WOB TOD Project Addendum #1 to the WOSP EIR (SCH#2012102047) January 2019 Lead Agency: City of Oakland Planning and Building Department 250 Frank H. Ogawa Plaza Suite 2114 Oakland, CA 94612 Prepared By: Lamphier–Gregory 1944 Embarcadero Oakland, CA 94606
Transcript
Page 1: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

WOB TOD Project

Addendum #1

to the WOSP EIR (SCH#2012102047) January 2019

Lead Agency:

City of Oakland Planning and Building Department

250 Frank H. Ogawa Plaza Suite 2114

Oakland, CA 94612

Prepared By:

Lamphier–Gregory 1944 Embarcadero

Oakland, CA 94606

Page 2: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

 

Page 3: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

WOB TOD Project Addendum Page i

Table of Contents

I.  Project Characteristics ..................................................................................................... 1 

II.  Executive Summary ......................................................................................................... 2 

III.  Purpose and Organization of this CEQA Document ..................................................... 3 Purpose .............................................................................................................................................................. 3 Standard Conditions of Approval ............................................................................................................ 4 Organization..................................................................................................................................................... 4 

IV.  Project Description .......................................................................................................... 5 Project Location .............................................................................................................................................. 5 Proposed Project ............................................................................................................................................ 5 Project Approvals ......................................................................................................................................... 21 

V.  Project Consistency Assessment .................................................................................. 22 Proposed Project .......................................................................................................................................... 22 Project Consistency ..................................................................................................................................... 22 

VI.  Summary of CEQA Findings .......................................................................................... 30 

VII. Environmental Checklist ............................................................................................... 31 A. Aesthetics, Shadow, and Wind ........................................................................................................... 32 B. Air Quality .................................................................................................................................................. 33 C. Biological Resources .............................................................................................................................. 36 D. Cultural Resources .................................................................................................................................. 37 E. Geology, Soils, and Geohazards ......................................................................................................... 39 F. Greenhouse Gas Emissions and Climate Change ........................................................................ 40 G. Hazards and Hazardous Materials .................................................................................................... 43 H. Hydrology and Water Quality ............................................................................................................ 45 I. Land Use ....................................................................................................................................................... 47 J. Noise ............................................................................................................................................................. 48 K. Population & Housing ........................................................................................................................... 50 M. Transportation and Circulation ......................................................................................................... 52 N. Utilities and Service Systems .............................................................................................................. 60 

Acronyms and Terms ............................................................................................................ 61  

 

Page 4: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

Page ii WOB TOD Project Addendum

Attachments 

A:   City of Oakland Standard Conditions of Approval 

 

Tables 

1:   Project Development Summary ....................................................................................................... 6 

2:   Evaluation of Consistency with General Plan and WOSP .............................................................. 24 

3:   Summary of Project GHG Emissions .............................................................................................. 41 

4:   Trip Generation for Development Projects within the WOSP Area ............................................... 54 

5:  Daily Vehicle Miles Traveled Summary .......................................................................................... 58 

 

Figures 

1:   Project Location ............................................................................................................................... 7 

2:   Project Development Areas and Possible Phasing........................................................................... 8 

3:   Floor Plan, Ground Level .................................................................................................................. 9 

4:   Floor Plan, 2nd Floor ....................................................................................................................... 10 

5:  Floor Plan, 3rd‐4th Floors ................................................................................................................. 11 

6:   Floor Plan, 5th Floor ........................................................................................................................ 12 

7:   Floor Plan, 6th Floor ........................................................................................................................ 13 

8:   Floor Plan, 7th Floor ........................................................................................................................ 14 

9:   Floor Plan, 8th‐18th Floors ............................................................................................................... 15 

10:  Floor Plan, 19th‐28th Floors ............................................................................................................. 16 

11:   Floor Plan, Basement Level ............................................................................................................ 17 

12:  Illustrative View, Looking South .................................................................................................... 18 

13:   Illustrative View, Looking North .................................................................................................... 19 

 

Page 5: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

WOB TOD Project Addendum Page 1

I. Project Characteristics

1. Project Title:   West Oakland BART Transportation‐Oriented Development (WOB TOD) Project  

2. Lead Agency Name and Address:  City of Oakland Bureau of Planning 250 Frank H. Ogawa Plaza, Suite 2114 Oakland, CA 94612 

3. Contact Person and Phone Number:  Dara O’Byrne, City Planner 510.238.6983 DO'[email protected] 

4. Project Location:  1451 7th Street   Oakland, CA 

Assessor’s Parcel Numbers: 004‐0077‐003 and 004‐0071‐003 

 5. Project Sponsors’ Names and Addresses:  China Harbour Engineering Company (CHEC) / 

Strategic Urban Development Alliance (SUDA) JV Partnership 4000 Executive Parkway, Suite 275 San Ramon, CA 94583 

6. Existing General Plan Designations:  Community Commercial (West Oakland Specific Plan) 

7. Existing Zoning:   S‐15W (Transit‐Oriented Development Commercial Zones) 

  Height Limit: 60’ (western half) and 100’ (eastern half) 

8. Requested Approvals:   Planned Unit Development / Preliminary Development Plan 

  Regular Design Review  

Vesting Tentative Parcel Map 

   

 

Page 6: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

Page 2 WOB TOD Project Addendum

II. Executive Summary

The project represents establishment of the transit‐oriented development (TOD) as contemplated in the West Oakland Specific Plan (WOSP) on the site surrounding the West Oakland BART station. The project would demolish the existing 451‐space West Oakland BART station surface parking  lot and associated  circulation  and  construct  three  new mid‐rise  and  high‐rise  buildings,  retail  under  the BART  tracks, and a row of residential duplexes  for a  total of 762 residential units, 382,460 square feet  of  office  space,  and  up  to  75,000  square  feet  of  ground‐floor  retail  uses.  The  project  also includes a 400‐space underground parking lot, a surface plaza, and circulation elements. The project takes advantage of the 25 percent PUD residential bonus, the 35 percent State Affordable Housing Density Bonus, and includes a minor variance for group open space. 

As presented  in  Section VI:  Summary  of  Findings,  this Addendum has determined  that  the West Oakland BART TOD project qualifies for an Addendum pursuant to CEQA Guidelines Section 15164 and  that  the WOSP  EIR  and  this  Addendum  comprises  the  full  and  complete  CEQA  evaluation necessary for the proposed project and no further CEQA evaluation for the project is required. 

The  Section  V:  Project  Consistency  Assessment  provides  substantial  evidence  that  the  project  is generally consistent with applicable plans and regulations. 

The Section VII: Environmental Checklist provides substantial evidence pursuant to CEQA Guidelines Section 15162  that with  implementation of  the  applicable  SCAs,  the proposed project would not result  in  a  substantial  increase  in  the  severity  of  significant  impacts  previously  identified  in  the WOSP EIR or any new significant impacts that were not previously identified in the WOSP EIR. 

 

 

 

Page 7: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

WOB TOD Project Addendum Page 3

III. Purpose and Organization of this CEQA Document

Purpose The purpose of this CEQA document is to analyze the West Oakland BART TOD Project, proposed at 1451 7th Street (Assessor’s Parcel Number: 004‐007‐700‐300 and 004‐007‐100‐300), to determine if it  qualifies  for  an Addendum  pursuant  to  Public  Resources  Code  Section  21166  and  State  CEQA Guidelines Section 15164 such that no additional environmental review is required. 

The project site is within the 7th Street Opportunity Area of the West Oakland Specific Plan (WOSP) Area. The City adopted the WOSP and certified the associated EIR in 2014 (State Clearinghouse No. 2012102047).  The  WOSP  identifies  policies  to  guide  future  development  in  West  Oakland  by providing  a  comprehensive  and  multi‐faceted  strategy  for  development  and  redevelopment  of vacant  and/or  underutilized  commercial  and  industrial  properties  in  strategic  areas  (Opportunity Areas) of West Oakland. The WOSP establishes a  land use and development framework,  identifies needed  transportation  and  infrastructure  improvements,  and  recommends  implementation strategies  needed  to  develop  these  areas.  Subsequent  activities  under  the WOSP  are  subject  to environmental  requirements  pursuant  to  the  WOSP  EIR.  The  effects  of  future  growth  and development  within West  Oakland  were  fully  considered  in  the  cumulative  growth  projections factored  into  the  WOSP  EIR  analysis.  The  WOSP  EIR  analyzed  the  environmental  impacts  of implementation of the WOSP, including development of the project site.  

The WOSP EIR  is hereby  incorporated by reference and can be obtained  from  the City of Oakland Bureau of Planning at 250 Frank H. Ogawa Plaza, Suite 2114, Oakland, California, 94612, and on the City of Oakland Planning and Building Department website at: http://www2.oaklandnet.com/Government/o/PBN/OurServices/Application/DOWD009157. 

State CEQA Guidelines Section 15164 states  that an Addendum  to a certified EIR  is allowed when minor  changes  or  additions  are  necessary  and  none  of  the  conditions  for  preparation  of  a Subsequent  EIR  pursuant  to  Section  15162  are  satisfied.  Section  15162  further  specifies  that  no subsequent EIR shall be prepared unless one or more of the following conditions are met:  

1)  Substantial  changes  are  proposed  in  the  project  which  will  require  major  revisions  of  the previous EIR or negative declaration due  to  the  involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects; 

2)  Substantial  changes  occur  with  respect  to  the  circumstances  under  which  the  project  is undertaken which will require major revisions of the previous EIR or Negative Declaration due to the  involvement  of  new  significant  environmental  effects  or  a  substantial  increase  in  the severity of previously identified significant effects; or 

3)  New  information  of  substantial  importance, which was  not  known  and  could  not  have  been known with  the exercise of  reasonable diligence at  the  time  the previous EIR was certified as complete or the Negative Declaration was adopted, shows any of the following: 

A)  The project will have one or more  significant effects not discussed  in  the previous EIR or negative declaration; 

Page 8: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

Page 4 WOB TOD Project Addendum

B)  Significant effects previously examined will be substantially more severe than shown in the previous EIR; 

C)  Mitigation measures or  alternatives previously  found not  to be  feasible would  in  fact  be feasible, and would substantially reduce one or more significant effects of the project, but the project proponents decline to adopt the mitigation measure or alternative; or Mitigation measures  or  alternatives  which  are  considerably  different  from  those  analyzed  in  the previous EIR would substantially reduce one or more significant effects on the environment, but the project proponents decline to adopt the mitigation measure or alternative. 

The  Environmental  Checklist  contained  in  this  document  summarizes  the  impact  findings  of  the WOSP EIR, which  is the underlying EIR  for the proposed project, and assesses whether  impacts of the proposed project would  fall within  those  identified  in  the WOSP EIR or whether new or more significant environmental impacts than those identified in the WOSP EIR are identified which would trigger the need for a subsequent EIR.  

Standard Conditions of Approval The  City  established  its  Standard  Conditions  of  Approval  and  Uniformly  Applied  Development Standards  in 2008, and they have since been amended and revised several times.   The City’s SCAs are  incorporated  into new and changed projects as conditions of approval regardless of a project’s environmental determination. The  SCAs  incorporate policies and  standards  from  various adopted plans, policies, and ordinances (such as the Oakland Planning and Municipal Codes, Oakland Creek Protection Ordinance, Stormwater Water Management and Discharge Control Ordinance, Oakland Protected Trees Ordinance, Oakland Grading Regulations, National Pollutant Discharge Elimination System  (NPDES)  permit  requirements,  Housing  Element‐related  mitigation  measures,  California Building  Code  and  Uniform  Fire  Code,  among  others),  which  have  been  found  to  substantially mitigate environmental effects. The SCAs are adopted as requirements of an individual project when it is approved by the City and are designed to, and will, substantially mitigate environmental effects.  

Note  that  the  SCAs  included  in  this  document  are  referred  to  using  an  abbreviation  for  the environmental topic area and are numbered sequentially for each topic area—e.g., SCA‐AIR‐1, SCA‐AIR‐2. The SCA title  is also provided—e.g., SCA‐AIR‐1: Construction‐Related Air Pollution (Dust and Equipment  Emissions).  Finally,  the  current City of Oakland master‐list  SCA numbering  is  included though it should be noted that this numbering can change as SCAs are added or deleted. 

Consistent with  the  requirements of CEQA, a determination of whether  the project would have a significant  impact assumes  implementation of required SCAs. Attachment A  includes the complete Standard Conditions of Approval and Mitigation Monitoring and Reporting Program (SCAMMRP).  

Organization This document describes the proposed project in Section IV, Project Description, and documents the project’s  consistency  with  the WOSP  in  Section  V,  Project  Consistency  Assessment.  Section  VI, Summary of Findings, provides an overview of the environmental analysis conclusions. The potential environmental  impacts  of  the  project  are  detailed  in  Section VII,  Environmental  Checklist, which identifies the  impact findings of the WOSP Environmental  Impact Report (EIR) and relevant City of Oakland Standard Conditions of Approval (SCAs) and explains whether the project would cause new or more significant environmental impacts than those identified in the WOSP EIR.   

Page 9: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

WOB TOD Project Addendum Page 5

IV. Project Description

This section describes  the proposed West Oakland BART TOD project evaluated  in  this Addendum and  includes a description of  the project site, existing site conditions,  the proposed development, and the required project approvals. 

Project Location As  shown  in  Figure  1,  the  approximately  5.58‐acre  site  encompassing  the West  Oakland  BART station is bounded by 7th Street to the north, 5th Street to the south, Chester Street to the west, and Mandela Parkway to the east. The project site consists of two parcels at 1451 7th Street (Assessor’s Parcel Number: 004‐007‐700‐300 and 004‐007‐100‐300).  

Existing Conditions and Surrounding Land Uses

The  project  site  is  a  rectangular  lot  occupied  by  the West Oakland  BART  station  and  associated surface parking and circulation. Vegetation onsite is currently limited to some street and parking lot landscaping and trees.  

Existing land uses in the vicinity include multi‐story commercial and residential development to the north,  parking/fuel  station/vacant  lot  to  the  east,  light  industrial  and  low‐rise  residential  to  the south, and low‐rise residential to the west. 

General Plan and Zoning Designations

The Oakland General  Plan  and WOSP  designate  the  project  site  as  Community  Commercial.  This designation  seeks  to encourage neighborhood  center uses and  larger  scale  retail and  commercial uses, which can be complemented by the addition of urban residential development and compatible mixed use development.  

The  project  site  is  zoned  as  Transit‐Oriented  Development  Commercial  Zone  (S‐15W),  which  is intended  to  feature  high‐density  residential,  commercial,  and  mixed‐use  developments  to encourage  a  balance  of  pedestrian‐oriented  activities,  transit  opportunities,  and  concentrated development near transit stations.  

The proposed uses  (mixed‐use multi‐family  residential, office, and  retail) are allowable under  the General Plan designation and zoning. A more detailed consistency discussion  is  included  in Section VI of this document.  

Proposed Project The project  sponsor  is proposing  to demolish  the  existing  451‐space West Oakland BART  station surface  parking  lot  and  associated  circulation  and  construct  three  new  mid‐rise  and  high‐rise buildings,  retail  under  the  BART  tracks,  and  a  row  of  residential  duplexes  for  a  total  of  762 residential units, 382,460 square feet of office space, and up to 75,000 square feet of ground‐floor retail  uses.  The  project  also  includes  a  400‐space  underground  parking  lot,  a  surface  plaza,  and circulation elements. The BART station and tracks will remain. The project represents establishment of the transit‐oriented development (TOD) contemplated  in the WOSP on the site surrounding the West Oakland BART station. 

Page 10: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

Page 6 WOB TOD Project Addendum

The proposed project would consist of the following development, split into four development areas labeled T‐1 through T‐4 as shown on Figure 2 and summarized in Table 1: 

•  T‐1: 28‐story 320‐foot  tall high‐rise building with 500  residential units, 82,460  square  feet of office, and 17,185 square feet of ground‐floor retail 

•  T‐2: surface plaza with 7,670 square feet of retail under the BART tracks 

•  T‐3: 7‐story, 80‐foot  tall mid‐rise  residential building of 240 multi‐family units and 22 3‐story residential duplex units and 15,200 square feet of ground‐floor retail 

•  T‐4: 8‐story, 100‐foot tall mid‐rise commercial office building with 300,000 square feet of office 

and 30,800 square feet of ground‐floor retail 

Table 1. Project Development Summary

Uses T1 T2 T3 T4 Total

Office 82,460 sf 300,000 sf 382,460 sf

Retail 17,185 sf 7,670 sf 15,200 sf 30,800 sf up to 75,000 sf 1

Residential 500 units 240 units

+22 duplexes 762 units

Parking 286 stalls 114 stalls 400 stalls 1 Total retail square footage has been increased from the proposed 70,855 square feet to allow

some flexibility in ground level design tweaks for up to 75,000 square feet of retail, which is what has been analyzed in this document.

 

Figures  3  through  11  show  the  floor  plans  and  Figures  12  and  13  show  illustrative  views  of  the project. Additional  plans  and  elevations  are  available  as  part  of  the  project  file with  the  City  of Oakland. 

The proposed residential units would include market‐rate units but also affordable units amounting to  at  least  20%  of  the  base  units  (at  least  152  units)  and  would  rely  upon  the  and  the  State Affordable Housing Density Bonus Law  (Government Code Section 65915 et seq.), which  is  locally enacted through City of Oakland Municipal Code Chapter 17.107, to allow for the increased density and heights. A more detailed discussion of  consistency  and  the  required  approvals  is  included  in Section VI of this document. 

As detailed in the consistency assessment in Section V, the project would be substantially consistent with  the  development  density  established  by  existing  zoning,  community  plan,  or  General  Plan policies and the State Affordable Housing Density Bonus Law, which requires that the City grant a density bonus if the project meets affordable housing requirements. Requested variations from base zoning, community plan or General Plan requirements are allowable under the applicable local and State regulations and would therefore not represent conflicts with applicable plans.   

The proposed 400‐space parking area would be accessed through T3 via Chester Street and includes 129 stalls within the first and second levels of T3, 143 stalls in the basement of T3, and 128 stalls in the basement of T4. 

Page 11: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

WOB TOD Project Addendum Page 7

 

 

Figure 1. Project Location

Page 12: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

Page 8 WOB TOD Project Addendum

Figure 2. Project Development Areas and Possible Phasing

Page 13: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

WOB TOD Project Addendum Page 9

Figure 3. Floor Plan, Ground Floor

Page 14: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

Page 10 WOB TOD Project Addendum

Figure 4. Floor Plan, 2nd Floor

Page 15: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

WOB TOD Project Addendum Page 11

Figure 5. Floor Plan, 3rd-4th Floors

Page 16: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

Page 12 WOB TOD Project Addendum

Figure 6. Floor Plan, 5th Floor

Page 17: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

WOB TOD Project Addendum Page 13

Figure 7. Floor Plan, 6th Floor

Page 18: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

Page 14 WOB TOD Project Addendum

Figure 8. Floor Plan, 7th Floor

Page 19: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

WOB TOD Project Addendum Page 15

Figure 9. Floor Plan, 8th–18th Floors

Page 20: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

Page 16 WOB TOD Project Addendum

Figure 10. Floor Plan, 19th–28th Floors

Page 21: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

WOB TOD Project Addendum Page 17

Figure 11. Floor Plan, Basement Level

Page 22: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

Page 18 WOB TOD Project Addendum

Figure 12. Illustrative View, Looking South

Page 23: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

WOB TOD Project Addendum Page 19

Figure 13. Illustrative View, Looking North

Page 24: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

Page 20 WOB TOD Project Addendum

 

 

 

 

 

 

 

 

This page has been intentionally left blank 

 

Page 25: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

WOB TOD Project Addendum Page 21

Retail space  is proposed at  the ground  level under  the BART  tracks and along  the ground  level of proposed high‐ and mid‐rise buildings and is intended to include smaller local retail spaces and food options as well as a  larger food market and co‐working maker  lab space. Also on the ground floor would be ancillary areas for on‐site uses including lobby/office areas, trash/recycling areas, loading areas, utility areas, and bicycle parking. The BART station, a surface plaza, and pedestrian circulation elements take up the remainder of the ground level. 

The  project  would  include  public  ground  level  open  space  consisting  of  plaza  and  pedestrian circulation areas  totaling 89,073 square  feet. Additionally,  the  two buildings containing residential uses also have  common open  space,  including  in T1: a 7,830  square  foot  landscaped  terrace and 1,100 square  feet of private decks on  level 5, a 5,712 square  foot  landscaped  terrace on  level 28, and  3,360  square  feet  of  other  common  use  decks;  and  in  T3:  a  8,380  square  foot  landscaped courtyard on  level 3 with 17,584 square feet of private open space, and on  level 7, a 1,673 square foot landscaped terrace and 15,000 square feet of common use terrace space. 

Project Construction

The  project  is  currently  in  the  design  phase  of  development  and  no  details  are  as‐yet  available regarding the construction schedule and phasing. For the purpose of this analysis, however,  it has been assumed that project construction would last at least 14 months and likely substantially longer due to phasing of building construction. 

Project Approvals The project requires the following discretionary actions/approvals, including without limitation: 

Discretionary Actions by the City of Oakland

City discretionary approvals include, but may not be limited to: 

Planned Unit Development / Preliminary Development Plan including use of State Affordable Housing Density Bonus waivers/concessions  

Minor Variance for residential open space requirements  

Regular Design Review for new building construction 

Vesting Tentative Parcel Map  

Subsequent approval of Final Development Plans for each phase 

Administrative/ministerial City permits required for the project include, but may not be limited to: 

Tree Protection Removal Permit 

Building permit and other related on‐site and off‐site work permits 

Actions by Other Agencies

The  project will  require  other  administrative  approvals  from  other  agencies  and  utility  providers such as East Bay Municipal Utility District  (EBMUD), PG&E, and California Regional Water Quality Control  Board  (RWQCB).  The  project  may  require  additional  approvals  related  to  potential contaminants at the site, as applicable. 

Page 26: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

Page 22 WOB TOD Project Addendum

V. Project Consistency Assessment

Proposed Project The project would establish the transit‐oriented development (TOD) originally contemplated  in the WOSP on the site surrounding the West Oakland BART station, which is currently a surface parking lot.  The  project  would  redevelop  a  surface  parking  lot  with  three  new  mid‐rise  and  high‐rise buildings,  a  row  of  residential  duplexes,  and  a  surface  plaza  and would  provide  affordable  and market‐rate multi‐family housing, office space, and ground‐floor retail space, which  is  intended  to include a food market and co‐working maker  lab space. See the project description  in Section V of this document for additional detail. 

Under  State  Affordable  Housing  Density  Bonus  Law  and  the  City’s  Density  Bonus  and  Incentive Procedure, because  the project proposes  to set aside approximately 20 percent of  the  residential units for very  low  income and/or  low  income units, the project  is entitled to  increase the project’s base  allowable  density  by  up  to  35  percent  and  request  up  to  two  additional  concessions/ incentives.1,2  

Project Consistency Considering  the  bonuses  allowed  under  the  State  Affordable  Housing  Density  Bonus  Law,  the proposed project is permitted in the zoning district in which it is located, and is consistent with the bulk, density, and  land uses envisioned  in  the Plan Area, as outlined below, as determined by  the City of Oakland Bureau of Planning. 

In the West Oakland Specific Plan, the project site is located in the 7th Street Opportunity Area on site #23. The project is consistent with the plan policies for the 7th Street Opportunity Area, which contemplate higher‐density housing, commercial office, and government/institutional office space around the core of the BART Station, and neighborhood‐serving retail as well as custom manufacturing / industrial arts/ artist exhibition space on the ground floor. 

The project site is zoned as Transit‐Oriented Development Commercial Zone (S‐15W), which is intended to create, preserve and enhance areas devoted primarily to serve multiple modes of transportation and to feature high‐density residential, commercial, and mixed‐use developments to encourage a balance of pedestrian‐oriented activities, transit opportunities, and concentrated development; and encourage a safe and pleasant pedestrian environment near transit stations by allowing a mixture of Residential, Civic, Commercial, and Light Industrial Activities, allowing for amenities such as benches, kiosks, lighting, and outdoor cafes; and by limiting conflicts between vehicles and pedestrians, and is typically appropriate around transit centers such as Bay Area Rapid Transit (BART) stations, AC Transit centers, and other transportation modes.  

                                                                 

1   Government Code Sections 65915‐65918; City of Oakland, 2017. Oakland Planning Code, Chapter 17.107: Density Bonus and Incentive Procedure. Section 17.107.090‐Permitted Number of Density Incentives or Concessions. 

2   Government Code Sections 65915‐65918; City of Oakland, 2017. Oakland Planning Code, Chapter 17.107: Density Bonus and Incentive Procedure. Section 17.107.095‐Waiver of Development Standards. 

Page 27: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

WOB TOD Project Addendum Page 23

The proposed uses (multi‐family residential, office, and retail) are allowable in this zone. The site spans two height districts, with the T2 and T3 areas in the 60’ height zone and the T1 and T4 areas in the 100’ height zone. The project proposes 262 units in the 60’ zone, which would be 1 unit per 424 square feet, within the maximum density of 1 unit per 375. The project proposes 500 units in the 100’ zone, which would be 1 unit per 263 square feet, within the maximum density of 1 unit per 225. 

However, the non‐residential FAR also factors into the density calculations. For the entire site, non‐residential uses account for approximately 46% of the base FAR. Under the base density, that would result in a maximum 476 residential units.  The allowable units, including the Planned Unit Area 25 percent density bonus would be 595. The State Affordable Housing Density Bonus increase of 35 percent would allow up to 803 residential units, which is more than the 762 units proposed. 

Additionally, both residential towers would require waivers of the following development standards imposed by the Specific Plan and Planning Code: i) increase the number of stories allowable under the Specific Plan and Planning Code; and ii) elimination of the height limits to allow the T1 building to reach a height of 320’ in the 100’ zone and the T3 building to reach a height of 80’ in a 60’ zone. The applicant requests the right to determine a second concession, if needed, as final design plans are prepared. 

The General Plan land use designation for the site is Community Commercial. The intent of the Community Commercial designation is to “identify, create, maintain, and enhance areas suitable for a wide variety of commercial and institutional operations along the City’s major corridors and in shopping districts or centers.” This designation seeks to encourage neighborhood center uses and larger scale retail and commercial uses, which can be complemented by the addition of urban residential development and compatible mixed use development. The maximum FAR for this classification is 5.0 and maximum residential density is 125 units per gross acre, not including the State Affordable Housing Density Bonus. 3 

The project includes market‐rate and affordable multi‐family residential, office space, and ground‐floor retail and would create ground‐floor commercial uses at the site complimented by mixed‐use, including urban residential uses. Because the project is consistent with the intent of the land use designations, the project would be consistent with the General Plan.4 

As  Table  2  demonstrates,  the  project would  also  be  consistent with  the  relevant  policies  of  the General Plan and West Oakland Specific Plan.  

                                                                 3   City of Oakland, 1998. General Plan, Land Use and Transportation Element, p. 150. 4   State law “does not require precise conformity of a proposed project with the land use designation for a 

site, or an exact match between the project and the applicable general plan… Instead, a finding of consistency requires only that the proposed project be ‘compatible with the objectives, policies, general land uses, and programs specified in’ the applicable plan. State of California, 2015. Court of Appeals of California, Fourth District, Division One. Save Our Heritage Organization v. City of San Diego (2015) 237 Cal.App.4th 163, 185‐186, 187. 

Page 28: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

Page 24 WOB TOD Project Addendum

TABLE 2: EVALUATION OF CONSISTENCY WITH GENERAL PLAN AND WOSP

Relevant Policies, Principles, and Guidelines of the General Plan and WOSP

Project Consistency

Policy N3.1 Facilitating Housing Construction. Facilitating the construction of housing units should be considered a high priority for the City of Oakland.

Consistent. The project would involve redevelopment of the site to add 762 new housing units, including at least 152 affordable units.

Policy N3.2 Encouraging Infill Development. In order to facilitate the construction of needed housing units, infill development that is consistent with the General Plan should take place throughout the City of Oakland.

Consistent. The project site is surrounded by development and represents an infill development opportunity.

Policy N3.5 Encouraging Housing Development. The City should actively encourage development of housing in designated mixed housing type and urban housing areas through regulatory and fiscal incentives, assistance in identifying parcels that are appropriate for new development, and other measures.

Consistent. The project would add housing to an urban housing area and would utilize the state’s affordable housing density bonus regulatory incentive as well as potentially other TOD and/or affordable housing incentives/funding.

Policy N3.8 Required High-Quality Design. High-quality design standards should be required of all new residential construction. Design requirements and permitting procedures should be developed and implemented in a manner that is sensitive to the added costs of those requirements and procedures.

Consistent. The project would be designed pursuant to California Building Code and other applicable codes, and would be subject to Design Review approval by the City.

Policy N3.9 Orienting Residential Development. Residential developments should be encouraged to face the street and to orient their units to desirable sunlight and views, while avoiding unreasonably blocking sunlight and views for neighboring buildings, respecting the privacy needs of residents of the development and surrounding properties, providing for sufficient conveniently located on-site open space, and avoiding undue noise exposure.

Consistent. The project is on an already-busy BART station site indicated for TOD development and is expected to develop taller and denser than surrounding uses and therefore, any change in sunlight, views, and privacy in the vicinity would not be considered unreasonable. As appropriate for a busy BART station site, the project includes mostly hardscape plaza and walkways and as part of an area plan (WOSP), more noise-sensitive open space is located elsewhere in the Plan Area.

Policy N3.10 Guiding the Development of Parking. Off-street parking for residential buildings should be adequate in amount and conveniently located and laid out, but its visual prominence should be minimized.

Consistent. Four hundred parking spaces would be provided in below-ground garage on the project site, using the allowed reductions under Municipal Code 17.116.110 (transit accessible area).

Policy N4.2 Advocating for Affordable Housing. The City encourages local non-profit organizations, affordable housing proponents, the business community, the real estate industry, and other local policy makers to join in efforts to advocate for the provision of affordable housing in communities throughout the Bay Area region.

Consistent. The project would involve redevelopment of the site to add at least 152 (20%) new affordable units.

Policy N7.1 Ensuring Compatible Development. New residential development in Detached Unit and Mixed Housing Type areas should be compatible with the density, scale, design, and existing or desired character of surrounding development.

Consistent. The project’s choice of materials, design features, and scale of development would be compatible with existing character of surrounding development.

Policy N7.2 Defining Compatibility. Infrastructure availability, environmental constraints and natural features, emergency response and evacuation

Consistent, with density bonus. The project design would be consistent with the values that define compatibility. The project is located near infrastructure for utilities, transit, and

Page 29: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

WOB TOD Project Addendum Page 25

times, street width and function, prevailing lot size, predominant development type and height, scenic values, distance from public transit, and desired neighborhood character are among the factors that could be taken into account when developing and mapping zoning designations or determining compatibility. These factors should be balanced with the citywide need for additional housing.

community services. In height, scale, and development type, the project would be consistent with existing community character. The residential use would therefore be compatible with the Mixed Housing Type Residential land use goals in the General Plan.

Policy N9.7 Creating Compatible but Diverse Development. Diversity in Oakland's built environment should be as valued as the diversity in population. Regulations and permit processes should be geared toward creating compatible and attractive development, rather than "cookie cutter" development.

Consistent. The project’s choice of materials, design features, and scale of development would be compatible with existing character of surrounding development and is subject to Design Review approval by the City.

Policy N11.4 Alleviating Public Nuisances. The City should strive to alleviate public nuisances and unsafe and illegal activities. Code Enforcement efforts should be given as high a priority as facilitating the development process. Public nuisance regulations should be designed to allow community members to use City codes to facilitate nuisance abatement in their neighborhood.

Consistent. The project site would be redeveloped to accommodate new residential uses and commercial uses per applicable codes.

West Oakland Specific Plan Guidelines – Applicant-Submitted Consistency Assessment

1. Enhancements could include mitigating the sound and visual effects of the elevated BART tracks

Consistent. Residential and commercial buildings will be constructed with required sound insulating window and wall construction to meet planning and building code requirements. The station location has reduced BART noise due to low speed of trains at this station.

2. Create an enhanced local transit system involving streetcar, light rail, buses, and/or shuttles to serve employment, business, and community centers.

Consistent. Site design complies. Access plan is designed to accommodate maximum flexibility of current and future transit modes. This includes planned curb space for AC buses and curb drop-off for transit riders. The site has been designed to maximize the pedestrian access from all surrounding blocks. Bike access is enhanced with dedicated bike tracks on the 7th Street and Mandela Street sides of the project.

3. Ensure adequate parking to attract and support development while encouraging alternative travel modes

Consistent. Site design complies. The on-site Parking exceeds minimum requirement for proposed uses, and is planned to provide adequate parking for the residential, commercial and retail uses on site. The site plan is also designed to maximize the use of transit and non-vehicular use of the site. The Site design is planned to encourage pedestrian and bike access to the BART station and the public uses on site.

4. Improve lighting and street appearance so as to deter dumping and blight.

Consistent. The Lighting plan will be designed to create well lighted plazas and pedestrian pathways through the site. The visual security of all pedestrian spaces within the site is facilitated by locating retail and other public activities along all edges of the development.

5. Ensure that new development employs sustainable ‘‘green’’ building practices, facilitates access to pedestrian

Consistent. All new buildings and the site design meet or exceed requirements for energy efficiency and sustainable

Page 30: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

Page 26 WOB TOD Project Addendum

and transit networks, and enhances streetscapes and open spaces.

development. By developing an infill site with a high density of residential and commercial uses, this development is “green” in terms of land use. The site plan has been designed to maximize transit access, and pedestrian and bike use and access to the site, and to the BART station.

6. Promote energy efficiency throughout all aspects of new development and redevelopment.

Consistent. All new buildings and the site are designed to incorporate energy efficient systems and design standards. The buildings will be designed to meet or exceed local Green Building standards. Measures employed during the design and construction of the project will contribute additional environmental benefits. These measures will promote occupant comfort while conserving water, energy, water and natural resources.

7. Encourage sustainable development that incorporates innovative approaches to storm water management and air pollution mitigation, and continues to enhance the well-being of residents of West Oakland.

Consistent. Site is designed to provide innovative strategies policy for achieving storm water management on site. The overall site design will meet or exceed city standard for water management and air pollution mitigation. Wellness design is incorporated into the master plan design concept to encourage the overall comfort and wellbeing of residents and visitors to the site. These measures will promote occupant comfort while conserving water, energy, water and natural resources.

8. Recognize and market the artisan and arts community for their contribution to social, cultural, youth education and the economic development in West Oakland.

Consistent. The site program will incorporate significant and innovative arts, education and cultural programing on site. The open spaces will be programed with year round cultural, community and arts events that encourages use of the site, and encourages local arts and artists within the West Oakland community. This cultural, education and arts programming is incorporated into the overall design, leasing and operations to encourage and incubate the arts in West Oakland.

9. Establish new grocery stores in West Oakland that can serve the un-met food needs of current and future West Oakland consumers. A grocery anchor can also create a customer flow that can be leveraged to successfully attract other retail shops that can then draw patrons from the anchor tenant’s shoppers. A safe and pleasant pedestrian environment will be necessary, especially near the transit station.

Consistent. It is anticipated food, grocery or other neighborhood serving retail will be incorporated into the tenant leasing of the ground floor retail. Planning incorporates large retail spaces with loading and transit access that are conducive to these neighborhood serving uses. The pedestrian environment is designed to encourage local shopping by planning safe, active pedestrian spaces and access and to promote community use and a quality shopping pedestrian experience.

10. Neighborhood amenities such as benches, kiosks, lighting, and outdoor cafes are needed to enrich and enhance the urban setting.

Consistent. The site design is designed to facilitate flexible community uses including: recreation, community events, farmers markets, makers markets, arts events, festivals and other events that promote this as a central destination for the local and regional community. Neighborhood amenities, such as seating, lighting, retail kiosks, cafes, maker spaces and other activated uses will be incorporated into the pedestrian edges of all public edges of the development. This will ensure that the overall development becomes a year round activated urban community destination.

11. Potential conflicts between vehicles and pedestrians in and around the station will need to be eliminated.

Consistent. The Site Circulation and Access plan is designed to coordinate the vehicle and pedestrian access and use of the site. The design intentionally mitigates these conflicts to

Page 31: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

WOB TOD Project Addendum Page 27

ensure site use enjoyment for all users. Vehicular traffic is minimized on site to ensure maximum pedestrian safety, access and use. Parking is restricted to non-pedestaling areas. Building loading areas are located to minimize pedestrian conflicts, and to minimize conflicts with transit and other access modes to the site.

12. Noise from the BART tracks needs to be mitigated with sound barriers.

Consistent. Residential and commercial buildings will be constructed with additional sound insulating window and wall construction to meet planning code and building code requirement. This station site location has reduced BART noise due to low speed of trains at this station.

13. Mandela/7th 1: Site Planning. Close to the West Oakland BART station, a large civic plaza should be created near the intersection of Mandela Parkway and 7th Street that is surrounded by ground floors that include publicly accessible uses such as restaurants, retail, building lobbies, galleries, and studios.

Consistent. Site design complies. A larger civic plaza and pedestrian passages have been designed into the site design to celebrate the central location of the site and the Mandela corridor. The large civic plaza has been located at the center of the site at the gateway to the BART station. This plaza is located to be more central to the overall site in order to increase its public importance, public access, and public use for community, arts and cultural events. The central plaza is visible and accessible from Mandela and 7th Street.

14. Mandela/7th -2: Massing, Height. Taller buildings are encouraged along Mandela Parkway and in particular to mark intersection of 7th St and Mandela Parkway.

Consistent. Site design complies. Larger buildings are located on 7th street and Mandela. A signature tower will be located at the intersection of Mandela and 7th Street to create a visual icon for the West Oakland community. This massing will reinforce the importance of Mandela and 7th Street corridors.

15. Mandela/7th- 3: Height. It is encouraged that taller buildings mark the intersection of 7th Street and Mandela Parkway.

Consistent. Site design complies. Larger buildings are located on 7th street and Mandela. This massing will reinforce the importance of Mandela and 7th Street corridors. The urban design of the overall site locates smaller buildings along 5th and Chester Streets to transition the scale lower to the south and west portions of the site.

16. Mandela /7th -4: Fenestration. Ground floors should have large openings and a high degree of transparency in the blocks adjacent to the West Oakland BART Station.

Consistent. Site design complies. Ground floors have high floor to floor heights and retail with high proportion of glass store front for good retail transparency. The ground floor retail spaces are planned at all building ground floors to provide activated street edges, and to activate the interior plazas and pedestrian passages. Quality materials and varied design will be incorporated into the ground floor retail design to create visual interest for shoppers and pedestrians using the site.

17. Mandela/7th - 5: Landscape. Landscaping should be coordinated with that of the existing public landscaped areas along Mandela Parkway and should include a similarly high quality of planting and paving.

Consistent. Site design complies. Landscape plan is designed to enhance 7th street corridor and to create a high quality of pedestrian experience and civic prominence. The existing trees will be replaced because of conflicts with the access plan. The new tree planting will complement the overall landscape strategy of the 7th Street corridor to ensure a continuous, interesting and varied visual experience. Planting and paving materials will be of high quality and will be aesthetically designed to differentiate unique spaces within the pedestrian plazas, promote visual access to the BART station entrance, and to create opportunities for cultural, community and arts events. The landscape plan is

Page 32: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

Page 28 WOB TOD Project Addendum

designed to create a visually significant destination and center for the West Oakland community and users of the transit hub.

18. 7th Street TOD Env-1: New residences within the West Oakland BART Station TOD area will be subject to Title 24 of the California Code of Regulations, which requires an interior noise standard of 45 dBA DNL in any habitable room, and requires an acoustical analysis demonstrating how dwelling units have been designed to meet this interior standard. To meet the interior noise standard, a noise level reduction of up to nearly 35 dBA will likely be necessary from the exterior façades of the buildings facing towards the I-880 freeway and BART tracks and station.

Consistent. Residential and commercial buildings will be constructed with code complying sound insulating window and wall construction to meet planning and building code requirement. This includes required sound insulation from the I-880 freeway to ensure development meets necessary noise reduction criteria. The station location has reduced BART noise due to low speed of trains at this station.

19. 7th Street TOD Env.-4: New development of all sensitive receptor uses at the West Oakland BART Station TOD sites must mitigate the anticipated health risks and air quality hazards at this location through implementation of Best Management Practices (BMPs) for air quality.

Consistent. Site design complies. The building design will use practical and cost effective Best Management Practices (BPM) practices in the design of all structures and open space to mitigate the anticipated health risks and air quality hazards. It is also the intent of the overall plan to facilitate dramatic increases in transit use which will have a major impact on the decrease in air quality hazards in the community.

20. Provide a more effective and substantial transition in building heights nearest to the South Prescott neighborhood, with buildings nearest to this neighborhood as low as 2- stories.

Consistent. Site Design complies. The master plan development places the maximum height along Mandela and 7th Street, and transitions down to 5th Street and Chester Street. The Chester Street frontage has been designed with 3 level residential buildings that reflect more of the scale and detail of the structures of the South Prescott neighborhood, to further mitigate the height of the larger structures and to create a good urban scale transition to the smaller structures in the neighborhood. It is the intent to use a more modern design vocabulary along Chester Street that uses scale and fenestration elements that relate to the neighboring structures.

21. Ensure that new development projects along 7th Street are of compatible height and mass as the existing, newer developments within Mandela Gateway.

Consistent. Site design complies. The base of the larger buildings has been articulated with a cornice height, materials and a variety of window fenestrations that intentionally scales the buildings to relate to the lower existing structures along 7th Street and 5th Street neighborhood context. These larger buildings are designed with a clear separation of lower tower and upper towers to differentiate the higher structures, and to emphasize the importance of the lower buildings that create the activated street elevations.

22. Target 15% of the new units to be built in the Plan Area between now and 2035 for low and moderate income households.

Consistent. Site complies. The development plan will meet or exceed the requirement for affordable units on-site.

23. Neighborhood Commercial 3: Height. Except when located at important intersections such as Mandela Parkway and 7th Street, buildings over 5 stories in height should generally include a significant step-back along commercial arterial roadways to harmonize the scale of new buildings with the existing neighborhood.

Consistent. Site design complies. The lower 5 floors of the high rise buildings have been articulated with a cornice and clear differentiation between the lower and upper portions of the building. The building massing is designed to provide a varied base and street elevation that relates to the smaller scale of the surrounding buildings along the 7th Street

Page 33: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

WOB TOD Project Addendum Page 29

corridor. Residential buildings along 5th Street exceed the 5 floor set back in order to have a better proportioned street façade. The building base massing to provide a variety of scales to provide a visually active street scape, and to relate better to the varied neighborhood context.

24. Neighborhood Commercial 8: Landscape. Publicly accessible outdoor space areas should be comprehensively designed with high quality pavement, landscaping, and seating, and are encouraged at the following locations: Mandela and 7th Street.

Consistent. Site design complies. The landscape materials are designed with high quality stone, brick, finished concrete and other materials to create a high quality public pedestrian experience and to maximize the types of uses that can occur on site. The landscape will be designed to relate to a larger vision for the 7th Street corridor. The new tree planting will complement the overall landscape strategy of the 7th Street corridor to ensure a continuous, interesting and varied visual experience. Planting and paving materials will be of high quality and will be aesthetically designed to differentiate unique spaces within the pedestrian plazas, promote visual access to the BART station entrance, and to create opportunities for cultural, community and arts events. The landscape plan is designed to create a visually significant destination and center for the West Oakland community and users of the transit hub.

Based on  the above,  the project would be  substantially  consistent with  the development density established by existing zoning, community plan, or General Plan policies and  the State Affordable Housing Density Bonus Law, which requires that the City grant a density bonus if the project meets affordable  housing  requirements.  Requested  variations  from  base  zoning,  community  plan  or General Plan requirements are allowable under the applicable local and State regulations and would therefore not represent conflicts with applicable plans. 

Page 34: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated
Page 35: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

WOB TOD Project Addendum Page 31

VII. ENVIRONMENTAL CHECKLIST

The  Abbreviated  Appendix  N  Checklist  below  compares  potential  environmental  impacts  of  the project to the findings of the WOSP EIR, notes whether the project would result  in new significant impacts or  impacts substantially greater or more severe  than  those previously  identified  in WOSP EIR, and includes an explanation substantiating the findings for each topic. It uses the abbreviation SU  for  significant  and  unavoidable  and  LTS  for  less‐than‐significant  and  LTS w/  SCAs  of MM  for impacts  that  are  reduced  to  LTS  with  implementation  of  identified  SCAs  and/or  Mitigation Measures. Topics  for which No  Impact was  identified  in  the WOSP EIR were assessed against  the proposed  project  and  determined  to  remain  applicable  so  are  not  further  discussed  in  this document. 

The checklist also  lists mitigation measures and  standard conditions of approval applicable  to  the impacts. A  full  list of  the  SCAs  and Mitigation Measures  (MMs)  applicable  to  the project  can be found  in Attachment A, Standard Conditions of Approval and Mitigation Monitoring and Reporting Program (SCAMMRP). More detail regarding the significance criteria used in this Addendum and the environmental impacts of implementation of the WOSP is available in the WOSP Draft and Final EIR at the following link:  http://www2.oaklandnet.com/Government/o/PBN/ OurOrganization/PlanningZoning/OAK028334. 

When a dash  (‐‐) appears  in  the checklist below,  it means  that  the WOSP EIR did not  identify any MMs or SCAs related to that environmental impact. N/A appears when an MM or SCA was identified but it does not apply to the project (e.g., the project location does not meet the criteria specified in the MM or SCA). The SCAs that appear in the checklist represent the City’s latest standards, revised November 5, 2018.  In many  cases, newer SCAs  from  the 2018 update have  superseded  the SCAs originally  listed  in  the WOSP EIR  and  functionally  equivalent  SCA  are  substituted without  further comment.  The  numbers  used  to  identify  the  SCAs  are  also  reflective  of  the  2018  SCAs,  not  the numbers used in the WOSP EIR. 

Page 36: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

Page 32 WOB TOD Project Addendum

A. Aesthetics, Shadow, and Wind

 Impacts Related To: 

WOSP EIR Findings with 

Implementation of SCA or MMs (If Required) 

PROJECT 

Relationship to WOSP EIR Findings 

Applicable MMs  Applicable SCAs 

Project Level of Significance

Equal or Less 

Severity 

Substantial Increase in Severity 

a.  Scenic Vistas or Resources 

 

LTS  ☒  ☐  ‐‐  ‐‐  LTS 

b. Visual Character or Quality 

LTS  ☒  ☐  ‐‐  ‐‐  LTS 

c.  Light or Glare  LTS w/ SCA  ☒  ☐  ‐‐  SCA‐AES‐1: Lighting Plan (#19) 

LTS w/ SCA 

d. Shadows  LTS  ☒  ☐  ‐‐  ‐‐  LTS 

e.  Wind  LTS  ☒  ☐  ‐‐  ‐‐  LTS 

Discussion

Under  Public  Resources  Code  Section  21099(d),  effective  January  1,  2014,  aesthetics  of  “a residential, mixed‐use  residential, or employment  center project on an  infill  site  located within a transit priority  area”  shall no  longer be  considered  significant  impacts on  the  environment. As  a result, no further analysis is needed for the proposed project related to aesthetics and the following is provided for informational purposes.  

Consistent with WOSP EIR conclusions, implementation of SCA‐AES‐1: Lighting (#19) will ensure the project will comply with guidelines related to light and glare. 

Consistent with WOSP EIR conclusions, due to distance and  intervening development, there are no public  parks  that  the  project would  substantially  shadow  and  no  historic  resources  nearby  that contain light‐sensitive features with the potential to be substantially affected by shadowing.  

Consistent with WOSP EIR conclusions, the project  is not within an area where the City requires a wind study for tall projects. 

Independent  of  the  Addendum,  the  project  would  be  required  to  implement  the  following additional  SCAs  related  to  aesthetics,  as  found  in  Attachment  A:  SCA‐AES‐1:  Trash  and  Blight Removal (#16), SCA‐AES‐2: Graffiti Control (#17), and SCA‐AES‐3: Landscape Plan (#18). 

   

Page 37: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

WOB TOD Project Addendum Page 33

B. Air Quality

 Impacts Related To: 

WOSP EIR Findings with 

Implementation of SCA or MMs (If Required) 

PROJECT 

Relationship to WOSP EIR Findings 

Applicable MMs  Applicable SCAs 

Project Level of 

Significance 

Equal or Less 

Severity 

Substantial Increase in Severity 

a.  Criteria Air Pollutant Emissions 

SU  ☒  ☐  ‐‐  SCA‐AIR‐1 Dust Controls‐ Construction Related 

(#21) 

SCA‐AIR‐2 Criteria Air Pollutant Controls ‐ Construction‐Related 

(#22) 

SCA‐AIR‐3 Diesel Particulate Matter 

Controls‐ Construction Related (#23) 

SCA‐TRANS‐4 Transportation and Parking Demand 

Management (#79) 

SU 

b. Toxic Air Contaminants 

Construction LTS w/SCAs 

 

Operational SU 

☒  ☐  N/A a  SCA‐AIR‐1 Dust Controls‐ 

Construction Related (#21) 

SCA‐AIR‐2 Criteria Air Pollutant Controls ‐ Construction‐Related 

(#22) 

SCA‐AIR‐3 Diesel Particulate Matter 

Controls‐ Construction Related (#23) 

SCA‐AIR‐4: Stationary Sources of Air Pollution (Toxic Air Contaminants) 

(#25) 

Construction LTS w/SCAs 

 

Operational SU 

a Mitigation Measures Air‐9, ‐9B, ‐9C, and ‐10 are now incorporated into SCA‐AIR‐4 and SCA‐AIR‐6. Only the SCAs appear in Attachment A, not the mitigation measure. 

Discussion

Air Quality was analyzed in the WOSP EIR, which found impacts related to construction‐period and operational  air  pollutant  emissions  and  operational  toxic  air  contaminants  to  be  significant  and unavoidable under build‐out of the WOSP EIR. Construction‐period dust and toxic air contaminants were found to be reduced to a less‐than‐significant level through implementation of SCAs. All other impacts were found to be less‐than‐significant. 

The proposed project would construct mid‐rise and high‐rise residential and office uses with ground‐floor  retail.  It  is  assumed  the high‐rise building  and potentially  also  the mid‐rise buildings would include emergency generators that would not be used regularly, but that could be used to operate 

Page 38: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

Page 34 WOB TOD Project Addendum

elevators in the event of an emergency. The project is consistent with the assumptions used in the WOSP EIR for the 7th Street Opportunity Area. The WOSP and the associated EIR intend to provide flexibility in the location, amount, and type of development. Therefore, the project would contribute to  the  identified emissions and  significant  impacts  identified  in  the WOSP EIR, and  the air quality impact  analysis  and  conclusions  presented  in  the  WOSP  EIR  remains  valid  so  long  as  the development in the overall Plan Area remains below the forecasted level. Since the approval of the WOSP  EIR,  eleven  developments,  including  this  project,  have  been  proposed  and  are  under construction  or  are  in  some  stage  of  the  City’s  approval  process.  As  detailed  in  subsection M, Transportation and Circulation, the current proposal  is within the overall development assumed  in the WOSP EIR. 

Construction‐Period  

Because  of  the  size  of  the  project  site,  the  City’s  basic  and  enhanced  control  measures  for construction  dust  and  emissions  would  apply,  as  described  under  SCA‐AIR‐1:  Dust  Controls  – Construction  Related  (#21)  and  SCA‐AIR‐2:  Criteria  Air  Pollutant  Controls  –  Construction  Related (#22), originally combined as SCA A of the WOSP EIR. Although not yet required at the time of the WOSP EIR, SCA‐AIR‐3: Diesel Particulate Matter Controls‐Construction Related  (#23)  is a currently required SCA and would further reduce diesel particulate matter emissions and related health risk during construction. As reported  in the WOSP EIR, these SCAs would keep  fugitive dust  levels and construction‐related TAC emissions to less‐than‐significant levels.  

However, consistent with the findings of the WOSP EIR, it is assumed that the project is one of the large construction projects pursuant to the WOSP that would result in a significant and unavoidable impact for construction‐related criteria air pollutant emissions. This significant construction‐related criteria pollutant emission  impact was studied  in the WOSP EIR under  Impact Air‐5. The WOSP did not have any additional mitigation measures for this impact, but the project would comply with the relevant SCAs listed in Attachment A.  

With  implementation  of  SCA‐Air‐1,  SCA‐AIR‐2,  and  SCA‐AIR‐3,  the  project  impact  would  be consistent  with  WOSP  Impacts  Air‐4,  Air‐5,  and  Air‐6  and  no  further  analysis  is  required  for construction‐period air pollutant and toxic air contaminant emissions. 

Operational 

The WOSP EIR identified functionally equivalent SCA‐TRANS‐4: Transportation and Parking Demand Management (#79) as reducing the operational air pollutant emissions through reduction of vehicle emissions  though not below significance  levels. With  implementation of SCA‐TRANS‐4,  the project impact would be consistent with WOSP Impact Air‐7 and no further analysis is required with respect to operational air pollutant emissions. 

Residential, office, and  retail uses are not generally considered  substantial  sources of operational toxic  air  emissions.  However,  while  specifics  would  be  determined  during  building‐specific permitting,  it  is  likely  that  the project would  include  a back‐up diesel  generator on  the high‐rise building and potentially also back‐up generators for the mid‐rise building(s), which would generate some amount of stationary‐source toxic air contaminants. Consistent with the findings of the WOSP EIR, health risk impacts related to the project’s operational‐emitted TACs to nearby existing sensitive receptors  would  be  considered  significant  and  unavoidable,  even  with  inclusion  of  SCA‐AIR‐4: Stationary  Sources  of  Air  Pollution  (Toxic  Air  Contaminants)  (#25)  (which  includes  elements 

Page 39: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

WOB TOD Project Addendum Page 35

functionally  equivalent  to  WOSP  EIR  Mitigation  Measure  AIR‐9:  Risk  Reduction  Plan).  With implementation of SCA‐AIR‐4, the project  impact would be consistent with WOSP Impact Air‐9 and no further analysis is required. 

Impacts  of  the  existing  environment  on  the  project  are  not  required  by  CEQA  and  so  are  not analyzed  in  this  CEQA  document  and  related  Mitigation  Measures  Air‐9B  and  Air‐9c  are  not applicable.5 (These mitigation measures have also been replaced by requirements under SCA‐AIR‐5, listed below.) Independent of conclusions of the Addendum, the following SCAs related to air quality and  future  site  users  would  be  applicable:  SCA‐AIR‐5:  Exposure  to  Air  Pollution  (Toxic  Air Contaminants) (#25). 

   

                                                                 5   Supreme Court of California, 2018. California Building Industry Association v Bay Area Air Quality 

Management District No S213478. December 17. 

Page 40: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

Page 36 WOB TOD Project Addendum

C. Biological Resources

 Impacts Related To: 

WOSP EIR Findings with 

Implementation of SCA or MMs (If Required) 

PROJECT 

Relationship to WOSP EIR Findings 

Applicable MMs  Applicable SCAs 

Project Level of 

Significance 

Equal or Less 

Severity 

Substantial Increase in Severity 

a.  Special‐Status Species, Wildlife Corridors, Riparian/ Sensitive Habitat, Wetlands 

LTS w/SCAs  ☒  ☐  ‐‐  SCA‐BIO‐1: Tree Removal 

During Breeding 

Season (#30) 

LTS w/SCAs 

b. Tree and Creek Protection 

LTS w/SCAs  ☒  ☐  ‐‐  SCA‐BIO‐2: Tree 

Permit (#31) 

LTS w/SCAs 

Discussion

Biological Resources  

The project site  is  located within a developed area and  is currently occupied by the West Oakland BART station plaza and associated surface parking. Wildlife and botanical resources present within the WOSP  Plan Area,  including  the  project  site,  are  adapted  to  disturbed,  urban  conditions  and would not be adversely affected by the implementation of the project.  

The WOSP EIR determined that due to the absence of natural habitat in the Plan Area, special‐status species  and  habitat  as well  as wildlife  corridors  and wetlands were  not  expected  to  be  present within the Plan Area, with the exception of common birds, which are protected when nesting under the Migratory Bird Treaty Act.  

Biological  impacts related to disturbance of nesting birds and their movements (Impacts Bio‐1 and Bio‐4) were determined to be less‐than‐significant with implementation of SCA‐BIO‐1: Tree Removal During  Breeding  Season  (#30).  (The WOSP  EIR‐identified  SCA  related  to  Bird  Collision  Reduction would not be applicable to this site as this project site is not immediately adjacent to a water body or  park  and  does  not  include  substantial  green  roofs.) With  implementation  of  SCA‐BIO‐1,  the project impact would be consistent with WOSP Impacts Bio‐1 through Bio‐4 and no further analysis is required with respect to special‐status species, habitat, corridors, or wetlands. 

Creek and Tree Protection  

No creeks exist on the project site, and no off‐site creeks would be affected by the project. There are no habitat conservation plans or natural community conservation plans applicable  to  the site. Construction of the project would require removal of existing  landscaping trees at the project site. The WOSP  EIR  determined  that  through  compliance  with  SCA‐BIO‐2:  Tree  Permit  (#31)  (which combines the tree removal and tree replacement SCAs identified in the WOSP EIR), tree removal for Plan Area projects would  comply with  the  applicable City of Oakland  Tree Protection Ordinance. With  implementation of SCA‐BIO‐2, the project  impact would be consistent with the WOSP Impact Bio‐5 and no further analysis is required with respect to tree and creek protection.   

Page 41: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

WOB TOD Project Addendum Page 37

D. Cultural Resources

 Impacts Related To: 

WOSP EIR Findings with 

Implementation of SCA or MMs (If Required) 

PROJECT 

Relationship to WOSP EIR Findings 

Applicable MMs  Applicable SCAs 

Project Level of 

Significance 

Equal or Less 

Severity 

Substantial Increase in Severity 

a.  Historical Resources 

LTS w/SCAs  ☒  ☐  ‐‐  N/A  LTS 

b. Archaeological, Paleontological, and Tribal Resources and Human Remains 

LTS w/SCAs  ☒  ☐  ‐‐  SCA‐CUL‐1: Archaeological and Paleontological 

Resources – Discovery During Construction 

(#33)  

SCA‐CUL‐2: Archaeologically 

Sensitive Areas – Pre‐Construction Measures 

(#34)  

SCA‐CUL‐3: Human Remains – 

Discovery During 

Construction (#35) 

LTS w/SCAs 

Discussion

Historic Resources 

The project site does not include and is not adjacent to any of the historically significant structures identified  in  the  WOSP  EIR  and  therefore  identified  SCAs  related  to  historic  preservation  and vibration adjacent to historic structures are not applicable.  

The WOSP EIR shows that the project site is near, but not within, the Oakland Point Area of Primary Importance (Oakland Point API), whose southern boundary is one half to one full block north of the project  site  across  7th  Street.  The WOSP  EIR  concludes  that  properties  surrounding  the Oakland Point API, other than some 7th Street commercial strip properties that abut the district (which does not  include  the project site), do not contribute  to  its historical significance. The WOSP EIR  further concludes  that proposed development elsewhere  in  the 7th Street Opportunity Area,  including on the project site, would not cause a substantial adverse change in the significance of this API or of the individual historical  resources within  the API. The WOSP EIR determined  that Areas of Secondary Importance (ASIs) did not qualify as significant historical resources under CEQA and therefore, that while the project site is adjacent across Chester Street to the South Prescott ASI to the west, there would be no potential  for significant historical  impacts on this area. Therefore, the project  impact would be consistent with the WOSP Impacts CR‐1 and CR‐3 and no further analysis is required with respect to historic resources. 

 

Page 42: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

Page 38 WOB TOD Project Addendum

Archaeological, Paleontological, and Tribal Resources and Human Remains 

With respect to archaeological, paleontological, and Native American resources and human remains, the WOSP EIR concluded  that  the Plan Are  is  located  in an area of moderate  to high potential  for unrecorded historic‐period archaeological and/or Native American resources. Compliance with the following SCAs, which are functionally equivalent to the SCAs that were in effect at the writing of the WOSP  EIR, would  ensure  that  any  impacts  related  to  discovery  of  unrecorded  resources  during construction  at  the  project  site  are  mitigated  to  a  less‐than‐significant  level:  SCA‐CUL‐1: Archaeological  and  Paleontological  Resources  –  Discovery  During  Construction  (#33);  SCA‐CUL‐2 Archaeologically  Sensitive  Areas  –  Pre‐Construction  Measures  (#34);  and  SCA‐CUL‐3:  Human Remains – Discovery During Construction (#35). 

Page 43: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

WOB TOD Project Addendum Page 39

E. Geology, Soils, and Geohazards

 Impacts Related To: 

WOSP EIR Findings with 

Implementation of SCA or MMs (If Required) 

PROJECT 

Relationship to WOSP EIR Findings 

Applicable MMs  Applicable SCAs 

Project Level of 

Significance 

Equal or Less 

Severity 

Substantial Increase in Severity 

a.  Seismic Hazards & Unstable Soil 

LTS w/SCAs  ☒  ☐  ‐‐  SCA‐GEO‐1: Construction‐ 

Related Permit[s] (#37) 

SCA‐GEO‐2: Soils Report (#38) 

SCA‐GEO‐3: Seismic Hazards Zone (Landslide/ 

Liquefaction) (#40) 

LTS w/SCAs 

b. Soil Erosion  LTS w/SCAs  ☒  ☐  ‐‐  SCA‐GEO‐4: State General Construction 

Permit (#50)  

SCA‐HYD‐1: Erosion and Sedimentation Control Plan for 

Construction (#49) 

LTS w/SCAs 

Discussion

Seismic Hazards and Unstable Soil 

The WOSP EIR noted that there are no Alquist‐Priolo Earthquake Fault Zones within the Plan Area and therefore no significant  impact related to  fault rupture. The WOSP EIR  further noted  that the Plan  Area,  including  the  project  site,  is  located  within  the  greater  San  Francisco  Bay  Area,  a seismically  active  region with  risks  of  strong  seismic  ground  shaking  and  seismic‐related  ground failure,  particularly  the  potential  for  liquefaction  at  and  around  the  project  site.  Further, construction activities that disturb soils could result in erosion or loss of topsoil. 

The WOSP EIR concluded  that compliance with SCAs, which  include  the current SCAs: SCA‐GEO‐1: Construction‐Related  Permit(s)  (#37),  SCA‐GEO‐2:  Soils  Report  (#38),  and  SCA‐GEO‐3:  Seismic Hazards  Zone  (Landslide/Liquefaction)  (#40), would  ensure  that  the  project would  not  result  in significant  impacts  related  to  seismic  hazards  and  unstable  soils.  These  SCAs  are  included  in Attachment A. With implementation of SCA‐GEO‐1, SCA‐GEO‐2, and SCA‐GEO‐3, the project impact would be  consistent with WOSP EIR  Impacts GEO‐1, GEO‐2, and GEO‐5 and no  further analysis  is required with respect to seismic hazards and unstable soils. 

Soil Erosion 

The  WOSP  EIR  identified  SCA‐GEO‐4:  State  General  Construction  Permit  (#50)  and  SCA‐HYD‐1: Erosion and Sedimentation Control Plan for Construction (#49) to ensure that the project would not result  in significant  impacts related to soil erosion. These SCAs are  included  in Attachment A. With implementation of SCA‐GEO‐4 and SCA‐HYD‐1, the project  impact would be consistent with WOSP EIR Impact GEO‐4 and no further analysis is required with respect to erosion.

Page 44: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

Page 40 WOB TOD Project Addendum

F. Greenhouse Gas Emissions and Climate Change

 Impacts Related To: 

WOSP EIR Findings with 

Implementation of SCA or MMs (If Required) 

PROJECT 

Relationship to WOSP EIR Findings 

Applicable MMs  Applicable SCAs 

Project Level of 

Significance 

Equal or Less 

Severity 

Substantial Increase in Severity 

a.  GHG Emissions  LTS  

(Stationary sources SU but not applicable to current project) 

☒  ☐  ‐‐  ‐‐  LTS 

b. Consistency with Applicable GHG Plans 

LTS  ☒  ☐  ‐‐  ‐‐  LTS 

Discussion

GHG Emissions 

According to the City of Oakland’s thresholds of significance, which were also used in the WOSP EIR, a project would have a significant impact if it would produce total greenhouse gas (GHG) emissions of more  than 1,100 metric  tons of carbon dioxide equivalents  (CO2e) annually and more  than 4.6 metric  tons  of  CO2e  per  service  population  annually.  The  service  population  includes  both  the residents and the employees of the project. 

The WOSP  EIR  evaluated  impacts  related  to GHG  emissions  from  construction  and  operation  of development  under  the  WOSP.  Future  projects  and  development  under  the  WOSP  would  be required to implement SCAs that would reduce GHG emissions during construction and operation of projects  and, with  the  exception of new  stationary  sources of GHG, would be  expected  to meet applicable  efficiency  thresholds  and  result  in  less‐than‐significant  impacts.  The  project  does  not include permitted stationary sources of GHG so these are not further discussed.  

While  the project  is consistent with  the WOSP EIR analysis and  therefore would have a  less‐than‐significant  impact  with  regard  to  GHG  emissions,  Oakland  requires  quantification  to  determine applicability  of  SCAs.  Full  inputs  and  outputs  of  the GHG  emissions  analysis  are  included  in  the Greenhouse Gas Reduction Plan and summarized below.  

Based on  the GHG analysis  shown  in Table 3,  the project’s estimated CO2e emissions per  service population would  be  0.57 metric  tons  annually, which  is  below  the  efficiency  threshold  of  4.6. Because the project would be below one of the project‐level significance thresholds, impacts related to  GHG  emissions  would  be  less‐than‐significant.  Therefore,  the  proposed  project  would  not substantially  increase  the  severity of  significant  impacts  identified  in  the WOSP EIR, nor would  it result in new significant impacts related to GHG and climate change that were not identified in the WOSP EIR.  

The WOSP EIR did not identify any mitigation measures related to GHGs, and none are required for the proposed project.  

Page 45: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

WOB TOD Project Addendum Page 41

Table 3. Summary of Project GHG Emissions 

 Emission Source 

CO2e (MT/year) CO2e Efficiency 

(MT/year/SP) a 

Construction b  21  0.00 

Operation – Area  40  0.01 

Operation – Energy  2,075  0.49 

Operation – Mobile c  5,670  1.33 

Operation – Waste   43  0.01 

Operation – Water   240  0.06 

Total Projects Emissions c  2,419  0.57 

Thresholds of Significance  1,100  4.6 

Threshold Exceeded? d  YES  NO a   The service population of 4,261 residents and employees was used, see subsection K, Population and 

Housing for details.  b   In accordance with CEQA guidance from the City of Oakland, GHG emissions during construction are 

amortized over 40 years c  In accordance with SB 375, the estimated GHG emissions from cars and light‐duty trucks are 

excluded from the GHG analysis. d   Project must exceed both thresholds to be considered a significant impact. 

Source: Greenhouse Gas Reduction Plan for WOB TOD Project, December 2018. 

 

Independent of the Addendum, because of the size of the project and exceedance of at  least one threshold,  the  project would  be  required  to  implement  SCA‐GHG‐1:  GHG  Reduction  Plan  (#42). Implementation of other SCAs would also reduce GHG emissions. These include but are not limited to SCA‐TRANS‐4: Transportation and Parking Demand Management (#79), SCA‐UTIL‐1: Construction and  Demolition Waste  Reduction  and  Recycling  (#84),  SCA‐UTIL‐4:  Green  Building  Requirements (#87),  SCA‐UTIL‐7:  Recycled Water  (#91),  and  SCA‐UTIL‐8: Water  Efficient  Landscape  Ordinance (WELO) (#92). 

Consistency with GHG Emissions and Policies 

The City’s GHG quantitative thresholds were designed to ensure compliance with the State’s AB 32 GHG  reduction goals, as set  forth  in  the California Air Resources Board’s  (CARB’s) Climate Change Scoping  Plan.  Since  the  GHG  emissions  from  the  project  would  be  below  the  City’s  efficiency threshold based on the service population (see above), it can be assumed that the proposed project is consistent, and not  in fundamental conflict, with the AB 32 Scoping Plan. Moreover, the project site  is  located  in  a  Priority  Development  Area  designated  by  Plan  Bay  Area,6  the  Sustainable Communities Strategy adopted  for  the purpose of achieving  the GHG reduction  target established by CARB for the region’s transportation and land use sector pursuant to the AB 32 Scoping Plan. As stated by Plan Bay Area, a Priority Development Area is a geographic area “where new development 

                                                                 6   Metropolitan Transportation Commission (MTC) and Association of Bay Area Governments (ABAG), 2017. 

Priority Development Areas (Plan Bay Area 2040), available at http://opendata.mtc.ca.gov/datasets/56ee3b41d6a242e5a5871b043ae84dc1_0. 

Page 46: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

Page 42 WOB TOD Project Addendum

will  support  the day‐to‐day needs of  residents  and workers  in  a pedestrian‐friendly  environment served by transit.” By focusing new development within a Priority Development Area, Plan Bay Area establishes a preferred development scenario, which will achieve the plan’s GHG reduction targets. Since the proposed project would be constructed within a Priority Development Area with land uses at a density and intensity higher than the minimum recommendation included in Plan Bay Area (i.e., >20 dwelling units per acre; 0.75 FAR),  the proposed project would  further, and not conflict with, Plan Bay Area’s GHG reduction targets. 

The project is consistent with, and would not hinder, the GHG reduction goals set forth in the City of Oakland’s Energy and Climate Action Plan (ECAP) and the green planning policies of the General Plan because  the proposed project would promote  land use patterns and densities  that help  improve regional air quality  conditions, as demonstrated by  its  compliance with Plan Bay Area’s preferred development scenario. The project would also be required to comply with the City’s Green Building Ordinance, which supports the goals, policies, and actions of the ECAP and General Plan. 

As  listed  under  GHG  Emissions  discussion  above,  implementation  of  the  City’s  SCAs would  also reduce GHG emissions. Overall, the project would not conflict with applicable GHG plans, policies or regulations, and  this  impact would be  less‐than‐significant, consistent with  the conclusions of  the WOSP EIR. 

   

Page 47: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

WOB TOD Project Addendum Page 43

G. Hazards and Hazardous Materials

 Impacts Related To: 

WOSP EIR Findings with 

Implementation of SCA or MMs (If Required) 

PROJECT 

Relationship to WOSP EIR Findings 

Applicable MMs  Applicable SCAs 

Project Level of 

Significance 

Equal or Less 

Severity 

Substantial Increase in Severity 

a.  Hazardous Materials Use, Exposure, Storage & Disposal 

LTS w/ SCAs  ☒  ☐  ‐‐  SCA‐HAZ‐1: Hazardous Materials 

Related to Construction (#43) 

SCA‐HAZ‐2: Hazardous Building Materials and Site 

Contamination (#44) 

SCA‐HAZ‐3: Fire Safety Phasing Plan 

(#46) 

LTS w/ SCAs 

b. Hazardous Materials within a ¼‐mile of a School 

LTS w/ SCAs  ☒  ☐  ‐‐  N/A  LTS 

c. Emergency Access Routes 

LTS w/ SCAs  ☒  ☐  ‐‐  SCA‐GEN‐1: Construction 

Management Plan (#13) 

LTS w/ SCAs 

Discussion

The project site is not located near wildland areas or public or private airstrips. Therefore, there are no wildland fire risks or risk of airport hazards at the project site and these are not further discussed in this document.  

Hazardous Materials 

As noted  in the WOSP EIR, the site  is  included  in the DTSC Geotracker database as a site requiring evaluation  though  no  known  sources  of  contaminants  or  known  contaminants  of  concern were identified.7  Construction  activities  would  use,  transport,  and  store  on  site  hazardous materials, including  fuels  and  other  chemicals  and  disturb  soils  and/or  groundwater  that  may  contain contaminates.  The WOSP  EIR  reported  that  hazards  and  hazardous materials  impacts would  be mitigated to less‐than‐significant levels with compliance with local, state, and federal regulations for treatment, remediation, and/or disposal of contaminated soil and/or groundwater and the City SCAs that were in effect at the time, which are functionally equivalent to the City’s current SCAs, including SCA‐HAZ‐1:  Hazardous  Materials  Related  to  Construction  (#43),  SCA‐HAZ‐2:  Hazardous  Building Materials and Site Contamination  (#44), SCA‐HAZ‐3: Fire Safety Phasing Plan  (#46).  Impacts of  the environment on  the project are not  required under CEQA and  information/SCAs  related  to  future site users or residents are included for informational purposes. 

                                                                 7   State Department of Toxic Substances Control, EnviroStor records, available at 

https://www.envirostor.dtsc.ca.gov/public/, including record ID # 70000133 for the project site. 

Page 48: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

Page 44 WOB TOD Project Addendum

Hazardous Materials Near Schools 

Because  the  project would  not  include  any  industrial  uses,  the  proposed  project would  not  use substantial  amounts  of  hazardous  materials  and  the  small  amounts  of  “household  hazardous waste”, which  includes  cleaning products, would be handled  according  to  applicable  regulations. While  there are  schools  located within ¼ mile of  the project  site,  the  impact would be  less‐than‐significant because the project would not handle significant amounts of hazardous materials during operations.  

Emergency Access Routes 

As noted in the WOSP EIR, 7th Street in the project area is an identified emergency evacuation route. The WOSP EIR noted that temporary localized disruption of evacuation routes could be possible but that  the  impact would be  reduced  to  less‐than‐significant  through  implementation of  functionally equivalent SCA‐GEN‐1: Construction Management Plan (#13).  

 

Page 49: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

WOB TOD Project Addendum Page 45

H. Hydrology and Water Quality

 Impacts Related To: 

WOSP EIR Findings with 

Implementation of SCA or MMs (If Required) 

PROJECT 

Relationship to WOSP EIR Findings 

Applicable MMs  Applicable SCAs 

Project Level of 

Significance 

Equal or Less 

Severity 

Substantial Increase in Severity 

a.  Water Quality & Drainage 

LTS w/ SCAs  ☒  ☐  ‐‐  SCA‐HYD‐1: Erosion and Sedimentation Control Plan for 

Construction (#49) 

SCA‐HYD‐2: State Construction 

General Permit (#50) 

SCA‐HYD‐3: NPDES C.3 Stormwater Requirements for Regulated Projects 

(#54) 

LTS w/ SCAs 

b. Use of Groundwater 

LTS  ☒  ☐  ‐‐  ‐‐  LTS 

c. Flooding & Substantial Risks from Flooding 

LTS  ☒  ☐  ‐‐  ‐‐  LTS 

Discussion

Water Quality and Drainage 

The majority of the site (212,865 square feet, which  is 87.5% of the site)  is currently covered with impervious  surfaces.  Implementation  of  the  project would  include  landscaped  areas  that would reduce impervious surfaces on the project site (relative to the existing condition) by approximately 10,320  square  feet.  The project would be  required  to  comply with  Provision C.3 of  the National Pollutant Discharge Elimination System  (NPDES) Municipal Regional Permit  (MRP). Consistent with conclusions  of  the  WOSP  EIR,  because  the  project  would  adhere  to  national,  state,  and  local regulations,  as well  as  the  City’s  SCAs,  including  functionally  equivalent  SCA‐HYD‐1:  Erosion  and Sedimentation Control Plan  for Construction  (#49), SCA‐HYD‐2: State Construction General Permit (#50),  and  SCA‐HYD‐3:  NPDES  C.3  Stormwater  Requirements  for  Regulated  Projects  (#54),  the potential  for  the  proposed  project  to  substantially  alter  drainage  patterns,  increase  the  flow  of runoff, impact groundwater, or affect water quality would be less‐than‐significant. 

Use of Groundwater 

The WOSP EIR noted that the local water district, EBMUD, relies on surface water and does not use the groundwater basin  for municipal water supply so  the  impact  in  regard  to use of groundwater would  be  less‐than‐significant.  Additionally,  the  WOSP  noted  that  development  is  required  to comply with C.3 provisions requiring recharge rates at development sites at least equivalent to pre‐development rates.  

Page 50: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

Page 46 WOB TOD Project Addendum

Flooding 

As noted in the WOSP EIR, the project site is not in an area subject to inundation in the event of dam failure, seiche, or mudflows. However, some areas, including a portion of the project site, could be subject to tsunami  inundation  in the event of an off‐shore earthquake. The WOSP EIR determined that due  to  the  rare occurrence of  tsunamis,  the distance  from  the shoreline, and  the emergency alert system, the potential impacts related to tsunami inundation would be less‐than‐significant. 

As noted in the WOSP EIR and confirmed on current flood maps, 8 the project site is outside of the 100‐year‐flood hazard zone and would not have a significant impact related to flood hazards.   

                                                                 8   Federal Emergency Management Agency (FEMA) Flood Insurance Rate Map (FIRM) #06001C0066H, 

effective 12/21/2018, available at https://msc.fema.gov/portal/search. 

Page 51: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

WOB TOD Project Addendum Page 47

I. Land Use

 Impacts Related To: 

WOSP EIR Findings with 

Implementation of SCA or MMs (If Required) 

PROJECT 

Relationship to WOSP EIR Findings 

Applicable MMs  Applicable SCAs 

Project Level of 

Significance 

Equal or Less 

Severity 

Substantial Increase in Severity 

a.  Division of an Existing Community 

LTS  ☒  ☐  ‐‐  ‐‐  LTS 

b. Conflict with Land Uses / Land Use Plans 

LTS  ☒  ☐  ‐‐  ‐‐  LTS 

Discussion

Division of an Existing Community 

Consistent with WOSP EIR findings, the project would not disrupt or divide a community, but instead would  replace a surface  lot with walkways and plaza areas  lined with neighborhood‐serving  retail uses with increased activation as well as comfort and appearance of pedestrian connections through the site.  

Conflict with Land Uses / Land Use Plans 

As detailed in the consistency assessment in Section V, the project would be substantially consistent with  the  development  density  established  by  existing  zoning,  community  plan,  or  General  Plan policies and the State Affordable Housing Density Bonus Law, which requires that the City grant a density bonus if the project meets affordable housing requirements. Requested variations from base zoning, community plan or General Plan requirements are allowable under the applicable local and State regulations and would therefore not represent conflicts with applicable plans.   

The WOSP EIR acknowledges that higher‐density development would be allowed at the project site than  in  adjacent  low‐rise  residential  areas.  The WOSP  EIR  further determined  that  the  increased density  was  appropriate  for  the  transit  site  and  would  not  result  in  a  substantial  conflict  with existing uses if building height transitions were considered at boundaries. The project proposes low‐rise  residential  duplex  units  along  the  Chester  Street  boundary  with  the  South  Prescott neighborhood  low‐rise  residential  units  consistent  with  this  conclusion  and  would  therefore  be consistent with the less‐than‐significant conclusion in the WOSP EIR. 

 

Page 52: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

Page 48 WOB TOD Project Addendum

J. Noise

 Impacts Related To: 

WOSP EIR Findings with 

Implementation of SCA or MMs (If Required) 

PROJECT 

Relationship to WOSP EIR Findings 

Applicable MMs  Applicable SCAs 

Project Level of 

Significance 

Equal or Less 

Severity 

Substantial Increase in Severity 

a.  Construction Noise and Vibration 

LTS w/ SCAs  ☒  ☐  ‐‐  SCA‐NOI‐1: Construction 

Days/Hours (#62) 

 SCA‐NOI‐2: Construction Noise 

(#63) 

SCA‐NOI‐3: Extreme Construction Noise 

(#64) 

SCA‐NOI‐4: Project‐Specific Construction Noise Reduction Measures (#65) 

SCA‐NOI‐5: Construction Noise Complaints (#66) 

LTS w/ SCAs 

b. Operational Noise and Vibration 

LTS w/ SCAs  ☒  ☐  ‐‐  SCA‐NOI‐6: Operational Noise 

(#68) 

LTS w/ SCAs 

d. Noise Exposure / Compatibility 

LTS w/ SCAs  ☒  ☐  ‐‐  N/A  N/A 

Discussion

Construction Noise and Vibration 

Sensitive receptors are  located across the street from the project site, which  includes single‐family homes approximately 60  feet away across Chester Street and 80  feet across 5th Street and multi‐family  structures  approximately  100  feet  away  across  7th  Street.  The  project  site’s  proximity  to sensitive  receptors,  and  the  type  of  construction  equipment  that would  be  used  as  part  of  the project,  are  similar  to  other  projects  in  urban  areas.  Because  the  proposed  project  site  and  its vicinity are part of an established, urbanized area, periodic exposure to construction‐related noise and  vibration  are  existing  conditions.  The  use  of  heavy  construction  equipment would  occur  at different  locations  across  the  site.  Therefore,  the  duration  and  frequency  of  heavy  construction equipment operation near sensitive receptors would be limited on any given day and would not be expected to last more than a few days at a time. The WOSP EIR concluded that the impacts related to construction noise and vibration would be less‐than‐significant with implementation of applicable SCAs which are functionally equivalent to the applicable SCA‐NOI‐1: Construction Days/Hours (#62), SCA‐NOI‐2:  Construction  Noise  (#63),  SCA‐NOI‐3:  Extreme  Construction  Noise  (#64),  SCA‐NOI‐4: Project‐Specific  Construction  Noise  Reduction  Measures  (#65),  SCA‐NOI‐5:  Construction  Noise Complaints  (#66). With  implementation  of  these  SCAs,  the  project’s  impact would  be  less‐than‐significant and within Impacts Noise‐1 and Noise‐4 of the WOSP EIR. 

Page 53: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

WOB TOD Project Addendum Page 49

Operational Noise and Vibration 

The WOSP EIR concluded  that  increases  in  traffic noise  from build‐out of  the Plan Area would be below  threshold  levels  and would  therefore  represent  a  less‐than‐significant  impact.  Residential, office, and  retail uses such as  those proposed are not generally considered substantial sources of operational noise or vibration, though noise from rooftop equipment can exceed threshold levels if not appropriately shielded. The WOSP EIR concluded the  impacts related to operational noise and vibration would be  less‐than‐significant with  compliance with  relevant  regulations  and  applicable SCAs functionally equivalent to SCA‐NOI‐6: Operational Noise (#68).  

Additionally, a noise specialist assessed  the potential  for noise  from  the BART  line and nearby 7th Street to reflect off the large surfaces of the project’s proposed buildings. Even assuming that 100% of  such noise were  reflected, given  the distance  from  receptors and way  that noise  is perceived, even  under  worst‐case  conditions,  the  reflected  noise  component  would  increase  overall  noise levels by only  0.3 dBA, which would  not be  a  noticeable or measurable  increase  at  receptors  in nearby buildings. Therefore, the noise reflection would not result in significant noise impacts.9 

Noise Exposure / Compatibility 

Analysis  of  existing  noise  and  vibration  on  the  project  is  not  required  under  CEQA  and  is  not analyzed in this CEQA document. Independent of the Addendum, the project would comply with the following SCAs related to nose levels at future site users: SCA‐NOI‐7: Exposure to Community Noise (#67). 

                                                                 9   Personal correspondence with Michael Thill, Illingworth & Rodkin, Inc., 12/20/2018. BART produces a 

noise level of approximately 69 dBA Ldn at 50 feet and 7th Street a level of 72 dBA CNEL at 50 feet from centerline. Existing noise levels at sensitive receptors to the north of the project are approximately 72.6 dBA CNEL/Ldn. The reflected source would travel farther as it would bounce off the proposed buildings, and would be 61 dBA Ldn at sensitive receptors to the north. Calculating the combined noise level of existing and reflected noise, the noise level at sensitive receptors to the north would be 72.9  dBA CNEL/Ldn, an increase of 0.3 dBA. 

Page 54: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

Page 50 WOB TOD Project Addendum

K. Population & Housing

 Impacts Related To: 

WOSP EIR Findings with 

Implementation of SCA or MMs (If Required) 

PROJECT 

Relationship to WOSP EIR Findings 

Applicable MMs  Applicable SCAs 

Project Level of 

Significance 

Equal or Less 

Severity 

Substantial Increase in Severity 

a.  Population Growth  LTS  ☒  ☐  ‐‐  ‐‐  LTS 

b. Displacement of Housing & People 

LTS  ☒  ☐  ‐‐  ‐‐  LTS 

Discussion

The project would not remove any existing housing nor displace people.  In fact, the project would function to do the opposite; serving to combat displacement by providing much needed affordable housing (at least 152 units).  The project would result in an estimated 2,287 permanent employees on site and approximately 1,974 new residents.10, 11 The WOSP EIR anticipated significant residential and  employment  growth,  and  as  detailed  in  subsection M,  Transportation  and  Circulation,  the current proposal  is within the overall development assumed  in the WOSP EIR. Consistent with the WOSP EIR, environmental impacts related to population and housing would be less‐than‐significant. 

                                                                 10   Employee estimates are based on an office and retail employment density of 5 employees per 1,000 

square feet.  11   Residential estimates are based on a residential density of 2.59 persons per household per the State of 

California, Department of Finance, E‐5 Population and Housing Estimates for Cities, Counties, and the State, 2011‐2018, with 2010 Benchmark. Sacramento, California, January 2018.  

Page 55: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

WOB TOD Project Addendum Page 51

PUBLIC SERVICES, PARKS, AND RECREATION FACILITIES

 Impacts Related To: 

WOSP EIR Findings with 

Implementation of SCA or MMs (If Required) 

PROJECT 

Relationship to WOSP EIR Findings 

Applicable MMs  Applicable SCAs 

Project Level of Significance

Equal or Less 

Severity 

Substantial Increase in Severity 

a. Public Services  LTS w/ SCA  ☒  ☐  ‐‐  SCA‐GEN‐1: Compliance with 

Other Requirements (#3) 

 SCA‐PUB‐1: Capital Improvements Impact Fee (#74) 

SCA‐HAZ‐4: Fire Safety Phasing Plan 

(#46) 

LTS w/ SCA 

b. Parks & Recreation 

LTS  ☒  ☐  ‐‐  ‐‐  LTS 

Discussion

The WOSP  EIR  concluded  that while  development  of  the  Plan  Area would  increase  demand  for public services and  recreation,  it also  includes  improvements and would pay development  fees  to support  services and  the  impacts  in  this  regard would be  less‐than‐significant or  reduced  to  that level through implementation of applicable SCAs. The project would comply with the following SCAs related to public services, parks, and recreation: SCA‐GEN‐1: Compliance with Other Requirements (#3), SCA‐PUB‐1: Capital  Improvements  Impact Fee  (#74), and SCA‐HAZ‐4: Fire Safety Phasing Plan (#46). 

Page 56: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

Page 52 WOB TOD Project Addendum

M. Transportation and Circulation

 Impacts Related To: 

WOSP EIR Findings with 

Implementation of SCA or MMs (If Required) 

PROJECT 

Relationship to WOSP EIR Findings 

Applicable MMs  Applicable SCAs 

Project Level of 

Significance 

Equal or Less 

Severity 

Substantial Increase in Severity 

a.  Conflict with Circulation Plans 

LTS w/ SCAs  ☒  ☐  N/A  SCA‐TRANS‐4: Transportation and Parking Demand 

Management (#79) 

SCA‐TRANS‐5: Transportation Impact Fee (#80) 

SCA‐GEN‐1: Construction 

Management Plan (#13) 

LTS w/ SCAs 

b. Substantial Additional VMT 

a LTS‐SU  ☒  ☐  N/A  ‐‐  LTS 

c. Induce Traffic  LTS  ☒  ☐  ‐‐    LTS 

a   As explained in the discussion below, LOS‐based impact analysis has been replaced by VMT‐based analysis. WOSP EIR findings were for LOS‐based analysis. 

Discussion

Transportation and circulation was analyzed in the WOSP EIR, which found Level of Service (LOS) at Intersection #13, Broadway and West Grand Avenue,  LOS at  Intersection #15, Adeline Street and 18th  Street,  and  LOS  at  Intersection  #24, Adeline  Street  and  5th  Street  impacts  to  be  less  than significant with  implementation of mitigation measures or SCAs.  Impacts  to  Intersection #1, 40th Street and Hollis Street, at PM hours, LOS at Intersection #2, 40th Street and San Pablo Avenue, LOS at Intersection #1, queue storage at Intersection #2, and LOS at Intersection #7, West Grand Avenue at Mandela Parkway, were found to be significant and unavoidable under the WOSP EIR. All other transportation and circulation impacts under the WOSP were found to have no impacts or less‐than‐significant impacts. 

The  2010  Oakland  Housing  Element  Update  EIR  and  2014  Addendum  found  significant  and unavoidable impacts related to traffic delays. The remaining transportation and circulation impacts were found to have no impacts or less‐than‐significant impacts. In addition, the 1998 LUTE EIR found impacts  to  intersection  operations  to  be  less  than  significant with  implementation  of mitigation measures  or  SCAs.  Impacts  to  roadway  segments  under  the  1998  LUTE  EIR  were  found  to  be significant and unavoidable. The  remaining  transportation and circulation  impacts under  the 1998 LUTE EIR were found to have no or less‐than‐significant impacts. 

Conflicts with Circulation Plans 

The  project  is  consistent with  applicable  plans,  ordinances,  and  policies,  and would  not  cause  a significant  impact by  conflicting with adopted plans, ordinances, or policies addressing  the  safety 

Page 57: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

WOB TOD Project Addendum Page 53

and performance of the circulation system, including transit, roadways, bicycle lanes, and pedestrian paths (except for automobile level of service or other measures of vehicle delay). 

The  1998  LUTE,  as well  as  the  City’s  Public  Transit  and  Alternative Mode  and  Complete  Streets policies,  states  a  strong  preference  for  encouraging  the  use  of  non‐automobile  transportation modes,  such  as  transit,  bicycling,  and  walking.  The  project  would  encourage  the  use  of  non‐automobile transportation modes by  locating a mixed‐use project (residential, office, and retail)  in an area  that  is becoming  a more dense, walkable urban environment and  is well‐served by both local  and  regional  transit.  The  project would  further  discourage  driving  in  the  project  vicinity  by eliminating 337 existing parking spaces at the existing West Oakland BART Station. 

The project  is  consistent with both  the City’s  2017  Pedestrian Master  Plan  and  the  2007 Bicycle Master Plan as  it would not make major modifications to existing pedestrian or bicycle facilities  in the surrounding areas and would not adversely affect installation of future facilities.  

Further,  the project  is  required  to prepare and  implement a Transportation and Parking Demand Management  Plan  (TDM  Plan)  because  it  would  generate  more  than  50  peak  hour  trips  (see separate  Transportation  and  Parking  Demand Management memorandum  for more  detail).  The TDM Plan  includes on‐going operational  strategies, as well as  infrastructure  improvements  in  the project vicinity, that encourage the use of non‐automobile travel modes.  

The major off‐site infrastructure improvements included in the project consist of: 

New Class 4 bicycle lanes along both directions of 7th Street and Mandela Parkway adjacent to the project. 

Improved sidewalks and other pedestrian amenities along the project frontages and pedestrian safety and accessibility improvements along the corridor and at intersections.  

Enhanced bus facilities along the project frontage. 

These  improvements would not only benefit  the project  residents, workers, and visitors, but also residents, workers, and visitors  in the areas surrounding  the project site,  including BART riders.  In addition,  these  improvements  are  also  consistent with  the City’s  adopted plans, ordinances,  and policies  relating  to  safety  and  performance  of  the  circulation  system  because  they  improve  the pedestrian and bicycle environment in the vicinity of the project. 

Overall,  the project would not  conflict with adopted plans, ordinances, or policies addressing  the safety  and  performance  of  the  circulation  system.  This  is  a  less‐than‐significant  impact;  no mitigation measures are required. 

In  addition,  the  project  is  consistent  with  the  WOSP  EIR,  which  evaluated  the  impacts  of developments in the West Oakland area, as described below.  

WOSP EIR Traffic Analysis  

The  project  site  is  located within  the WOSP Area.  The  development  evaluated  in  the WOSP  EIR represents the reasonably foreseeable development expected to occur in the next 20 to 25 years in the WOSP Area. The WOSP and its EIR intend to provide flexibility in the location, amount, and type of development. Thus, as  long as the trip generation for the overall WOSP Area remains below the 

Page 58: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

Page 54 WOB TOD Project Addendum

levels estimated in the WOSP EIR, the traffic impact analysis presented in the WOSP EIR continues to remain valid.  

Since  the  certification  of  the  WOSP  EIR,  11  developments,  including  this  project,  have  been proposed and are in some stage of the City’s approval process at this time. Table 4 summarizes the trip  generation  for  these  developments.  The  11  developments  combined would  generate  about 1,305 AM peak hour and 1,452 PM peak hour trips. The combined trip generation  is  less than the total  trip  generation  estimated  in  the  WOSP  EIR.  Similarly,  inclusive  of  the  project,  the  11 developments currently entitled and proposed within the WOSP Area are substantially less than the total cumulative development assumed within the WOSP Area by the WOSP EIR. 

Table 4. Trip Generation for Development Projects within the WOSP Area 

 Project Name 

AM  Peak Hour 

PM  Peak Hour 

2201 Filbert (Icehouse)a  52  84 

532 Union Street (The Union Project)b  34  47 

1708 Wood Street (Roadway Express)c  50  58 

Mandela Parkway Hotel d  135  141 

914 West Grand Avenue e  15  17 

34th and San Pablo Affordable Housing Development f 

38  41 

1450 32nd Street g  12  15 

1919 Market Street h  34  41 

801 Pine Street (The Phoenix) i  84  97 

500 Kirkham Street j  384  399 

West Oakland BART Project k  472  548 

Total Projects Trips  1,310  1,488 

WOSP Estimated Trip Generation l  5,537  6,698 

Percent Complete  24%  22% a Source: West Grand Avenue & Market Street CEQA Analysis, August 20, 2015. b Source: 532 Union Street CEQA Analysis, July 15, 2016. c Source: 1708 Wood Street CEQA Analysis, June 20, 2016. d Source: 914 West Grand Avenue Project in Oakland – Transportation Impact Review, November 17, 2017. e Source: Mandela Hotel in Oakland – Transportation Assessment, November 29, 2017. f Source: 34th and San Pablo Project – Transportation Impact Review, October 20, 2017. g Source: 1450 32nd Street – Preliminary Transportation Impact Analysis, July 28, 2017. h Source: 1919 Market Street Project in Oakland – Preliminary Transportation Assessment, August 8, 2017. i Source: 500 Kirkham Street – Planning‐Related Non‐CEQA Transportation Impact Review, January X, 2019 j Source: The Phoenix – Transportation Assessment (Non‐CEQA Memorandum), November 29, 2018 k Source: West Oakland BART Project Planning‐Related Non‐CEQA Transportation Impact Review, January X, 2019. l Source: West Oakland Specific Plan Draft EIR, Table 4.10‐4, May 2014. 

Source: Fehr & Peers, 2019. 

 

Page 59: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

WOB TOD Project Addendum Page 55

The project  is  located  in  the 7th  Street Opportunity Area and  is  consistent with  the assumptions used  in the WOSP EIR for the 7th Street Opportunity Area. Since the project, combined with other currently proposed developments  in the WOSP Area, would generate  fewer automobile trips than assumed in the WOSP EIR, the project would not result in additional impacts on traffic operations at the intersections analyzed in the WOSP EIR. In addition, all the mitigation measures identified in the WOSP EIR are included in the citywide Transportation Impact Fee (TIF), implemented as SCA‐TRANS‐5:  Transportation  Impact  Fee  (#80).  SCA‐TRANS‐4:  Transportation  and  Parking  Demand Management (#79) and SCA‐GEN‐1: Construction Management Plan (#13) would also be applicable to ensure consistency with applicable plans and regulations.  

Substantial Additional VMT 

On  September 21, 2016,  the City of Oakland’s Planning Commission directed  staff  to update  the CEQA Thresholds of Significance Guidelines related to transportation impacts in order to implement the  directive  from  Senate  Bill  743  to modify  local  environmental  review  processes  by  removing automobile delay, as described solely by level of service or similar measures of vehicular capacity or traffic  congestion,  as  a  significant  impact  on  the  environment  pursuant  to  CEQA.12  The  Planning Commission direction aligns with draft proposed guidance  from  the Governor’s Office of Planning and Research  and  the City’s  approach  to  transportation  impact  analysis, with  adopted plans  and polices  related  to  transportation, which promote  the  reduction of greenhouse gas emissions,  the development of multimodal transportation networks, and a diversity of  land uses. Consistent with the  Planning  Commission  direction  and  the  Senate  Bill  743  requirements,  the  City  of  Oakland published  the  revised  Transportation  Impact  Review  Guidelines  on  April  14,  2017  to  guide  the evaluation of the transportation impacts associated with land use development projects. 

Many factors affect travel behavior, including density of development, diversity of land uses, design of  the  transportation  network,  access  to  regional  destinations,  distance  to  high‐quality  transit, development scale, demographics, and transportation demand management. Typically, low‐density development that  is  located at a great distance from other  land uses,  in areas with poor access to non‐single occupancy vehicle travel modes generate more vehicle travel compared to development located  in urban areas, where a higher density of development, a mix of  land uses, and non‐single occupancy vehicle travel options are available.  

Given these travel behavior factors, most of Oakland has lower VMT per capita and VMT per worker ratios than the nine‐county San Francisco Bay Area region. Further, within the City of Oakland, some neighborhoods may have lower VMT ratios than others.  

VMT Estimate 

Neighborhoods within Oakland are expressed geographically in transportation analysis zones (TAZ), which  are used  in  transportation planning models  for  transportation  analysis  and other planning purposes.  The Metropolitan  Transportation  Commission  (MTC)  Travel Model  includes  116  TAZs within Oakland that vary  in size from a few city blocks  in the downtown core, to multiple blocks  in outer neighborhoods, to even larger geographic areas in lower‐density neighborhoods.  

                                                                 12 Steinberg, 2013. (Senate Bill SB 743) 

Page 60: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

Page 56 WOB TOD Project Addendum

The MTC Travel Model is a model that assigns all predicted trips within, across, or to/from the nine‐county San Francisco Bay Area region onto  the roadway network and  the  transit system by mode (single‐driver  and  carpool  vehicle,  biking, walking,  or  transit)  and  transit  carrier  (bus,  rail)  for  a particular scenario.  

The travel behavior from MTC Travel Model is modeled based on the following inputs:  

Socioeconomic data developed by the Association of Bay Area Governments (ABAG). 

Population data created using the 2000 US Census and modified using the open source PopSyn software. 

Zonal accessibility measurements for destinations of interest. 

Travel characteristics and vehicle ownership rates derived from the 2000 Bay Area Travel Survey (BATS). 

Observed vehicle counts and transit boardings. 

The daily VMT output from the MTC Travel Model for residential and office uses comes from a tour‐based analysis. The tour‐based analysis examines the entire chain of trips over the course of a day, not  just trips to and from the project site.  In this way, all of the VMT for an  individual resident or employee is included; not just trips into and out of the person’s home or workplace. For example, a resident  leaves her apartment  in the morning, stops for coffee, and then goes to the office.  In the afternoon she heads out to lunch, and then returns to the office, with a stop at the drycleaners on the way. After work, she goes to the gym to work out, and then  joins some friends at a restaurant for dinner before returning home. All the stops and trips within her day form her “tour”. The tour‐based approach would add up  the  total number of miles driven over  the  course of her  tour and assign it as her daily VMT. 

Based  on  the MTC  Travel Model,  the  regional  average  daily  VMT  per  capita  is  15.0  under  2020 conditions and 13.8 under 2040 conditions. The regional average daily VMT per worker is 21.8 under 2020 conditions and 20.3 under 2040 conditions. 

Thresholds of Significance for VMT  

According to the City of Oakland Transportation Impact Review Guidelines (TIRG), the following are thresholds of significance related to substantial additional VMT:  

For residential projects, a project would cause substantial additional VMT if it exceeds existing regional household VMT per capita minus 15 percent.  

For office projects, a project would cause substantial additional VMT if it exceeds the existing regional VMT per worker minus 15 percent.  

For retail projects, a project would cause substantial additional VMT if it results in a net increase in total VMT.  

Screening Criteria 

VMT  impacts would be  less  than significant  for a project  if any of  the  identified screening criteria outlined below are met:  

1. Small Projects: The project generates fewer than 100 vehicle trips per day 

Page 61: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

WOB TOD Project Addendum Page 57

2. Low‐VMT Areas: The project meets map‐based screening criteria by being located in an area that exhibits below threshold VMT, or 15 percent or more below the regional average 

3. Near Transit Stations: The project is located in a Transit Priority Area or within a one‐half mile of a Major Transit Corridor or Stop13 and satisfies the following:  

Has a Floor Area Ratio (FAR) of more than 0.75. 

Includes less parking for use by residents, customers, or employees of the project than other typical nearby uses, or less than required by the City (if parking minimums pertain to the site) or allowed without a conditional use permit (if minimums and/or maximums pertain to the site).  

And is consistent with the applicable Sustainable Communities Strategy (as determined by the lead agency, with input from the MTC). 

The project satisfies the Near Transit Stations (#3) criterion as described below. 

Criterion #1: Small Projects 

The  project would  generate more  than  100  vehicle  trips  per  day  and  therefore  does  not meet criterion #1. 

Criterion #2: Low‐VMT Area 

Table 5 shows the estimated 2020 and 2040 VMT per capita and VMT per worker for TAZ 965, the TAZ in which the project is located, as well as the applicable VMT thresholds of 15 percent below the regional  average. As  shown  in  Table  5,  the  2020  estimated  average  daily VMT  per  capita  in  the project TAZ is less than the regional averages minus 15 percent. However, the 2040 VMT per capita and both the 2020 and 2040 VMT per worker in TAZ 965 is greater than the regional average minus 15 percent.  

Note that TAZ 965 has more than double the estimated VMT per capita and VMT per worker than other nearby TAZs. Although the West Oakland BART Station is located in TAZ 965, the MTC Model does not accurately reflect the proximity of the uses in the TAZ, especially the proposed project, to the BART Station because TAZ 965  is a relatively  large TAZ (it  is more than three or four times the size of the other nearby TAZs and includes the Port of Oakland to the West which is not very transit accessible.)  The Model  assumes  that  all  the  developments  in  the  TAZ  are  uniformly  distributed throughout  the  TAZ;  even  though many  uses,  such  as  the  proposed  project,  are  concentrated around the BART Station. Considering that the proposed project would consist of diverse uses with high densities  adjacent  to  the BART  station,  it  is  expected  that  its VMT per  capita  and VMT per worker would be  lower than the TAZ averages shown  in Table 5.  It  is  likely that the project would generate  less VMT per capita and/or VMT per worker than the regional average minus 15 percent. However,  since  TAZ  965  does  not  meet  the  map‐based  screening  criteria,  it  is  conservatively assumed that the residential and office components of the project cannot be presumed to result in less than substantial additional VMT under the screening criterion. 

                                                                 13 “Major transit stop” is defined in CEQA Section 21064.3 as a rail transit station, a ferry terminal served by either a bus or rail transit service, or the intersection of two or more major bus routes with a frequency of service interval of 15 minutes or less during the morning and afternoon peak commute periods.

Page 62: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

Page 58 WOB TOD Project Addendum

Table 5. Daily Vehicle Miles Traveled Summary 

Metric 

Bay Area 

TAZ 965 2020  2040 

Regional Average 

Regional Average minus 15% 

Regional Average 

Regional Average minus 15%  2020  2040 

Residential  (VMT per Capita)a 

15.0  12.8  13.8  11.7  12.5  12.4 

Non‐Residential  (VMT per Worker)b 

21.8  18.5  20.3  17.3  32.0  28.1 

Notes:  

Bold indicates that the TAZ does not meet the screening criteria of VMT less than the regional average minus 15 

a MTC Model results at analytics.mtc.ca.gov/foswiki/Main/PlanBayAreaVmtPerCapita and accessed in December 2018. b MTC Model results at analytics.mtc.ca.gov/foswiki/Main/PlanBayAreaVmtPerWorker and accessed in December 2018. 

Source: Fehr & Peers, 2018. 

 

According  to  the City of Oakland TIRG,  retail  spaces  less  than 80,000  square‐feet  are  considered local serving and are not expected  to contribute  to an  increase  in VMT. Therefore,  it  is presumed that the retail component of the project, which would consist of up to 75,000 square feet of ground level retail, would not result in substantial additional VMT and project impacts with respect to VMT would be less than significant.  

Criterion #3: Near Transit Stations 

The  project  would  be  located  adjacent  to  the West  Oakland  BART  Station  and  would  be  near frequent bus service at the West Oakland BART Station (Lines 14 and 62 with 15‐minute headways during the peak periods). The project would satisfy Criterion #3 because it would meet the following three conditions for this criterion: 

The project would have a FAR greater than 0.75.  

The project would include 400 automobile parking spaces. The City of Oakland Planning Code requires the project to provide the following: 

o Section 17.116.060 requires a minimum of 0.5 space per dwelling unit and allows a maximum of 1.25 space per dwelling unit for multi‐family residential developments in the S‐15W zone. Section 17.116.110.C allows the residential parking minimums to be reduced by 50 percent because the project is located in a transit accessible area (30 percent) and it would provide on‐site car‐share spaces (20 percent). Thus, the residential component of the project is required to provide between 190 and 953 parking spaces. 

o Section 17.116.080 does not have any minimum parking for commercial activities, and allows a maximum of one space for each 300 square feet of floor area on the ground level and 500 square feet of floor area on other levels for commercial uses in the S‐15W zone. Thus, the retail and office components of the project are required to provide between zero and 964 spaces.  

Overall, the Code requires the project to provide a minimum of 190 and a maximum of 1,917 parking spaces. Thus, the 400 parking spaces provided by the project would be within the 

Page 63: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

WOB TOD Project Addendum Page 59

parking supply allowed by the Planning Code for the project. Therefore, the project would not provide more parking for use by residents, customers, or employees than other typical nearby uses, nor would it provide more parking than required by City Code.  

The project is located within the West Oakland PDA as defined by Plan Bay Area, and is therefore consistent with the region’s Sustainable Communities Strategy 

VMT Screening Conclusion 

As described above, VMT impacts would be less than significant for a project if any of the identified screening criteria outlined below are met: Small Projects, Low‐VMT Areas, and Near Transit Stations. The  project  would  satisfy  the  Near  Transit  Stations  (#3)  criterion  and  would  have  a  less–than‐significant impact on VMT. 

Induce Automobile Travel 

The project would not  increase  the automobile capacity of  the  roadway network surrounding  the project site. Therefore, it would not increase the physical roadway capacity and would not add new roadways  to  the network, and would not  induce additional automobile  traffic. This  is a  less‐than‐significant impact; no mitigation measures are required.  

Overall Conclusion  

Consistent with the findings of the WOSP EIR, the project would not result in any significant impacts related  to  transportation  or  circulation.  Further,  based  on  an  examination  of  the  other  Program EIRs, implementation of the project would not result in any increase in the severity of any previously identified  impacts,  nor  would  it  result  in  new  significant  impacts  related  to  transportation  or circulation that were not previously identified in the WOSP EIR and Program EIRs.

Page 64: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

Page 60 WOB TOD Project Addendum

N. Utilities and Service Systems

 Impacts Related To: 

WOSP EIR Findings with 

Implementation of SCA or MMs (If Required) 

PROJECT 

Relationship to WOSP EIR Findings 

Applicable MMs  Applicable SCAs 

Project Level of 

Significance 

Equal or Less 

Severity 

Substantial Increase in Severity 

a.  Wastewater & Stormwater Facilities 

LTS  ☒  ☐  ‐‐  ‐‐  LTS 

b. Water Supplies  LTS  ☒  ☐  ‐‐  ‐‐  LTS 

c. Solid Waste Services 

LTS   ☒  ☐  ‐‐  ‐‐  LTS  

d. Energy  LTS  ☒  ☐  ‐‐  ‐‐  LTS 

Discussion

The Water Supply Assessment prepared by EBMUD  for  the WOSP EIR concluded  that EBMUD has sufficient water supplies  to meet current water demand and  future water demand  through 2035, including the increased water demand associated with development of the Plan Area during normal, single dry, and multiple dry years. The WOSP EIR determined  that development of  the Plan Area would  have  less‐than‐significant  impacts  related  to  stormwater  and  wastewater  facilities,  solid waste  services,  and  energy.  The WOSP  EIR  did  not  identify  any mitigation measures  related  to utilities and service systems, and none would be required for the project.  

Independent  of  the  Addendum,  the  project would  comply with  the  following  SCAs:  SCA‐UTIL‐1: Construction  and  Demolition  Waste  Reduction  and  Recycling  (#84),  SCA‐UTIL‐2:  Underground Utilities (#85), SCA‐UTIL‐3: Recycling Collection and Storage Space (#86), SCA‐UTIL‐4: Green Building Requirements  (#87),  SCA‐UTIL‐5:  Sanitary  Sewer  System  (#89),  SCA‐UTIL‐6:  Storm  Drain  System (#90), SCA‐UTIL‐7: Recycled Water (#91), SCA‐UTIL‐8: Water Efficient Landscape Ordinance (WELO) (#92), and SCA‐HYD‐3: NPDES C.3 Stormwater Requirements for Regulated Projects (#54). 

Page 65: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

WOB TOD Project Addendum Page 61

Acronyms and Terms

AC Transit  Alameda–Contra Costa Transit District 

BART  Bay Area Rapid Transit 

CEQA  California Environmental Quality Act 

City  City of Oakland 

EIR  Environmental Impact Report 

FAR  floor area ratio 

GHG  greenhouse gas 

LUTE  Land Use and Transportation Element 

NPDES  National Pollution Discharge Elimination System 

PM2.5  particulate matter, 2.5 micrometers or less 

PM10  particulate matter, 10 micrometers or less 

SCA  Standard Condition of Approval 

TAC  toxic air contaminant 

VMT  vehicle miles traveled 

WOSP  West Oakland Specific Plan 

Page 66: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated
Page 67: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

WOB TOD Project Addendum Page A-1

Attachment A: City of Oakland Standard Conditions of Approval

The  City  of Oakland’s Uniformly Applied Development  Standards  adopted  as  Standard  Conditions  of Approval  (Standard  Conditions  of  Approval,  or  SCAs)  were  originally  adopted  by  the  City  in  2008 (Ordinance  No.  12899  C.M.S.)  pursuant  to  Public  Resources  Code  section  21083.3  and  have  been incrementally  updated  over  time.  The  SCAs  incorporate  development  policies  and  standards  from various  adopted plans, policies,  and ordinances  (such  as  the Oakland  Planning  and Municipal Codes, Oakland Creek Protection, Stormwater Water Management and Discharge Control Ordinance, Oakland Tree  Protection  Ordinance,  Oakland  Grading  Regulations,  National  Pollutant  Discharge  Elimination System  (NPDES)  permit  requirements,  Housing  Element‐related mitigation measures,  Green  Building Ordinance, historic/Landmark status, California Building Code, and Uniform Fire Code, among others), which have been found to substantially mitigate environmental effects. 

These SCAs are incorporated into projects as conditions of approval, regardless of the determination of a project’s environmental impacts. As applicable, the SCAs are adopted as requirements of an individual project when  it  is approved by  the City, and are designed  to, and will, avoid or substantially reduce a project’s environmental effects.  

In reviewing project applications, the City determines which SCAs apply based upon the zoning district, community plan,  site,  surroundings, project proposal, and  the  type of permits/approvals  required  for the project. Depending on the specific characteristics of the project type and/or project site, the City will determine which SCAs apply to a specific project. Because these SCAs are mandatory City requirements imposed  on  a  city‐wide  basis,  environmental  analyses  assume  that  these  SCAs will  be  imposed  and implemented by the project sponsor, and are not imposed as mitigation measures under CEQA.  

All SCAs  identified  in the Addendum—which  is consistent with the measures and conditions presented in the City of Oakland General Plan, LUTE EIR—are included herein. To the extent that any SCA identified in the Addendum was inadvertently omitted, it is automatically incorporated herein by reference. 

The first column identifies the SCA applicable to that topic in the Addendum. 

The second column identifies the monitoring schedule or timing applicable to the project. 

The third column names the party responsible for monitoring the required action for the project. 

In addition to the SCAs identified and discussed in the Addendum, other SCAs that are applicable to the project are included herein. 

The  project  sponsor  is  responsible  for  compliance with  any  recommendations  in  approved  technical reports  and with  all  SCAs  set  forth  herein  at  its  sole  cost  and  expense,  unless  otherwise  expressly provided  in  a  specific  SCA,  and  subject  to  the  review  and  approval  of  the  City  of  Oakland.  Overall monitoring and compliance with the SCAs will be the responsibility of the Planning and Zoning Division. Prior to the issuance of a demolition, grading, and/or construction permit, the project sponsor shall pay the  applicable mitigation  and monitoring  fee  to  the  City  in  accordance  with  the  City’s Master  Fee Schedule. 

Page 68: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

Page A-2 WOB TOD Project Addendum

Note  that  the  SCAs  included  in  this  document  are  referred  to  using  an  abbreviation  for  the environmental topic area and are numbered sequentially for each topic area—e.g., SCA‐AIR‐1, SCA‐AIR‐2. The  SCA  title  and  the  SCA number  that  corresponds  to  the City’s  current master  SCA  list  are  also provided—e.g., SCA‐AIR‐1: Construction‐Related Air Pollution (Dust and Equipment Emissions) (#19). 

Page 69: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

WOB TOD Project Addendum Page A-3

City of Oakland Standard SCAs Required for the Project

Standard Conditions of Approval When Required Initial Approval Monitoring/ Inspection

GENERAL

SCA-AES-1: Construction Management Plan (#13) Prior to the issuance of the first construction-related permit, the project applicant and his/her general contractor shall submit a Construction Management Plan (CMP) for review and approval by the Bureau of Planning, Bureau of Building, and other relevant City departments such as the Fire Department, Department of Transportation, and the Public Works Department as directed. The CMP shall contain measures to minimize potential construction impacts including measures to comply with all construction-related Conditions of Approval (and mitigation measures if applicable) such as dust control, construction emissions, hazardous materials, construction days/hours, construction traffic control, waste reduction and recycling, stormwater pollution prevention, noise control, complaint management, and cultural resource management (see applicable Conditions below). The CMP shall provide project-specific information including descriptive procedures, approval documentation, and drawings (such as a site logistics plan, fire safety plan, construction phasing plan, proposed truck routes, traffic control plan, complaint management plan, construction worker parking plan, and litter/debris clean-up plan) that specify how potential construction impacts will be minimized and how each construction-related requirement will be satisfied throughout construction of the project.

Prior to the issuance of the first construction-related permit

Bureau of Planning, Bureau of Building, and other relevant City departments such as the Fire Department, Department of Transportation, and the Public Works Department as directed

Bureau of Building

AESTHETICS, SHADOW, AND WIND

SCA-AES-1: Trash and Blight Removal (#16) The project applicant and his/her successors shall maintain the property free of blight, as defined in chapter 8.24 of the Oakland Municipal Code. For nonresidential and multi-family residential projects, the project applicant shall install and maintain trash receptacles near public entryways as needed to provide sufficient capacity for building users.

Ongoing N/A Bureau of Building

SCA-AES-2: Graffiti Control (#17) a. During construction and operation of the project, the project applicant shall

incorporate best management practices reasonably related to the control of graffiti and/or the mitigation of the impacts of graffiti. Such best management practices may include, without limitation: i. Installation and maintenance of landscaping to discourage defacement of and/or

protect likely graffiti-attracting surfaces. ii. Installation and maintenance of lighting to protect likely graffiti-attracting

Ongoing N/A Bureau of Building

Page 70: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

Page A-4 WOB TOD Project Addendum

Standard Conditions of Approval When Required Initial Approval Monitoring/ Inspection

surfaces. iii. Use of paint with anti-graffiti coating. iv. Incorporation of architectural or design elements or features to discourage graffiti

defacement in accordance with the principles of Crime Prevention Through Environmental Design (CPTED).

v. Other practices approved by the City to deter, protect, or reduce the potential for graffiti defacement.

b. The project applicant shall remove graffiti by appropriate means within seventy-two (72) hours. Appropriate means include: i. Removal through scrubbing, washing, sanding, and/or scraping (or similar

method) without damaging the surface and without discharging wash water or cleaning detergents into the City storm drain system.

ii. Covering with new paint to match the color of the surrounding surface. iii. Replacing with new surfacing (with City permits if required).

SCA-AES-3: Landscape Plan (#18) a. Landscape Plan Required The project applicant shall submit a final Landscape Plan for City review and approval that is consistent with the approved Landscape Plan. The Landscape Plan shall be included with the set of drawings submitted for the construction-related permit and shall comply with the landscape requirements of chapter 17.124 of the Planning Code. Proposed plants shall be predominantly drought-tolerant. Specification of any street trees shall comply with the Master Street Tree List and Tree Planting Guidelines (which can be viewed at http://www2.oaklandnet.com/oakca1/groups/pwa/documents/report/oak042662.pdf and http://www2.oaklandnet.com/oakca1/groups/pwa/documents/form/oak025595.pdf, respectively), and with any applicable streetscape plan.

Prior to approval of construction-related permit

Bureau of Planning

N/A

b. Landscape Installation The project applicant shall implement the approved Landscape Plan unless a bond, cash deposit, letter of credit, or other equivalent instrument acceptable to the Director of City Planning, is provided. The financial instrument shall equal the greater of $2,500 or the estimated cost of implementing the Landscape Plan based on a licensed contractor’s bid.

Prior to building permit final

Bureau of Planning

Bureau of Building

c. Landscape Maintenance All required planting shall be permanently maintained in good growing condition and, whenever necessary, replaced with new plant materials to ensure continued compliance with applicable landscaping requirements. The property owner shall be responsible for

Ongoing N/A Bureau of Building

Page 71: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

WOB TOD Project Addendum Page A-5

Standard Conditions of Approval When Required Initial Approval Monitoring/ Inspection

maintaining planting in adjacent public rights-of-way. All required fences, walls, and irrigation systems shall be permanently maintained in good condition and, whenever necessary, repaired or replaced.

SCA-AES-4: Lighting (#19) Proposed new exterior lighting fixtures shall be adequately shielded to a point below the light bulb and reflector to prevent unnecessary glare onto adjacent properties.

Prior to building permit final

N/A Bureau of Building

SCA-AES-5: Public Art for Private Development (#20) The project is subject to the City’s Public Art Requirements for Private Development, adopted by Ordinance No. 13275 C.M.S. (“Ordinance”). The public art contribution requirements are equivalent to one-half percent (0.5%) for the “residential” building development costs, and one percent (1.0%) for the “non-residential” building development costs. The contribution requirement can be met through: 1) the installation of freely accessible art at the site; 2) the installation of freely accessible art within one-quarter mile of the site; or 3) satisfaction of alternative compliance methods described in the Ordinance, including, but not limited to, payment of an in-lieu fee contribution. The applicant shall provide proof of full payment of the in-lieu contribution and/or provide plans, for review and approval by the Planning Director, showing the installation or improvements required by the Ordinance prior to issuance of a building permit. Proof of installation of artwork, or other alternative requirement, is required prior to the City’s issuance of a final certificate of occupancy for each phase of a project unless a separate, legal binding instrument is executed ensuring compliance within a timely manner subject to City approval.

Payment of in-lieu fees and/or plans showing fulfillment of public art requirement: Prior to Issuance of Building permit. Installation of art/cultural space: Prior to Issuance of a Certificate of Occupancy

Bureau of Planning

Bureau of Building

AIR QUALITY

SCA-AIR-1: Dust Controls – Construction Related (#21) The project applicant shall implement all of the following applicable air pollution control measures during construction of the project: a. Water all exposed surfaces of active construction areas at least twice daily. Watering

should be sufficient to prevent airborne dust from leaving the site. Increased watering frequency may be necessary whenever wind speeds exceed 15 miles per hour. Reclaimed water should be used whenever feasible.

b. Cover all trucks hauling soil, sand, and other loose materials or require all trucks to maintain at least two feet of freeboard (i.e., the minimum required space between the top of the load and the top of the trailer).

c. All visible mud or dirt track-out onto adjacent public roads shall be removed using

During construction

N/A Bureau of Building

Page 72: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

Page A-6 WOB TOD Project Addendum

Standard Conditions of Approval When Required Initial Approval Monitoring/ Inspection

wet power vacuum street sweepers at least once per day. The use of dry power sweeping is prohibited.

e. All demolition activities (if any) shall be suspended when average wind speeds exceed 20 mph.

f. All trucks and equipment, including tires, shall be washed off prior to leaving the site. g. Site accesses to a distance of 100 feet from the paved road shall be treated with a 6 to

12 inch compacted layer of wood chips, mulch, or gravel.

SCA-AIR-2 : Criteria Air Pollutant Controls – Construction Related (#22) The project applicant shall implement all of the following applicable basic control measures for criteria air pollutants during construction of the project as applicable: a. Idling times on all diesel-fueled commercial vehicles over 10,000 lbs. shall be

minimized either by shutting equipment off when not in use or reducing the maximum idling time to two minutes (as required by the California airborne toxics control measure Title 13, Section 2485, of the California Code of Regulations). Clear signage to this effect shall be provided for construction workers at all access points.

b. Idling times on all diesel-fueled off-road vehicles over 25 horsepower shall be minimized either by shutting equipment off when not in use or reducing the maximum idling time to two minutes and fleet operators must develop a written policy as required by Title 23, Section 2449, of the California Code of Regulations (“California Air Resources Board Off-Road Diesel Regulations”).

c. All construction equipment shall be maintained and properly tuned in accordance with the manufacturer’s specifications. All equipment shall be checked by a certified mechanic and determined to be running in proper condition prior to operation. Equipment check documentation should be kept at the construction site and be available for review by the City and the Bay Area Air Quality District as needed.

d. Portable equipment shall be powered by grid electricity if available. If electricity is not available, propane or natural gas generators shall be used if feasible. Diesel engines shall only be used if grid electricity is not available and propane or natural gas generators cannot meet the electrical demand.

e. Low VOC (i.e., ROG) coatings shall be used that comply with BAAQMD Regulation 8, Rule 3: Architectural Coatings.

f. All equipment to be used on the construction site shall comply with the requirements of Title 13, Section 2449, of the California Code of Regulations (“California Air Resources Board Off-Road Diesel Regulations”) and upon request by the City (and the Air District if specifically requested), the project applicant shall provide written documentation that fleet requirements have been met.

During construction

N/A Bureau of Building

Page 73: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

WOB TOD Project Addendum Page A-7

Standard Conditions of Approval When Required Initial Approval Monitoring/ Inspection

The project applicant shall implement all of the following applicable enhanced control measures for criteria air pollutants during construction of the project as applicable: g. Criteria Air Pollutant Reduction Measures The project applicant shall retain a qualified air quality consultant to identify criteria

air pollutant reduction measures to reduce the project's average daily emissions below 54 pounds per day of ROG, NOx, or PM2.5 or 82 pounds per day of PM10. Quantified emissions and identified reduction measures shall be submitted to the City (and the Air District if specifically requested) for review and approval prior to the issuance of building permits and the approved criteria air pollutant reduction measures shall be implemented during construction.

h. Construction Emissions Minimization Plan The project applicant shall prepare a Construction Emissions Minimization Plan

(Emissions Plan) for all identified criteria air pollutant reduction measures. The Emissions Plan shall be submitted to the City (and the Air District if specifically requested) for review and approval prior to the issuance of building permits. The Emissions Plan shall include the following: i. An equipment inventory summarizing the type of off-road equipment required

for each phase of construction, including the equipment manufacturer, equipment identification number, engine model year, engine certification (tier rating), horsepower, and engine serial number. For all Verified Diesel Emissions Control Strategies (VDECS), the equipment inventory shall also include the technology type, serial number, make, model, manufacturer, CARB verification number level, and installation date.

ii. A Certification Statement that the Contractor agrees to comply fully with the Emissions Plan and acknowledges that a significant violation of the Emissions Plan shall constitute a material breach of contract.

Prior to issuance of a construction related permit

Bureau of Planning

Bureau of Building

SCA-AIR-3: Diesel Particulate Matter Controls-Construction Related (#23) a. Diesel Particulate Matter Reduction Measures The project applicant shall implement appropriate measures during construction to

reduce potential health risks to sensitive receptors due to exposure to diesel particulate matter (DPM) from construction emissions. The project applicant shall choose one of the following methods: i. The project applicant shall retain a qualified air quality consultant to prepare a

Health Risk Assessment (HRA) in accordance with current guidance from the California Air Resources Board (CARB) and Office of Environmental Health and Hazard Assessment to determine the health risk to sensitive receptors exposed to

Prior to issuance of a construction related permit (i), during construction (ii)

Bureau of Planning

Bureau of Building

Page 74: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

Page A-8 WOB TOD Project Addendum

Standard Conditions of Approval When Required Initial Approval Monitoring/ Inspection

DPM from project construction emissions. The HRA shall be submitted to the City (and the Air District if specifically requested) for review and approval. If the HRA concludes that the health risk is at or below acceptable levels, then DPM reduction measures are not required. If the HRA concludes that the health risk exceeds acceptable levels, DPM reduction measures shall be identified to reduce the health risk to acceptable levels as set forth under subsection b below. Identified DPM reduction measures shall be submitted to the City for review and approval prior to the issuance of building permits and the approved DPM reduction measures shall be implemented during construction.

-or- ii. All off-road diesel equipment shall be equipped with the most effective Verified

Diesel Emission Control Strategies (VDECS) available for the engine type (Tier 4 engines automatically meet this requirement) as certified by CARB. The equipment shall be properly maintained and tuned in accordance with manufacturer specifications. This shall be verified through an equipment inventory submittal and Certification Statement that the Contractor agrees to compliance and acknowledges that a significant violation of this requirement shall constitute a material breach of contract.

b. Construction Emissions Minimization Plan (if required by a above) The project applicant shall prepare a Construction Emissions Minimization Plan

(Emissions Plan) for all identified DPM reduction measures (if any). The Emissions Plan shall be submitted to the City (and the Bay Area Air Quality District if specifically requested) for review and approval prior to the issuance of building permits. The Emissions Plan shall include the following: i. An equipment inventory summarizing the type of off-road equipment required

for each phase of construction, including the equipment manufacturer, equipment identification number, engine model year, engine certification (tier rating), horsepower, and engine serial number. For all VDECS, the equipment inventory shall also include the technology type, serial number, make, model, manufacturer, CARB verification number level, and installation date.

ii. A Certification Statement that the Contractor agrees to comply fully with the Emissions Plan and acknowledges that a significant violation of the Emissions Plan shall constitute a material breach of contract.

Prior to issuance of a construction related permit

Bureau of Planning

Bureau of Building

SCA-AIR-4: Exposure to Air Pollution (Toxic Air Contaminants) (#24) a. Health Risk Reduction Measures The project applicant shall incorporate appropriate measures into the project design

Prior to approval of construction-related permit

Bureau of Planning

Bureau of Building

Page 75: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

WOB TOD Project Addendum Page A-9

Standard Conditions of Approval When Required Initial Approval Monitoring/ Inspection

in order to reduce the potential health risk due to exposure to toxic air contaminants. The project applicant shall choose one of the following methods: i. The project applicant shall retain a qualified air quality consultant to prepare a

Health Risk Assessment (HRA) in accordance with California Air Resources Board (CARB) and Office of Environmental Health and Hazard Assessment requirements to determine the health risk of exposure of project residents/occupants/users to air pollutants. The HRA shall be submitted to the City for review and approval. If the HRA concludes that the health risk is at or below acceptable levels, then health risk reduction measures are not required. If the HRA concludes that the health risk exceeds acceptable levels, health risk reduction measures shall be identified to reduce the health risk to acceptable levels. Identified risk reduction measures shall be submitted to the City for review and approval and be included on the project drawings submitted for the construction-related permit or on other documentation submitted to the City.

- or - ii. The project applicant shall incorporate the following health risk reduction

measures into the project. These features shall be submitted to the City for review and approval and be included on the project drawings submitted for the construction-related permit or on other documentation submitted to the City: • Installation of air filtration to reduce cancer risks and Particulate Matter (PM)

exposure for residents and other sensitive populations in the project that are in close proximity to sources of air pollution. Air filter devices shall be rated MERV-13 [insert MERV-16 for projects located in the West Oakland Specific Plan area] or higher. As part of implementing this measure, an ongoing maintenance plan for the building’s HVAC air filtration system shall be required.

• Where appropriate, install passive electrostatic filtering systems, especially those with low air velocities (i.e., 1 mph).

• Phasing of residential developments when proposed within 500 feet of freeways such that homes nearest the freeway are built last, if feasible.

• The project shall be designed to locate sensitive receptors as far away as feasible from the source(s) of air pollution. Operable windows, balconies, and building air intakes shall be located as far away from these sources as feasible. If near a distribution center, residents shall be located as far away as feasible from a loading dock or where trucks concentrate to deliver goods.

• Sensitive receptors shall be located on the upper floors of buildings, if feasible.

Page 76: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

Page A-10 WOB TOD Project Addendum

Standard Conditions of Approval When Required Initial Approval Monitoring/ Inspection

• Planting trees and/or vegetation between sensitive receptors and pollution source, if feasible. Trees that are best suited to trapping PM shall be planted, including one or more of the following: Pine (Pinus nigra var. maritima), Cypress (X Cupressocyparis leylandii), Hybrid poplar (Populus deltoids X trichocarpa), and Redwood (Sequoia sempervirens).

• Sensitive receptors shall be located as far away from truck activity areas, such as loading docks and delivery areas, as feasible.

• Existing and new diesel generators shall meet CARB’s Tier 4 emission standards, if feasible.

• Emissions from diesel trucks shall be reduced through implementing the following measures, if feasible: o Installing electrical hook-ups for diesel trucks at loading docks. o Requiring trucks to use Transportation Refrigeration Units (TRU) that meet

Tier 4 emission standards. o Requiring truck-intensive projects to use advanced exhaust technology

(e.g., hybrid) or alternative fuels. o Prohibiting trucks from idling for more than two minutes. o Establishing truck routes to avoid sensitive receptors in the project. A truck

route program, along with truck calming, parking, and delivery restrictions, shall be implemented.

b. Maintenance of Health Risk Reduction Measures The project applicant shall maintain, repair, and/or replace installed health risk

reduction measures, including but not limited to the HVAC system (if applicable), on an ongoing and as-needed basis. Prior to occupancy, the project applicant shall prepare and then distribute to the building manager/operator an operation and maintenance manual for the HVAC system and filter including the maintenance and replacement schedule for the filter.

Ongoing N/A Bureau of Building

SCA-AIR-4: Stationary Sources of Air Pollution (Toxic Air Contaminants) (#25) The project applicant shall incorporate appropriate measures into the project design in order to reduce the potential health risk due to on-site stationary sources of toxic air contaminants. The project applicant shall choose one of the following methods: a. The project applicant shall retain a qualified air quality consultant to prepare a

Health Risk Assessment (HRA) in accordance with California Air Resources Board (CARB) and Office of Environmental Health and Hazard Assessment requirements to determine the health risk associated with proposed stationary sources of pollution in the project. The HRA shall be submitted to the City for review and approval. If the

Prior to approval of construction-related permit

Bureau of Planning

Bureau of Building

Page 77: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

WOB TOD Project Addendum Page A-11

Standard Conditions of Approval When Required Initial Approval Monitoring/ Inspection

HRA concludes that the health risk is at or below acceptable levels, then health risk reduction measures are not required. If the HRA concludes the health risk exceeds acceptable levels, health risk reduction measures shall be identified to reduce the health risk to acceptable levels. Identified risk reduction measures shall be submitted to the City for review and approval and be included on the project drawings submitted for the construction-related permit or on other documentation submitted to the City.

- or - b. The project applicant shall incorporate the following health risk reduction measures

into the project. These features shall be submitted to the City for review and approval and be included on the project drawings submitted for the construction-related permit or on other documentation submitted to the City: i. Installation of non-diesel fueled generators, if feasible, or; ii. Installation of diesel generators with an EPA-certified Tier 4 engine or engines

that are retrofitted with a CARB Level 3 Verified Diesel Emissions Control Strategy, if feasible.

BIOLOGICAL RESOURCES

SCA-BIO-1: Tree Removal During Bird Breeding Season (#30) To the extent feasible, removal of any tree and/or other vegetation suitable for nesting of birds shall not occur during the bird breeding season of February 1 to August 15 (or during December 15 to August 15 for trees located in or near marsh, wetland, or aquatic habitats). If tree removal must occur during the bird breeding season, all trees to be removed shall be surveyed by a qualified biologist to verify the presence or absence of nesting raptors or other birds. Pre-removal surveys shall be conducted within 15 days prior to the start of work and shall be submitted to the City for review and approval. If the survey indicates the potential presence of nesting raptors or other birds, the biologist shall determine an appropriately sized buffer around the nest in which no work will be allowed until the young have successfully fledged. The size of the nest buffer will be determined by the biologist in consultation with the California Department of Fish and Wildlife, and will be based to a large extent on the nesting species and its sensitivity to disturbance. In general, buffer sizes of 200 feet for raptors and 50 feet for other birds should suffice to prevent disturbance to birds nesting in the urban environment, but these buffers may be increased or decreased, as appropriate, depending on the bird species and the level of disturbance anticipated near the nest.

Prior to removal of trees

Bureau of Building

Bureau of Building

Page 78: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

Page A-12 WOB TOD Project Addendum

Standard Conditions of Approval When Required Initial Approval Monitoring/ Inspection

SCA-BIO-2: Tree Permit (#31) a. Tree Permit Required Pursuant to the City’s Tree Protection Ordinance (OMC chapter 12.36), the project

applicant shall obtain a tree permit and abide by the conditions of that permit.

Prior to approval of construction-related permit

Permit approval by Public Works Department, Tree Division; evidence of approval submitted to Bureau of Building

Bureau of Building

b. Tree Protection During Construction Adequate protection shall be provided during the construction period for any trees

which are to remain standing, including the following, plus any recommendations of an arborist: i. Before the start of any clearing, excavation, construction, or other work on the

site, every protected tree deemed to be potentially endangered by said site work shall be securely fenced off at a distance from the base of the tree to be determined by the project’s consulting arborist. Such fences shall remain in place for duration of all such work. All trees to be removed shall be clearly marked. A scheme shall be established for the removal and disposal of logs, brush, earth and other debris which will avoid injury to any protected tree.

ii. Where proposed development or other site work is to encroach upon the protected perimeter of any protected tree, special measures shall be incorporated to allow the roots to breathe and obtain water and nutrients. Any excavation, cutting, filling, or compaction of the existing ground surface within the protected perimeter shall be minimized. No change in existing ground level shall occur within a distance to be determined by the project’s consulting arborist from the base of any protected tree at any time. No burning or use of equipment with an open flame shall occur near or within the protected perimeter of any protected tree.

iii. No storage or dumping of oil, gas, chemicals, or other substances that may be harmful to trees shall occur within the distance to be determined by the project’s consulting arborist from the base of any protected trees, or any other location on the site from which such substances might enter the protected perimeter. No heavy construction equipment or construction materials shall be operated or stored within a distance from the base of any protected trees to be determined by the project’s consulting arborist. Wires, ropes, or other devices shall not be

During construction

Public Works Department, Tree Division

Bureau of Building

Page 79: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

WOB TOD Project Addendum Page A-13

Standard Conditions of Approval When Required Initial Approval Monitoring/ Inspection

attached to any protected tree, except as needed for support of the tree. No sign, other than a tag showing the botanical classification, shall be attached to any protected tree.

iv. Periodically during construction, the leaves of protected trees shall be thoroughly sprayed with water to prevent buildup of dust and other pollution that would inhibit leaf transpiration.

v. If any damage to a protected tree should occur during or as a result of work on the site, the project applicant shall immediately notify the Public Works Department and the project’s consulting arborist shall make a recommendation to the City Tree Reviewer as to whether the damaged tree can be preserved. If, in the professional opinion of the Tree Reviewer, such tree cannot be preserved in a healthy state, the Tree Reviewer shall require replacement of any tree removed with another tree or trees on the same site deemed adequate by the Tree Reviewer to compensate for the loss of the tree that is removed.

vi. All debris created as a result of any tree removal work shall be removed by the project applicant from the property within two weeks of debris creation, and such debris shall be properly disposed of by the project applicant in accordance with all applicable laws, ordinances, and regulations.

c. Tree Replacement Plantings Replacement plantings shall be required for tree removals for the purposes of erosion

control, groundwater replenishment, visual screening, wildlife habitat, and preventing excessive loss of shade, in accordance with the following criteria: i. No tree replacement shall be required for the removal of nonnative species, for

the removal of trees which is required for the benefit of remaining trees, or where insufficient planting area exists for a mature tree of the species being considered.

ii. Replacement tree species shall consist of Sequoia sempervirens (Coast Redwood), Quercus agrifolia (Coast Live Oak), Arbutus menziesii (Madrone), Aesculus californica (California Buckeye), Umbellularia californica (California Bay Laurel), or other tree species acceptable to the Tree Division.

iii. Replacement trees shall be at least twenty-four (24) inch box size, unless a smaller size is recommended by the arborist, except that three fifteen (15) gallon size trees may be substituted for each twenty-four (24) inch box size tree where appropriate.

iv. Minimum planting areas must be available on site as follows: • For Sequoia sempervirens, three hundred fifteen (315) square feet per tree;

Prior to building permit final

Public Works Department, Tree Division

Bureau of Building

Page 80: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

Page A-14 WOB TOD Project Addendum

Standard Conditions of Approval When Required Initial Approval Monitoring/ Inspection

• For other species listed, seven hundred (700) square feet per tree. v. In the event that replacement trees are required but cannot be planted due to

site constraints, an in lieu fee in accordance with the City’s Master Fee Schedule may be substituted for required replacement plantings, with all such revenues applied toward tree planting in city parks, streets and medians.

vi. The project applicant shall install the plantings and maintain the plantings until established. The Tree Reviewer of the Tree Division of the Public Works Department may require a landscape plan showing the replacement plantings and the method of irrigation. Any replacement plantings which fail to become established within one year of planting shall be replanted at the project applicant’s expense.

CULTURAL RESOURCES

SCA-CUL-1: Archaeological and Paleontological Resources – Discovery During Construction (#33) Pursuant to CEQA Guidelines section 15064.5(f), in the event that any historic or prehistoric subsurface cultural resources are discovered during ground disturbing activities, all work within 50 feet of the resources shall be halted and the project applicant shall notify the City and consult with a qualified archaeologist or paleontologist, as applicable, to assess the significance of the find. In the case of discovery of paleontological resources, the assessment shall be done in accordance with the Society of Vertebrate Paleontology standards. If any find is determined to be significant, appropriate avoidance measures recommended by the consultant and approved by the City must be followed unless avoidance is determined unnecessary or infeasible by the City. Feasibility of avoidance shall be determined with consideration of factors such as the nature of the find, project design, costs, and other considerations. If avoidance is unnecessary or infeasible, other appropriate measures (e.g., data recovery, excavation) shall be instituted. Work may proceed on other parts of the project site while measures for the cultural resources are implemented. In the event of data recovery of archaeological resources, the project applicant shall submit an Archaeological Research Design and Treatment Plan (ARDTP) prepared by a qualified archaeologist for review and approval by the City. The ARDTP is required to identify how the proposed data recovery program would preserve the significant information the archaeological resource is expected to contain. The ARDTP shall identify the scientific/historic research questions applicable to the expected resource, the data classes the resource is expected to possess, and how the expected data classes would address the applicable research questions. The ARDTP shall include the analysis and specify the curation and storage methods. Data recovery, in general, shall be limited to

During construction

N/A Bureau of Building

Page 81: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

WOB TOD Project Addendum Page A-15

Standard Conditions of Approval When Required Initial Approval Monitoring/ Inspection

the portions of the archaeological resource that could be impacted by the proposed project. Destructive data recovery methods shall not be applied to portions of the archaeological resources if nondestructive methods are practicable. Because the intent of the ARDTP is to save as much of the archaeological resource as possible, including moving the resource, if feasible, preparation and implementation of the ARDTP would reduce the potential adverse impact to less than significant. The project applicant shall implement the ARDTP at his/her expense. In the event of excavation of paleontological resources, the project applicant shall submit an excavation plan prepared by a qualified paleontologist to the City for review and approval. All significant cultural materials recovered shall be subject to scientific analysis, professional museum curation, and/or a report prepared by a qualified paleontologist, as appropriate, according to current professional standards and at the expense of the project applicant.

SCA-CUL-2: Archaeologically Sensitive Areas – Pre-Construction Measures (#34) The project applicant shall implement either Provision A (Intensive Pre-Construction Study) or Provision B (Construction ALERT Sheet) concerning archaeological resources. Provision A: Intensive Pre-Construction Study. The project applicant shall retain a qualified archaeologist to conduct a site-specific, intensive archaeological resources study for review and approval by the City prior to soil-disturbing activities occurring on the project site. The purpose of the site-specific, intensive archaeological resources study is to identify early the potential presence of history-period archaeological resources on the project site. At a minimum, the study shall include: a. Subsurface presence/absence studies of the project site. Field studies may include,

but are not limited to, auguring and other common methods used to identify the presence of archaeological resources.

b. A report disseminating the results of this research. c. Recommendations for any additional measures that could be necessary to mitigate

any adverse impacts to recorded and/or inadvertently discovered cultural resources. If the results of the study indicate a high potential presence of historic-period archaeological resources on the project site, or a potential resource is discovered, the project applicant shall hire a qualified archaeologist to monitor any ground disturbing activities on the project site during construction and prepare an ALERT sheet pursuant to Provision B below that details what could potentially be found at the project site. Archaeological monitoring would include briefing construction personnel about the type of artifacts that may be present (as referenced in the ALERT sheet, required per Provision

Prior to approval of construction-related permit; during construction

Bureau of Building; Bureau of Planning

Bureau of Building

Page 82: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

Page A-16 WOB TOD Project Addendum

Standard Conditions of Approval When Required Initial Approval Monitoring/ Inspection

B below) and the procedures to follow if any artifacts are encountered, field recording and sampling in accordance with the Secretary of Interior’s Standards and Guidelines for Archaeological Documentation, notifying the appropriate officials if human remains or cultural resources are discovered, and preparing a report to document negative findings after construction is completed if no archaeological resources are discovered during construction. Provision B: Construction ALERT Sheet. The project applicant shall prepare a construction “ALERT” sheet developed by a qualified archaeologist for review and approval by the City prior to soil-disturbing activities occurring on the project site. The ALERT sheet shall contain, at a minimum, visuals that depict each type of artifact that could be encountered on the project site. Training by the qualified archaeologist shall be provided to the project’s prime contractor, any project subcontractor firms (including demolition, excavation, grading, foundation, and pile driving), and utility firms involved in soil-disturbing activities within the project site. The ALERT sheet shall state, in addition to the basic archaeological resource protection measures contained in other standard conditions of approval, all work must stop and the City’s Environmental Review Officer contacted in the event of discovery of the following cultural materials: concentrations of shellfish remains; evidence of fire (ashes, charcoal, burnt earth, fire-cracked rocks); concentrations of bones; recognizable Native American artifacts (arrowheads, shell beads, stone mortars [bowls], humanly shaped rock); building foundation remains; trash pits, privies (outhouse holes); floor remains; wells; concentrations of bottles, broken dishes, shoes, buttons, cut animal bones, hardware, household items, barrels, etc.; thick layers of burned building debris (charcoal, nails, fused glass, burned plaster, burned dishes); wood structural remains (building, ship, wharf); clay roof/floor tiles; stone walls or footings; or gravestones. Prior to any soil-disturbing activities, each contractor shall be responsible for ensuring that the ALERT sheet is circulated to all field personnel, including machine operators, field crew, pile drivers, and supervisory personnel. The ALERT sheet shall also be posted in a visible location at the project site.

SCA-CUL-3: Human Remains – Discovery during Construction (#35) Pursuant to CEQA Guidelines section 15064.5(e)(1), in the event that human skeletal remains are uncovered at the project site during construction activities, all work shall immediately halt and the project applicant shall notify the City and the Alameda County Coroner. If the County Coroner determines that an investigation of the cause of death is required or that the remains are Native American, all work shall cease within 50 feet of

During Construction

N/A Bureau of Building

Page 83: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

WOB TOD Project Addendum Page A-17

Standard Conditions of Approval When Required Initial Approval Monitoring/ Inspection

the remains until appropriate arrangements are made. In the event that the remains are Native American, the City shall contact the California Native American Heritage Commission (NAHC), pursuant to subdivision (c) of section 7050.5 of the California Health and Safety Code. If the agencies determine that avoidance is not feasible, then an alternative plan shall be prepared with specific steps and timeframe required to resume construction activities. Monitoring, data recovery, determination of significance, and avoidance measures (if applicable) shall be completed expeditiously and at the expense of the project applicant.

GEOLOGY AND SOILS

SCA-GEO-1: Construction-Related Permit(s) (#37) The project applicant shall obtain all required construction-related permits/approvals from the City. The project shall comply with all standards, requirements and conditions contained in construction-related codes, including but not limited to the Oakland Building Code and the Oakland Grading Regulations, to ensure structural integrity and safe construction.

Prior to approval of construction-related permit

Bureau of Building

Bureau of Building

SCA-GEO-2: Soils Report (#38) The project applicant shall submit a soils report prepared by a registered geotechnical engineer for City review and approval. The soils report shall contain, at a minimum, field test results and observations regarding the nature, distribution and strength of existing soils, and recommendations for appropriate grading practices and project design. The project applicant shall implement the recommendations contained in the approved report during project design and construction.

Prior to approval of construction-related permit

Bureau of Building

Bureau of Building

SCA-GEO-3: Seismic Hazards Zone (Landslide/Liquefaction) (#40) The project applicant shall submit a site-specific geotechnical report, consistent with California Geological Survey Special Publication 117 (as amended), prepared by a registered geotechnical engineer for City review and approval containing at a minimum a description of the geological and geotechnical conditions at the site, an evaluation of site-specific seismic hazards based on geological and geotechnical conditions, and recommended measures to reduce potential impacts related to liquefaction and/or slope stability hazards. The project applicant shall implement the recommendations contained in the approved report during project design and construction.

Prior to approval of construction-related permit

Bureau of Building

Bureau of Building

GREENHOUSE GAS EMISSIONS

SCA-GHG-1: Greenhouse Gas (GHG) Reduction Plan (#42) a. Greenhouse Gas (GHG) Reduction Plan Required The project applicant shall retain a qualified air quality consultant to develop a

Prior to approval of construction-related permit.

Bureau of Planning

N/A

Page 84: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

Page A-18 WOB TOD Project Addendum

Standard Conditions of Approval When Required Initial Approval Monitoring/ Inspection

Greenhouse Gas (GHG) Reduction Plan for City review and approval and shall implement the approved GHG Reduction Plan.

The goal of the GHG Reduction Plan shall be to increase energy efficiency and reduce GHG emissions to below at least one of the Bay Area Quality Management District’s (BAAQMD’s) CEQA Thresholds of Significance (1,100 metric tons of CO2e per year or 4.6 metric tons of CO2e per year per service population) AND to reduce GHG emissions by 36 percent below the project’s 2005 “business-as-usual” baseline GHG emissions(as explained below) to help implement the City’s Energy and Climate Action Plan (adopted in 2012) which calls for reducing GHG emissions by 36 percent below 2005 levels. The GHG Reduction Plan shall include, at a minimum, (a) a detailed GHG emissions inventory for the project under a “business-as-usual” scenario with no consideration of project design features, or other energy efficiencies, (b) an “adjusted” baseline GHG emissions inventory for the project, taking into consideration energy efficiencies included as part of the project (including the City’s Standard Conditions of Approval, proposed mitigation measures, project design features, and other City requirements), and additional GHG reduction measures available to further reduce GHG emissions, and (c) requirements for ongoing monitoring and reporting to demonstrate that the additional GHG reduction measures are being implemented. If the project is to be constructed in phases, the GHG Reduction Plan shall provide GHG emission scenarios by phase.

Potential GHG reduction measures to be considered include, but are not be limited to, measures recommended in BAAQMD’s latest CEQA Air Quality Guidelines, the California Air Resources Board Scoping Plan (December 2008, as may be revised), the California Air Pollution Control Officers Association (CAPCOA) Quantifying Greenhouse Gas Mitigation Measures (August 2010, as may be revised), the California Attorney General’s website, and Reference Guides on Leadership in Energy and Environmental Design (LEED) published by the U.S. Green Building Council.

The types of allowable GHG reduction measures include the following (listed in order of City preference): (1) physical design features; (2) operational features; and (3) the payment of fees to fund GHG-reducing programs (i.e., the purchase of “carbon credits”) as explained below.

The allowable locations of the GHG reduction measures include the following (listed in order of City preference): (1) the project site; (2) off-site within the City of Oakland; (3) off-site within the San Francisco Bay Area Air Basin; (4) off-site within the State of California; then (5) elsewhere in the United States.

As with preferred locations for the implementation of all GHG reductions measures,

Page 85: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

WOB TOD Project Addendum Page A-19

Standard Conditions of Approval When Required Initial Approval Monitoring/ Inspection

the preference for carbon credit purchases include those that can be achieved as follows (listed in order of City preference): (1) within the City of Oakland; (2) within the San Francisco Bay Area Air Basin; (3) within the State of California; then (4) elsewhere in the United States. The cost of carbon credit purchases shall be based on current market value at the time purchased and shall be based on the project’s operational emissions estimated in the GHG Reduction Plan or subsequent approved emissions inventory, which may result in emissions that are higher or lower than those estimated in the GHG Reduction Plan.

For physical GHG reduction measures to be incorporated into the design of the project, the measures shall be included on the drawings submitted for construction-related permits.

b. GHG Reduction Plan Implementation During Construction The project applicant shall implement the GHG Reduction Plan during construction

of the project. For physical GHG reduction measures to be incorporated into the design of the project, the measures shall be implemented during construction. For physical GHG reduction measures to be incorporated into off-site projects, the project applicant shall obtain all necessary permits/approvals and the measures shall be included on drawings and submitted to the City Planning Director or his/her designee for review and approval. These off-site improvements shall be installed prior to completion of the subject project (or prior to completion of the project phase for phased projects). For GHG reduction measures involving the purchase of carbon credits, evidence of the payment/purchase shall be submitted to the City for review and approval prior to completion of the project (or prior to completion of the project phase, for phased projects).

During construction

Bureau of Planning

Bureau of Building

c. GHG Reduction Plan Implementation After Construction The project applicant shall implement the GHG Reduction Plan after construction of

the project (or at the completion of the project phase for phased projects). For operational GHG reduction measures to be incorporated into the project or off-site projects, the measures shall be implemented on an indefinite and ongoing basis.

The project applicant shall satisfy the following requirements for ongoing monitoring and reporting to demonstrate that the additional GHG reduction measures are being implemented. The GHG Reduction Plan requires regular periodic evaluation over the life of the project (generally estimated to be at least 40 years) to determine how the Plan is achieving required GHG emissions reductions over time, as well as the efficacy of the specific additional GHG reduction measures identified in the Plan.

Annual Report. Implementation of the GHG reduction measures and related requirements shall be ensured through compliance with Conditions of Approval

Ongoing Bureau of Planning

Bureau of Planning

Page 86: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

Page A-20 WOB TOD Project Addendum

Standard Conditions of Approval When Required Initial Approval Monitoring/ Inspection

adopted for the project. Generally, starting two years after the City issues the first Certificate of Occupancy for the project, the project applicant shall prepare each year of the useful life of the project an Annual GHG Emissions Reduction Report (“Annual Report”), for review and approval by the City Planning Director or his/her designee. The Annual Report shall be submitted to an independent reviewer of the City’s choosing, to be paid for by the project applicant.

The Annual Report shall summarize the project’s implementation of GHG reduction measures over the preceding year, intended upcoming changes, compliance with the conditions of the Plan, and include a brief summary of the previous year’s Annual Report results (starting the second year). The Annual Report shall include a comparison of annual project emissions to the baseline emissions reported in the GHG Plan.

The GHG Reduction Plan shall be considered fully attained when project emissions are less than either applicable numeric BAAQMD CEQA Thresholds AND GHG emissions are 36 percent below the project’s 2005 “business-as-usual” baseline GHG emissions, as confirmed by the City through an established monitoring program. Monitoring and reporting activities will continue at the City’s discretion, as discussed below.

Corrective Procedure. If the third Annual Report, or any report thereafter, indicates that, in spite of the implementation of the GHG Reduction Plan, the project is not achieving the GHG reduction goal, the project applicant shall prepare a report for City review and approval, which proposes additional or revised GHG measures to better achieve the GHG emissions reduction goals, including without limitation, a discussion on the feasibility and effectiveness of the menu of other additional measures (“Corrective GHG Action Plan”). The project applicant shall then implement the approved Corrective GHG Action Plan.

If, one year after the Corrective GHG Action Plan is implemented, the required GHG emissions reduction target is still not being achieved, or if the project applicant fails to submit a report at the times described above, or if the reports do not meet City requirements outlined above, the City may, in addition to its other remedies, (a) assess the project applicant a financial penalty based upon actual percentage reduction in GHG emissions as compared to the percent reduction in GHG emissions established in the GHG Reduction Plan; or (b) refer the matter to the City Planning Commission for scheduling of a compliance hearing to determine whether the project’s approvals should be revoked, altered or additional conditions of approval imposed.

The penalty as described in (a) above shall be determined by the City Planning

Page 87: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

WOB TOD Project Addendum Page A-21

Standard Conditions of Approval When Required Initial Approval Monitoring/ Inspection

Director or his/her designee and be commensurate with the percentage GHG emissions reduction not achieved (compared to the applicable numeric significance thresholds) or required percentage reduction from the “adjusted” baseline.

In determining whether a financial penalty or other remedy is appropriate, the City shall not impose a penalty if the project applicant has made a good faith effort to comply with the GHG Reduction Plan.

The City would only have the ability to impose a monetary penalty after a reasonable cure period and in accordance with the enforcement process outlined in Planning Code Chapter 17.152. If a financial penalty is imposed, such penalty sums shall be used by the City solely toward the implementation of the GHG Reduction Plan.

Timeline Discretion and Summary. The City shall have the discretion to reasonably modify the timing of reporting, with reasonable notice and opportunity to comment by the applicant, to coincide with other related monitoring and reporting required for the project.

HAZARDS AND HAZARDOUS MATERIALS

SCA-HAZ-1: Hazardous Materials Related to Construction (#43) The project applicant shall ensure that Best Management Practices (BMPs) are implemented by the contractor during construction to minimize potential negative effects on groundwater, soils, and human health. These shall include, at a minimum, the following: a. Follow manufacture’s recommendations for use, storage, and disposal of chemical

products used in construction; b. Avoid overtopping construction equipment fuel gas tanks; c. During routine maintenance of construction equipment, properly contain and

remove grease and oils; d. Properly dispose of discarded containers of fuels and other chemicals; e. Implement lead-safe work practices and comply with all local, regional, state, and

federal requirements concerning lead (for more information refer to the Alameda County Lead Poisoning Prevention Program); and

f. If soil, groundwater, or other environmental medium with suspected contamination is encountered unexpectedly during construction activities (e.g., identified by odor or visual staining, or if any underground storage tanks, abandoned drums or other hazardous materials or wastes are encountered), the project applicant shall cease work in the vicinity of the suspect material, the area shall be secured as necessary, and the applicant shall take all appropriate measures to protect human health and

During construction

N/A Bureau of Building

Page 88: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

Page A-22 WOB TOD Project Addendum

Standard Conditions of Approval When Required Initial Approval Monitoring/ Inspection

the environment. Appropriate measures shall include notifying the City and applicable regulatory agency(ies) and implementation of the actions described in the City’s Standard Conditions of Approval, as necessary, to identify the nature and extent of contamination. Work shall not resume in the area(s) affected until the measures have been implemented under the oversight of the City or regulatory agency, as appropriate.

SCA-HAZ-2: Hazardous Building Materials and Site Contamination (#44) a. Hazardous Building Materials Assessment The project applicant shall submit a comprehensive assessment report to the Bureau

of Building, signed by a qualified environmental professional, documenting the presence or lack thereof of asbestos-containing materials (ACMs), lead-based paint, polychlorinated biphenyls (PCBs), and any other building materials or stored materials classified as hazardous materials by State or federal law. If lead-based paint, ACMs, PCBs, or any other building materials or stored materials classified as hazardous materials are present, the project applicant shall submit specifications prepared and signed by a qualified environmental professional, for the stabilization and/or removal of the identified hazardous materials in accordance with all applicable laws and regulations. The project applicant shall implement the approved recommendations and submit to the City evidence of approval for any proposed remedial action and required clearances by the applicable local, state, or federal regulatory agency.

Prior to approval of demolition, grading, or building permits

Bureau of Building

Bureau of Building

b. Environmental Site Assessment Required The project applicant shall submit a Phase I Environmental Site Assessment report,

and Phase II Environmental Site Assessment report if warranted by the Phase I report, for the project site for review and approval by the City. The report(s) shall be prepared by a qualified environmental assessment professional and include recommendations for remedial action, as appropriate, for hazardous materials. The project applicant shall implement the approved recommendations and submit to the City evidence of approval for any proposed remedial action and required clearances by the applicable local, state, or federal regulatory agency.

Prior to approval of construction-related permit

Applicable regulatory agency with jurisdiction

Applicable regulatory agency with jurisdiction

c. Health and Safety Plan Required The project applicant shall submit a Health and Safety Plan for the review and

approval by the City in order to protect project construction workers from risks associated with hazardous materials. The project applicant shall implement the approved Plan.

Prior to approval of construction-related permit

Bureau of Building

Bureau of Building

Page 89: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

WOB TOD Project Addendum Page A-23

Standard Conditions of Approval When Required Initial Approval Monitoring/ Inspection

d. Best Management Practices (BMPs) Required for Contaminated Sites The project applicant shall ensure that Best Management Practices (BMPs) are

implemented by the contractor during construction to minimize potential soil and groundwater hazards. These shall include the following: i. Soil generated by construction activities shall be stockpiled on-site in a secure

and safe manner. All contaminated soils determined to be hazardous or non-hazardous waste must be adequately profiled (sampled) prior to acceptable reuse or disposal at an appropriate off-site facility. Specific sampling and handling and transport procedures for reuse or disposal shall be in accordance with applicable local, state, and federal requirements.

ii. Groundwater pumped from the subsurface shall be contained on-site in a secure and safe manner, prior to treatment and disposal, to ensure environmental and health issues are resolved pursuant to applicable laws and policies. Engineering controls shall be utilized, which include impermeable barriers to prohibit groundwater and vapor intrusion into the building.

Prior to approval of demolition, grading, or building permits

Bureau of Building

Bureau of Building

SCA-HAZ-2: Fire Safety Phasing Plan (#46) The project applicant shall submit a Fire Safety Phasing Plan for City review and approval, and shall implement the approved Plan. The Fire Safety Phasing Plan shall include all of the fire safety features incorporated into each phase of the project and the schedule for implementation of the features.

Prior to approval of construction-related permit

Oakland Fire Department

Bureau of Building

HYDROLOGY AND WATER QUALITY

SCA-HYDRO-1: Erosion and Sedimentation Control Plan for Construction (#49) a. Erosion and Sedimentation Control Plan Required The project applicant shall submit an Erosion and Sedimentation Control Plan to the

City for review and approval. The Erosion and Sedimentation Control Plan shall include all necessary measures to be taken to prevent excessive stormwater runoff or carrying by stormwater runoff of solid materials on to lands of adjacent property owners, public streets, or to creeks as a result of conditions created by grading and/or construction operations. The Plan shall include, but not be limited to, such measures as short-term erosion control planting, waterproof slope covering, check dams, interceptor ditches, benches, storm drains, dissipation structures, diversion dikes, retarding berms and barriers, devices to trap, store and filter out sediment, and stormwater retention basins. Off-site work by the project applicant may be necessary. The project applicant shall obtain permission or easements necessary for off-site work. There shall be a clear notation that the plan is subject to changes as changing conditions occur. Calculations of anticipated stormwater runoff and

Prior to approval of construction-related permit

Bureau of Building

N/A

Page 90: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

Page A-24 WOB TOD Project Addendum

Standard Conditions of Approval When Required Initial Approval Monitoring/ Inspection

sediment volumes shall be included, if required by the City. The Plan shall specify that, after construction is complete, the project applicant shall ensure that the storm drain system shall be inspected and that the project applicant shall clear the system of any debris or sediment.

b. Erosion and Sedimentation Control During Construction The project applicant shall implement the approved Erosion and Sedimentation

Control Plan. No grading shall occur during the wet weather season (October 15 through April 15) unless specifically authorized in writing by the Bureau of Building.

During construction

N/A Bureau of Building

SCA-HYDRO-2: State Construction General Permit (#50) The project applicant shall comply with the requirements of the Construction General Permit issued by the State Water Resources Control Board (SWRCB). The project applicant shall submit a Notice of Intent (NOI), Stormwater Pollution Prevention Plan (SWPPP), and other required Permit Registration Documents to SWRCB. The project applicant shall submit evidence of compliance with Permit requirements to the City.

Prior to approval of construction-related permit

State Water Resources Control Board; evidence of compliance submitted to Bureau of Building

State Water Resources Control Board

SCA-HYDRO-2: Site Design Measures to Reduce Stormwater Runoff (#52) Pursuant to Provision C.3 of the Municipal Regional Stormwater Permit issued under the National Pollutant Discharge Elimination System (NPDES), the project applicant is encouraged to incorporate appropriate site design measures into the project to reduce the amount of stormwater runoff. These measures may include, but are not limited to, the following: a. Minimize impervious surfaces, especially directly connected impervious surfaces

and surface parking areas; b. Utilize permeable paving in place of impervious paving where appropriate; c. Cluster structures; d. Direct roof runoff to vegetated areas; e. Preserve quality open space; and f. Establish vegetated buffer areas.

Ongoing N/A N/A

SCA-HYDRO-3: NPDES C.3 Stormwater Requirements for Regulated Projects (#54) a. Post-Construction Stormwater Management Plan Required The project applicant shall comply with the requirements of Provision C.3 of the

Municipal Regional Stormwater Permit issued under the National Pollutant Discharge Elimination System (NPDES). The project applicant shall submit a Post-Construction Stormwater Management Plan to the City for review and approval with

Prior to approval of construction-related permit

Bureau of Planning; Bureau of Building

Bureau of Building

Page 91: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

WOB TOD Project Addendum Page A-25

Standard Conditions of Approval When Required Initial Approval Monitoring/ Inspection

the project drawings submitted for site improvements, and shall implement the approved Plan during construction. The Post-Construction Stormwater Management Plan shall include and identify the following: i. Location and size of new and replaced impervious surface; ii. Directional surface flow of stormwater runoff; iii. Location of proposed on-site storm drain lines; iv. Site design measures to reduce the amount of impervious surface area; v. Source control measures to limit stormwater pollution; vi. Stormwater treatment measures to remove pollutants from stormwater runoff,

including the method used to hydraulically size the treatment measures; and vii. Hydromodification management measures, if required by Provision C.3, so that

post-project stormwater runoff flow and duration match pre-project runoff.

b. Maintenance Agreement Required The project applicant shall enter into a maintenance agreement with the City, based

on the Standard City of Oakland Stormwater Treatment Measures Maintenance Agreement, in accordance with Provision C.3, which provides, in part, for the following: i. The project applicant accepting responsibility for the adequate

installation/construction, operation, maintenance, inspection, and reporting of any on-site stormwater treatment measures being incorporated into the project until the responsibility is legally transferred to another entity; and

ii. Legal access to the on-site stormwater treatment measures for representatives of the City, the local vector control district, and staff of the Regional Water Quality Control Board, San Francisco Region, for the purpose of verifying the implementation, operation, and maintenance of the on-site stormwater treatment measures and to take corrective action if necessary.

The maintenance agreement shall be recorded at the County Recorder’s Office at the applicant’s expense.

Prior to building permit final

Bureau of Building

Bureau of Building

NOISE

SCA-NOS-1: Construction Days/Hours (#62) The project applicant shall comply with the following restrictions concerning construction days and hours: a. Construction activities are limited to between 7:00 a.m. and 7:00 p.m. Monday

through Friday, except that pier drilling and/or other extreme noise generating activities greater than 90 dBA shall be limited to between 8:00 a.m. and 4:00 p.m.

During Construction

N/A Bureau of Building

Page 92: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

Page A-26 WOB TOD Project Addendum

Standard Conditions of Approval When Required Initial Approval Monitoring/ Inspection

b. Construction activities are limited to between 9:00 a.m. and 5:00 p.m. on Saturday. In residential zones and within 300 feet of a residential zone, construction activities are allowed from 9:00 a.m. to 5:00 p.m. only within the interior of the building with the doors and windows closed. No pier drilling or other extreme noise generating activities greater than 90 dBA are allowed on Saturday.

c. No construction is allowed on Sunday or federal holidays. Construction activities include, but are not limited to, truck idling, moving equipment (including trucks, elevators, etc.) or materials, deliveries, and construction meetings held on-site in a non-enclosed area. Any construction activity proposed outside of the above days and hours for special activities (such as concrete pouring which may require more continuous amounts of time) shall be evaluated on a case-by-case basis by the City, with criteria including the urgency/emergency nature of the work, the proximity of residential or other sensitive uses, and a consideration of nearby residents’/occupants’ preferences. The project applicant shall notify property owners and occupants located within 300 feet at least 14 calendar days prior to construction activity proposed outside of the above days/hours. When submitting a request to the City to allow construction activity outside of the above days/hours, the project applicant shall submit information concerning the type and duration of proposed construction activity and the draft public notice for City review and approval prior to distribution of the public notice.

SCA-NOS-2: Construction Noise (#63) The project applicant shall implement noise reduction measures to reduce noise impacts due to construction. Noise reduction measures include, but are not limited to, the following: a. Equipment and trucks used for project construction shall utilize the best available

noise control techniques (e.g., improved mufflers, equipment redesign, use of intake silencers, ducts, engine enclosures and acoustically-attenuating shields or shrouds) wherever feasible.

b. Except as provided herein, impact tools (e.g., jack hammers, pavement breakers, and rock drills) used for project construction shall be hydraulically or electrically powered to avoid noise associated with compressed air exhaust from pneumatically powered tools. However, where use of pneumatic tools is unavoidable, an exhaust muffler on the compressed air exhaust shall be used; this muffler can lower noise levels from the exhaust by up to about 10 dBA. External jackets on the tools themselves shall be used, if such jackets are commercially available, and this could achieve a reduction of 5 dBA. Quieter procedures shall be used, such as drills rather than impact equipment, whenever such procedures are available and consistent with

During Construction

N/A Bureau of Building

Page 93: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

WOB TOD Project Addendum Page A-27

Standard Conditions of Approval When Required Initial Approval Monitoring/ Inspection

construction procedures. c. Applicant shall use temporary power poles instead of generators where feasible. d. Stationary noise sources shall be located as far from adjacent properties as possible,

and they shall be muffled and enclosed within temporary sheds, incorporate insulation barriers, or use other measures as determined by the City to provide equivalent noise reduction.

e. The noisiest phases of construction shall be limited to less than 10 days at a time. Exceptions may be allowed if the City determines an extension is necessary and all available noise reduction controls are implemented.

SCA-NOS-3: Extreme Construction Noise (#64) a. Construction Noise Management Plan Required Prior to any extreme noise generating construction activities (e.g., pier drilling, pile driving and other activities generating greater than 90 dBA), the project applicant shall submit a Construction Noise Management Plan prepared by a qualified acoustical consultant for City review and approval that contains a set of site-specific noise attenuation measures to further reduce construction impacts associated with extreme noise generating activities. The project applicant shall implement the approved Plan during construction. Potential attenuation measures include, but are not limited to, the following: i. Erect temporary plywood noise barriers around the construction site, particularly

along on sites adjacent to residential buildings; ii. Implement “quiet” pile driving technology (such as pre-drilling of piles, the use of

more than one pile driver to shorten the total pile driving duration), where feasible, in consideration of geotechnical and structural requirements and conditions;

iii. Utilize noise control blankets on the building structure as the building is erected to reduce noise emission from the site;

iv. Evaluate the feasibility of noise control at the receivers by temporarily improving the noise reduction capability of adjacent buildings by the use of sound blankets for example and implement such measure if such measures are feasible and would noticeably reduce noise impacts; and

v. Monitor the effectiveness of noise attenuation measures by taking noise measurements.

Prior to Approval Bureau of Building

Bureau of Building

b. Public Notification Required The project applicant shall notify property owners and occupants located within 300 feet of the construction activities at least 14 calendar days prior to commencing extreme noise generating activities. Prior to providing the notice, the project applicant shall

Page 94: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

Page A-28 WOB TOD Project Addendum

Standard Conditions of Approval When Required Initial Approval Monitoring/ Inspection

submit to the City for review and approval the proposed type and duration of extreme noise generating activities and the proposed public notice. The public notice shall provide the estimated start and end dates of the extreme noise generating activities and describe noise attenuation measures to be implemented.

SCA-NOS-4: Construction Noise Complaints (#66) The project applicant shall submit to the City for review and approval a set of procedures for responding to and tracking complaints received pertaining to construction noise, and shall implement the procedures during construction. At a minimum, the procedures shall include: a. Designation of an on-site construction complaint and enforcement manager for the

project; b. A large on-site sign near the public right-of-way containing permitted construction

days/hours, complaint procedures, and phone numbers for the project complaint manager and City Code Enforcement unit;

c. Protocols for receiving, responding to, and tracking received complaints; and d. Maintenance of a complaint log that records received complaints and how

complaints were addressed, which shall be submitted to the City for review upon the City’s request.

Prior to Approval of Construction-Related Permit

Bureau of Building

Bureau of Building

SCA-NOS-5: Exposure to Community Noise (#67) The project applicant shall submit a Noise Reduction Plan prepared by a qualified acoustical engineer for City review and approval that contains noise reduction measures (e.g., sound-rated window, wall, and door assemblies) to achieve an acceptable interior noise level in accordance with the land use compatibility guidelines of the Noise Element of the Oakland General Plan. The applicant shall implement the approved Plan during construction. To the maximum extent practicable, interior noise levels shall not exceed the following: a. 45 dBA: Residential activities, civic activities, hotels b. 50 dBA: Administrative offices; group assembly activities c. 55 dBA: Commercial activities d. 65 dBA: Industrial activities

Prior to approval of construction-related permit

Bureau of Planning

Bureau of Building

SCA-NOS-6: Operational Noise (#68) Noise levels from the project site after completion of the project (i.e., during project operation) shall comply with the performance standards of chapter 17.120 of the Oakland Planning Code and chapter 8.18 of the Oakland Municipal Code. If noise levels exceed these standards, the activity causing the noise shall be abated until appropriate noise reduction measures have been installed and compliance verified by the City.

Ongoing N/A Bureau of Building

Page 95: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

WOB TOD Project Addendum Page A-29

Standard Conditions of Approval When Required Initial Approval Monitoring/ Inspection

POPULATION AND HOUSING

SCA-POP-1: Jobs/Housing Impact Fee (#71) The project applicant shall comply with the requirements of the City of Oakland Jobs/Housing Impact Fee Ordinance (chapter 15.68 of the Oakland Municipal Code).

Prior to issuance of building permit; subsequent milestones pursuant to ordinance

Bureau of Building

N/A

PUBLIC SERVICES

SCA-PUB-1: Capital Improvements Impact Fee (#74) The project applicant shall comply with the requirements of the City of Oakland Capital Improvements Fee Ordinance (chapter 15.74 of the Oakland Municipal Code).

Prior to issuance of building permit

Bureau of Building

N/A

TRANSPORTATION AND TRAFFIC

SCA-TRANS-1: Construction Activity in the Public Right-of-Way (#76) a. Obstruction Permit Required The project applicant shall obtain an obstruction permit from the City prior to placing any temporary construction-related obstruction in the public right-of-way, including City streets, sidewalks, bicycle facilities, and bus stops.

Prior to approval of construction-related permit

Department of Transportation

Department of Transportation

b. Traffic Control Plan Required In the event of obstructions to vehicle or bicycle travel lanes, bus stops, or sidewalks, the project applicant shall submit a Traffic Control Plan to the City for review and approval prior to obtaining an obstruction permit. The project applicant shall submit evidence of City approval of the Traffic Control Plan with the application for an obstruction permit. The Traffic Control Plan shall contain a set of comprehensive traffic control measures for auto, transit, bicycle, and pedestrian accommodations (or detours, if accommodations are not feasible), including detour signs if required, lane closure procedures, signs, cones for drivers, and designated construction access routes. The Traffic Control Plan shall be in conformance with the City’s Supplemental Design Guidance for Accommodating Pedestrians, Bicyclists, and Bus Facilities in Construction Zones. The project applicant shall implement the approved Plan during construction.

Department of Transportation

Department of Transportation

c. Repair of City Streets The project applicant shall repair any damage to the public right-of way, including streets and sidewalks, caused by project construction at his/her expense within one week of the occurrence of the damage (or excessive wear), unless further damage/excessive wear may continue; in such case, repair shall occur prior to approval of the final inspection of the construction-related permit. All damage that is a threat to public health or safety shall be repaired immediately.

Prior to building permit final

N/A Department of Transportation

Page 96: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

Page A-30 WOB TOD Project Addendum

Standard Conditions of Approval When Required Initial Approval Monitoring/ Inspection

SCA-TRANS-2: Bicycle Parking (#77) The project applicant shall comply with the City of Oakland Bicycle Parking Requirements (chapter 17.118 of the Oakland Planning Code). The project drawings submitted for construction-related permits shall demonstrate compliance with the requirements.

Prior to approval of construction-related permit

Bureau of Planning

Bureau of Building

SCA-TRANS-3: Transportation Improvements (#78) The project applicant shall implement the recommended on- and off-site transportation-related improvements contained within the Transportation Impact Review for the project (e.g., signal timing adjustments, restriping, signalization, traffic control devices, roadway reconfigurations, transportation demand management measures, and transit, pedestrian, and bicyclist amenities). The project applicant is responsible for funding and installing the improvements, and shall obtain all necessary permits and approvals from the City and/or other applicable regulatory agencies such as, but not limited to, Caltrans (for improvements related to Caltrans facilities) and the California Public Utilities Commission (for improvements related to railroad crossings), prior to installing the improvements. To implement this measure for intersection modifications, the project applicant shall submit Plans, Specifications, and Estimates (PS&E) to the City for review and approval. All elements shall be designed to applicable City standards in effect at the time of construction and all new or upgraded signals shall include these enhancements as required by the City. All other facilities supporting vehicle travel and alternative modes through the intersection shall be brought up to both City standards and ADA standards (according to Federal and State Access Board guidelines) at the time of construction. Current City Standards call for, among other items, the elements listed below: a. 2070L Type Controller with cabinet accessory b. GPS communication (clock) c. Accessible pedestrian crosswalks according to Federal and State Access Board

guidelines with signals (audible and tactile) d. Countdown pedestrian head module switch out e. City Standard ADA wheelchair ramps f. Video detection on existing (or new, if required) g. Mast arm poles, full activation (where applicable)

Prior to building permit final or as otherwise specified

Bureau of Building; Department of Transportation

Bureau of Building

Page 97: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

WOB TOD Project Addendum Page A-31

Standard Conditions of Approval When Required Initial Approval Monitoring/ Inspection

h. Polara Push buttons (full activation) i. Bicycle detection (full activation) j. Pull boxes k. Signal interconnect and communication with trenching (where applicable), or

through existing conduit (where applicable), 600 feet maximum l. Conduit replacement contingency m. Fiber switch n. PTZ camera (where applicable) o. Transit Signal Priority (TSP) equipment consistent with other signals along corridor p. Signal timing plans for the signals in the coordination group q. Bi-directional curb ramps (where feasible, and if project is on a street corner) r. Upgrade ramps on receiving curb (where feasible, and if project is on a street corner)

SCA-TRANS-4: Transportation and Parking Demand Management (#79) a. Transportation and Parking Demand Management (TDM) Plan Required The project applicant shall submit a Transportation and Parking Demand

Management (TDM) Plan for review and approval by the City. i. The goals of the TDM Plan shall be the following:

• Reduce vehicle traffic and parking demand generated by the project to the maximum extent practicable.

• Achieve the following project vehicle trip reductions (VTR): o Projects generating 50-99 net new a.m. or p.m. peak hour vehicle trips:

10 percent VTR o Projects generating 100 or more net new a.m. or p.m. peak hour vehicle

trips: 20 percent VTR • Increase pedestrian, bicycle, transit, and carpool/vanpool modes of travel. All

four modes of travel shall be considered, as appropriate. • Enhance the City’s transportation system, consistent with City policies and

programs. ii. The TDM Plan should include the following:

• Baseline existing conditions of parking and curbside regulations within the surrounding neighborhood that could affect the effectiveness of TDM strategies, including inventory of parking spaces and occupancy if applicable.

• Proposed TDM strategies to achieve VTR goals (see below). iii. For employers with 100 or more employees at the subject site, the TDM Plan

Prior to approval of planning application.

Bureau of Planning

per TDM Plan

Page 98: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

Page A-32 WOB TOD Project Addendum

Standard Conditions of Approval When Required Initial Approval Monitoring/ Inspection

shall also comply with the requirements of Oakland Municipal Code Chapter 10.68 Employer-Based Trip Reduction Program.

iv. The following TDM strategies must be incorporated into a TDM Plan based on a project location or other characteristics. When required, these mandatory strategies should be identified as a credit toward a project’s VTR.

Improvement Required by code or when…

Bus boarding bulbs or islands A bus boarding bulb or island does not already exist and a bus stop is located along the project frontage; and/or

A bus stop along the project frontage serves a route with 15 minutes or better peak hour service and has a shared bus-bike lane curb

Bus shelter A stop with no shelter is located within the project frontage, or

The project is located within 0.10 miles of a flag stop with 25 or more boardings per day

Concrete bus pad A bus stop is located along the project frontage and a concrete bus pad does not already exist

Curb extensions or bulb-outs Identified as an improvement within site analysis

Implementation of a corridor-level bikeway improvement

A buffered Class II or Class IV bikeway facility is in a local or county adopted plan within 0.10 miles of the project location; and

The project would generate 500 or more daily bicycle trips

Implementation of a corridor-level transit capital improvement

A high-quality transit facility is in a local or county adopted plan within 0.25 miles of the project location; and

The project would generate 400 or more peak period transit trips

Installation of amenities such as lighting; pedestrian-oriented green infrastructure, trees, or other greening landscape; and trash receptacles per the Pedestrian Master Plan and any

Always required

Page 99: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

WOB TOD Project Addendum Page A-33

Standard Conditions of Approval When Required Initial Approval Monitoring/ Inspection

applicable streetscape plan. Installation of safety improvements identified in the Pedestrian Master Plan (such as crosswalk striping, curb ramps, count down signals, bulb outs, etc.)

When improvements are identified in the Pedestrian Master Plan along project frontage or at an adjacent intersection

In-street bicycle corral A project includes more than 10,000 square feet of ground floor retail, is located along a Tier 1 bikeway, and on-street vehicle parking is provided along the project frontages.

Intersection improvements14 Identified as an improvement within site analysis

New sidewalk, curb ramps, curb and gutter meeting current City and ADA standards

Always required

No monthly permits and establish minimum price floor for public parking15

If proposed parking ratio exceeds 1:1000 sf. (commercial)

Parking garage is designed with retrofit capability

Optional if proposed parking ratio exceeds 1:1.25 (residential) or 1:1000 sf. (commercial)

Parking space reserved for car share

If a project is providing parking and a project is located within downtown. One car share space reserved for buildings between 50 – 200 units, then one car share space per 200 units.

Paving, lane striping or restriping (vehicle and bicycle), and signs to midpoint of street section

Typically required

Pedestrian crossing improvements

Identified as an improvement within site analysis

Pedestrian-supportive signal changes16

Identified as an improvement within

                                                                 14   Including but not limited to visibility improvements, shortening corner radii, pedestrian safety islands, accounting for pedestrian desire lines. 15   May also provide a cash incentive or transit pass alternative to a free parking space in commercial properties. 

Page 100: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

Page A-34 WOB TOD Project Addendum

Standard Conditions of Approval When Required Initial Approval Monitoring/ Inspection

operations analysis

Real-time transit information system

A project frontage block includes a bus stop or BART station and is along a Tier 1 transit route with 2 or more routes or peak period frequency of 15 minutes or better

Relocating bus stops to far side A project is located within 0.10 mile of any active bus stop that is currently near-side

Signal upgrades17 Project size exceeds 100 residential units, 80,000 sf. of retail, or 100,000 sf. of commercial; and

Project frontage abuts an intersection with signal infrastructure older than 15 years

Transit queue jumps Identified as a needed improvement within operations analysis of a project with frontage along a Tier 1 transit route with 2 or more routes or peak period frequency of 15 minutes or better

Transit Operations The project applicant shall, if feasible, contribute its fair share to AC Transit service enhancements to meet access goals outlined in the City of Oakland West Oakland Specific Plan and AC Transit’s ACgo expanded service plan and improve connections to local goods and services. Alternatively, the project applicant may explore and propose other TDM measure(s), including those already set forth in the TDM plan, in lieu of this fair share contribution. The City may approve the substitute TDM measure(s) if the City, in its discretion, deems the measure(s) more feasible and reasonably related and roughly proportional to the impacts of the development.

                                                                                                                                                                                                                                                                                                 16   Including but not limited to reducing signal cycle lengths to less than 90 seconds to avoid pedestrian crossings against the signal, providing a leading 

pedestrian interval, provide a “scramble” signal phase where appropriate. 17   Including typical traffic lights, pedestrian signals, bike actuated signals, transit‐only signals 

Page 101: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

WOB TOD Project Addendum Page A-35

Standard Conditions of Approval When Required Initial Approval Monitoring/ Inspection

Trenching and placement of conduit for providing traffic signal interconnect

Project size exceeds 100 units, 80,000 sf. of retail, or 100,000 sf. of commercial; and

Project frontage block is identified for signal interconnect improvements as part of a planned ITS improvement; and

A major transit improvement is identified within operations analysis requiring traffic signal interconnect

Unbundled parking If proposed parking ratio exceeds 1:1.25 (residential)

v. Other TDM strategies to consider include, but are not limited to, the following:

• Inclusion of additional long-term and short-term bicycle parking that meets the design standards set forth in chapter five of the Bicycle Master Plan and the Bicycle Parking Ordinance (chapter 17.117 of the Oakland Planning Code), and shower and locker facilities in commercial developments that exceed the requirement.

• Construction of and/or access to bikeways per the Bicycle Master Plan; construction of priority bikeways, on-site signage and bike lane striping.

• Installation of safety elements per the Pedestrian Master Plan (such as crosswalk striping, curb ramps, count down signals, bulb outs, etc.) to encourage convenient and safe crossing at arterials, in addition to safety elements required to address safety impacts of the project.

• Installation of amenities such as lighting, street trees, and trash receptacles per the Pedestrian Master Plan, the Master Street Tree List and Tree Planting Guidelines (which can be viewed at http://www2.oaklandnet.com/oakca1/groups/pwa/documents/report/oak042662.pdf and http://www2.oaklandnet.com/oakca1/groups/pwa/documents/form/oak025595.pdf, respectively) and any applicable streetscape plan.

• Construction and development of transit stops/shelters, pedestrian access, way finding signage, and lighting around transit stops per transit agency plans or negotiated improvements.

• Direct on-site sales of transit passes purchased and sold at a bulk group rate (through programs such as AC Transit Easy Pass or a similar program through another transit agency).

Page 102: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

Page A-36 WOB TOD Project Addendum

Standard Conditions of Approval When Required Initial Approval Monitoring/ Inspection

• Provision of a transit subsidy to employees or residents, determined by the project applicant and subject to review by the City, if employees or residents use transit or commute by other alternative modes.

• Provision of an ongoing contribution to transit service to the area between the project and nearest mass transit station prioritized as follows: 1) Contribution to AC Transit bus service; 2) Contribution to an existing area shuttle service; and 3) Establishment of new shuttle service. The amount of contribution (for any of the above scenarios) would be based upon the cost of establishing new shuttle service (Scenario 3).

• Guaranteed ride home program for employees, either through 511.org or through separate program.

• Pre-tax commuter benefits (commuter checks) for employees. • Free designated parking spaces for on-site car-sharing program (such as City

Car Share, Zip Car, etc.) and/or car-share membership for employees or tenants.

• On-site carpooling and/or vanpool program that includes preferential (discounted or free) parking for carpools and vanpools.

• Distribution of information concerning alternative transportation options. • Parking spaces sold/leased separately for residential units. Charge employees

for parking, or provide a cash incentive or transit pass alternative to a free parking space in commercial properties.

• Parking management strategies including attendant/valet parking and shared parking spaces.

• Requiring tenants to provide opportunities and the ability to work off-site. • Allow employees or residents to adjust their work schedule in order to

complete the basic work requirement of five eight-hour workdays by adjusting their schedule to reduce vehicle trips to the worksite (e.g., working four, ten-hour days; allowing employees to work from home two days per week).

• Provide or require tenants to provide employees with staggered work hours involving a shift in the set work hours of all employees at the workplace or flexible work hours involving individually determined work hours.

The TDM Plan shall indicate the estimated VTR for each strategy, based on published research or guidelines where feasible. For TDM Plans containing ongoing operational VTR strategies, the Plan shall include an ongoing monitoring and enforcement program to ensure the Plan is implemented on an ongoing basis during project operation. If an

Page 103: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

WOB TOD Project Addendum Page A-37

Standard Conditions of Approval When Required Initial Approval Monitoring/ Inspection

annual compliance report is required, as explained below, the TDM Plan shall also specify the topics to be addressed in the annual report. b. TDM Implementation – Physical Improvements

For VTR strategies involving physical improvements, the project applicant shall obtain the necessary permits/approvals from the City and install the improvements prior to the completion of the project.

Prior to building permit final

Bureau of Building

Bureau of Building

c. TDM Implementation – Operational Strategies For projects that generate 100 or more net new a.m. or p.m. peak hour vehicle trips

and contain ongoing operational VTR strategies, the project applicant shall submit an annual compliance report for the first five years following completion of the project (or completion of each phase for phased projects) for review and approval by the City. The annual report shall document the status and effectiveness of the TDM program, including the actual VTR achieved by the project during operation. If deemed necessary, the City may elect to have a peer review consultant, paid for by the project applicant, review the annual report. If timely reports are not submitted and/or the annual reports indicate that the project applicant has failed to implement the TDM Plan, the project will be considered in violation of the Conditions of Approval and the City may initiate enforcement action as provided for in these Conditions of Approval. The project shall not be considered in violation of this Condition if the TDM Plan is implemented but the VTR goal is not achieved.

Ongoing Department of Transportation

Department of Transportation

SCA-TRANS-5: Transportation Impact Fee (#80) The project applicant shall comply with the requirements of the City of Oakland Transportation Impact Fee Ordinance (chapter 15.74 of the Oakland Municipal Code).

Prior to issuance of building permit

Bureau of Building

N/A

SCA-TRANS-6: Plug-In Electric Vehicle (PEV) Charging Infrastructure (#83) a. PEV-Ready Parking Spaces The applicant shall submit, for review and approval of the Building Official and the Zoning Manager, plans that show the location of parking spaces equipped with full electrical circuits designated for future PEV charging (i.e. “PEV-Ready) per the requirements of Chapter 15.04 of the Oakland Municipal Code. Building electrical plans shall indicate sufficient electrical capacity to supply the required PEV-Ready parking spaces.

Prior to Issuance of Building Permit

Bureau of Building

Bureau of Building

b. PEV-Capable Parking Spaces The applicant shall submit, for review and approval of the Building Official, plans that show the location of inaccessible conduit to supply PEV-capable parking spaces per the requirements of Chapter 15.04 of the Oakland Municipal Code. Building electrical plans shall indicate sufficient electrical capacity to supply the required PEV-capable parking spaces.

Prior to Issuance of Building Permit

Bureau of Building

Bureau of Building

Page 104: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

Page A-38 WOB TOD Project Addendum

Standard Conditions of Approval When Required Initial Approval Monitoring/ Inspection

UTILITIES AND SERVICE SYSTEMS

SCA-UTIL-1: Construction and Demolition Waste Reduction and Recycling (#84) The project applicant shall comply with the City of Oakland Construction and Demolition Waste Reduction and Recycling Ordinance (chapter 15.34 of the Oakland Municipal Code) by submitting a Construction and Demolition Waste Reduction and Recycling Plan (WRRP) for City review and approval, and shall implement the approved WRRP. Projects subject to these requirements include all new construction, renovations/alterations/modifications with construction values of $50,000 or more (except R-3 type construction), and all demolition (including soft demolition) except demolition of type R-3 construction. The WRRP must specify the methods by which the project will divert construction and demolition debris waste from landfill disposal in accordance with current City requirements. The WRRP may be submitted electronically at www.greenhalosystems.com or manually at the City’s Green Building Resource Center. Current standards, FAQs, and forms are available on the City’s website and in the Green Building Resource Center.

Prior to Approval of Construction-Related Permit

Public Works Department, Environmental Services Division

Public Works Department, Environmental Services Division

SCA-UTIL-2: Underground Utilities (#85) The project applicant shall place underground all new utilities serving the project and under the control of the project applicant and the City, including all new gas, electric, cable, and telephone facilities, fire alarm conduits, street light wiring, and other wiring, conduits, and similar facilities. The new facilities shall be placed underground along the project’s street frontage and from the project structures to the point of service. Utilities under the control of other agencies, such as PG&E, shall be placed underground if feasible. All utilities shall be installed in accordance with standard specifications of the serving utilities.

During Construction

N/A Bureau of Building

SCA-UTIL-3: Recycling Collection and Storage Space (#86) The project applicant shall comply with the City of Oakland Recycling Space Allocation Ordinance (chapter 17.118 of the Oakland Planning Code). The project drawings submitted for construction-related permits shall contain recycling collection and storage areas in compliance with the Ordinance. For residential projects, at least two cubic feet of storage and collection space per residential unit is required, with a minimum of ten cubic feet. For nonresidential projects, at least two cubic feet of storage and collection space per 1,000 sf of building floor area is required, with a minimum of ten cubic feet.

Prior to Approval of Construction-Related Permit

Bureau of Planning

Bureau of Building

SCA-UTIL-4: Green Building Requirements (#87) a. Compliance with Green Building Requirements During Plan-Check The project applicant shall comply with the requirements of the California Green Building Standards (CALGreen) mandatory measures and the applicable requirements of

Prior to approval of construction-related permit

Bureau of Building

N/A

Page 105: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

WOB TOD Project Addendum Page A-39

Standard Conditions of Approval When Required Initial Approval Monitoring/ Inspection

the City of Oakland Green Building Ordinance (chapter 18.02 of the Oakland Municipal Code). The following information shall be submitted to the City for review and approval with the application for a building permit: • Documentation showing compliance with Title 24 of the current version of the

California Building Energy Efficiency Standards. • Completed copy of the final green building checklist approved during the review of

the Planning and Zoning permit. • Copy of the Unreasonable Hardship Exemption, if granted, during the review of the

Planning and Zoning permit. • Permit plans that show, in general notes, detailed design drawings, and specifications

as necessary, compliance with the items listed in subsection (ii) below. • Copy of the signed statement by the Green Building Certifier approved during the

review of the Planning and Zoning permit that the project complied with the requirements of the Green Building Ordinance.

• Signed statement by the Green Building Certifier that the project still complies with the requirements of the Green Building Ordinance, unless an Unreasonable Hardship Exemption was granted during the review of the Planning and Zoning permit.

• Other documentation as deemed necessary by the City to demonstrate compliance with the Green Building Ordinance.

The set of plans in subsection (i) shall demonstrate compliance with the following: • CALGreen mandatory measures. • Green building point level/certification requirement per the appropriate checklist

approved during the Planning entitlement process. • All green building points identified on the checklist approved during review of the

Planning and Zoning permit, unless a Request for Revision Plan-check application is submitted and approved by the Bureau of Planning that shows the previously approved points that will be eliminated or substituted.

• The required green building point minimums in the appropriate credit categories.

b. Compliance with Green Building Requirements During Construction The project applicant shall comply with the applicable requirements of CALGreen and the Oakland Green Building Ordinance during construction of the project. The following information shall be submitted to the City for review and approval: i. Completed copies of the green building checklists approved during the review of the

Planning and Zoning permit and during the review of the building permit.

During construction

N/A Bureau of Building

Page 106: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

Page A-40 WOB TOD Project Addendum

Standard Conditions of Approval When Required Initial Approval Monitoring/ Inspection

ii. Signed statement(s) by the Green Building Certifier during all relevant phases of construction that the project complies with the requirements of the Green Building Ordinance.

iii. Other documentation as deemed necessary by the City to demonstrate compliance with the Green Building Ordinance.

c. Compliance with Green Building Requirements After Construction Prior to the final Building Permit, the Green Building Certifier shall submit the appropriate documentation to City staff and attain the minimum required point level.

Prior to Final Approval

Bureau of Planning

Bureau of Building

SCA-UTIL-5: Sanitary Sewer System (#89) The project applicant shall prepare and submit a Sanitary Sewer Impact Analysis to the City for review and approval in accordance with the City of Oakland Sanitary Sewer Design Guidelines. The Impact Analysis shall include an estimate of pre-project and post-project wastewater flow from the project site. In the event that the Impact Analysis indicates that the net increase in project wastewater flow exceeds City-projected increases in wastewater flow in the sanitary sewer system, the project applicant shall pay the Sanitary Sewer Impact Fee in accordance with the City’s Master Fee Schedule for funding improvements to the sanitary sewer system.

Prior to Approval of Construction-Related Permit

Public Works Department, Department of Engineering and Construction

N/A

SCA-UTIL-6: Storm Drain System (#90) The project storm drainage system shall be designed in accordance with the City of Oakland’s Storm Drainage Design Guidelines. To the maximum extent practicable, peak stormwater runoff from the project site shall be reduced by at least 25 percent compared to the pre-project condition.

Prior to Approval of Construction-Related Permit

Bureau of Building

Bureau of Building

SCA-UTIL-7: Water Efficient Landscape Ordinance (WELO) (#92) The project applicant shall comply with California’s Water Efficient Landscape Ordinance (WELO) in order to reduce landscape water usage. For any landscape project with an aggregate (total noncontiguous) landscape area equal to 2,500 sq. ft. or less. The project applicant may implement either the Prescriptive Measures or the Performance Measures, of, and in accordance with the California’s Model Water Efficient Landscape Ordinance. For any landscape project with an aggregate (total noncontiguous) landscape area over 2,500 sq. ft., the project applicant shall implement the Performance Measures in accordance with the WELO. Prescriptive Measures: Prior to construction, the project applicant shall submit documentation showing compliance with Appendix D of California’s Model Water Efficient Landscape Ordinance (see website below starting on page 23): http://www.water.ca.gov/wateruseefficiency/landscapeordinance/docs/Title%2023%20ex

Prior to approval of construction-related permit

Bureau of Planning

Bureau of Building

Page 107: WOB TOD Addendum - City of OaklandPage 2 WOB TOD Project Addendum II. Executive Summary The project represents establishment of the transit‐oriented development (TOD) as contemplated

WOB TOD Project Addendum Page A-41

Standard Conditions of Approval When Required Initial Approval Monitoring/ Inspection

tract%20-%20Official%20CCR%20pages.pdf Performance Measures: Prior to construction, the project applicant shall prepare and submit a Landscape Documentation Package for review and approval, which includes the following a. Project Information:

i. Date, ii. Applicant and property owner name, iii. Project address, iv. Total landscape area, v. Project type (new, rehabilitated, cemetery, or home owner installed), vi. Water supply type and water purveyor, vii. Checklist of documents in the package, and viii. Applicant signature and date with the statement: “I agree to comply with the

requirements of the water efficient landscape ordinance and submit a complete Landscape Documentation Package.”

b. Water Efficient Landscape Worksheet i. Hydrozone Information Table ii. Water Budget Calculations with Maximum Applied Water Allowance (MAWA)

and Estimated Total Water Use c. Soil Management Report d. Landscape Design Plan e. Irrigation Design Plan, and f. Grading Plan Upon installation of the landscaping and irrigation systems, the Project applicant shall submit a Certificate of Completion and landscape and irrigation maintenance schedule for review and approval by the City. The Certificate of Compliance shall also be submitted to the local water purveyor and property owner or his or her designee. For the specific requirements within the Water Efficient Landscape Worksheet, Soil Management Report, Landscape Design Plan, Irrigation Design Plan and Grading Plan, see the link below. http://www.water.ca.gov/wateruseefficiency/landscapeordinance/docs/Title%2023%20extract%20-%20Official%20CCR%20pages.pdf