Wisconsin Department of Transportation
Version 06-2014 Solving tomorrow’s transportation challenges
Division of Transportation Systems Development Bureau of Project Development 4802 Sheboygan Avenue, Rm 601 P O Box 7916 Madison, WI 53707-7916 Telephone: (608) 266-1631 Facsimile (FAX): (608) 266-8459
March 6, 2017
NOTICE TO ALL CONTRACTORS: Proposal #30: 1570-02-73, WISC 2017 117
V Turtle Lake, USH 8 CTH K/Norway Street Intersection USH 8 Barron County
1570-02-75, WISC 2017 118 V Turtle Lake, USH 8 USH 63 E Jct/Maple St Intersection USH 8 Barron County
Letting of March 14, 2017 This is Addendum No. 01, which provides for the following: Special Provisions:
Revised Special Provisions Article
No. Description
05 Holiday Work Restrictions Schedule of Items:
Revised Bid Item Quantities
Bid Item Item Description Unit Old
Quantity Revised Quantity
Proposal Total
305.0120 Base Aggregate Dense 1 1/4 – Inch TON 23,578 -35 23,543 455.0605 Tack Coat GAL 2,434 -1 2,433 465.0105 Asphaltic Surface TON 384 -5 379 601.0411 Concrete Curb & Gutter 30-Inch Type D LF 2,730 -50 2,680 643.0410 Traffic Control Barricades Type II DAY 377 360 737 643.1050 Traffic Control Signs PCMS DAY 92 360 452 643.3000 Traffic Control Detour Signs DAY 5,252 360 5,612 690.0150 Sawing Asphalt LF 6,585 -74 6,511
Added Bid Item Quantities
Bid Item Item Description Unit Old
Quantity Revised Quantity
Proposal Total
643.1051 Traffic Control PCMS with Cellular Communications
DAY 0 360 360
Plan Sheets: ID 1570-02-73
Revised Plan Sheets Plan
Sheet Plan Sheet Title (brief description of changes to sheet)
38 Updated sheet to include staking information for point 126 on Cherry Street due revised C&G location.
42 Revised detail sheet to remove point number 511 due to revision of C&G on Cherry Street.
47 Revised driveway detail to remove a section of C&G on Cherry Street and match into existing pavement surface on the north side of the driveway.
138 Updated quantities of Base Aggregate and HMA Pavement.
139 Updated quantities of Concrete Curb & Gutter, Base Aggregate, Asphaltic Surface, Tack Coat, and Sawing Asphalt
148 Updated quantity of Traffic Control Signs Fixed Message
149 Updated quantity of Traffic Control Signs PCMS and PCMS with Cellular Communications. Additional quantity of Traffic Control Detour Signs item.
The responsibility for notifying potential subcontractors and suppliers of these changes remains with the prime contractor.
Sincerely,
Mike Coleman Proposal Development Specialist Proposal Management Section
ADDENDUM NO. 01
1570-02-73 & 1570-02-75
March 6, 2017
Special Provisions 5. Holiday Work Restrictions. Replace entire article language with the following.
Do not perform work on, nor haul materials of any kind along or across any portion of the highway carrying USH 8 traffic, and entirely clear the traveled way and shoulders of such portions of the highway of equipment, barricades, signs, lights, and any other material that might impede the free flow of traffic during the following holiday periods: From noon Friday, May 26, 2017 to 6:00 AM Tuesday, May 30, 2017; From noon Friday, June 30, 2017 to 6:00 AM Wednesday, July 5, 2017; From noon Friday, September 1, 2017 to 6:00 AM Tuesday, September 5, 2017; Do not haul materials of any kind along or across any portion of the highway carrying USH 8 traffic, nor impede the free flow of traffic during the weekend periods between Friday at 3:00 PM to Monday at 6:00 AM each weekend between Memorial Day and Labor Day unless prior authorization is approved by the engineer.
Schedule of Items Attached, dated March 6, 2017, are the revised Schedule of Items Pages 2, 3, 9, 10, 14, and 17. Plan Sheets The following 8½ x 11-inch sheets are attached and made part of the plans for this proposal: Revised (1570-02-73): 38, 42, 47, 138, 139, 148, and 149.
END OF ADDENDUM
(465.0
315)
*(465.0
310)
AS
PH
ALTIC
AS
PH
ALTIC
FLU
ME
SC
UR
B
CA
TE
GO
RY
STA
TIO
NLO
CA
TIO
NS
YL
F
00
10
601+
87"C
H"
RT
36
36
*AD
DIT
ION
AL
QU
AN
TIT
IES
FO
UN
D E
LS
EW
HE
RE
PR
OJE
CT
TO
TA
LS
AS
PH
ALTIC
FLU
ME
(SP
V.0
195
.01)
CA
TE
GO
RY
STA
TIO
NTO
STA
TIO
NL
OC
AT
ION
TO
N
00
10
1291+
16"E
B"
1292
+87"E
B"
LT &
RT
200
200
EXC
AV
AT
ION
, H
AU
LIN
G,
AN
D D
ISP
OS
AL
OF
PE
TR
OLE
UM
CO
NTA
MIN
AT
ED
SO
IL
PR
OJE
CT
TO
TA
L
*(30
5.0
12
0)
*(40
5.0
10
0)
(416.0
512)
BA
SE
AG
GR
EG
AT
EC
OL
OR
ING
CO
NC
RE
TE
DE
NS
E 1
1/4
-IN
CH
CO
NC
RE
TE
TR
UC
K A
PR
ON
WIS
DO
T R
ED
12-IN
CH
CA
TE
GO
RY
STA
TIO
NTO
STA
TIO
NT
ON
CY
SY
00
10
7+
23"C
"10+
89"C
"221
157
470
221
157
470
*AD
DIT
ION
AL
QU
AN
TIT
IES
FO
UN
D E
LS
EW
HE
RE
PR
OJ
EC
T T
OT
AL
S
CO
NC
RE
TE
RO
UN
DA
BO
UT
TR
UC
K A
PR
ON
(SP
V.0
16
5.0
1)
(SP
V.0
090.1
0)
(SP
V.0
035
.01)
WA
LL M
OD
UL
AR
BLO
CK
RA
ILIN
GD
EC
OR
AT
IVE
ME
CH
AN
ICA
LLY
STA
BIL
IZE
DP
ED
ES
TR
IAN
STE
EL
STO
NE
MU
LC
H
EA
RT
H L
RF
D/Q
MP
CA
TE
GO
RY
STA
TIO
NT
O S
TA
TIO
NS
FL
FC
Y
00
10
70+
17
"WL"
72+
03
"WL"
672
120
3
672
120
3P
RO
JE
CT
TO
TA
LS
WA
LL M
OD
UL
AR
BLO
CK
ME
CH
AN
ICA
LL
Y S
TA
BIL
IZE
D E
AR
TH
LR
FD
/QM
P
*(305
.0110
)*(
305.0
120)
(624.0
100)
(208.1
100)
BA
SE
AG
GR
EG
ATE
BA
SE
AG
GR
EG
ATE
WA
TE
RS
ELE
CT
DE
NS
E 3
/4-I
NC
HD
EN
SE
1 1
/4-IN
CH
BO
RR
OW
CA
TE
GO
RY
STA
TIO
NTO
STA
TIO
NLO
CA
TIO
NT
ON
TO
NM
GA
LC
Y
00
10
1285+
39"E
B"
1298
+11"E
B"
LT &
RT
-5,5
27
77
3,6
10
10+
00"P
R"
12+
96"P
R"
LT &
RT
21
76
011
-
14+
56"P
R"
17+
11"P
R"
LT &
RT
-73
310
-
300+
63"N
"303
+35"N
"LT &
RT
-72
910
-
200+
94"S
L"
203
+62"S
L"
LT &
RT
943
16
-
600+
41"C
H"
605
+28"C
H"
LT &
RT
10
10
31
-
40
8,2
83
116
3,6
10
*AD
DIT
ION
AL Q
UA
NTIT
IES
FO
UN
D E
LS
EW
HE
RE
NO
TE
: W
ATE
R B
ID ITE
M T
O B
E U
SE
D F
OR
BA
SE
AG
GR
EG
AT
E D
US
T C
ON
TR
OL A
ND
CO
MP
AC
TIO
N
BA
SE
AG
GR
EG
ATE
PR
OJ
EC
T T
OT
AL
S
(460.6
443)
(46
0.6
44
4)
(460.7
443)
(460.7
644)
(450
.4000
)*(
45
5.0
60
5)
*(690
.0150
)
HM
AH
MA
HM
AH
MA
HM
A C
OL
DT
AC
KS
AW
ING
PA
VE
ME
NT
PA
VE
ME
NT
PA
VE
ME
NT
PA
VE
ME
NT
WE
ATH
ER
CO
AT
AS
PH
ALT
3 M
T 5
8-3
4 H
4 M
T 5
8-3
4 H
3 H
T 5
8-3
4 H
4 H
T 5
8-3
4 V
PA
VIN
G
CA
TE
GO
RY
STA
TIO
NTO
STA
TIO
NL
OC
ATIO
NTO
NTO
NTO
NTO
NT
ON
GA
LL
F
00
10
12
85+
39"E
B"
12
98+
11"E
B"
LT &
RT
--
4,1
22
1,3
74
1,3
74
981
182
10+
00
"PR
"1
2+
96"P
R"
LT &
RT
267
118
--
-53
33
14+
56
"PR
"1
7+
11"P
R"
LT &
RT
268
119
--
-53
45
300+
63"N
"3
03+
35"N
"LT &
RT
264
117
--
-52
114
200+
94
"SL"
203+
62
"SL"
LT &
RT
-142
--
-36
-
600+
41
"CH
"60
5+
28
"CH
"LT &
RT
14
255
--
270
10
-
813
753
4,1
22
1,3
74
1,6
44
1,1
86
374
*AD
DIT
ION
AL
QU
AN
TIT
IES
FO
UN
D E
LS
EW
HE
RE
PR
OJE
CT
TO
TA
LS
HM
A P
AV
EM
EN
T
(601.0
405)
(SP
V.0
090.0
2)
(SP
V.0
090.0
3)
(601
.041
1)
(SP
V.0
090.0
1)
(SP
V.0
090
.04)
(SP
V.0
09
0.0
7)
(601.0
600)
(650
.5500
)(S
PV
.0090
.08)
CO
NC
RE
TE
CU
RB
CO
NC
RE
TE
CU
RB
CO
NC
RE
TE
CU
RB
CO
NC
RE
TE
CU
RB
CO
NC
RE
TE
CU
RB
CO
NC
RE
TE
CU
RB
CO
NC
RE
TE
CU
RB
CO
NC
RE
TE
CO
NS
TR
UC
TIO
N S
TA
KIN
GC
ON
CR
ETE
CU
RB
& G
UT
TE
R 1
8-IN
CH
& G
UTTE
R 2
4-IN
CH
& G
UTTE
R 2
4-IN
CH
& G
UTTE
R 3
0-IN
CH
& G
UT
TE
R 3
0-IN
CH
& G
UTT
ER
4-I
NC
H&
GU
TTE
R H
ES
CU
RB
CU
RB
GU
TTE
R A
ND
& G
UTTE
R
TY
PE
ATY
PE
D S
PE
CIA
LTY
PE
D S
PE
CIA
LTY
PE
DTY
PE
D S
PE
CIA
LS
LO
PE
D 3
6-I
NC
H30-IN
CH
TY
PE
DP
ED
ES
TR
IAN
CU
RB
& G
UTTE
RC
UR
E A
ND
SE
AL
12-I
NC
H H
EA
DTY
PE
R S
PE
CIA
LS
PE
CIA
LTR
EA
TM
EN
T
CA
TE
GO
RY
STA
TIO
NT
O S
TA
TIO
NLO
CA
TIO
NLF
LF
LF
LF
LF
LF
LF
LF
LF
LF
0010
128
5+
42
"EB
"12+
96
"PR
"R
T/L
T-
--
-630
--
-300
630
128
5+
34"W
B"
300+
63"N
"L
T-
--
-535
--
-260
535
128
7+
07"W
B"
300+
75"N
"LT (
DR
IVE
WA
Y)
--
360
--
--
-360
360
128
7+
39
"EB
"1
289+
56"E
B"
SP
LIT
TE
R IS
LA
ND
--
--
475
--
70
160
475
30
0+
02
"N"
300+
44"N
"S
PL
ITTE
R IS
LA
ND
--
--
75
--
20
-75
40
0+
40
"K"
401+
27"K
"S
PL
ITTE
R IS
LA
ND
--
--
210
--
60
-210
129
1+
27
"EB
"1
291+
88"E
B"
SP
LIT
TE
R IS
LA
ND
--
--
140
--
50
-140
7+
23"C
"10+
89"C
"C
EN
TE
R C
IRC
LE
255
--
--
355
--
-610
14
+56"P
R"
1297+
51"E
B"
LT
/RT
--
--
850
--
-530
850
129
7+
84
"EB
"1
298+
11"E
B"
RT
--
--
45
--
-45
45
30
0+
63
"N"
1298+
11"E
B"
RT
/LT
--
--
765
--
-765
765
30
1+
15
"N"
10+
13
"NE
"R
T-
--
160
--
--
160
160
129
3+
12
"EB
"1
296+
53"E
B"
LT
--
-340
--
-10
350
340
129
3+
57
"EB
"1
295+
15"E
B"
RT
-1
60
--
--
--
160
160
10
+00"P
R"
12+
96
"PR
"R
T-
--
300
--
--
300
300
11
+68"P
R"
12+
99
"PR
"R
T-
--
150
--
--
150
150
12
+96"P
R"
14+
56
"PR
"R
T-
--
175
160
--
-335
335
14
+56"P
R"
17+
11
"PR
'R
T-
--
250
--
--
250
250
12
+40"P
R"
12+
96"P
RL
T-
--
55
--
--
55
55
14
+56"P
R"
17+
11
"PR
"L
T-
--
260
--
--
260
260
30
0+
63
"N"
203+
62"S
L"
LT
/RT
--
-210
--
--
75
210
30
0+
63
"N"
303+
20"N
"R
T-
--
280
--
--
170
280
20
0+
46"S
L"
200+
63"S
L"
LT
--
-30
--
--
30
30
605
+28"C
H"
302+
91
"C
H"
LT
--
-340
--
--
340
340
601
+90"C
H"
602+
51"C
H"
RT
--
-105
--
--
105
105
601
+98"C
H"
602+
53"C
H"
LT
--
-25
--
--
25
25
--
--
--
100
--
-
255
160
360
2,6
80
3,8
85
355
100
210
5,1
85
7,6
95
NO
TE
: B
AS
E A
GG
RE
GA
TE
DE
NS
E 1
1/4
-IN
CH
UN
DE
R T
HE
CU
RB
& G
UT
TE
R I
S IN
CLU
DE
D W
ITH
TH
E H
MA
PA
VE
ME
NT A
ND
CO
NC
RE
TE
TR
UC
K A
PR
ON
BID
IT
EM
S
PR
OJ
EC
T T
OT
AL
S
UN
DIS
TR
IBU
TE
D
CO
NC
RE
TE
CU
RB
& G
UTTE
R
*(305.0
110)
*(305
.0120
)(4
65.0
105)
*(455.0
605)
(416
.0170
)*(
69
0.0
150)
(SP
V.0
180.0
1)
BA
SE
AG
GR
EG
ATE
BA
SE
AG
GR
EG
ATE
AS
PH
ALTIC
TA
CK
CO
NC
RE
TE
SA
WIN
GC
ON
CR
ETE
DR
IVE
WA
Y
DE
NS
E 3
/4-IN
CH
DE
NS
E 1
1/4
-IN
CH
SU
RF
AC
EC
OA
TD
RIV
EW
AY
A
SP
HA
LT
CU
RE
AN
D S
EA
L
7-I
NC
HTR
EA
TM
EN
T
CA
TE
GO
RY
ST
ATIO
NT
O S
TA
TIO
NL
OC
AT
ION
TO
NT
ON
TO
NG
AL
SY
LF
SY
00
10
1293
+38"E
B"
-R
T-
74
45
13
42
141
42
1295
+33"E
B"
-R
T-
78
48
14
42
124
42
13+
58"P
R"
-R
T6
303
94
27
-40
-
16+
10"P
R"
-R
T-
13
31
30
45
30
16+
61"P
R"
-LT
-2
10
-15
-
300
+95"N
"-
LT
-25
41
62
55
62
301
+51"N
"-
LT
-14
31
33
67
33
202+
27"S
L"
-R
T-
31
24
7-
--
602+
30"C
H"
-R
T-
274
82
24
-221
-
603+
72"C
H"
-LT
-1
51
-23
-
301
+15"N
"1
0+
13
"NE
"R
T-
32
14
4-
155
-
1293
+12"E
B"
1296+
53"E
B"
LT
-80
33
9-
351
-
10+
00"P
R"
10+
96
"PR
"R
T-
22
17
5-
100
-
11+
68"P
R"
13+
15
"PR
"R
T-
23
51
-254
-
14+
00"P
R"
14+
45
"PR
"R
T-
--
--
63
-
69
73
37
911
02
09
1,6
54
209
*AD
DIT
ION
AL Q
UA
NTIT
IES
FO
UN
D E
LS
EW
HE
RE
PR
OJE
CT
TO
TA
LS
DR
IVE
WA
YS
AN
D P
AR
KIN
G L
OT
S
(64
4.1
41
0.S
)(6
44.1
601.S
)(6
44.1
61
6.S
)
TE
MP
OR
AR
YT
EM
PO
RA
RY
TE
MP
OR
AR
Y
PE
DE
STR
IAN
CU
RB
RA
MP
PE
DS
TR
IAN
SU
RF
AC
E A
SP
HA
LT
SA
FE
TY
FE
NC
E
CA
TE
GO
RY
DE
SC
RIP
TIO
NS
FE
AC
HLF
001
0S
TA
GE
1B
- U
SH
8/C
HE
RR
Y S
TR
EE
T IN
TE
RS
EC
TIO
N800
3140
ST
AG
ES
2A
& 2
B -
US
H 8
/CH
ER
RY
ST
RE
ET
IN
TE
RS
EC
TIO
N25
1-
STA
GE
3 -
US
H 8
/CH
ER
RY
STR
EE
T IN
TE
RS
EC
TIO
N25
1-
STA
GE
S 2
A &
2B
- C
AS
INO
PA
RK
ING
LO
T-
-860
PR
OJE
CT
TO
TA
LS
850
51,0
00
PE
DE
STR
IAN
AC
CE
SS
*(646
.0600
)(6
49.0
801)
(649.0
803)
(64
9.0
90
0)
(649
.1800
)(6
49.2
000
)
RE
MO
VIN
GTE
MP
OR
AR
YTE
MP
OR
AR
YTE
MP
OR
AR
YT
EM
PO
RA
RY
TE
MP
OR
AR
Y
PA
VE
ME
NT
PA
VE
ME
NT
MA
RK
ING
PA
VE
ME
NT
MA
RK
ING
PA
VE
ME
NT M
AR
KIN
GP
AV
EM
EN
T M
AR
KIN
GP
AV
EM
EN
T M
AR
KIN
G
MA
RK
ING
S(Y
ELLO
W)
(WH
ITE
)(Y
ELLO
W)
(WH
ITE
)R
EM
OV
AB
LE
TA
PE
EP
OXY
STO
P L
INE
A
RR
OW
SW
OR
DS
8-IN
CH
8-IN
CH
12-IN
CH
RE
MO
VA
BLE
TA
PE
RE
MO
VA
BLE
TA
PE
CA
TE
GO
RY
DE
SC
RIP
TIO
NTO
DE
SC
RIP
TIO
NL
FLF
LF
LF
LF
LF
LF
LF
EA
CH
EA
CH
0010
ST
AG
E 1
B
STA
GIN
G L
IMIT
SU
SH
8/C
HE
RR
Y S
TR
EE
T IN
TE
RS
EC
TIO
N2,3
45
3,1
70
540
510
-96
0110
100
93
US
H 8
/CH
ER
RY
ST
RE
ET IN
TE
RS
EC
TIO
N U
SH
8 P
RO
JEC
T 1
570
-02-7
3 L
IMIT
S1,6
65
1,6
50
360
2,3
80
2,2
30
26
5300
25
52
ST
AG
E 2
A
US
H 8
/CH
ER
RY
ST
RE
ET IN
TE
RS
EC
TIO
N U
SH
8 P
RO
JEC
T 1
570
-02-7
3 L
IMIT
S-
200
265
2,3
20
2,4
10
-100
25
31
ST
AG
E 2
B
US
H 8
/CH
ER
RY
ST
RE
ET IN
TE
RS
EC
TIO
N U
SH
8 P
RO
JEC
T 1
570
-02-7
3 L
IMIT
S-
--
1,2
20
100
25
0-
25
21
ST
AG
E 3
US
H 8
/CH
ER
RY
ST
RE
ET IN
TE
RS
EC
TIO
N U
SH
8 P
RO
JEC
T 1
570
-02-7
3 L
IMIT
S-
880
150
1,5
35
1,2
75
-360
40
42
490
625
160
870
650
17
5130
35
53
-6,5
25
1,4
75
8,8
35
6,6
65
--
--
-
4,5
00
1,6
50
1,0
00
250
28
12
*AD
DIT
ION
AL Q
UA
NTIT
IES
FO
UN
D E
LS
EW
HE
RE
TE
MP
OR
AR
Y P
AV
EM
EN
T M
AR
KIN
GS
(649.0
403)
EP
OXY
4-IN
CH
SU
BT
OT
AL
S
PR
OJE
CT
TO
TA
LS
15,5
00
TE
MP
OR
AR
Y P
AV
EM
EN
T M
AR
KIN
G
(649.0
400)
TE
MP
OR
AR
Y P
AV
EM
EN
T M
AR
KIN
G
RE
MO
VA
BLE
TA
PE
4-IN
CH
8,0
00
UN
DIS
TR
IBU
TE
D
(643.0
300)
(643.0
410)
(643.0
420)
(643.0
500)
(643.0
600)
(643.0
705)
(643.0
715)
(643.0
900)
(643.1
000)
(643.0
100)
TR
AF
FIC
TR
AF
FIC
CO
NTR
OL
TR
AF
FIC
CO
NTR
OL
TR
AF
FIC
CO
NTR
OL
TR
AF
FIC
CO
NTR
OL
TR
AF
FIC
CO
NTR
OL
TR
AF
FIC
CO
NTR
OL
TR
AF
FIC
TR
AF
FIC
CO
NTR
OL
TR
AF
FIC
CO
NTR
OL
BA
RR
ICA
DE
SB
AR
RIC
AD
ES
BA
RR
ICA
DE
SB
AR
RIC
AD
ES
FLE
XIB
LE
TU
BU
LA
RF
LE
XIB
LE
TU
BU
LA
RW
AR
NIN
G L
IGH
TS
WA
RN
ING
LIG
HTS
WA
RN
ING
LIG
HTS
WA
RN
ING
LIG
HTS
CO
NTR
OL
SIG
NS
FIX
ED
CO
NTR
OL
DR
UM
SD
RU
MS
TY
PE
II
TY
PE
II
TY
PE
III
TY
PE
III
MA
RK
ER
PO
STS
MA
RK
ER
BA
SE
STY
PE
ATY
PE
ATY
PE
CTY
PE
CS
IGN
SS
IGN
SM
ES
SA
GE
(PR
OJE
CT)
CA
TE
GO
RY
DE
SC
RIP
TIO
NN
O.
DE
VIC
ES
DA
YN
O.
DE
VIC
ES
DA
YN
O.
DE
VIC
ES
DA
YE
AC
HE
AC
HN
O.
DE
VIC
ES
DA
YN
O.
DE
VIC
ES
DA
YN
O.
DE
VIC
ES
DA
YS
FE
AC
HD
UR
ATIO
N
0010
STA
GE
1A
69
2,1
39
131
12
372
--
26
806
23
713
13
403
--
31
DA
YS
STA
GE
1B
231
3,4
65
115
27
405
102
102
56
840
48
720
63
945
7.5
-15
DA
YS
STA
GE
2A
276
13,8
00
150
17
850
103
103
36
1,8
00
48
2,4
00
64
3,2
00
--
50
DA
YS
STA
GE
2B
240
6,4
80
381
27
729
121
121
60
1,6
20
51
1,3
77
70
1,8
90
--
27
DA
YS
STA
GE
3251
10,0
40
5200
38
1,5
20
79
79
86
3,4
40
53
2,1
20
75
3,0
00
--
40
DA
YS
STA
GE
4-
--
-18
18
--
36
36
--
10
10
--
1D
AY
S
STA
GE
5-
--
-11
231
--
22
462
--
9189
--
21
DA
YS
PR
OJE
CT 1
570-0
2-7
3-
--
--
--
--
--
--
--
1
INC
IDE
NT M
AN
AG
EM
EN
T-
-12
360
--
--
--
--
--
-30
DA
YS
PR
OJE
CT
TO
TA
LS
35,9
24
737
4,1
25
405
405
9,0
04
7,3
30
9,6
37
7.5
1
TR
AF
FIC
CO
NTR
OL
(SP
V.0
060
.02)
(61
1.8
12
0.S
)
TE
MP
OR
AR
YC
OV
ER
PL
ATE
S
PIP
E C
ON
NE
CTIO
NTE
MP
OR
AR
Y
CA
TE
GO
RY
DE
SC
RIP
TIO
NE
AC
HE
AC
H
001
0S
TA
GE
1A
2-
STA
GE
1B
26
PR
OJE
CT
TO
TA
LS
46
ST
OR
M S
EW
ER
STA
GIN
G
(614.0
905)
BA
CK
O
BJE
CT
CR
AS
HC
RA
SH
TE
MP
OR
AR
YW
IDTH
MA
RK
ING
TE
ST
TR
AF
FIC
TR
AF
FIC
CU
STIO
N
CA
TE
GO
RY
LO
CA
TIO
NE
AC
HF
TP
ATTE
RN
LE
VE
LD
IRE
CTIO
NL
OC
AT
ION
SH
IEL
DS
00
10
108+
78,
18' R
T1
2O
M-3
R
(WO
5-5
8R
)T
L-2
BID
IRE
CTIO
NA
LR
TB
LU
NT E
ND
OF
TE
MP
OR
AR
Y B
AR
RIE
R
110+
58,
18' R
T1
2O
M-3
R
(WO
5-5
8R
)T
L-2
BID
IRE
CTIO
NA
LR
TB
LU
NT E
ND
OF
TE
MP
OR
AR
Y B
AR
RIE
R
PR
OJE
CT
TO
TA
LS
2
CR
AS
H C
US
HIO
N
(616.0
700.S
)
CA
TE
GO
RY
DE
SC
RIP
TIO
NLF
00
10
UN
DIS
TR
IBU
TE
D500
PR
OJE
CT
TO
TA
L500
FE
NC
E S
AF
ETY
(661.0
200.0
1)
(SP
V.0
10
5.0
1)
US
H 8
&TE
MP
OR
AR
Y V
EH
ICLE
DE
TE
CTIO
N
CH
ER
RY
STR
EE
T(U
SH
8 &
CH
ER
RY
STR
EE
T)
CA
TE
GO
RY
DE
SC
RIP
TIO
NLS
LS
0010
US
H 8
& C
HE
RR
Y S
TR
EE
T1
1
PR
OJE
CT
TO
TA
LS
11
TE
MP
OR
AR
Y T
RA
FF
IC S
IGN
ALS
FO
R IN
TE
RS
EC
TIO
NS
(SP
V.0
10
5.0
3)
CA
TE
GO
RY
DE
SC
RIP
TIO
NLS
00
10
ALO
NG
TE
MP
OR
AR
Y R
OA
D (
STA
GE
2A
)1
PR
OJE
CT
TO
TA
L1
TE
MP
OR
AR
Y L
IGH
TIN
G
(603.8
000)
(603.8
125)
CO
NC
RE
TE
BA
RR
IER
CO
NC
RE
TE
BA
RR
IER
TE
MP
OR
AR
Y P
RE
CA
ST
TE
MP
OR
AR
Y P
RE
CA
ST
DE
LIE
VE
RE
DIN
STA
LLE
D
CA
TE
GO
RY
DE
SC
RIP
TIO
NL
FL
F
00
10
STA
GE
S 2
A &
2B
- U
SH
8 A
LO
NG
TH
E N
EW
FR
ON
TIE
R R
ES
TA
UR
AN
T P
AR
KIN
G L
OT
180
18
0
ST
AG
ES
2A
& 2
B -
PR
OS
SE
R A
VE
NU
E A
LO
NG
BU
S P
AR
KIN
G L
OT
170
17
0
PR
OJE
CT
TO
TA
LS
350
35
0
TE
MP
OR
AR
Y C
ON
CR
ETE
BA
RR
IER
WIT
H C
ELL
ULA
R
CO
MM
UN
CIA
TIO
N
(643.1
050)
(643.1
051)
CA
TE
GO
RY
DE
SC
RIP
TIO
NN
O.
DE
VIC
ES
DA
YD
AY
001
0U
SH
8 E
AS
TB
OU
ND
- P
RIO
R T
O C
ON
STR
UC
TIO
N1
14
-
CT
H K
/MA
RT
IN A
VE
NU
E W
ES
TB
OU
ND
- P
RIO
R T
O R
OA
D C
LO
SU
RE
17
-
AD
VA
NC
E W
AR
NIN
G,
PR
OJE
CT D
UR
ATIO
N2
360
-
AD
VA
NC
E W
AR
NIN
G,
PR
OJE
CT
DU
RA
TIO
N (
CE
LLU
LA
R)
2-
360
UN
DIS
TR
IBU
TE
D1
14
-
PR
OJE
CT
TO
TA
L3
81
360
TR
AF
FIC
CO
NTR
OL S
IGN
S P
CM
S
(643.3
000)
(643
.2000
)
TR
AF
FIC
CO
NT
RO
LTR
AF
FIC
CO
NTR
OL
DE
TO
UR
SIG
NS
DE
TO
UR
NO
.(P
RO
JEC
T)
CA
TE
GO
RY
DE
SC
RIP
TIO
NS
IGN
SD
AY
SE
AC
HD
UR
AT
ION
NO
TE
001
0S
TA
GE
414
31
43
-1
DA
YS
INC
IDE
NT M
AN
AG
EM
EN
T6
180
-30
DA
YS
M4-9
L;
AT
TA
CH
TO
TY
PE
III
BA
RR
ICA
DE
S
INC
IDE
NT M
AN
AG
EM
EN
T6
180
-30
DA
YS
M4-9
R;
AT
TA
CH
TO
TY
PE
III
BA
RR
ICA
DE
S
PR
OJE
CT 1
570
-02-7
3-
-1
-
PR
OJE
CT
TO
TA
LS
15
55
03
1
TR
AF
FIC
CO
NTR
OL D
ETO
UR
(465
.012
5)
*(4
55.0
605)
*(30
5.0
11
0)
*(3
05.0
120)
*(69
0.0
15
0)
*(690
.025
0)
*(4
65.0
310)
AS
PH
ALT
ICTA
CK
BA
SE
AG
GR
EG
AT
EB
AS
E A
GG
RE
GA
TE
SA
WIN
GS
AW
ING
AS
PH
AL
TIC
SU
RF
AC
EC
OA
TD
EN
SE
3/4
-IN
CH
DE
NS
E 1
1/4
-IN
CH
AS
PH
AL
TC
ON
CR
ET
EC
UR
B
HM
A P
AV
EM
EN
TTE
MP
OR
AR
Y
CA
TE
GO
RY
STA
TIO
NT
O S
TA
TIO
NLO
CA
TIO
NS
FTH
ICK
NE
SS
TO
NG
AL
TO
NTO
NLF
LF
LF
00
10
100
+59
113
+01
LT &
RT
34
,598
3.0
0646
384
50
1,9
30
1,0
85
10
475
34
,598
646
384
50
1,9
30
1,0
85
10
475
*AD
DIT
ION
AL Q
UA
NTIT
IES
FO
UN
D E
LS
EW
HE
RE
PR
OJE
CT
TO
TA
LS
TE
MP
OR
AR
Y R
OA
D (
ST
AG
E 1
B)
Wisconsin Department of Transportation 03/06/2017 07:35:47
Proposal ID: 20170314030 Project(s): 1570-02-73, 1570-02-75Federal ID(s): WISC 2017117, WISC 2017118
0001 Contract ItemsSECTION:
Alt Set ID: Alt Mbr ID:
Bid AmountUnit PriceApproximateQuantity and
UnitsDescriptionItem ID
ProposalLine
Number
0160 205.0100Excavation Common CY
35,862.000_________._____ _________._____
0170 208.1100Select Borrow CY
8,730.000_________._____ _________._____
0180 213.0100Finishing Roadway (project) 01. 1570-02-73
EACH1.000
_________._____ _________._____
0190 213.0100Finishing Roadway (project) 02. 1570-02-75
EACH1.000
_________._____ _________._____
0200 214.0100Obliterating Old Road STA
3.000_________._____ _________._____
0210 305.0110Base Aggregate Dense 3/4-Inch TON
1,063.000_________._____ _________._____
0220 305.0120Base Aggregate Dense 1 1/4-Inch TON
23,543.000_________._____ _________._____
0230 310.0110Base Aggregate Open-Graded TON
74.000_________._____ _________._____
0240 405.0100Coloring Concrete WisDOT Red CY
678.000_________._____ _________._____
0250 416.0170Concrete Driveway 7-Inch SY
209.000_________._____ _________._____
0260 416.0512Concrete Truck Apron 12-Inch SY
1,400.000_________._____ _________._____
0270 450.4000HMA Cold Weather Paving TON
1,647.000_________._____ _________._____
0280 455.0605Tack Coat GAL
2,433.000_________._____ _________._____
1.000000290 460.2000
Incentive Density HMA Pavement DOL8,500.000
8,500.00
0300 460.6244HMA Pavement 4 MT 58-34 S TON
300.000_________._____ _________._____
0310 460.6443HMA Pavement 3 MT 58-34 H TON
816.000_________._____ _________._____
Proposal Schedule of Items Page 2 of 17
Wisconsin Department of Transportation 03/06/2017 07:35:47
Proposal ID: 20170314030 Project(s): 1570-02-73, 1570-02-75Federal ID(s): WISC 2017117, WISC 2017118
0001 Contract ItemsSECTION:
Alt Set ID: Alt Mbr ID:
Bid AmountUnit PriceApproximateQuantity and
UnitsDescriptionItem ID
ProposalLine
Number
0320 460.6444HMA Pavement 4 MT 58-34 H TON
753.000_________._____ _________._____
0330 460.7443HMA Pavement 3 HT 58-34 H TON
8,332.000_________._____ _________._____
0340 460.7644HMA Pavement 4 HT 58-34 V TON
3,074.000_________._____ _________._____
0350 465.0105Asphaltic Surface TON
379.000_________._____ _________._____
0360 465.0125Asphaltic Surface Temporary TON
2,036.000_________._____ _________._____
0370 465.0310Asphaltic Curb LF
481.000_________._____ _________._____
0380 465.0315Asphaltic Flumes SY
73.000_________._____ _________._____
0390 520.2018Culvert Pipe Temporary 18-Inch LF
70.000_________._____ _________._____
0400 522.0124Culvert Pipe Reinforced Concrete ClassIII 24-Inch
LF82.000
_________._____ _________._____
0410 522.1018Apron Endwalls for Culvert PipeReinforced Concrete 18-Inch
EACH5.000
_________._____ _________._____
0420 522.1024Apron Endwalls for Culvert PipeReinforced Concrete 24-Inch
EACH2.000
_________._____ _________._____
0430 601.0405Concrete Curb & Gutter 18-Inch Type A LF
500.000_________._____ _________._____
0440 601.0411Concrete Curb & Gutter 30-Inch Type D LF
2,680.000_________._____ _________._____
0450 601.0600Concrete Curb Pedestrian LF
495.000_________._____ _________._____
0460 602.0410Concrete Sidewalk 5-Inch SF
38,140.000_________._____ _________._____
0470 602.0505Curb Ramp Detectable Warning FieldYellow
SF416.000
_________._____ _________._____
Proposal Schedule of Items Page 3 of 17
Wisconsin Department of Transportation 03/06/2017 07:35:47
Proposal ID: 20170314030 Project(s): 1570-02-73, 1570-02-75Federal ID(s): WISC 2017117, WISC 2017118
0001 Contract ItemsSECTION:
Alt Set ID: Alt Mbr ID:
Bid AmountUnit PriceApproximateQuantity and
UnitsDescriptionItem ID
ProposalLine
Number
1280 641.8100Overhead Sign Support (structure) 01. S-3-004
LUMP SUM _________._____LS
1290 641.8100Overhead Sign Support (structure) 02. S-3-005
LUMP SUM _________._____LS
1300 641.8100Overhead Sign Support (structure) 03. S-3-003
LUMP SUM _________._____LS
1310 642.5401Field Office Type D EACH
1.000_________._____ _________._____
1320 643.0100Traffic Control (project) 01. 1570-02-73 EACH
1.000_________._____ _________._____
1330 643.0100Traffic Control (project) 02. 1570-02-75 EACH
1.000_________._____ _________._____
1340 643.0300Traffic Control Drums DAY
54,000.000_________._____ _________._____
1350 643.0410Traffic Control Barricades Type II DAY
737.000_________._____ _________._____
1360 643.0420Traffic Control Barricades Type III DAY
6,726.000_________._____ _________._____
1370 643.0500Traffic Control Flexible Tubular MarkerPosts
EACH471.000
_________._____ _________._____
1380 643.0600Traffic Control Flexible Tubular MarkerBases
EACH471.000
_________._____ _________._____
1390 643.0705Traffic Control Warning Lights Type A DAY
11,676.000_________._____ _________._____
1400 643.0715Traffic Control Warning Lights Type C DAY
8,378.000_________._____ _________._____
1410 643.0900Traffic Control Signs DAY
14,435.000_________._____ _________._____
1420 643.1000Traffic Control Signs Fixed Message SF
82.500_________._____ _________._____
Proposal Schedule of Items Page 9 of 17
Wisconsin Department of Transportation 03/06/2017 07:35:47
Proposal ID: 20170314030 Project(s): 1570-02-73, 1570-02-75Federal ID(s): WISC 2017117, WISC 2017118
0001 Contract ItemsSECTION:
Alt Set ID: Alt Mbr ID:
Bid AmountUnit PriceApproximateQuantity and
UnitsDescriptionItem ID
ProposalLine
Number
1430 643.1050Traffic Control Signs PCMS DAY
452.000_________._____ _________._____
1440 643.2000Traffic Control Detour (project) 01. 1570-02-73
EACH1.000
_________._____ _________._____
1450 643.2000Traffic Control Detour (project) 02. 1570-02-75
EACH1.000
_________._____ _________._____
1460 643.3000Traffic Control Detour Signs DAY
5,612.000_________._____ _________._____
1470 644.1410.STemporary Pedestrian Surface Asphalt SF
850.000_________._____ _________._____
1480 644.1601.STemporary Curb Ramp EACH
5.000_________._____ _________._____
1490 644.1616.STemporary Pedestrian Safety Fence LF
1,000.000_________._____ _________._____
1500 645.0111Geotextile Type DF Schedule A SY
556.000_________._____ _________._____
1510 645.0120Geotextile Type HR SY
80.000_________._____ _________._____
1520 646.0106Pavement Marking Epoxy 4-Inch LF
20,820.000_________._____ _________._____
1530 646.0126Pavement Marking Epoxy 8-Inch LF
3,920.000_________._____ _________._____
1540 646.0156Pavement Marking Epoxy 18-Inch LF
189.000_________._____ _________._____
1550 646.0600Removing Pavement Markings LF
20,623.000_________._____ _________._____
1560 647.0156Pavement Marking Arrows Epoxy Type 1 EACH
4.000_________._____ _________._____
1570 647.0160Pavement Marking Arrows Epoxy Type2R
EACH2.000
_________._____ _________._____
1580 647.0166Pavement Marking Arrows Epoxy Type 2 EACH
9.000_________._____ _________._____
Proposal Schedule of Items Page 10 of 17
Wisconsin Department of Transportation 03/06/2017 07:35:47
Proposal ID: 20170314030 Project(s): 1570-02-73, 1570-02-75Federal ID(s): WISC 2017117, WISC 2017118
0001 Contract ItemsSECTION:
Alt Set ID: Alt Mbr ID:
Bid AmountUnit PriceApproximateQuantity and
UnitsDescriptionItem ID
ProposalLine
Number
2020 656.0200Electrical Service Meter BreakerPedestal (location) 01. USH 8 & CTH K
LUMP SUM _________._____LS
2030 656.0200Electrical Service Meter BreakerPedestal (location) 02. 1570-02-75
LUMP SUM _________._____LS
2040 657.0255Transformer Bases Breakaway 11 1/2-Inch Bolt Circle
EACH30.000
_________._____ _________._____
2050 657.0322Poles Type 5-Aluminum EACH
30.000_________._____ _________._____
2060 657.0605Luminaire Arms Single Member 4 1/2-Inch Clamp 4-FT
EACH12.000
_________._____ _________._____
2070 657.0715Luminaire Arms Truss Type 4 1/2-InchClamp 15-FT
EACH16.000
_________._____ _________._____
2080 659.1115Luminaires Utility LED A EACH
17.000_________._____ _________._____
2090 659.1120Luminaires Utility LED B EACH
3.000_________._____ _________._____
2100 659.1125Luminaires Utility LED C EACH
13.000_________._____ _________._____
2110 659.2124Lighting Control Cabinets 120/240 24-Inch
EACH2.000
_________._____ _________._____
2120 661.0200Temporary Traffic Signals forIntersections (location) 01. USH 8 &Cherry Street
LUMP SUM _________._____LS
2130 661.0200Temporary Traffic Signals forIntersections (location) 02. USH 8 & USH63
LUMP SUM _________._____LS
2140 690.0150Sawing Asphalt LF
6,511.000_________._____ _________._____
2150 690.0250Sawing Concrete LF
396.000_________._____ _________._____
Proposal Schedule of Items Page 14 of 17
Wisconsin Department of Transportation 03/06/2017 07:35:47
Proposal ID: 20170314030 Project(s): 1570-02-73, 1570-02-75Federal ID(s): WISC 2017117, WISC 2017118
0001 Contract ItemsSECTION:
Alt Set ID: Alt Mbr ID:
Bid AmountUnit PriceApproximateQuantity and
UnitsDescriptionItem ID
ProposalLine
Number
2450 SPV.0105Special 04. Lighting System Integrator(1570-02-73)
LUMP SUM _________._____LS
2460 SPV.0105Special 05. Lighting System Integrator(1570-02-75)
LUMP SUM _________._____LS
2470 SPV.0105Special 06. Lighting System Survey(1570-02-73)
LUMP SUM _________._____LS
2480 SPV.0105Special 07. Lighting System Survey(1570-02-75)
LUMP SUM _________._____LS
2490 SPV.0105Special 08. Construction StakingRoundabout (1570-02-73)
LUMP SUM _________._____LS
2500 SPV.0105Special 09. Construction StakingRoundabout (1570-02-75)
LUMP SUM _________._____LS
2510 SPV.0120Special 01. Water for Seeded Areas MGAL
1,220.000_________._____ _________._____
2520 SPV.0165Special 01. Wall Modular BlockMechanically Stabilized EarthLRFD/QMP
SF672.000
_________._____ _________._____
2530 SPV.0165Special 02. Concrete Sidewalk Cure andSeal Treatment
SF38,140.000
_________._____ _________._____
2540 SPV.0180Special 01. Concrete Driveway Cure andSeal Treatment
SY209.000
_________._____ _________._____
2550 SPV.0195Special 01. Excavation, Hauling, andDisposal of Petroleum Contaminated Soil
TON200.000
_________._____ _________._____
2560 643.1051Traffic Control Signs PCMS with CellularCommunications
DAY360.000
_________._____ _________._____
Section: 0001 _________._____Total:
Total Bid: _________._____
Proposal Schedule of Items Page 17 of 17