WORK ZONE DELAY ESTIMATION

Date post: 14-Jan-2016
Category:
Upload: fancy
View: 90 times
Download: 0 times
Share this document with a friend
Description:
WORK ZONE DELAY ESTIMATION. Work Zone Management, Accelerated Construction, and Smart Work Zones. TEAM Monthly Meeting November 16, 2004 Luis Porrello, Ph.D., P.E. – HNTB Corporation Tom Ryan, P.E. - MoDOT. TOPICS. FHWA directive - PowerPoint PPT Presentation
46
WORK ZONE DELAY ESTIMATION Work Zone Management, Accelerated Construction, and Smart Work Zones TEAM Monthly Meeting November 16, 2004 Luis Porrello, Ph.D., P.E. – HNTB Corporation Tom Ryan, P.E. - MoDOT
Transcript
Page 1: WORK ZONE DELAY ESTIMATION

WORK ZONE DELAY ESTIMATION

Work Zone Management, Accelerated Construction, and Smart Work Zones

TEAM Monthly Meeting

November 16, 2004

Luis Porrello, Ph.D., P.E. – HNTB Corporation

Tom Ryan, P.E. - MoDOT

Page 2: WORK ZONE DELAY ESTIMATION

2

TOPICS

FHWA directive QuickZone background, functions, requirements, and

methodology TxDOT accelerated construction and A+B bidding IH-410 project, QuickZone model development and

preliminary results Other QuickZone case studies and further

enhancements Smart Work Zones

Page 3: WORK ZONE DELAY ESTIMATION

3

FHWA DIRECTIVE

The “soft cost” of traveler delay is typically not considered when key decisions about project staging and duration are made.

FHWA recommendation to develop an analytical tool to estimate and quantify work zone delays.

Page 4: WORK ZONE DELAY ESTIMATION

4

QuickZone BACKGROUND

Work Zone Delay Impact Analysis Tool– FHWA-sponsored– Developed by Mitretek Systems– Available for purchase at McTrans or PCTrans ($195)

Microsoft Excel-based Application Open Source Code Targeted at State and Local Traffic Construction

Staff, Operations and Planning, and Construction Contractors

Page 5: WORK ZONE DELAY ESTIMATION

5

QuickZone FUNCTIONS

Quantifies corridor delay resulting from capacity decreases in work zones

Identifies delay impacts of alternative construction phasing plans

Supports Trade-Off Analyses between construction costs and delay costs

Considers Alternate Phasing Schedules:– Time-of-day (peak vs. off-peak) – Season (summer vs. winter)

Assesses Impacts of Delay Mitigation Strategies:– E.g., Variable message sign deployments– Signal retiming on detour routes

Page 6: WORK ZONE DELAY ESTIMATION

6

QuickZone REQUIREMENTS

Network– Links & Nodes– Link Characteristics

Demand Characteristics– At minimum: AADT and some distribution of hourly demand– Hourly Counts– Seasonality

Capacity– Normal Conditions– Work Zone Conditions

Page 7: WORK ZONE DELAY ESTIMATION

7

QuickZone METHODOLOGYS

imp

leC

om

plex

Limited,Rough EstimationShort Run TimesLimited TrainingLower Set-Up CostsQuicker Development

Comprehensive,Precise CalculationLonger Run TimesTraining RequiredHigher Set-Up CostsLonger Development

Simulation+ TDM (PRUEVIIN)

Traffic SimulationTravel

Demand Model Analysis(TDM)

IDAS

STEAM

DelayNomographs

QuickZone Program

DELAY 1.2

Page 8: WORK ZONE DELAY ESTIMATION

8

TxDOT ACCELERATED CONSTRUCTION

A+B Provisions. Consider for large and or highly critical projects where early completion should be a consideration for award.

Milestones with Incentives/Disincentives. Identify specific project phases that have a significant impact on traffic or business.

Page 9: WORK ZONE DELAY ESTIMATION

9

A+B BIDDING

Incentive for early completion up to cap (number of days).

Contractor’s duration becomes CPM.

Disincentive for late delivery, no cap.

Contractor’s rule of thumb: 5% of total cost to be “worth it”

Page 10: WORK ZONE DELAY ESTIMATION

10

A+B BIDDING

  "A+B" "A" "B" RUC Rate  

Bidder Cost Cost Days $/Day Total "B"

CONTRACTOR A $198,568,662.01 $154,717,662.01 933 $47,000 $43,851,000.00

CONTRACTOR B $213,023,330.91 $147,975,330.91 1,384 $47,000 $65,048,000.00

CONTRACTOR C $227,386,257.93 $183,488,257.93 934 $47,000 $43,898,000.00

CONTRACTOR D $231,579,868.49 $180,349,868.49 1,090 $47,000 $51,230,000.00

CONTRACTOR E $249,632,889.62 $177,534,889.62 1,534 $47,000 $72,098,000.00

Page 11: WORK ZONE DELAY ESTIMATION

11

IH-410 WIDENING

Widening of IH-410 in San Antonio from Nacagoches Road to Perrin-Beitel Road.

6 Lanes to 8 Lanes 2003 ADT = 150,000 Approximately $70

Million

Page 12: WORK ZONE DELAY ESTIMATION

12

NETWORK CONSTRUCTION

Frequently noted shortcoming with QuickZone: Coding Large Networks (More on this later)

Page 13: WORK ZONE DELAY ESTIMATION

13

NETWORK CONSTRUCTION

GIS-driven network development – base map

Page 14: WORK ZONE DELAY ESTIMATION

14

NETWORK CONSTRUCTION

GIS-driven network development - nodes

Page 15: WORK ZONE DELAY ESTIMATION

15

NETWORK CONSTRUCTION

GIS-driven network development - links

Page 16: WORK ZONE DELAY ESTIMATION

16

NETWORK CONSTRUCTION

GIS-driven network development - attributes

Page 17: WORK ZONE DELAY ESTIMATION

17

QuickZone MODEL

Nodes Links AADT Patterns Demand Seasonality Project Information Phasing Information Delay Cost

Parameters

Page 18: WORK ZONE DELAY ESTIMATION

18

QuickZone MODEL

Nodes and links

Page 19: WORK ZONE DELAY ESTIMATION

19

QuickZone MODEL

Temporal distribution of demand

Page 20: WORK ZONE DELAY ESTIMATION

20

QuickZone MODEL

Demand

Page 21: WORK ZONE DELAY ESTIMATION

21

QuickZone MODEL

Travel demand seasonality

Page 22: WORK ZONE DELAY ESTIMATION

22

QuickZone MODEL

Project Information Module

Page 23: WORK ZONE DELAY ESTIMATION

23

QuickZone MODEL

Project information

Page 24: WORK ZONE DELAY ESTIMATION

24

QuickZone MODEL

Sequencing plan

ADJUSTMENT CODE TYPICAL SECTION

CAPACITY

REDUCTION 1

AC-1 10-12-12-12-10 0AC-2 1-12-12-12-10 129AC-3 1-12-12-12-1 259AC-4 10-10-11-10-10 588AC-5 1-10-11-10-10 682AC-6 1-10-11-10-1 987

CAPACITY REDUCTION FOR RESTRICTED LANE WIDTH AND LATERAL CLEARANCE

AC-5SLD LN#1 LN#2 LN#3 SLD LN#1 - No Reduction = 0.860 1' 10' 11' 10' 10' LN#2 - No Reduction = 0.950

LN#3 - No Reduction = 0.900Capacity Reduction = 682

Page 25: WORK ZONE DELAY ESTIMATION

25

QuickZone MODEL

Sequencing planPhase 1 Stage 2

Begin Date: 4

Cost ($M): 5

QUICKZONE LINKADJUSTMENT

CODECAPACITY DECREASE

1 AC-2 1292 AC-5 6823 AC-5 6824 AC-5 6825 AC-5 6826 AC-5 6827 AC-5 6828 AC-5 6829 AC-5 682

10 AC-5 68211 AC-5 68212 AC-5 68213 AC-5 68214 AC-4 58824 AC-5 68225 AC-5 68226 AC-5 68227 AC-5 68228 AC-5 68229 AC-5 68230 AC-5 68231 AC-5 68232 AC-5 68233 AC-5 68234 AC-5 68235 AC-5 68236 AC-5 68237 AC-4 588

INBOUND WORKZONE LINKS

OUTBOUND WORKZONE LINKS

Page 26: WORK ZONE DELAY ESTIMATION

26

QuickZone MODEL

Sequencing plan

Page 27: WORK ZONE DELAY ESTIMATION

27

QuickZone MODEL

Phase descriptions, capacity reductions

Page 28: WORK ZONE DELAY ESTIMATION

28

QuickZone MODEL

Delay cost parameters– CPI-adjusted delay costs– OMB inflation rate

projections

Page 29: WORK ZONE DELAY ESTIMATION

29

QuickZone MODEL

Program controls

Page 30: WORK ZONE DELAY ESTIMATION

30

QuickZone MODEL

Network generation

Page 31: WORK ZONE DELAY ESTIMATION

31

QuickZone MODEL

Output data

Page 32: WORK ZONE DELAY ESTIMATION

32

QuickZone MODEL

Delay graphChange in Delay from Base Case

0

500

1000

1500

2000

2500

3000

3500

4000

Sun-0

:00

Sun-0

5:00

Sun-1

0:00

Sun-1

5:00

Sun-2

0:00

Mon

-1:0

0

Mon

-6:0

0

Mon

-11:

00

Mon

-16:

00

Mon

-21:

00

Tue-2

:00

Tue-7

:00

Tue-1

2:00

Tue-1

7:00

Tue-2

2:00

Wed

-3:0

0

Wed

-8:0

0

Wed

-13:

00

Wed

-18:

00

Wed

-23:

00

Thr-4

:00

Thr-9

:00

Thr-1

4:00

Thr-1

9:00

Fri-0:

00

Fri-5:

00

Fri-10

:00

Fri-15

:00

Fri-20

:00

Sat-1

:00

Sat-6

:00

Sat-1

1:00

Sat-1

6:00

Sat-2

1:00

Time of Day

De

lay

Ve

chic

le-H

ou

r/H

ou

r

Phase1

Phase 2

Phase 3

Phase 4

Phase 5

Phase 6

Phases with the highest delay values

Page 33: WORK ZONE DELAY ESTIMATION

33

QuickZone MODEL

Summary of results

– Unidirectional or both– Baseline (recurring)– After (work zone)– Sum

Page 34: WORK ZONE DELAY ESTIMATION

34

QuickZone MODEL

Summary of results - baseline

Weekly Weekly Weekly Weekly Phase Take 1 HR Cancel ModeTitle Max (mi) Total (mi) User Max (min) Total (VH) Total 1000 (VH) Detour (V) Shifting Trip (V) Shift (V) Infrastructure Car Trucks TotalPhase 1 - Stage 1 2.41 10.5 21.3 7889 71 0 0 0 0 3 1.29 0.13 1.42 Phase 1 - Stage 1 2.41 10.5 21.3 7889Phase 1 - Stage 2 0.42 0.8 2.7 570.6 10.3 0 0 0 0 5 0.19 0.02 0.21 Phase 1 - Stage 2 0.42 0.8 2.7 570.6Phase 2 - Stage 1 3.23 17.6 30.6 13213.8 476 0 0 0 0 12 8.65 0.88 9.53 Phase 2 - Stage 1 3.23 17.6 30.6 13213.8Phase 2 - Stage 2 0.42 0.8 2.7 570.6 2.3 0 0 0 0 4 0.04 0 0.05 Phase 2 - Stage 2 0.42 0.8 2.7 570.6Phase 2 - Stage 3 0.42 0.8 2.7 570.6 2.3 0 0 0 0 4 0.04 0 0.05 Phase 2 - Stage 3 0.42 0.8 2.7 570.6Phase 2 - Stage 4 0.42 0.8 2.7 570.6 2.3 0 0 0 0 3 0.04 0 0.05 Phase 2 - Stage 4 0.42 0.8 2.7 570.6Phase 3 - Stage 1 2.41 10.5 21.3 7889 174 0 0 0 0 8 3.16 0.32 3.48 Phase 3 - Stage 1 2.41 10.5 21.3 7889Phase 4 - Stage 1 2.41 10.5 21.3 7889 284 0 0 0 0 15 5.17 0.52 5.69 Phase 4 - Stage 1 2.41 10.5 21.3 7889Phase 4 - Stage 2 0.42 0.8 2.7 570.6 2.3 0 0 0 0 6 0.04 0 0.05 Phase 4 - Stage 2 0.42 0.8 2.7 570.6Phase 5 - Stage 1 4.38 29 43.7 21752.5 392 0 0 0 0 6 7.12 0.72 7.84 Phase 5 - Stage 1 4.38 29 43.7 21752.5Phase 5 - Stage 2 6.54 52.5 66.1 39355.3 157 0 0 0 0 4 2.86 0.29 3.15 Phase 5 - Stage 2 6.54 52.5 66.1 39355.3

70 28.6 2.88 31.52

Delay

IH 410 Widening - Nacogdoches to Perrin BeitelBaseline Data

Queue-Both Delay-Both Phase Travel Behavior (Weekly Inbound + Outbound) Cost (millions $)-BothOption Form

Page 35: WORK ZONE DELAY ESTIMATION

35

QuickZone MODEL

Summary of results – work zone

Weekly Weekly Weekly Weekly Phase Take 1 HR Cancel ModeTitle Max (mi) Total (mi) User Max (min) Total (VH) Total 1000 (VH) Detour (V) Shifting Trip (V) Shift (V) Infrastructure Car Trucks TotalPhase 1 - Stage 1 0 0 0 0 0 0 0 0 0 3 0 0 0 Phase 1 - Stage 1 0 0 0 0Phase 1 - Stage 2 3.81 20.8 32.4 15598.5 281 0 0 0 0 5 5.11 0.52 5.63 Phase 1 - Stage 2 3.81 20.8 32.4 15598.5Phase 2 - Stage 1 5.23 24 33.4 18025.6 649 0 0 0 0 12 11.8 1.2 13 Phase 2 - Stage 1 5.23 24 33.4 18025.6Phase 2 - Stage 2 2.89 9.8 18.4 7361.4 29.4 0 0 0 0 4 0.54 0.05 0.59 Phase 2 - Stage 2 2.89 9.8 18.4 7361.4Phase 2 - Stage 3 1.26 3.4 8.1 2545.7 10.2 0 0 0 0 4 0.19 0.02 0.2 Phase 2 - Stage 3 1.26 3.4 8.1 2545.7Phase 2 - Stage 4 1.26 3.4 8.1 2545.7 10.2 0 0 0 0 3 0.19 0.02 0.2 Phase 2 - Stage 4 1.26 3.4 8.1 2545.7Phase 3 - Stage 1 4.89 20.1 31.2 15057 331 0 0 0 0 8 6.03 0.61 6.64 Phase 3 - Stage 1 4.89 20.1 31.2 15057Phase 4 - Stage 1 4.89 27.5 42.3 20648 743 0 0 0 0 15 13.52 1.37 14.89 Phase 4 - Stage 1 4.89 27.5 42.3 20648Phase 4 - Stage 2 2.89 12.5 23.9 9379.1 37.5 0 0 0 0 6 0.68 0.07 0.75 Phase 4 - Stage 2 2.89 12.5 23.9 9379.1Phase 5 - Stage 1 2.95 12.5 18.8 9399.8 169 0 0 0 0 6 3.08 0.31 3.39 Phase 5 - Stage 1 2.95 12.5 18.8 9399.8Phase 5 - Stage 2 6.98 45.6 44.6 34221.5 137 0 0 0 0 4 2.49 0.25 2.74 Phase 5 - Stage 2 6.98 45.6 44.6 34221.5

70 43.63 4.42 48.03

Delay

IH 410 Widening - Nacogdoches to Perrin BeitelAfter Data

Queue-Both Delay-Both Phase Travel Behavior (Weekly Inbound + Outbound) Cost (millions $)-BothOption Form

Page 36: WORK ZONE DELAY ESTIMATION

36

ROAD USER COST REPORT

Milestone No.

Milestone Description Average Road User

Cost per Day

(1)Incentive /Disincentive Equivalence

1 Phase 2 – Stage 2 $17,143 $4,286

2 Phase 2 – Stage 3 and Phase 2 – Stage 4 $12,143 $3,036

3 Phase 5 – Stage 1 and Phase 5 – Stage 2 $104,286 $26,072

A+B All Phases $38,790 $9,698

Queue Delay Cost CostWeekly Weekly Total per day

Max (mi) Max (min) ($Million) ($)Phase 1 - Stage 1 0 0 0 $0Phase 1 - Stage 2 3.81 32.4 4.58 $40,893Phase 2 - Stage 1 5.23 33.4 10.58 $47,232Phase 2 - Stage 2 2.89 18.4 0.48 $17,143Phase 2 - Stage 3 1.26 8.1 0.17 $6,071Phase 2 - Stage 4 1.26 8.1 0.17 $6,071Phase 3 - Stage 1 4.89 31.2 5.4 $38,571Phase 4 - Stage 1 4.89 42.3 12.12 $54,107Phase 4 - Stage 2 2.89 23.9 0.61 $21,786Phase 5 - Stage 1 2.95 18.8 2.76 $24,643Phase 5 - Stage 2 6.98 44.6 2.23 $79,643

TOTAL = 39.1

Phase-Stage

Page 37: WORK ZONE DELAY ESTIMATION

37

QuickZone

Other tools

Page 38: WORK ZONE DELAY ESTIMATION

38

QuickZone

Case studies

Page 39: WORK ZONE DELAY ESTIMATION

39

QuickZone

Future enhancements

Page 40: WORK ZONE DELAY ESTIMATION

40

QuickZone

Future enhancements

Page 41: WORK ZONE DELAY ESTIMATION

41

SMART WORK ZONE SYSTEM

Provides Real Time Information– Travel time through work zone

– Distance to the end of work zone

– Decision making by local travelers

Page 42: WORK ZONE DELAY ESTIMATION

42

SMART WORK ZONE SYSTEM

Provides Work Zone Management Tool– Delay monitoring

– Flexibility in Operations

– Enhances Operations

Page 43: WORK ZONE DELAY ESTIMATION

43

SMART WORK ZONE SYSTEM

Page 44: WORK ZONE DELAY ESTIMATION

44

SMART WORK ZONE SYSTEM

Page 45: WORK ZONE DELAY ESTIMATION

45

SMART WORK ZONE SYSTEM

Page 46: WORK ZONE DELAY ESTIMATION

46

SMART WORK ZONE SYSTEM

Work Site Server

Radio tower

System Server

Message Sign

Detection

Subtitle

11/12/2004

Wireless

Subtitle

11/12/2004

Leased


Recommended