SITTING ROOM
UTILITYKITCHEN/
DINING ROOM
CONSERVATORY
W/C
STORE COALSTORE
LOBBY
HALLWAY
PORCH
ramp
upup
up
up
MASTER
BEDROOM
LANDING
BEDROOM 2
BEDROOM 3
BATHROOM
RevDate
Notes
NOTES:Do not scale from this drawing except for planningapplication purposes.
PROJECT:
DRAWING TITLE:
SCALE:DATE: DRAW
N:
DWG NO.
REV. Initials
Proposed extension & alterations to-
Existing Floor Plans, Elevations,
1:50 1:100
Site & Site Location Plans.
The Contractor is to check and verify all building and site dimensions,levels and sewer invert levels at connection points before work starts.The Contractor is to comply in all respects with current BuildingLegislation, British Standard Specifications, Building Regulations,Construction (Design & Management) Regulations, Party W
all Act, etc.whether or not specifically stated on this drawing. This drawing mustbe read with and checked against any structural, geotechnical or otherspecialist documentation provided.
This drawing is not intended to show details of foundations, groundconditions or ground contaminants. Each area of ground relied upon tosupport any structure depicted (including drainage) must be investigatedby the Contractor. A suitable method of foundation should be providedallowing for existing ground conditions. Any suspect or fluid ground,contaminates on or within the ground, should be further investigatedby a suitable expert. Any earthwork constructions shown indicate typicalslopes for guidance only & should be further investigated by a suitableexpert.
Where existing trees are to be retained they should be subject to a full
Arboricultural inspection for safety. All trees are to be planted so as toensure they are a minimum of 5 metres from buildings and 3 metres fromdrainage and services. A suitable method of foundation is to be providedto accommodate the proposed tree planting.
Sketch proposals are for illustrative purposes only & as such aresubject to detailed site investigation including groundconditions/contaminants, drainage, design & planning/densitynegotiations. Sketch proposals may be based upon enlargements ofOS sheets & visual estimations of existing site features, accuracywill therefore need to be verified by survey. Sketch proposals have notbeen considered in respect of CDM Regulations.
4 H O L L Y B U S H R O A D , N E W B O R O U G H
BUILDING REGULATIONS
SITE PLANSCALE 1:500
SITE LOCATION PLANSCALE 1:1250
1:500 1:1250 at A1
C COPYRIGHT NICHE ARCHITECTURE LTD
SIDE ELEVATIONREAR ELEVATION
FRONT ELEVATION
GROUND FLOOR PLANFIRST FLOOR PLAN
SECOND FLOOR PLANAch
Staffordshire, DE13 8SF
4 Hollybush Road
16-014-WD-101
29.04.16
Newborough
SITTING ROOM
UTILITY
HALLWAY
up
BOOTS
SHOWER ROOM
STORE
STUDY/ PLAYROOM
KITCHEN
DINING
FAMILY
w/mt/d
f/f
void
ROOFLIGHTROOFLIGHT
up
STEEL TO STRUCTURAL ENGINEER'S DETAILSTEEL TO STRUCTURAL ENGINEER'S DETAIL
W1
D1
W2
D2
D3D4
New Openingformed asshown.
New Openingformed asshown.
DCSFG
SFG
SFG
SFG
RWP
Walls to be
demolishedshown dashed
Walls to be
demolishedshown dashed
Walls to be
demolishedshown dashed
Foundation shown dashed.
Foundation shown dashed.
ICSVP
Lintel aboveLintel above
RWP
RWP
RWP
IC
IC
IC IC
Sink drainageconnected toexisting kitchendrainage
IC
To existingdrainage
NOTE:-ALL DRAW
INGS TO BEREAD IN CONJUNCTIONW
ITH STRUCTURALENGINEERS DRAW
INGS &CALCULATIONS.
NOTE:-CONTRACTOR TO CHECK ALL DIM
ENSIONS ON SITE.
DRAINAGE INDICATIVE ONLY - TO BE DETERMINDED
ON THE SITE BY THE CONTRACTOR.
300415
985
9938325
30001085
24933000
75
10563
3002779751496 2526752313
3850
300
9939
5094 995
3002415
2715
3004193
17701362
4493
1362
450
4
3 3
22
22
2
2
BTTV
BT
SD
FD30
FD30
FD30
TR
Keep electricsand heating asexisting
182875
2265
1928
851
875
131575
2803
2313 75 1496 75 2526 75 2779
588
1895
8254645
415
165 850 3760 850 1299
B
A
SFS
SFS
SFS
SFS
SFS
Electric layoutindicative only -refer tospecialistkitchen design.
B
Assumed joist span. TBC bystructural engineer.
Assumed joist span. TBC bystructural engineer.
Assumed looserafter span. TBC bystructural engineer.
Underfloor heating tosingle storey rearextension.
EXTRACT
A
Log burner installedin stict accordancewith manufacturersinstructions.
RF1RF2
HEARTH
SCAV
STOVECOM
BUSTIBLEAIR VENTPIPE
SVP
C C
D1W
1W
2
W3
to match existing
1350
to match existing to match existing
1200
to match existing
RF7
Code 4 flashing to all abutments.
OBSCURE
D2
2100
2220DPC TO
US SOFFIT
to match
existing
to matchexisting
Code 4 flashing toall abutments.
SVPRW
PRW
PRW
P
D4D3 W
4
2100 1200
to match existing
to match existing
2100
2220 DPC TO
US SOFFIT
RF4RF5
RF6RF3
RF1RF2
Code 4 flashing to all abutments.
2220DPC TO USOF SOFFIT
to matchexisting
BEDROOM 5
LANDING
BEDROOM 2
BEDROOM 3
BATHROOM
ENSUITE
W.
W.
W.
W.
W.
void
dnup
BEDROOM 4
New Openingformed asshown.
SVP
RWP
W3
W4
New Openingformed asshown.
Walls to be
demolishedshown dashed
SVP
RF1780X980
RF2780X980
Lintel above
New trimmer
New trimmer
RWP
RWP
7224
300300 3223753327
4193300
4493
13621770
1362
4193300
13621770
1362
4493
1085780
1440780
6478
Keep electricsand heating asexisting
Keep electricsand heating asexisting
2
4
4
4
3
SDFD
30
FD30
FD30
FD30
TR
101375
3106
310675
1013
1425 75 1723756002727
128 850 2954 882 1810
1440 75
A
A
SFS
Assumed attictruss span. TBC bystructural engineer.
Assumed attictruss span. TBC bystructural engineer.
LOOSE RAFTERS
RS RS RS
RS RS RS
Soffit & fascia to matchexisting roof.
100 x 50mm timber wallplatebedded in mortar.
Gable ladders fixed to the lasttruss with nails at 400 cts.
Insulation in wall taken 250mm above bottom of ceilingtie to gables. provide cavity tray over with weepholesat 450mm cts. provide wall ties at 750mm cts. totop of cavity tray.Double trimmers to all rooflights.
Double trimmers to all rooflights.
B B
TVTV
OBSCURE
FLUE LOCATION
C C
2100mm Ceiling Height Approx
1800mm Ceiling Height Approx
1500mm Ceiling Height Approx
Purlin Line
Ridge Line
2100mm Ceiling Height Approx
1800mm Ceiling Height Approx
1500mm Ceiling Height Approx
Purlin Line
Ridge Line
2100mm Ceiling Height Approx
1800mm Ceiling Height Approx
2100mm Ceiling Height Approx
1800mm Ceiling Height Approx
1500mm Ceiling Height ApproxW
.
W.
STORE
ENSUITEDRESSING
LANDINGM
ASTERBEDROOM
ROOFLIGHT
up
ROOFLIGHT
ROOFLIGHT
ROOFLIGHT
SVP
New Openingformed asshown.
Lintel above
2SD
FD30
FD30
TR
1225
2382
2532
7731431
751614
187675
3622
10148501787
A
A
B BSFS
C.M.E.F.
TO TILE VENT
RF3
RF4RF5
RF6
RF7
TV
C C
Full Fill Cavity Wall - Facing Brickwork
To achieve minimum U Value of 0.28W/m²K
New cavity wall to comprise of 1no leaf of 102.5 brick and 1 no leaf of100mm block K value 1.13, e.g Lafarge Stancrete; full fill cavity with 100mmDritherm32 cavity insulation as manufacturer's details. Internal finish to be 2no12.5mm plasterboard on dabs. W
alls to be built with 1:1:6 cement mortar.SFS
SD
Radiator point
SFS
BT
Low level switched fused spur outlet
2P
Double switched socket at low level
Single switched socket at high level
Fluorescent light fitting
Pendant type light fitting
High level unswitched fused spur outlet
Telephone outlet point
TR
High Level Television aerial outlet point
Low voltage downlighter
High level switched fused spur outlet
3
Mechanical extract to tile vent
Batten holder light fitting
Two way light switch
Pull cord light switch
Heat detector
ELECTRICAL LEGEND
Low level unswitched fused spur outlet
Towel Rail
Single light switch
TV
Three way light switch
Wall bracket light point
All radiator/boiler positions to refer tomanufacturers layouts.
External light
HD
Main operated interlinked smoke
detection with battery backup
All switches & sockets to be positioned between450 & 1200mm above local f.f.l.
Low Level Television aerial outlet point
Cooker Hood extract vent
Double switched socket at high level
TV
INTERNAL LIGHTINGInstall low energy light fittings that only takelamps having a luminous efficiency greaterthan 45 lumens per circuit watt and a totaloutput greater than 400 lamp lumens. Notless than three energy efficient light fittingsper four of all the light fittings in the maindwelling spaces to comply with Part L of thecurrent Building Regulations.
Carbon Monoxide Detector
SOIL VENT PIPE
DC
CMD
CONSTRUCTION LEGEND
SFGSEALED FLOOR GULLEY
SVP
INSPECTION CHAMBER
INTERNAL STUD PARTITIONS75mm x 50mm softwood treated timbers studs at 400mm cts with 50 x75mm head and sole plates and solid intermediate horizontal noggins at 1/3height or 450mm. Provide min 10kg/m³ density acoustic soundproof quilttightly packed (eg. Rockwool or Isowool mineral fibre sound insulation) in allvoids the full depth of the stud. Partitions built off doubled up joists wherepartitions run parallel or provide noggins where at right angles, or built offDPC on thickened concrete slab if solid ground floor. W
alls faced throughoutwith 12.5mm plaster board with skim plaster finish. Taped and jointedcomplete with beads and stops.
RAINWATER PIPE
DENOTES EXISTING STRUCTUREExisting structure including foundations, beams, walls and lintels carrying newand altered loads are to be exposed and checked for adequacy prior tocommencement of work and as required by the building control officer.
DENOTES WALLS TO M
ATCH EXISTING STRUCTURE
IC
DRAINAGE LEGEND
RWP
DIRECT FOUL CONNECTION
STUD DWARF W
ALLTo achieve minimum U Value of 0.28W
/m²KConstruct stud wall using 100mm x 50mm head and sole plates and verticalstuds (with noggins) at 400mm centres or to structural engineer's details andcalculations. Insulation between and over studs; 60mm Celotex GA4000between plus 37.5mm Celotex PL4000 insulated plasterboard with VCL.Finish with 3mm skim coat of finishing plaster. All junctions to have water tightconstruction, seal all perimeter joints with tape internally and with siliconsealant externally.
RevDate
Notes
NOTES:Do not scale from this drawing except for planningapplication purposes.
PROJECT:
DRAWING TITLE:
SCALE:DATE:
DRAWN:
DWG NO.
REV. Initials
Proposed Floor Plans & Elevations
1:50 1:100
MG
The Contractor is to check and verify all building and site dimensions,levels and sewer invert levels at connection points before work starts.The Contractor is to comply in all respects with current BuildingLegislation, British Standard Specifications, Building Regulations,Construction (Design & Management) Regulations, Party W
all Act, etc.whether or not specifically stated on this drawing. This drawing mustbe read with and checked against any structural, geotechnical or otherspecialist documentation provided.
This drawing is not intended to show details of foundations, groundconditions or ground contaminants. Each area of ground relied upon tosupport any structure depicted (including drainage) must be investigatedby the Contractor. A suitable method of foundation should be providedallowing for existing ground conditions. Any suspect or fluid ground,contaminates on or within the ground, should be further investigatedby a suitable expert. Any earthwork constructions shown indicate typicalslopes for guidance only & should be further investigated by a suitableexpert.
Where existing trees are to be retained they should be subject to a full
Arboricultural inspection for safety. All trees are to be planted so as toensure they are a minimum of 5 metres from buildings and 3 metres fromdrainage and services. A suitable method of foundation is to be providedto accommodate the proposed tree planting.
Sketch proposals are for illustrative purposes only & as such aresubject to detailed site investigation including groundconditions/contaminants, drainage, design & planning/densitynegotiations. Sketch proposals may be based upon enlargements ofOS sheets & visual estimations of existing site features, accuracywill therefore need to be verified by survey. Sketch proposals have notbeen considered in respect of CDM Regulations.
BUILDING REGULATIONS
1:500 1:1250 at A1
C COPYRIGHT NICHE ARCHITECTURE LTD
Proposed extension & alterations to-
Staffordshire, DE13 8SF
4 Hollybush Road
16-014-WD-102
10.08.16
Newborough
4 H O L L Y B U S H R O A D , N E W B O R O U G H
SIDE ELEVATION
REAR ELEVATION
FRONT ELEVATION
GROUND FLOOR PLANFIRST FLOOR PLAN
SECOND FLOOR PLAN
SIDE ELEVATION
PRELIMINARYSUBJECT TO STRUCTURAL CALCULATIONS,
LA & BUILDING CONTROL APPROVAL
RF3550X780
RF4660X1180
RF5RF6
RF7780X980
660X1180660X1180
Ridge Line
660100
660100
6601084
780741
11002134
5501209
Soffit & fascia to matchexisting roof.
100 x 50mm timber wallplatebedded in mortar.
Gable ladders fixed to the lasttruss with nails at 400 cts.
Insulation in wall taken 250mmabove bottom of ceiling tie togables. provide cavity tray overwith weepholes at 450mm cts.provide wall ties at 750mm cts.to top of cavity tray.
INDICATIVE ROOF PLAN
New roof pitch to match existing main roof pitchcontractor to confirm on site prior to orderingand manufacture of prefabricated roof trusses.Roof to be designed by specialist.
NOTE:-ROOF PITCH TO DETERM
INED ON SITE.PITCH TO BE SITE M
EASURE PRIOR TOANY ODERING/FABRICATION OF STEELW
ORK/ ROOF STRUCTURE.REFER TO STRUCTURAL ENGINEER'SDESIGN.
CS RS
OVERALL WALLPLATE TO BE MEASURED ON SITE
ATTIC TRUSSES
RS RSRSRS CSCS CS CSCS
Double trimmers to all rooflights.
SHOWER ROOM
WAREDROBE
EN SUITE
STORE
BEDROOM 2
DRESSINGM
ASTER BEDROOMLANDING
LANDING
HALLWAY
SITTING ROOM
BEDROOM 3
JOIST ZONE
JOIST ZONE
TO MATCH EXISTING TO MATCH EXISTING
WAREDROBE
WAREDROBE
BEDROOM 4
BEDROOM 2
DRESSING
WAREDROBE
WAREDROBE
ROOF VOIDROOF VOID
UTILITYSHOW
ERROOM
STUDYFAM
ILYW
2
W3
W4
1800mm Ceiling Height Approx
1500mm Ceiling Height Approx
2100mm Ceiling Height Approx
D3
F.F.L. TO F.F.L. TO MATCH EXISTING F.F.L. TO F.C.L. TO MATCH EXISTING
STEEL FORSTRUCTURALENGINEERDESIGN
38x50mm battens fixed to sides of raftersto restrain insulation and maintain 50mmmin. ventilation space.
50mm min. clear ventilation.
38x50mm battens fixed to sides of raftersto restrain insulation and maintain 50mmmin. ventilation space.
50mm min. clear ventilation.
9mm plywood fixed to underside of rafteronly with 3.35x75 galvanised wire nails
9mm plywood fixed to underside of rafteronly with 3.35x75 galvanised wire nails
A
A
SECTION THROUGH A.ASLOPING CEILING INSULATION DETAILScale 1:10
SLOPING CEILING INSULATION DETAILScale 1:10
100mm Xtratherm Thin-R tightlyinstalled between rafters.
Xtratherm Thin-R 45mm under rafters. Fix12.5mm foil backed plasterboard (jointsstaggered) and 5mm skim coat of finishingplaster to the underside of all ceilings usinggalvanized plasterboard nails.
100mm Xtratherm Thin-R tightlyinstalled between rafters.
Xtratherm Thin-R 45mm under rafters. Fix12.5mm foil backed plasterboard (jointsstaggered) and 5mm skim coat of finishingplaster to the underside of all ceilings usinggalvanized plasterboard nails.
OVER
ALL RO
OF C
ON
STRU
CTIO
N TO
ACH
EIVE A U-VALU
E OF 0.18 W
/m²k
FAMILY
KITCHENHALL
BATHROOMEN SUITE
LANDING
LANDINGSTORE
780x980mmROOFLIGHT
AS EXISTING AS EXISTING
38x50mm battens fixed to sides of rafters to restrain insulation and maintain 50mm min. ventilationspace.
50mm min. clear ventilation.
38x50mm battens fixed to sides of raftersto restrain insulation and maintain 50mmmin. ventilation space.
50mm min. clear ventilation.
SECTION THROUGH A.AA
SLOPING CEILING INSULATION DETAIL
SECTION THROUGH SLOPING CEILING
Breathable Roofing Felt Tyvek(or similar approved)
A
Scale 1:10
Scale 1:10
EXISTING SLOPING CEILINGS
Xtratherm Thin-R 80mm under rafters. Fix12.5mm foil backed plasterboard (jointsstaggered) and 5mm skim coat of finishingplaster to the underside of all ceilings usinggalvanized plasterboard nails.
50mm Xtratherm Thin-R tightly installed between rafters. (basedon 100mm deep rafter. If existing rsfter is deeper insulation canbe increased between and decreased below).
Xtratherm Thin-R 80mm under rafters. Fix 12.5mm foilbacked plasterboard (joints staggered) and 5mm skim coatof finishing plaster to the underside of all ceilings usinggalvanized plasterboard nails.
50mm Xtratherm Thin-R tightly installed between rafters. (basedon 100mm deep rafter. If existing rsfter is deeper insulation canbe increased between and decreased below).
RevDate
Notes
NOTES:
Do not scale from this drawing except for planningapplication purposes.
PROJECT:
DRAWING TITLE:
SCALE:DATE:
DRAWN:
DWG NO.
REV. Initials
Sections, Roof Plan &
1:50 1:100
MG
The Contractor is to check and verify all building andsite dimensions, levels and sewer invert levels atconnection points before work starts. TheContractor is to comply in all respects with currentBuilding Legislation, British Standard Specifications,Building Regulations, Construction (Design &Management) Regulations, Party W
all Act, etc.whether or not specifically stated on this drawing.This drawing must be read with and checked againstany structural, geotechnical or other specialistdocumentation provided.
This drawing is not intended to show details offoundations, ground conditions or groundcontaminants. Each area of ground relied upon tosupport any structure depicted (including drainage)must be investigated by the Contractor. A suitablemethod of foundation should be provided allowingfor existing ground conditions. Any suspect or fluidground, contaminates on or within the ground, shouldbe further investigated by a suitable expert. Anyearthwork constructions shown indicate typicalslopes for guidance only & should be furtherinvestigated by a suitable expert.
Where existing trees are to be retained they should be
subject to a full Arboricultural inspection for safety. Alltrees are to be planted so as to ensure they are aminimum of 5 metres from buildings and 3 metresfrom drainage and services. A suitable method offoundation is to be provided to accommodate theproposed tree planting.
Sketch proposals are for illustrative purposes only& as such are subject to detailed site investigationincluding ground conditions/contaminants, drainage,design & planning/density negotiations. Sketchproposals may be based upon enlargements of OSsheets & visual estimations of existing sitefeatures, accuracy will therefore need to be verified bysurvey. Sketch proposals have not been considered inrespect of CDM Regulations.
BUILDING REGULATIONS
1:10 at A1
C COPYRIGHT NICHE ARCHITECTURE LTD
Proposed extension & alterations to-
Staffordshire, DE13 8SF
4 Hollybush Road
16-014-WD-102
10.08.16
Newborough
4 H O L L Y B U S H R O A D , N E W B O R O U G H
SECTION A-ASECTION B-B
Construction Details
SECTION C-C
PRELIMINARYSUBJECT TO STRUCTURAL CALCULATIONS,
LA & BUILDING CONTROL APPROVAL
BUILDING REGULATIONS NOTES
CDM REGULATIONS 2015
The client must abide by the Construction Design and Management Regulations
2015. The client must appoint a contractor, if more than one contractor is to beinvolved, the client will need to appoint (in writing) a principal designer (to plan,manage and coordinate the planning and design work) and a principal contractor (toplan, manage and coordinate the construction and ensure there are arrangementsin place for managing and organising the project).
Domestic clientsThe domestic client is to appoint a principal designer and a principal contractorwhen there is more than one contractor, if not your duties will automaticallytransferred to the contractor or principal contractor.
The designer can take on the duties, provided there is a written agreementbetween you and the designer to do so.
The Health and Safety Executive is to be notified as soon as possible beforeconstruction work starts if the works:
(a) Last longer than 30 working days and has more than 20 workers workingsimultaneously at any point in the project.Or:(b) Exceeds 500 person days.
THERMAL BRIDGING
Care shall be taken to limit the occurrence of thermal bridging in the insulationlayers caused by gaps within the thermal element, (i.e. around windows and dooropenings). Reasonable provision shall also be made to ensure the extension isconstructed to minimise unwanted air leakage through the new building fabric.
MATERIALS AND W
ORKMANSHIP
All works are to be carried out in a workmanlike manner. All materials andworkmanship must comply with Regulation 7 of the Building Regulations, all relevantBritish Standards, European Standards, Agreement Certificates, ProductCertification of Schemes (Kite M
arks) etc. Products conforming to a Europeantechnical standard or harmonised European product should have a CE marking.
SITE PREPARATIONGround to be prepared for new works by removing all unsuitable material,vegetable matter and tree or shrub roots to a suitable depth to prevent futuregrowth. Seal up, cap off, disconnect and remove existing redundant services asnecessary. Reasonable precautions must also be taken to avoid danger to healthand safety caused by contaminants and ground gases e.g. landfill gases, radon,vapours etc. on or in the ground covered, or to be covered by the building.
EXISTING STRUCTUREExisting structure including foundations, beams, walls and lintels carrying new andaltered loads are to be exposed and checked for adequacy prior tocommencement of work and as required by the Building Control Officer.
BEAMS
Supply and install new structural elements such as new beams, roof structure, floorstructure, bearings, and padstones in accordance with the Structural Engineer'scalculations and details. New steel beams to be encased in 12.5mm GyprocFireLine board with staggered joints, Gyproc FireCase or painted in Nullifire S orsimilar intumescent paint to provide 1/2 hour fire resistance as agreed withBuilding Control. All fire protection to be installed as detailed by specialistmanufacturer.
LINTELS- For uniformly distributed loads and standard 2 storey domestic loadings onlyLintel widths are to be equal to wall thickness. All lintels over 750mm sized internaldoor openings to be 65mm deep pre-stressed concrete plank lintels. 150mmdeep lintels are to be used for 900mm sized internal door openings. Lintels tohave a minimum bearing of 150mm on each end. Any existing lintels carryingadditional loads are to be exposed for inspection at commencement of work onsite. All pre-stressed concrete lintels to be designed and manufactured inaccordance with BS 8110, with a concrete strength of 50 or 40 N/mm² andincorporating steel strands to BS 5896 to support loadings assessed to BS5977 Part 1.For other structural openings provide proprietary insulated steel lintels suitable forspans and loadings in compliance with Approved Document A and lintelmanufactures standard tables. Stop ends, DPC trays and weep holes to beprovided above all externally located lintels.
STRAPPING FOR PITCHED ROOFGable walls should be strapped to roofs at 2m centres. All external walls runningparallel to roof rafters to be restrained at roof level using 1000mm x 30mm x5mm galvanised mild steel horizontal straps or other approved to BSEN 845-1built into walls at max 2000mm centres and to be taken across minimum 3 raftersand screw fixed. Provide solid noggins between rafters at strap positions. All wallplates to be 100 x 50mm fixed to inner skin of cavity wall using 30mm x 5mm x1000mm galvanized metal straps or other approved to BSEN 845-1 at maximum2m centres.
STRAPPING OF FLOORSProvide lateral restraint where joists run parallel to walls, floors are to be strappedto walls with 1000mm x 30mm x 5mm galvanised mild steel straps or otherapproved in compliance with BS EN 845-1 at max 2.0m centres, straps to betaken across minimum of 3 joists. Straps to be built into walls. Provide 38mm widex ¾
depth solid noggins between joists at strap positions.
STRIP FOUNDATIONProvide 225mm x 600mm concrete foundation, concrete mix to conform to BS EN206-1 and BS 8500-2. All foundations to be a minimum of 1000mm belowground level, exact depth to be agreed on site with Building Control Officer to suitsite conditions. All constructed in accordance with 2004 Building RegulationsA1/2 and BS 8004:1986 Code of Practice for Foundations. Ensure foundationsare constructed below invert level of any adjacent drains. Base of foundationssupporting internal walls to be min 600mm below ground level. Sulphate resistantcement to be used if required. Please note that should any adverse soil conditionsbe found or any major tree roots in excavations, the Building Control Officer is tobe contacted and the advice of a structural engineer should be sought.
WALLS BELOW
GROUNDAll new walls to have Class A blockwork below ground level or alternatively semiengineering brickwork in 1:4 masonry cement or equal approved specification.Cavities below ground level to be filled with lean mix concrete min 225mm belowdamp proof course. Or provide lean mix backfill at base of cavity wall (150mmbelow damp course) laid to fall to weepholes.
DPCProvide horizontal strip polymer (hyload) damp proof course to both internal andexternal skins minimum 150mm above external ground level. New DPC to be madecontinuous with existing DPC’s and with floor DPM
. Vertical DPC to be installed atall reveals where cavity is closed.
WALL TIES
All walls constructed using stainless steel vertical twist type retaining wall ties builtin at 750mm ctrs horizontally, 450mm vertically and 225mm ctrs at reveals andcorners in staggered rows. W
all ties to be suitable for cavity width and inaccordance with BS 5628-6.1: 1996 and BS EN 845-1: 2003
CAVITIESProvide cavity trays over openings. All cavities to be closed at eaves and aroundopenings using Thermabate or similar non combustible insulated cavity closers.Provide vertical DPCs around openings and abutments. All cavity trays must have150mm upstands and suitable cavity weep holes (min 2) at max 900mm centres.
EXISTING TO NEW W
ALLCavities in new wall to be made continuous with existing where possible to ensurecontinuous weather break. If a continuous cavity cannot be achieved, where newwalls abuts the existing walls provide a movement joint with vertical DPC. All tiedinto existing construction with suitable proprietary stainless steel profiles.
SMOKE DETECTION
Mains operated linked smoke alarm detection system to BS EN 14604 and
BS5839-6:2004 to at least a Grade D category LD3 standard and to bemains powered with battery back up. Smoke alarms should be sited so thatthere is a smoke alarm in the circulation space on all levels/ storeys and within7.5m of the door to every habitable room. If ceiling mounted they should be300mm from the walls and light fittings. W
here the kitchen area is notseparated from the stairway or circulation space by a door, there should bean interlinked heat detector in the kitchen.
ROOF LIGHTSM
in U-value of 1.6 W/m²K.
Roof-lights to be double glazed with16mm argon gap and soft low-E glass.W
indow Energy Rating to be Band C or better. Roof lights to be fitted inaccordance with manufacturer's instructions with rafters doubled up to sidesand suitable flashings etc.
SAFETY GLAZINGAll glazing in critical locations to be toughened or laminated safety glass toBS 6206, BS EN 14179 or BS EN ISO 12543-1:2011 and Part K (Part Nin W
ales) of the current Building Regulations, i.e. within 1500mm above floorlevel in doors and side panels within 300mm of door opening and within800mm above floor level in windows.
NEW AND REPLACEM
ENT WINDOW
SNew and replacement windows to be double glazed with 16mm argon gap andsoft coat low-E glass. W
indow Energy Rating to be Band C or better and toachieve U-value of 1.6 W
/m²K. The door and window openings should belimited to 25%
of the extension floor area plus the area of any existingopenings covered by the extension.
NEW AND REPLACEM
ENT DOORSNew and replacement doors to achieve a U-Value of 1.80W
/m²K. Glazed areasto be double glazed with 16mm argon gap and soft low-E glass. Glass to betoughened or laminated safety glass to BS 6206, BS EN 14179 or BS ENISO 12543-1:2011 and Part K (Part N in W
ales) of the current BuildingRegulations.
BACKGROUND AND PURGE VENTILATIONBackground ventilation - Controllable background ventilation via trickle ventsto BS EN 13141-3 within the window frame to be provided to new habitablerooms at a rate of min 5000mm²; and to kitchens, bathrooms, W
Cs and utilityrooms at a rate of 2500mm²Purge ventilation - New W
indows/rooflights to have openable area in excess of1/20th of their floor area, if the window opens more than 30° or 1/10th oftheir floor area if the window opens less than 30°Internal doors should be provided with a 10mm gap below the door to aid aircirculation.Ventilation provision in accordance with the Domestic Ventilation ComplianceGuide.
EXTRACT TO BATHROOMBathroom to have mechanical vent ducted to external air to provide min 15litres / sec extraction. Vent to be connected to light switch and to have 15minute over run if no window in room. Internal doors should be provided with a10mm gap below the door to aid air circulation. Ventilation provision inaccordance with the Domestic Ventilation Compliance Guide. Intermittentextract fans to BS EN 13141-4. All fixed mechanical ventilation systems,where they can be tested and adjusted, shall be commissioned and acommissioning notice given to the Building Control Body.
EXTRACT TO UTILITY ROOMTo utility room provide mechanical ventilation ducted to external air capable ofextracting at a rate of 30 litres per second. Internal doors should beprovided with a 10mm gap below the door to aid air circulation. Ventilationprovision in accordance with the Domestic Ventilation Compliance Guide.Intermittent extract fans to BS EN 13141-4. All fixed mechanical ventilationsystems, where they can be tested and adjusted, shall be commissioned anda commissioning notice given to the Building Control Body.
EXTRACT TO KITCHENKitchen to have mechanical ventilation with an extract rating of 60l/sec or30l/sec if adjacent to hob to external air, sealed to prevent entry of moisture.Internal doors should be provided with a 10mm gap below the door to aid aircirculation. Ventilation provision in accordance with the Domestic VentilationCompliance Guide. Intermittent extract fans to BS EN 13141-4. Cookerhoods to BS EN 13141-3. All fixed mechanical ventilation systems, wherethey can be tested and adjusted, shall be commissioned and a commissioningnotice given to the Building Control Body.
PITCHED ROOF VENTILATIONM
aintain a 50mm air gap above insulation in the roof pitch to ventilate roof.Provide opening at eaves level at least equal to continuous strip 25mm wideand opening at ridge equal to continuous strip 5mm wide to promoteventilation.
RAINWATER DRAINAGE
New rainwater goods to be new 110mm UPVC half round gutters taken andconnected into 68mm dia UPVC downpipes. Rainwater taken to newsoakaway, situated a min distance of 5.0m away from any building, via 110mmdia UPVC pipes surrounded in 150mm granular fill. Soakaway to be min of 1cubic metre capacity (or to depth to Local Authorities approval) with suitablegranular fill and with geotextile surround to prevent migration of fines. Ifnecessary carry out a porosity test to determine design and depth ofsoakaway.
LEANTO
FLASHIN
G D
ETAIL.SC
ALE : 1/10.
Refer to manufacturers instructions for fixingdetails.
Code 4 lead cover flashing
Spacer bracket
Anchors to be M8 has rod
with HILTI HIT HY 70 resin.(80mm embedment)
Hilti resin anchors at 300mm horizontal c/c(only 1 per location) vertical offset betweenadjacent bolts 75mm as shown. bolt intocentre of brick.
75
50 x 200mm high wallplateproprietary angle bracket toboth sides of rafter.
Vapour permeable underlay (Type LR) toprovide a cold roof. underlay left short oflast batten to provide ventilation gap.
Glidevale MR50 monovent or
similar approved.
Double rafter/trimmerswhere necessary
INDICATIVE SECTION THRO PITCHED ROOFLIGHT DETAILScale 1:5
ROOF LIGHTS TO BE INSTALLED IN STRICTACCORDANCE W
ITH THE MANUFACTURERS DETAILS AND
RECOMM
ENDATIONS 25mm Celotex FR5000 tightlyinstalled between rafters.
70mm Celotex FR5000 to underside of rafters. Fix12.5mm foil backed plasterboard (joints staggered) on25x47mm battens and 3mm skim coat of finishing plasterto the underside of all ceilings using galvanizedplasterboard nails.
38x50mm battens fixed to sides of raftersto restrain insulation and maintain 50mmmin. ventilation space.
50mm min. clear ventilation.
Steel Beams/Columns size dependent on plot workingdrawing - Refer to Structural Engineers calculations
2 No. layers of 12.5mm British Gypsum'Gyproc' standard plasterboard
Timber packers to web of steel beam to supporttimber battens to in turn support fixing of plasterboard
38 x 38mm timber battens
For steel connections refer to specific locationwhere situation occurs (indicative only).
Ceiling finish (generally 15mm Gyproc wallboard)
Fire Protection To Structural SteelScale 1:10
Existing wall
Alternatively paint in Nullifire S or similar intumescentpaint to provide 1/2 hour fire resistance.
EXTERNAL WALL DETAIL
SCALE 1
:10
1200 gauge polythene dpm turned up edgeof slab and lapped with dpc50mm (average) sand blinding
Clean hardcore compactedin separate 150mm layers
Finished ground level
dpc min. 150mm above ground level
Weak mix concrete fill to
cavity
25mm thick insulation upstand toexternal walls.
12.5mm standard wallboard (nominal 8kg/m²)on dabs
100mm Celotex FF4000 insulation
100mm ST2 or Gen2 ground bearing slabconcrete mix to conform to BS 8500-2
65mm sand/cement finishing screed withlight mesh reinforcement
foundations to suit site conditions andto the approval of the Building Inspector.
CL CLCL
bell cast (render stop) bead
TO A
CHEIV
E A U
-VALU
E OF 0
.21
W/m
²k O
VER
ALL FLO
OR C
ONSTR
UC
TION
RevDate
Notes
NOTES:Do not scale from this drawing except for planningapplication purposes.
PROJECT:
DRAWING TITLE:
SCALE:DATE:
DRAWN:
DWG NO.
REV. Initials
MG
The Contractor is to check and verify all building and site dimensions,levels and sewer invert levels at connection points before work starts.The Contractor is to comply in all respects with current BuildingLegislation, British Standard Specifications, Building Regulations,Construction (Design & Management) Regulations, Party W
all Act, etc.whether or not specifically stated on this drawing. This drawing mustbe read with and checked against any structural, geotechnical or otherspecialist documentation provided.
This drawing is not intended to show details of foundations, groundconditions or ground contaminants. Each area of ground relied upon tosupport any structure depicted (including drainage) must be investigatedby the Contractor. A suitable method of foundation should be providedallowing for existing ground conditions. Any suspect or fluid ground,contaminates on or within the ground, should be further investigatedby a suitable expert. Any earthwork constructions shown indicate typicalslopes for guidance only & should be further investigated by a suitableexpert.
Where existing trees are to be retained they should be subject to a full
Arboricultural inspection for safety. All trees are to be planted so as toensure they are a minimum of 5 metres from buildings and 3 metres fromdrainage and services. A suitable method of foundation is to be providedto accommodate the proposed tree planting.
Sketch proposals are for illustrative purposes only & as such aresubject to detailed site investigation including groundconditions/contaminants, drainage, design & planning/densitynegotiations. Sketch proposals may be based upon enlargements ofOS sheets & visual estimations of existing site features, accuracywill therefore need to be verified by survey. Sketch proposals have notbeen considered in respect of CDM Regulations.
BUILDING REGULATIONS
at A1
C COPYRIGHT NICHE ARCHITECTURE LTD
Proposed extension & alterations to-
Staffordshire, DE13 8SF
4 Hollybush Road
16-014-WD-104
10.08.16
Newborough
4 H O L L Y B U S H R O A D , N E W B O R O U G H
Construction Notes
PRELIMINARYSUBJECT TO STRUCTURAL CALCULATIONS,
LA & BUILDING CONTROL APPROVAL