World Meteorological OrganizationWorking together in weather, climate and water
WMO OMM
WMO www.wmo.int
WMO STRATEGIC PLAN & OPERATING PLAN2012-2015
Commission for Atmospheric Sciences,Management Group
Geneva, Switzerland, 27-28 September 2010
WMO OMMTopics
1. WMO results-based strategic planning2. Global Societal Needs 3. Mission, Vision and Achievements4. The Structure of SP 2012-20155. Strategic Priority areas6. WMO OP 2012-20157. Summary
WMO OMM
GSN STn ERn1KOn12
KOn11
KOn13
Del
Del
Del
Act
Act
Act
Act
Budget
Budget
Budget
Budget
SP
OP (2012-15)
RBB (2012-15)
WMO Results-based Strategic Planning
Linkage between the next SP, OP and RBB
WMO M&E
WMO OMM
Global Societal Needs
• Global Societal Needs– Improved protection of life and property (related to impacts of
hazardous weather, climate, water and other environmental events and increased safety of transport on land, at sea and in the air;
– Poverty alleviation, sustained livelihoods and economic growth (in connection with the Millennium Development Goals) including improved health and social well-being of citizens (related to weather, climate, water and environmental events and influence); and
– Sustainable use of natural resources and improved environmental quality.
WMO OMM
Mission and Vision• Mission: The purpose statement in the WMO Convention• Vision: Provide world leadership in expertise and
international cooperation in weather, climate, hydrology and water resources, and related environmental issues, and thereby to contribute to the safety and well-being of people throughout the world and to the economic benefit of all nations.
• Achievements: Exchange of Meteorological and Related Data and Products, International Standards for Meteorological and Related Observations, Capacity Building, Promoting Science and Technology, and International Leadership
WMO OMM
Structure: 3GSNs, 5STs & 8ERs
WMO OMM
Five Strategic Priority Areas
• Global Framework for Climate Services;• Aviation meteorological services;• Capacity Building for the developing and least
developed countries;• Implementation of the WMO Integrated Global
Observing System (WIGOS) and WMO Information System (WIS); and
• Disaster Risk Reduction
WMO OMM
WMO Operating Plan
• Based on SP 2012-2015 and informs RBB and M&E.
• Has activities from RAs, TCs and Secretariat• CAS submitted activities for inclusion.• Any improvement is welcome.• Will be finalized after the approval of the
Strategic Plan and RBB by Congress in 2011.
WMO OMM
Summary
The EC-LXII, June 2010, endorsed the draft SP and recommended it to the WMO Congress for approval.
The SP is based on 3GSNs that would be achieved through 5Strategic Thrusts leading to 8 expected results and a set of Key Outcomes.
The OP would be finalized based on the approved budget after Congress May/June 2010
The contributions of RAs and TCs were essential in ensuring the SP and OP represent the shared strategic direction and for efficient implementation of the SP.
The Management Groups have a useful role in the implementation of SP as relates to the achievement of expected results.
WMO OMM
Thank youThank youThank youThank you