Work Breakdown Structure (WBS)
Transcript
Page 1: Work Breakdown Structure (WBS) - STIKOM Surabayaocw.stikom.edu/.../2012/10/Manajemen-PSI-04-Work-Breakdown-Stru… · Work Breakdown Structure (WBS) Definition ... Main output : WBS

Work Breakdown Structure

(WBS)

Page 2: Work Breakdown Structure (WBS) - STIKOM Surabayaocw.stikom.edu/.../2012/10/Manajemen-PSI-04-Work-Breakdown-Stru… · Work Breakdown Structure (WBS) Definition ... Main output : WBS

Definition

WBS is a deliverables-orientated

collection of project components

It is a categorization and decomposition

of the project deliverables

WBS should be input for the cost

estimation, time planning, risk planning,

quality planning and resource planning.

2

Page 3: Work Breakdown Structure (WBS) - STIKOM Surabayaocw.stikom.edu/.../2012/10/Manajemen-PSI-04-Work-Breakdown-Stru… · Work Breakdown Structure (WBS) Definition ... Main output : WBS

Why WBS is needed

WBS defines the required work to complete

the project

WBS creates a sense of urgency

WBS can help prevent scope creep

WBS provides control

WBS is the scope baseline

3

Page 4: Work Breakdown Structure (WBS) - STIKOM Surabayaocw.stikom.edu/.../2012/10/Manajemen-PSI-04-Work-Breakdown-Stru… · Work Breakdown Structure (WBS) Definition ... Main output : WBS

Building WBS (1)

Divide your project into phases

Phase has deadline, portion of project

that must be complete before another

phase in begin

Define the work package in each phase

4

Page 5: Work Breakdown Structure (WBS) - STIKOM Surabayaocw.stikom.edu/.../2012/10/Manajemen-PSI-04-Work-Breakdown-Stru… · Work Breakdown Structure (WBS) Definition ... Main output : WBS

Building WBS (2)

Work package is the smallest deriverable

in WBS ( 8/80 rules!)

Main output : WBS and WBS Dictionary

At the WBS should get approval from

project sponsor to confirm the series of

activities and the mesh with an

organization.

5

Page 6: Work Breakdown Structure (WBS) - STIKOM Surabayaocw.stikom.edu/.../2012/10/Manajemen-PSI-04-Work-Breakdown-Stru… · Work Breakdown Structure (WBS) Definition ... Main output : WBS

Creating WBS

6

Page 7: Work Breakdown Structure (WBS) - STIKOM Surabayaocw.stikom.edu/.../2012/10/Manajemen-PSI-04-Work-Breakdown-Stru… · Work Breakdown Structure (WBS) Definition ... Main output : WBS

Intranet WBS

Organized by Phase

7

Page 8: Work Breakdown Structure (WBS) - STIKOM Surabayaocw.stikom.edu/.../2012/10/Manajemen-PSI-04-Work-Breakdown-Stru… · Work Breakdown Structure (WBS) Definition ... Main output : WBS

Intranet WBS

Organized by Product

8

Page 9: Work Breakdown Structure (WBS) - STIKOM Surabayaocw.stikom.edu/.../2012/10/Manajemen-PSI-04-Work-Breakdown-Stru… · Work Breakdown Structure (WBS) Definition ... Main output : WBS

Intranet WBS in Tabular Form1.0 Concept

1.1 Evaluate current systems

1.2 Define Requirements

1.2.1 Define user requirements

1.2.2 Define content requirements

1.2.3 Define system requirements

1.2.4 Define server owner requirements

1.3 Define specific functionality

1.4 Define risks and risk management approach

1.5 Develop project plan

1.6 Brief Web development team

2.0 Web Site Design

3.0 Web Site Development

4.0 Roll Out

5.0 Support9

Page 10: Work Breakdown Structure (WBS) - STIKOM Surabayaocw.stikom.edu/.../2012/10/Manajemen-PSI-04-Work-Breakdown-Stru… · Work Breakdown Structure (WBS) Definition ... Main output : WBS

Intranet WBS and Gantt Chart in Project 2000

10

Page 11: Work Breakdown Structure (WBS) - STIKOM Surabayaocw.stikom.edu/.../2012/10/Manajemen-PSI-04-Work-Breakdown-Stru… · Work Breakdown Structure (WBS) Definition ... Main output : WBS

Intranet WBS and Gantt Chart Organized

by Project Management Process Groups

11

Page 12: Work Breakdown Structure (WBS) - STIKOM Surabayaocw.stikom.edu/.../2012/10/Manajemen-PSI-04-Work-Breakdown-Stru… · Work Breakdown Structure (WBS) Definition ... Main output : WBS

Intranet WBS and Gantt Chart Organized

by Project Management Process Groups

12

Page 13: Work Breakdown Structure (WBS) - STIKOM Surabayaocw.stikom.edu/.../2012/10/Manajemen-PSI-04-Work-Breakdown-Stru… · Work Breakdown Structure (WBS) Definition ... Main output : WBS

WBS Dictionary

WBS dictionary gives detail information

for each item on WBS

The level of WBS and WBS dictionary is

depend on project manager and team, as

long as the purpose is met.

13

Page 14: Work Breakdown Structure (WBS) - STIKOM Surabayaocw.stikom.edu/.../2012/10/Manajemen-PSI-04-Work-Breakdown-Stru… · Work Breakdown Structure (WBS) Definition ... Main output : WBS

WBS Approach

Top Down

Bottom up

Analogy approach

Using Guidelines ( depend on the

organization SOP)

Mind Mapping Approach

14

Page 15: Work Breakdown Structure (WBS) - STIKOM Surabayaocw.stikom.edu/.../2012/10/Manajemen-PSI-04-Work-Breakdown-Stru… · Work Breakdown Structure (WBS) Definition ... Main output : WBS

Top Down Approach

Use deductive method

Start from general to spesific

Prefer

15

Page 16: Work Breakdown Structure (WBS) - STIKOM Surabayaocw.stikom.edu/.../2012/10/Manajemen-PSI-04-Work-Breakdown-Stru… · Work Breakdown Structure (WBS) Definition ... Main output : WBS

Bottom Up Approach

Use inductive method

From spesific to general

Ideal for brainstrorming problem solving

16

Page 17: Work Breakdown Structure (WBS) - STIKOM Surabayaocw.stikom.edu/.../2012/10/Manajemen-PSI-04-Work-Breakdown-Stru… · Work Breakdown Structure (WBS) Definition ... Main output : WBS

Mind Mapping Approach

17

Page 18: Work Breakdown Structure (WBS) - STIKOM Surabayaocw.stikom.edu/.../2012/10/Manajemen-PSI-04-Work-Breakdown-Stru… · Work Breakdown Structure (WBS) Definition ... Main output : WBS

Note !

The WBS is not the project plan, the

schedule, or even the activity list. You will

use the WBS to help you schedule and

assign resources. A WBS is a process, as

well as a visual representation of the

work, to help you organize and plan the

action that must be completed for the

project to come to an end.

18