING LTD. REPORT AND MUST NOT BE USED FOR OTHER PURPOSES.

Client:

V:\1216\active\1276585786\1_cad\MODEL FILES\Survey 523800602-MODIFIED.dwg

Job No.:

Scale:

Date:

Dwn. By:

App'd By:

Dwg. No.:

1 : 2002017 06 19

GOVERNMENT OF BERMUDA - MINISTRY OF WORKS AND ENGINEERING

SECTION 2 (LOOKING NORTH EAST)ROCK SLOPE STABILITY ASSESSMENT WINTON HILL, REVISION 1, HAMILTON PARISH, BERMUDA

1276585786

JLJN

SEC-2

Page 15: Winton Hill Railway Trail Rock Cut Stabilization D...GOVERNMENT OF BERMUDA Drawings and Reference Documents Ministry of Public Works Project No. 90-05-76 Works and Engineering Winton

INSTALL 4.5 m ROCK ANCHOR TO WITHINPLUS OR MINUS 10% OF THE BOLTSPACING AT 1.5 m C'C SHOWN, EACHWAY, ADJUST SPACE AS REQUIRED

100 mm ± DIA.DRILL HOLE

TYPCIAL ROCK ANCHOR DETAIL 14

WELDED WIRE MESH (4 x 4 - W5.5 x W5.5)LOCATED AT CENTER OF EACH SHOTCRETE LAYERFASTENED AND SECURED TO ROCK ANCHOR

50 mm MIN. SHOTCRETE COVERON ROCK ANCHOR/STUD

WASHERS

ROCK ANCHOR

STUDDED HEAD (100 mm x 13 mm)

ANCHOR DETAIL 24

ANCHOR HEAD

FULLY GROUTEDROCK ANCHOR

N.T.S.

25 mm X 200 mm X 200 mmBEARING PLATEGROUT

FINAL AND/ORINTERMEDIATE FACING

INITIAL FACING

200 mm ±

200 mm ±

N.T.S.

SEE DETAIL 24 5°

1.5 m

1.5 m

ROCK

SEE DETAIL 1,24

ROADROCK SLOPE ESTIMATED AT 85° 85°

ROCK

10°

10°

4.5 m LONG ROCK ANCHOR

1.5 m

1.5 m

ROCK

ROADROCK SLOPE ESTIMATED AT 85° 85°

ROCK

FINAL ARCHITECTURALSTRUCTURAL REINFORCEDSHOTCRETE LAYER 200 mm ±

10°

10°

4 m LONG DRAIN (TO BELOCATED IN THE FIELD)

1.5 m C'C SPACING

4.5 m LONG ROCK ANCHOR

INSTALL 4.5 m ROCK ANCHOR1.5 m C'C SHOWN, EACH WAY

VOID FILLING SHOTCRETEOR DENTAL CONCRETE

TYPCIAL SHOTCRETE SECTION DETAIL WITH VOIDFILLING SHOTCRETE OR DENTAL CONCRETE 3

4N.T.S.TYPCIAL SHOTCRETE SECTION DETAIL 4

4N.T.S.

SEE DETAIL 1,24

FINAL ARCHITECTURALSTRUCTURAL REINFORCEDSHOTCRETE LAYER 200 mm ±

INSTALL 4.5 m ROCK ANCHOR1.5 m C'C SHOWN, EACH WAY

4 m LONG DRAIN (TO BELOCATED IN THE FIELD)

1.5 m C'C SPACING

V:\

1216

\act

ive\

1276

5857

86\1

_cad

\SHE

ET F

ILES

\127

6585

786_

BWP_

DW

G-4

_R1.

dw

g

Reference:

THIS DRAWING ILLUSTRATES SUPPORTING INFORMATION SPECIFIC TO A STANTEC CONSULTING LTD. REPORTAND MUST NOT BE USED FOR OTHER PURPOSES.

-

Client: GOVERNMENT OF BERMUDA

SHOTCRETE AND ROCK ANCHOR DETAILSBLACK WATCH PASS ROCK SLOPE STABILIZATION

PEMBROKE PARISH, BERMUDA

Job No.:

Scale:

Date:

Dwn. By:

App'd By:

Dwg. No.:1276585786N.T.S.2017 09 28JLJN

4

NOTES:

1. INSTALL ROCK ANCHORS AT LOCATIONS AS PER SPECIFICATIONS AND DRAWINGS. FACE PLATES AND TENSIONING NOTCOMPLETED AT THIS STAGE. ENSURE ROCK ANCHORS ARE INSTALLED TO DEPTHS ENSURING FREE LENGTH END IS WITHIN±50 mm OF THE FINAL SHOTCRETE FACE. REFER TO ANCHOR DETAIL 2/4.

2. FILL VOIDS WITH SHOTCRETE OR DENTAL CONCRETE AT LOCALIZED DEEP CAVITIES WHERE REQUIRED. PLACE VOIDFILLING SHOTCRETE IN MULTIPLE LAYERS IN ±200 mm LAYERS. DO NOT ENCROACH WITHIN STRUCTURAL LAYER.LOCATION TO BE DETERMINED IN THE FIELD.

3. FOLLOWING PLACEMENT AND CURE OF VOID FILL, FIRST LAYER OF STRUCTURAL SHOTCRETE SHOULD BE INSTALLED.

4. FOLLOWING INSTALLATION OF INITIAL SHOTCRETE LAYER, COMPLETE ROCK ANCHOR INSTALLATION WITH FACE PLATE,WASHERS, AND NUTS. TENSION ROCK ANCHORS TO NOMINAL 45 KN AS PER SPECIFICATION.

5. ADDITIONAL LAYERS OF STRUCTURAL SHOTCRETE, AS REQUIRED AS SHOWN ON THE DRAWING SHOULD BE INSTALLED.

6. FINAL LAYER OF SHOTCRETE REFERRED TO AS “ARCHITECTURAL SHOTCRETE”, MEANING THE FINAL LAYER SHALL HAVE ACOLOUR AND FACE TEXTURE/PATTERN AS PER THE SPECIFICATIONS.

7. DRAIN HOLES DRAINAGE PIPES SHOULD BE INSTALLED AFTER ARCHITECTURAL SHOTCRETE IS CURED.

8. DRAIN HOLES SHALL BE COVERED WITH A GALVANIZED WIRE MESH NETTING (BIRD SCREENS) HAVING A NOMINAL 5 mmOPENEING TO PREVENT BIRDS FROM ENTERING THE HOLES.