2
Knowing how to manage water from W hen the NYSDOT and NYSDEC signed a memorandum of understanding in 2012 on the treating and discharge of hydro-demolition wastewater, the requirements for bridge contractors became a lot more challenging. Many contractors were just not sure how they were going to comply and still be competitive. Rain For Rent has identifed the following items that will help contractors achieve * Understand the Environmental Requirements. The NYDOT and NYSDEC have established strict discharge requirements. The discharge limits for pH are between 6.5 and 8.5. For turbidity, discharge cannot exceed 50 NTUs. * Reduce the pH Levels. Using a Carbon Dioxide based pH adjustment system will efficiently, quickly and cost effectively reduce pH to well within the guidelines established by NY State. * Using Carbon Dioxide is the safest way to lower pH. Most acids are hazardous materials, often requiring special employee training and contingency plans for accidents & spills. Carbon Dioxide is non-hazardous and environmentally friendly. Settle Those Solids. and achieve your discharge requirements of 50 NTUs or less. By designing a solids settling system, using weir and frac tanks to remove the majority of solids, and bag filters to "polish" the treated water, we can help you maintain compliance * Build Safety Into Your System. Applications Construction Support Services Rain For Rent doesn't just rent equipment, we can assist assembling, dismantling, provide training, and/or operate our systems. We customize our As a bridge construction contractor you know what you need to get the job done. When discharge requirements, or other liquid related obstacles come up, Rain for Rent will help you save time. With an experienced team, supported by a large dedicated fleet of products, we'll help you navigate through planned and unplanned projects. • Pumping for: • Dewatering Treatment • Filtration • Water Storage rainforrent.com 800 742 7246 ® ® Serving Upstate NY 585-226-8280 you time and money. hydro-demolition projects will save pH Adjustment compliance goals in a cost effective manner. labor services to match our customers needs.
Transcript

Knowing how to manage water from

When the NYSDOT and NYSDEC signed a memorandum of understanding in 2012 on the treating and discharge of hydro-demolition wastewater, the requirements for bridge contractors became

a lot more challenging. Many contractors were just not sure how they were going to comply and stillbe competitive. Rain For Rent has identifed the following items that will help contractors achieve

* Understand the Environmental Requirements. The NYDOT and NYSDEC have established strict discharge

requirements. The discharge limits for pH are between 6.5 and

8.5. For turbidity, discharge cannot exceed 50 NTUs.

* Reduce the pH Levels.

Using a Carbon Dioxide based pH adjustment system will

efficiently, quickly and cost effectively reduce pH to well within

the guidelines established by NY State.

* Using Carbon Dioxide is the safest way to lower pH. Most acids are hazardous materials, often requiring special employee training and contingency plans for accidents & spills. Carbon Dioxide is non-hazardous and environmentally friendly.

Settle Those Solids.

and achieve your discharge requirements of 50 NTUs or less.

By designing a solids settling system, using weir andfrac tanks to remove the majority of solids, and bag filters to

"polish" the treated water, we can help you maintain compliance

*

Build Safety Into Your System.

ApplicationsConstruction Support ServicesRain For Rent doesn't just rent equipment, we can assist assembling, dismantling, provide training,and/or operate our systems. We customize our

As a bridge construction contractor you know what you need to get the job done. When discharge requirements, or other liquid related obstacles come up,Rain for Rent will help you save time. With anexperienced team, supported by a largededicated fleet of products,we'll help you navigate through planned and unplanned projects.

• Pumping for: • Dewatering • Treatment • Filtration• Water Storage

rainforrent.com800 742 7246

®

®

Serving Upstate NY 585-226-8280

you time and money. hydro-demolition projects will save

pH Adjustment•

compliance goals in a cost effective manner.

labor services to match our customers needs.

Pumps

Rain for Rent is a registered trademark of Western Oilfields Supply Company. Features and specifications are subject to change without notice.

Provide a stable surface for increased traction on muddy or sandy soil and protect landscapes.

Replace wood used for cribbing to provide stability and support to your pipe and hoses.

Portable spill containment systems improve environmental safety by capturing liquids, preventing accidental spills. Ideal under tanks, pumps, pipelines, and valves.

Advanced spray pattern technology cleans truck tires quickly and thoroughly without distorting driver visibility, ensuring compliance with regulators and eliminating the risk of a shutdown.

SolidGround™ Traction Mats

Steel Coated Tank

21,000 Gallons

Filtration and Treatment

CO2 Based 100 GPM

Worksafe® Open Top 18,100 Gallon

pH Adjustment Box FiltersWeir Tank

Conline Wheel Wash SystemsSpillguards

PipeStax®

Tanks Safety Products & Jobsite Protection

SolidGround® Traction Mats

Bag or Cartridge Filters 50 – 6,000 GPM Sediment Bags

Monitoring24/7 water quality monitoring ofpH and turbidity

BF100100 GPM

Flow MetersMeasures flows from255 to 43,000 GPM

Instrumentation2,400-Gallon 4,400-Gallon

EZ KLEEN® Polyethylene Tanks

DV80c Size 4” x 3”

DV100c Size 6” x 4” 1,450 GPM

165 FT HEAD

DV150 Sound Attenuated * Size 6” x 6” 2,200 GPM

157 FT HEAD

DV150iSize 6” x 6” 2,775 GPM

150 FT HEAD

Contractor PumpsSize 4” x 4”

880 GPM 425 GPM Gasoline 125 FT HEAD

25 Yard Available in a Variety of Sizes FILTER BOX 200 & 250 Micron

*Note: Sound Attenuation Available With Other Pump Sizes

••

Jeffrey Kocian
Stamp
Jeffrey Kocian
Stamp
Jeffrey Kocian
Stamp

Recommended