Workpack for Punch List Close Out and Polymer Coupon Installation Rev. 0

Date post: 07-Jul-2018
Category:
Upload: mohd-amir-imran
View: 229 times
Download: 0 times
Share this document with a friend

of 24

Transcript
  • 8/19/2019 Workpack for Punch List Close Out and Polymer Coupon Installation Rev. 0

    1/62

  • 8/19/2019 Workpack for Punch List Close Out and Polymer Coupon Installation Rev. 0

    2/62

    PROVISION FOR EPCIC FOR IFLTM

      – PL 221, PL 218, PL 220, AND PL 238WORKPACK (PUNCH LIST CLOSE OUT AND POLYMER COUPON INSTALLATION)

    601401/3004/C/PRC/1055 REV 0 / FEB 2015

    A.  REVISION STATUS LOG 

    Amendment

    No.Page

    Effective

    DateDetails of Changes

    Updated

    By

    A1 All 25.02.15 Issued for Comments MAI

    0 N/A 02.03.15 Schedule, Manpower, Equipment, Tools and

    Consumables Loading revised to reflect

    Estimated Shut Down (ESD) date on 18th

     March

    2015

    MAI

  • 8/19/2019 Workpack for Punch List Close Out and Polymer Coupon Installation Rev. 0

    3/62

    PROVISION FOR EPCIC FOR IFLTM

      – PL 221, PL 218, PL 220, AND PL 238WORKPACK (PUNCH LIST CLOSE OUT AND POLYMER COUPON INSTALLATION)

    601401/3004/C/PRC/1055 REV 0 / FEB 2015

    NO DESCRIPTION

    1 INTRODUCTION √ 

    1.1 PROJECT SUMMARY √ 

    1.2 ORGANIZATION CHART √ 

    2 SCOPE OF WORK √ 

    3 JOB METHOD STATEMENT (JOB CARDS) WITH MANHOURS √ 

    4 MANPOWER MOBILIZATION PLAN / LOADING √ 

    5 ERECTION MATERIAL TAKE-OFF (MTO) √ 

    6 EQUIPMENT, TOOLS AND CONSUMABLES LOADING √ 

    7 DETAIL WORK SCHEDULE √ 

    8 PROJECT SPECIFIC PROCEDURES (PSP) √ 

    8.1 POLYMER COUPON INSTALLATION √ 

    9 JOB HAZARD ANALYSIS √ 

    10 APPENDIX √ 

    10.1 APPENDIX A – PUNCH LIST √ 

    10.2 APPENDIX B – P&ID AND ISO MARK-UP DRAWINGS FOR POLYMER COUPONINSTALLATION

    √ 

  • 8/19/2019 Workpack for Punch List Close Out and Polymer Coupon Installation Rev. 0

    4/62

    PROVISION FOR EPCIC FOR IFLTM

      – PL 221, PL 218, PL 220, AND PL 238WORKPACK (PUNCH LIST CLOSE OUT AND POLYMER COUPON INSTALLATION)

    601401/3004/C/PRC/1055 REV 0 / FEB 2015

    1.0 INTRODUCTION

    1.1 Project Summary

    PCSB SKO IFL™ offshore installation campaign was successfully completed on 5 th December 2014. IFL were inserted through four (4) pipelines i.e. PL 238, PL 220, PL 218and PL 221. Interconnections of these pipelines between platforms are as follows:

    a) PL 238 (WL-4 to WLP-C)b) PL 220 (WLP-A to WL-4)c) PL 218 (WL-123 to WLDP-B)d) PL 221 (WLDP-A to WL-123)

     Apart from IFL™ installation through pipelines, corresponding topside piping modificationwas also part of APSM scope of work during that offshore installation campaign. In a tightschedule given the team has manageably prompted the task given and completed it on time.

    However as other projects would engage in as well, there are some punch lists andadditional work to be done in conjunction with this West Lutong project. Generally, the taskor scope of work to be done in this 8-hour shutdown allocated by PCSB SKO this comingMarch 2015 is as below:

    a) To close out remaining punch list (refer latest revision of punch list in Appendix A)b) To install polymer coupons at platform WLP-A and WLDP-A

    The above scope of work will be spelled out deliberately later on in Chapter 2  – Scope ofWork

    1.2 Definition

    PCSB - Petronas Carigali Sdn BhdSKO - Sarawak OperationsIFL™  - In-Field Liner™  APSM - Anticorrosion Protective Systems (M)E&I - Electrical and Instrumentation

    1st Pair

    2nd Pair

  • 8/19/2019 Workpack for Punch List Close Out and Polymer Coupon Installation Rev. 0

    5/62

    PROVISION FOR EPCIC FOR IFLTM

      – PL 221, PL 218, PL 220, AND PL 238WORKPACK (PUNCH LIST CLOSE OUT AND POLYMER COUPON INSTALLATION)

    601401/3004/C/PRC/1055 REV 0 / FEB 2015

    1.3 Organization Chart

  • 8/19/2019 Workpack for Punch List Close Out and Polymer Coupon Installation Rev. 0

    6/62

    ORGANIZATION CHART

    PROVISION FOR EPCIC FOR IFL™ TECHNOLOGY ‐ PL 238, PL 220, PL 221 AND PL

    MARCH 2015 SHUTDOWN

    PAINTER TEAM

    FIELD ENGINEER

    MOHD AMIR IMRAN M. NOR

    HP: +6019‐351 5470

    [email protected]

    QA / QC INSPECTOR

    PROJECT MANAGER

    SHAHARIN RAJAB

    HP: +6019‐646 6248

    [email protected]

    CONSTRUCTION MANAGER

    MOHD ZAMROS OMAR

    HP: +6012‐209 9747

    [email protected]

    QA / QC MANAGER

    MOHD PUAD MD LASIM

    HP: +012‐235 3767

    [email protected]

  • 8/19/2019 Workpack for Punch List Close Out and Polymer Coupon Installation Rev. 0

    7/62

    PROVISION FOR EPCIC FOR IFLTM

      – PL 221, PL 218, PL 220, AND PL 238WORKPACK (PUNCH LIST CLOSE OUT AND POLYMER COUPON INSTALLATION)

    601401/3004/C/PRC/1055 REV 0 / FEB 2015

    2.0 SCOPE OF WORK

    2.1 General

    This scope of work during comprises of onshore preparation and offshore hook up, testing,pre-commissioning and commissioning of the following:

    a) Punch List Close Outb) Polymer Coupon Installation

    2.2 Punch List Close Out

    Punch list for this West Lutong IFL™ installation project was initiated on 4th December 2014

    but then revised during punch list close out walk that was performed from 23th

      – 25th

     January2015.

    The latest revision of punch list can be referred to Appendix A of this document. There aresome additional punch list items that were captured during last January site visit as well as theclosed out items.

    The punch list is categorized as below for easier tracking and to classify further actions to betaken during this coming shutdown.

    Punch List

    PlatformTotal as of

    04th

     Dec 2014

    Additional(23

    th  – 25

    th 

    Jan 2015)

    Total as of13

    th Feb 2015

    Closed Remaining

    WLP-A 10 7 17 5 / 17 12 / 17

    WL-4 16 3 19 4 / 19 15 / 19

    WLP-C 14 2 16 9 / 16 7 / 16

    WLDP-A 11 13 24 15 / 24 9 / 24

    WL-123 4 2 6 1 / 6 5 / 6

    WLDP-B 6 1 7 4 / 7 3 / 7

    Total 61 28 89 38 / 89 51 / 89

    From the table above, we can further segregate those remaining punch list items into pre-shutdown, shutdown and post-shutdown execution windows as tabulated below:

  • 8/19/2019 Workpack for Punch List Close Out and Polymer Coupon Installation Rev. 0

    8/62

    PROVISION FOR EPCIC FOR IFLTM

      – PL 221, PL 218, PL 220, AND PL 238WORKPACK (PUNCH LIST CLOSE OUT AND POLYMER COUPON INSTALLATION)

    601401/3004/C/PRC/1055 REV 0 / FEB 2015

    NO. PLATFORMAREA OF

    CONCERNDESCRIPTION OF SCOPE OF WORK (SOW)

    DRAWING NO (IN

    APPENDIX B)REMARKS

    1

    WLP-C

    Painting Touch up paintingEnd Connector at

    Riser R5Pre SD

    2 PaintingTouch up painting on 2" blind flange mated with 2" ball valve

    PT No. 21150-PG10103-61440 Pre SD

    3Polyken

    TapeEnsure all flange joints are wrapped with Polyken Tape All Pre SD

    4 I-rod Install I-rods at all pipe supports All Pre SD

    1

    WL-4

    PaintingStencil piping line no. and directional flow arrow after touch

    up painting at visible location

    150-PG00001-61440X

    50-PG00002-61440

    50-VL00001-11440

    50-VL00002-11440

    Pre SD

    2 PaintingTouch up painting on dent mark suspected occurred during

    lifting50-VL00001-11440 Pre SD

    3Polyken

    TapeGrease back flange joints at manual valves All Pre SD

    4Polyken

    TapeEnsure all flange joints are wrapped with Polyken Tape All Pre SD

    5 I-rod Install I-rods at all pipe supports All Pre SD

    6Insulation

    Flange Kit

    Install IF washer at one (1) of the stud bolts near existing

    Pressure Element (PE)150-PG00001-61440X Pre SD

    1

    WLP-A

    PaintingTouch up painting, stencil piping line no. and directional flow

    arrow after touch up painting at visible location

    80-VL05005-11440

    50-PG05007-61440Pre SD

    2Polyken

    Tape

    Wrap Polyken Tape at four (4) flange joints (refer mark-up

    drawing)

    50-PG05007-61440

    50-PG05008-61440Pre SD

    3 I-rod Install I-rods at all pipe supports All Pre SD

    4 U-bolt Install U-bolt and drill holes to be drilled at PS-76 50-PG05003-61440 Pre SD

    5 U-bolt Properly tighten U-bolt at PS-105 50-PG05007-61440 Pre SD

    6 U-boltRemove existing oversized U-bolts, and replace with 2"

    accordingly

    50-PG05002-61440

    50-PG05007-61440

    50-PG05008-61440

    Pre SD

    1 WLDP-A

    Pressure

    Gauge (PI

    0512)

    Depressurize pipeline and topside piping. Break 1" flange at

    PI 0512 tie-in point of vent line. Install pre-fabricated 1" x

    1/2" pipe spool, 1/2" monoflange Single Block and Bleed(SBB) valve and 1/2" NPT pressure gauge.

    50-PG05008-61440 Shutdown

  • 8/19/2019 Workpack for Punch List Close Out and Polymer Coupon Installation Rev. 0

    9/62

    PROVISION FOR EPCIC FOR IFLTM

      – PL 221, PL 218, PL 220, AND PL 238WORKPACK (PUNCH LIST CLOSE OUT AND POLYMER COUPON INSTALLATION)

    601401/3004/C/PRC/1055 REV 0 / FEB 2015

    2Polymer

    Coupon

    Depressurize corresponding topside piping. Close 6" ball

    valves (refer mark-up drawing in Appendix B) and isolate line

    no. 150-PG05001-61440. Break flange and install five (5)

    polymer coupons together with polymer coupon holder,

    pressure gauge and fittings.

    150-PG05001-61440

    Polymer Coupon GA

    Drawing

    Shutdown

    3 WLP-APolymer

    Coupon

    Depressurize corresponding topside piping. Close 6" ballvalves (refer mark-up drawing in Appendix B) and isolate line

    no. 150-PG05001-61440. Break flange and install five (5)

    polymer coupons together with polymer coupon holder,

    pressure gauge and fittings.

    150-PG05001-61440

    Polymer Coupon GA

    Drawing

    Shutdown

    4 WLP-C

    Pressure

    Element /

    Transmitter

    (PE 501)

    Depressurize corresponding topside piping. Close ABV with

    aid of Operations and close ball valves (refer mark-up

    drawing in Appendix B). Break flange and install 2" Double

    Block and and Bleed (DBB) Valve and PE 501.

    150-PG10001-61440X Shutdown

    1

    WLDP-A

    PaintingTouch up painting near pressure gauge PI 0506 and pipe

    support WLDP-A-PS08-18.1150-PG05001-61440 Post SD

    2 PaintingStencil piping line no. and directional flow arrow at visible

    location50-PD05006-11440 Post SD

    3Polyken

    Tape

    Wrap Polyken Tape at 2" ball valve flange joint at deck

    penetration area50-PD05006-11440 Post SD

    4 I-rod Install I-rods at all pipe supports All Post SD

    5 Stud Bolt Stud bolt insufficient thread? 50-PD05006-11440 Post SD

    1 WL-123 PaintingStencil piping line no. and directional flow arrow at visible

    location

    50-VL00001-1144050-VL00002-11440

    50-PG00003-11440

    50-PG00004-11440

    50-PG00005-11440

    50-PG00006-11440

    Post SD

    2 WL-123Polyken

    TapeWrap Polyken Tape at flange joint of PI 0001 50-PG00003-61440 Post SD

    3 WL-123 I-rod Install I-rods at all pipe supports All Post SD

    1 WLDP-B PaintingStencil piping line no. and directional flow arrow at visible

    location

    150-PG06001-6143280-VL06025-11440

    150-PL06024-61432

    Post SD

    2 WLDP-B I-rod Install I-rods at all pipe supports All Post SD

    2.3 Polymer Coupon Installation

    Polymer coupon is constructed as an online retrievable IFL™ monitoring system, in whichextraction of IFL™ inner layers are patterned into 20 mm diameter disc coupons and insertedin polymer coupon holder of ten (10) sets each.

  • 8/19/2019 Workpack for Punch List Close Out and Polymer Coupon Installation Rev. 0

    10/62

    PROVISION FOR EPCIC FOR IFLTM

      – PL 221, PL 218, PL 220, AND PL 238WORKPACK (PUNCH LIST CLOSE OUT AND POLYMER COUPON INSTALLATION)

    601401/3004/C/PRC/1055 REV 0 / FEB 2015

    These disc coupons will then be contacted with in-pipe products, or in this case gas, and itsaffects are analyzed and recorded over time as per disc coupon retrieval schedule.

     Altogether ten (10) sets of polymer coupons shall be installed, five (5) each at platform WLDP-

     A and WLP-A, exact location as per site photos below:

    Polymer coupon installation procedure attached in Project Specific Procedure will guidethrough on how to install these polymer coupons during shutdown and precautions to betaken care of accordingly.

    Polymercoupon location

    Figure 1: Polymer coupon location at WLP-A

    Figure 2: Polymer coupon location at WLDP-A

    Polymercoupon location

  • 8/19/2019 Workpack for Punch List Close Out and Polymer Coupon Installation Rev. 0

    11/62

    PROVISION FOR EPCIC FOR IFLTM

      – PL 221, PL 218, PL 220, AND PL 238WORKPACK (PUNCH LIST CLOSE OUT AND POLYMER COUPON INSTALLATION)

    601401/3004/C/PRC/1055 REV 0 / FEB 2015

    3.0 JOB CARDS WITH MANHOURS (FOR SHUTDOWN ACTIVITIES)

  • 8/19/2019 Workpack for Punch List Close Out and Polymer Coupon Installation Rev. 0

    12/62

    PLAN. MHRS

    Rig up scaffolding at line no. 150‐PG‐05001‐61440 below polymer coupon area

    Break flange at five (5) polymer coupon tie‐in points at line no. 150‐PG‐05001‐61440

    Install and tie‐in / manual torque on five (5) polymer coupons at designated points

    Line walk to check leak test using snoop liquid at five (5) polymer coupon flange  joints

    Total, Direct Man‐hours

    REFERENCE DRAWINGS & DOCUMENTS

      Dwrg / Doc No Drawing / Document Title

    ISO Drawing

     of 

     Line

     No.

     150

    ‐PG05001

    ‐61440

    P&ID of  Line No. 150‐PG05001‐61440

      NOTES

    PROJECT TITLE

    JOBCARD ID NO

    SYSTEM DESC.   NA   QC TEST REQUIRED   NIL

    DISCIPLINE   TOPSIDE PIPING   SPECIAL PPE   NA

    JOB DESCRIPTION   To install / tie‐in five (5) 2" polymer coupons at line no. 150‐PG05001‐61440

    SYSTEM NUMBER   NA   TYPE OF PERMIT   CRITICAL PERMIT

    WORK LOCATION   WLDP‐A   WORK AREA  CELLAR DECK

    JOBCARD DETAILS

    TASK 

    NO  TASK DESCRIPTION TRADE ACT MHRS

    Qty Unit Unit Total

    3 pax 3 9

    1 RS 2 pax 5 10

    CS 1 pax 2 2

    RS 3 pax 2 2

    31

    DIRECT MAN‐HOUR SUMMARY

    Contractor 

    Personnel

    CS FE QC RS BP FW TOTAL

    2 0 2 27 0 0   31.00

    TOTAL

    0 0 0 0 0 0

    VRNDT PT

    0.00

    31.00

     SPECIAL TOOLS, EQUIPMENTS AND CONSUMMABLES

    SPECIAL TOOLS AND EQUIPMENTS SPECIAL CONSUMMABLES

    Third Party 

    Personnel

    BT IS CC

    Qty UnitItems Descriptions Qty Unit Items Description

    Rev

    150‐PG05001

    ‐61440 2

    B‐1005 2

    STATUS

    PROVISION FOR EPCIC FOR IFL™ TECHNOLOGY ‐ PL 221, PL 218, PL 238 AND PL 220

    POLYMER COUPON INSTALLATION AND PUNCH LIST CLOSE OUT

    WLDP‐A‐TS‐PC‐001

    WORK VOL.

    JOBCARD APPROVAL PREPARED BY APS(M) FEREVIEWED BY APS(M) CONSTRUCTION

    MANAGER

     ACCEPTED / APPRAISED BY PCSB-SKO

    REP

    STATUS

    JOBCARD COMPLETION RECORDED BY PCSB-SKO CSR ACCEPTED / APPRAISED BY PCSB-SKO OPERATIONS

    4

    QC 1 pax 2 2

    3 RS 3 pax 2 6

    2 RS

  • 8/19/2019 Workpack for Punch List Close Out and Polymer Coupon Installation Rev. 0

    13/62

    PLAN. MHRS

    Break flange at PI 0512 tie‐in point

    Tie‐in / manual torque on adapter spool and monoflange SBB together with IF kit, 

    ensure SBB is in 'close' position

    Install pressure gauge (PI 0512) at 1/2" NPTF end of  the monoflange SBB

    Line walk to check leak test using snoop liquid at two (2) flange  joints of  PI 0512

    Total, Direct Man‐hours

    REFERENCE DRAWINGS & DOCUMENTS

      Dwrg / Doc No Drawing / Document Title

    ISO Drawing

     of 

     Line

     No.

     50

    ‐PG05008

    ‐61440

    P&ID of  Line No. 50‐PG05008‐61440

      NOTES

    PROVISION FOR EPCIC FOR IFL™ TECHNOLOGY ‐ PL 221, PL 218, PL 238 AND PL 220

    PROJECT TITLE POLYMER COUPON INSTALLATION AND PUNCH LIST CLOSE OUT

    JOBCARD ID NO WLDP‐A‐TS‐PC‐002

    SYSTEM DESC.   NA   QC TEST REQUIRED   NIL

    DISCIPLINE   TOPSIDE PIPING   SPECIAL PPE   NA

    JOB DESCRIPTION   To install / tie‐in 1" x 1/2" adapter spool and 1/2" monoflange SBB

    SYSTEM NUMBER   NA   TYPE OF PERMIT   CRITICAL PERMIT

    WORK LOCATION   WLDP‐A   WORK AREA  CELLAR DECK

    JOBCARD DETAILS

    TASK 

    NO  TASK DESCRIPTION TRADE

    WORK VOL.ACT MHRS

    Qty Unit Unit Total

    2 RS 2 pax 1 2

    21 RS 2 pax 1

    4 CS 1 pax 1 1

    QC 1 pax 1 1

    RS 1 pax 1 1

    8

    DIRECT MAN‐HOUR SUMMARY

    Contractor 

    Personnel

    CS FE QC RS BP FW TOTAL

    1 0 1 6 0 0   8.00

    TOTAL

    0 0 0 0 0 0

    VRNDT PT

    0.00

    8.00

     SPECIAL TOOLS, EQUIPMENTS AND CONSUMMABLES

    SPECIAL TOOLS AND EQUIPMENTS SPECIAL CONSUMMABLES

    Third Party 

    Personnel

    BT IS CC

    Qty UnitItems Descriptions Qty Unit Items Description

    Rev

    50‐PG05008

    ‐61440 1

    P‐0035 3

    STATUS

    3 RS 1 pax 1 1

    JOBCARD APPROVAL PREPARED BY APS(M) FEREVIEWED BY APS(M) CONSTRUCTION

    MANAGER

     ACCEPTED / APPRAISED BY PCSB-SKO

    REP

    STATUS

    JOBCARD COMPLETION RECORDED BY PCSB-SKO CSR ACCEPTED / APPRAISED BY PCSB-SKO OPERATIONS

  • 8/19/2019 Workpack for Punch List Close Out and Polymer Coupon Installation Rev. 0

    14/62

    PLAN. MHRS

    Break flange at five (5) polymer coupon tie‐in points at line no. 150‐PG‐05001‐61440

    Install and tie‐in / manual torque on five (5) polymer coupons at designated points

    Line walk to check leak test using snoop liquid at five (5) polymer coupon flange  joints

    Total, Direct Man‐hours

    REFERENCE DRAWINGS & DOCUMENTS

      Dwrg / Doc No Drawing / Document Title

    ISO Drawing

     of 

     Line

     No.

     150

    ‐PG05001

    ‐61440

    P&ID of  Line No. 150‐PG05001‐61440

      NOTES

    PROVISION FOR EPCIC FOR IFL™ TECHNOLOGY ‐ PL 221, PL 218, PL 238 AND PL 220

    PROJECT TITLE POLYMER COUPON INSTALLATION AND PUNCH LIST CLOSE OUT

    JOBCARD ID NO WLP‐A‐TS‐PC‐001

    SYSTEM DESC.   NA   QC TEST REQUIRED   NIL

    DISCIPLINE   TOPSIDE PIPING   SPECIAL PPE   NA

    JOB DESCRIPTION   To install / tie‐in five (5) 2" polymer coupons at line no. 150‐PG05001‐61440

    SYSTEM NUMBER   NA   TYPE OF PERMIT   CRITICAL PERMIT

    WORK LOCATION   WLP‐A   WORK AREA  CELLAR DECK

    JOBCARD DETAILS

    TASK 

    NO  TASK DESCRIPTION TRADE

    WORK VOL.ACT MHRS

    Qty Unit Unit Total

    2 RS 3 pax 2 6

    91 RS 3 pax 3

    3 CS 1 pax 2 2

    QC 1 pax 2 2

    RS 3 pax 2 2

    21

    DIRECT MAN‐HOUR SUMMARY

    Contractor 

    Personnel

    CS FE QC RS BP FW TOTAL

    2 0 2 17 0 0   21.00

    TOTAL

    0 0 0 0 0 0

    VRNDT PT

    0.00

    21.00

     SPECIAL TOOLS, EQUIPMENTS AND CONSUMMABLES

    SPECIAL TOOLS AND EQUIPMENTS SPECIAL CONSUMMABLES

    Third Party 

    Personnel

    BT IS CC

    Qty UnitItems Descriptions Qty Unit Items Description

    Rev

    150‐PG05001

    ‐61440 2

    B‐1004 3

    STATUS

    JOBCARD APPROVAL PREPARED BY APS(M) FEREVIEWED BY APS(M) CONSTRUCTION

    MANAGER

     ACCEPTED / APPRAISED BY PCSB-SKO

    REP

    STATUS

    JOBCARD COMPLETION RECORDED BY PCSB-SKO CSR ACCEPTED / APPRAISED BY PCSB-SKO OPERATIONS

  • 8/19/2019 Workpack for Punch List Close Out and Polymer Coupon Installation Rev. 0

    15/62

    PLAN. MHRS

    Break flange at PE 501 tie‐in point

    Tie‐in / manual torque on 2" x 1/2" NPTF monoflange DBB at PE 501 tie‐in point together 

    with IF kit

    Install pressure transmitter (PE 501) at 1/2" NPTF (Remarks: Unit Concept's work scope)

    Line walk to check leak test using snoop liquid at flange and thread  joint of  PE 501

    Total, Direct Man‐hours

    REFERENCE DRAWINGS & DOCUMENTS

      Dwrg / Doc No Drawing / Document Title

    ISO Drawing

     of 

     Line

     No.

     150

    ‐PG10001

    ‐61440X

    P&ID of  Line No. 150‐PG10001‐61440X

      NOTES

    PROVISION FOR EPCIC FOR IFL™ TECHNOLOGY ‐ PL 221, PL 218, PL 238 AND PL 220

    PROJECT TITLE POLYMER COUPON INSTALLATION AND PUNCH LIST CLOSE OUT

    JOBCARD ID NO WLP‐C‐TS‐PC‐001

    SYSTEM DESC.   NA   QC TEST REQUIRED   NIL

    DISCIPLINE   TOPSIDE PIPING   SPECIAL PPE   NA

    JOB DESCRIPTION   To install 2" x 1/2" NPTF monoflange DBB

    SYSTEM NUMBER   NA   TYPE OF PERMIT   CRITICAL PERMIT

    WORK LOCATION   WLP‐C   WORK AREA  CELLAR DECK

    JOBCARD DETAILS

    TASK 

    NO  TASK DESCRIPTION TRADE

    WORK VOL.ACT MHRS

    1 RS 2 pax 2 4

    Qty Unit Unit Total

    2 RS 2 pax 2 4

    4 CS 1 pax 1 1

    3 N/A pax

    QC 1 pax 1 1

    RS 2 pax 1 2

    12

    DIRECT MAN‐HOUR SUMMARY

    Contractor 

    Personnel

    CS FE QC RS BP FW TOTAL

    1 0 1 10 0 0   12.00

    TOTAL

    0 0 0 0 0 0

    VRNDT PT

    0.00

    12.00

     SPECIAL TOOLS, EQUIPMENTS AND CONSUMMABLES

    SPECIAL TOOLS AND EQUIPMENTS SPECIAL CONSUMMABLES

    Third Party 

    Personnel

    BT IS CC

    Qty UnitItems Descriptions Qty Unit Items Description

    Rev

    150‐PG10001

    ‐61440X 1

    B‐0033 3

    STATUS

    JOBCARD APPROVAL PREPARED BY APS(M) FEREVIEWED BY APS(M) CONSTRUCTION

    MANAGER

     ACCEPTED / APPRAISED BY PCSB-SKO

    REP

    STATUS

    JOBCARD COMPLETION RECORDED BY PCSB-SKO CSR ACCEPTED / APPRAISED BY PCSB-SKO OPERATIONS

  • 8/19/2019 Workpack for Punch List Close Out and Polymer Coupon Installation Rev. 0

    16/62

    PROVISION FOR EPCIC FOR IFLTM

      – PL 221, PL 218, PL 220, AND PL 238WORKPACK (PUNCH LIST CLOSE OUT AND POLYMER COUPON INSTALLATION)

    601401/3004/C/PRC/1055 REV 0 / FEB 2015

    4.0 MANPOWER MOBILIZATION PLAN / LOADING

  • 8/19/2019 Workpack for Punch List Close Out and Polymer Coupon Installation Rev. 0

    17/62

    PROVISION FOR EPCICFOR IFL™ ‐ PL 221, PL 218, PL 220 AND PL 238

    MANPOWER LOADING FOR POLYMER COUPON INSTALLATION AND PUNCH LIST CLOSE OUT

    9‐Mar 10‐Mar 11‐Mar 12‐Mar 13‐Mar 14‐Mar 15‐Mar 16‐Mar 17‐Mar 18‐Mar 19‐Mar 20‐Mar 21‐Mar 22‐Mar 23‐Mar

    A Location: WLP‐C

    1 Construction Superintendent 1 1 1 1

    2 Field Engineer 2 2 2 2

    3 G ener al Supervisor 1 1 1 1

    4 Painting Inspector 1 1 1 1

    5 Scaffolding Foreman cum Inspector 1 1 1 1

    6 Rigger Foreman 1 1 1 1

    7 Rigger / Scaffolder 4 4 4 4

    8 Painter 4 4 4 4

    B Location: WL‐4

    1 Construction Superintendent 1 1 1 0.5

    2 Field Engineer 2 2 2 1

    3 Ge ner al Supervisor 1 1 1 0.5

    4 Painting Inspector 1 1 1 0.5

    5 Scaffolding Foreman cum Inspector 1 1 1 0.5

    6 Rigger Foreman 1 1 1 0.5

    7 Rigger / Scaffolder 4 4 4 2

    8 Painter 4 4 4 2

    C Location: WLP‐A

    1 Construction Superintendent 0.5 0.5 0.5 0.5 0.5

    2 Field Engineer 1 1 1 1 1

    3 G ener al Supervisor 0.5 0.5 0.5 0.5 0.5

    4 Painting Inspector 0.5 0.5 0.5 0.5 0.5

    5 Scaffolding Foreman cum Inspector 0.5 0.5 0.5 0.5 0.5

    6 Rigger Foreman 0.5 0.5 0.5 0.5 0.5

    7 Rigger / Scaffolder 2 2 2 2 2

    8 Painter 2 2 2 2 2

    D Location: WLDP‐A

    1 Construction Superintendent 0.5 0.5 0.5 0.5 0.5 0.5

    2 Field Engineer 1 1 1 1 1 1

    3 G en er al Supervisor 0.5 0.5 0.5 0.5 0.5 0.5

    4 Painting Inspector 0.5 0.5 0.5 0.5 0.5 0.5

    5 Scaffolding Foreman cum Inspector 0.5 0.5 0.5 0.5 0.5 0.5

    6 Rigger Foreman 0.5 0.5 0.5 0.5 0.5 0.5

    7 Rigger / Scaffolder 2 2 2 2 2 2

    8 Painter 2 2 2 2 2 2

    E Location: WL‐123

    1 Construction Superintendent 1

    2 Field Engineer 2

    3 G ener al Supervisor 1

    4 Painting Inspector 1

    5 Scaffolding Foreman cum Inspector 1

    6 Rigger Foreman 1

    7 Rigger 

    Scaffolder 48 Painter 4

    F Location: WLDP‐B

    1 Construction Superintendent

    2 Field Engineer

    3 G ener al Supervisor

    4 Painting Inspector

    5 Scaffolding Foreman cum Inspector

    6 Rigger Foreman

    7 Rigger / Scaffolder

    8 Painter

    Total Manhours 0 15 15 15 15 15 15 15 15 15 15 15 15 15 15

    DESCRIPTION / CATEGORYITEM  Week 1 Week 2

  • 8/19/2019 Workpack for Punch List Close Out and Polymer Coupon Installation Rev. 0

    18/62

    PROVISION FOR EPCICFOR IFL™ ‐ PL 221, PL 218, PL 220 AND PL 238

    MANPOWER LOADING FOR POLYMER COUPON INSTALLATION AND PUNCH LIST CLOSE OUT

    A Location: WLP‐C

    1 Construction Superintendent

    2 Field Engineer

    3 G ener al Supervisor

    4 Painting Inspector

    5 Scaffolding Foreman cum Inspector

    6 Rigger Foreman

    7 Rigger / Scaffolder

    8 P ai nt er

    B Location: WL‐4

    1 Construction Superintendent

    2 Field Engineer

    3 G ener al Supervisor

    4 Painting Inspector

    5 Scaffolding Foreman cum Inspector

    6 Rigger Foreman

    7 Rigger / Scaffolder

    8 P ai nt er

    C Location: WLP‐A

    1 Construction Superintendent

    2 Field Engineer

    3 G ener al Supervisor

    4 Painting Inspector

    5 Scaffolding Foreman cum Inspector

    6 Rigger Foreman

    7 Rigger / Scaffolder

    8 P ai nt er

    D Location: WLDP‐A

    1 Construction Superintendent

    2 Field Engineer

    3 G ener al Supervisor

    4 Painting Inspector

    5 Scaffolding Foreman cum Inspector

    6 Rigger Foreman

    7 Rigger / Scaffolder

    8 P ai nt er

    E Location: WL‐123

    1 Construction Superintendent

    2 Field Engineer

    3 G ener al Supervisor

    4 Painting Inspector

    5 Scaffolding Foreman cum Inspector

    6 Rigger Foreman

    7 Rigger 

    Scaffolder8 P ai nt er

    F Location: WLDP‐B

    1 Construction Superintendent

    2 Field Engineer

    3 G ener al Supervisor

    4 Painting Inspector

    5 Scaffolding Foreman cum Inspector

    6 Rigger Foreman

    7 Rigger / Scaffolder

    8 P ai nt er

    Total Manhours

    DESCRIPTION / CATEGORYITEM

    pax 48

    pax 96

    pax 48

    pax 48

    pax 48

    pax 48

    pax 192

    pax 192

    pax 42pax 84

    pax 42

    pax 42

    pax 42

    pax 42

    pax 168

    pax 168

    pax 30

    pax 60

    pax 30

    pax 30

    pax 30

    pax 30

    pax 120

    pax 120

    pax 36

    pax 72

    pax 36

    pax 36

    pax 36

    pax 36

    pax 144

    pax 144

    pax 0

    pax 0

    pax 0

    pax 0

    pax 0

    pax 0

    pax 0pax 0

    pax 0

    pax 0

    pax 0

    pax 0

    pax 0

    pax 0

    pax 0

    pax 0

    pax 2340

    Un it T ota l MH

  • 8/19/2019 Workpack for Punch List Close Out and Polymer Coupon Installation Rev. 0

    19/62

    PROVISION FOR EPCIC FOR IFLTM

      – PL 221, PL 218, PL 220, AND PL 238WORKPACK (PUNCH LIST CLOSE OUT AND POLYMER COUPON INSTALLATION)

    601401/3004/C/PRC/1055 REV 0 / FEB 2015

    5.0 ERECTION MATERIAL TAKE-OFF (MTO)

  • 8/19/2019 Workpack for Punch List Close Out and Polymer Coupon Installation Rev. 0

    20/62

  • 8/19/2019 Workpack for Punch List Close Out and Polymer Coupon Installation Rev. 0

    21/62

    MR NO. DATE QTY UNIT RCVD QTY

    PROVISION FOR EPCICFOR IFL™ ‐ PL 221, PL 218, PL 220 AND PL 238ERECTION MATERIAL TAKE‐OFF (MTO) FOR POLYMER COUPON INSTALLATION AND PUNCH LIST CLOSE OUT

    MATERIAL REQUISITION

    DESCRIPTIONITEM  LOCATION / 

    PLATFORM  DRAWING NO. TAG NO.

    O/S QTY  RCVD 

    DATE 

    LABUAN / MIRI

    5 I‐rod, 6" x 11 mm thk WLP‐C 11/2/15 5 ea

    6 I‐rod, 2" x 11 mm thk WLP‐C 11/2/15 4 ea

    7 I‐rod, 6" x 11 mm thk WLDP‐A 11/2/15 6 ea

    8 I‐rod, 2" x 11 mm thk WLDP‐A 11/2/15 11 ea

    9 I‐rod, 6" x 11 mm thk WL‐123 11/2/15 1 ea

    10 I‐rod, 2" x 11 mm thk WL‐123 11/2/15 9 ea

    11 I‐rod,

     6"

     x 11

     mm

     thk WLDP

    ‐B 11/2/15 2 ea

    12 I‐rod, 2" x 11 mm thk WLDP‐B 11/2/15 6 ea

    F U‐Bolts

    1 U‐bolt c/w sleeve and 4 hex. nuts, for 6" pipe WLP‐A 11/2/15 3 ea

    2 U‐bolt c/w sleeve and 4 hex. nuts, for 2" pipe WLP‐A 11/2/15 10 ea

    3 U‐bolt c/w sleeve and 4 hex. nuts, for 6" pipe WL‐4 11/2/15 1 ea

    4 U‐bolt c/w sleeve and 4 hex. nuts, for 2" pipe WL‐4 11/2/15 12 ea

    5 U‐bolt c/w sleeve and 4 hex. nuts, for 6" pipe WLP‐C 11/2/15 5 ea

    6 U‐bolt c/w sleeve and 4 hex. nuts, for 2" pipe WLP‐C 11/2/15 4 ea

    7 U‐bolt c/w sleeve and 4 hex. nuts, for 6" pipe WLDP‐A 11/2/15 6 ea

    8 U‐bolt c/w sleeve and 4 hex. nuts, for 2" pipe WLDP‐A 11/2/15 11 ea

    9 U‐bolt c/w sleeve and 4 hex. nuts, for 6" pipe WL‐123 11/2/15 1 ea

    10 U‐bolt c/w sleeve and 4 hex. nuts, for 2" pipe WL‐123 11/2/15 9 ea

    11 U‐bolt c/w sleeve and 4 hex. nuts, for 6" pipe WLDP‐B 11/2/15 2 ea

    12 U‐bolt c/w sleeve and 4 hex. nuts, for 2" pipe WLDP‐B 11/2/15 6 ea

    G ICCP and corresponding fittings

    1 ICCP, single

     core,

     1C,

     25

     mm2 WLP

    ‐A 24/2/15 100 m

     lg

    2 Cable lugs WLP‐A 24/2/15 8 pcs

    3 Cable glands WLP‐A 24/2/15 4 pcs

  • 8/19/2019 Workpack for Punch List Close Out and Polymer Coupon Installation Rev. 0

    22/62

    PROVISION FOR EPCIC FOR IFLTM

      – PL 221, PL 218, PL 220, AND PL 238WORKPACK (PUNCH LIST CLOSE OUT AND POLYMER COUPON INSTALLATION)

    601401/3004/C/PRC/1055 REV 0 / FEB 2015

    6.0 EQUIPMENT, TOOLS AND CONSUMABLES LOADING

  • 8/19/2019 Workpack for Punch List Close Out and Polymer Coupon Installation Rev. 0

    23/62

  • 8/19/2019 Workpack for Punch List Close Out and Polymer Coupon Installation Rev. 0

    24/62

    PROVISION FOR EPCICFOR IFL™ ‐ PL 221, PL 218, PL 220 AND PL 238

    EQUIPMENT, TOOLS AND CONSUMABLES LOADING FOR POLYMER COUPON INSTALLATION AND PUNCH LIST CLOSE OUT

    A Cargo Carrying Unit

    1 Cargo Container 4' x 4' x 4' c/w 4 Legged Sling

    2 Cargo Basket 12' x 4' x 4' c/w 4 Legged Sling

    B Scaffolding Equipment

    1 Scaffolding c/w Clamps, Plank etc.

    C L ifting & Positioning Equipment

    1 Beam Clamp ‐ 3.0 MT

    2 Chain Block ‐ 1.5 MT

    3 Chain Block ‐ 3.0 MT

    4 Lever Block ‐ 1.5 MT

    5 Lever Block ‐ 3.0 MT

    6 W ebbi ng 

    Sling ‐

    1.5 

    MT7 W ebbi ng Sling ‐ 2.0 MT

    8 W ebbi ng Sling ‐ 3.0 MT

    9 Shackle s ‐ 1.5 MT

    10 Shackles ‐ 2.0 MT

    11 Shackles ‐ 3.0 MT

    1 2 Bo dy Harness

    D F it te r Tools of  Trade

    1 H amm er Wrench ‐ 22 mm

    2 H amm er Wrench ‐ 27 mm

    3 Combination Spanner ‐ Various Sizes

    4 M an ua l Torque Wrench ‐ 22 mm

    5 M an ua l Torque Wrench ‐ 27 mm

    6 C rowbar

    7 Imp act Hammer

    8 Drill Machine ‐ Battery Operated

    9 Screw Drivers ‐ Various Sizes

    E Consumables

    1 M ani la Rope, 5/8" 

    2 Mas ki ng Tape, 2"

    3 Te flo n Tape

    4 WD 40 ‐ 328 ml / can

    5 Sand Paper

    6 Co tt on Rag

    7 Dust Mask

    8 Scaffolder Gloves

    9 Snoop Test Detector ‐ 8 oz / bottle

    10 Polyken Tape, 4"

    11 Polyken Tape, 2"

    12 Grease

    13 Garbage Bag

    F  Paints and Related Consumables for Touch Up 

    Painting

    1 Jotun Hardtop AS White

    2 Jotun Hardtop AS Yellow

    3 Jotun Hardtop AS Black

    4 Jotun Hardtop AS Brown

    5 Jotun Hardtop AS Red

    6 T hi nner 606 

    7 Paint Roller Handle

    8 Spare Roller

    9 Paint Tray

    10 2" Paint Brush

    11 Sticker for Stencil

    12 Scrapper

    13 C oppe r Hand Brush

    G Sa fe ty Equipment

    1 Barricade Tape

    2 H2S EBS

    3 H2S Detector

    4 Wa lk ie Talkie

    5 First Aid Kit

    Total Quantity

    DESCRIPTION / CATEGORYITEM28‐Ma r 2 9‐Mar

    1

    1

    2

    2

    2

    2

    2

    2

    22

    2

    4

    4

    4

    6

    4

    4

    2

    2

    2

    1

    4

    1

    1

    1

    1

    2

    10

    200

    20

    2

    3

    1

    5

    5

    5

    2

    3

    3

    3

    1

    1

    2

    8

    3

    8

    10

    16

    8

    20

    3

    12

    17

    5

    2

    441

  • 8/19/2019 Workpack for Punch List Close Out and Polymer Coupon Installation Rev. 0

    25/62

    PROVISION FOR EPCIC FOR IFLTM

      – PL 221, PL 218, PL 220, AND PL 238WORKPACK (PUNCH LIST CLOSE OUT AND POLYMER COUPON INSTALLATION)

    601401/3004/C/PRC/1055 REV 0 / FEB 2015

    7.0 DETAIL WORK SCHEDULE

  • 8/19/2019 Workpack for Punch List Close Out and Polymer Coupon Installation Rev. 0

    26/62

  • 8/19/2019 Workpack for Punch List Close Out and Polymer Coupon Installation Rev. 0

    27/62

    ID Task Name Duration Start Finish

    61 Install missing U-bolts 1 day Thu 19/3/15 Fri 20/3/15

    62 Dismantle scaffolding 1 day Sat 21/3/15 Sun 22/3/15

    63 Backload to vessel 0.5 days Sun 22/3/15 Sun 22/3/15

    64 WL-123 3 days Sun 22/3/15 Wed 25/3/15

    65 Lifting scaffolding sets to WL-123 0.5 days Sun 22/3/15 Mon 23/3/15

    66 Rig up scaffolding at vent line no.50-VL00001-11440

    0.5 days Mon 23/3/15 Mon 23/3/15

    67 Stencil piping line no. and directional flow at line no.50-VL00001-11440, 50-VL00002-11440,50-PG00003-11440, 50-PG00004-11440,50-PG00005-11440, 50-PG00006-11440

    1 day Mon 23/3/15 Tue 24/3/15

    68 Wrap flange joints with Polyken Tape 1 day Mon 23/3/15 Tue 24/3/15

    69 Install i-rods at all pipe supports 1 day Mon 23/3/15 Tue 24/3/15

    70 Dismantle scaffolding 0.5 days Tue 24/3/15 Wed 25/3/15

    71 Backload to vessel 0.5 days Wed 25/3/15 Wed 25/3/15

    72 WLDP-B 3 days Wed 25/3/15 Sat 28/3/15

    73 Lifting scaffolding sets to WLDP-B 0.5 days Wed 25/3/15 Thu 26/3/15

    74 Rig up scaffolding 0.5 days Thu 26/3/15 Thu 26/3/15

    75 Stencil piping line no. and directional flow at line no.150-PG06001-61432, 80-VL06025-11440,150-PL06024-61432

    1 day Thu 26/3/15 Fri 27/3/15

    76 Install i-rods at all pipe supports 1 day Thu 26/3/15 Fri 27/3/15

    77 Dismantle scaffolding and load out to Labuan 1 day Fri 27/3/15 Sat 28/3/15

    T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T'15 8 Feb '15 15 Feb '15 22 Feb '15 1 Mar '15

    Task

    Progress

    Milestone

    Summary

    Rolled Up Task

    Rolled Up Milestone

    Rolled Up Progress

    Split

    External Tasks

    Project Summary

    Group By Summary

    Deadline

    Page 2

    Project: Schedule for Punch List CloseDate: Mon 2/3/15

  • 8/19/2019 Workpack for Punch List Close Out and Polymer Coupon Installation Rev. 0

    28/62

    PROVISION FOR EPCIC FOR IFLTM

      – PL 221, PL 218, PL 220, AND PL 238WORKPACK (PUNCH LIST CLOSE OUT AND POLYMER COUPON INSTALLATION)

    601401/3004/C/PRC/1055 REV 0 / FEB 2015

    8.0 PROJECT SPECIFIC PROCEDURES (PSP)

  • 8/19/2019 Workpack for Punch List Close Out and Polymer Coupon Installation Rev. 0

    29/62

  • 8/19/2019 Workpack for Punch List Close Out and Polymer Coupon Installation Rev. 0

    30/62

    PROVISION FOR EPCIC FOR IFLTM

      – PL 221, PL 218, PL 220, AND PL 238POLYMER COUPON INSTALLATION

    601401/3004/C/PRC/1056 REV 0 / FEB 2015

    A.  REVISION STATUS LOG 

    Amendment

    No.Page

    Effective

    DateDetails of Changes

    Updated

    By

    A1 All 23.02.15 Issued for Comments MAI

    0 Nil 02.03.15 Issued for Approval MAI

  • 8/19/2019 Workpack for Punch List Close Out and Polymer Coupon Installation Rev. 0

    31/62

    PROVISION FOR EPCIC FOR IFLTM

      – PL 221, PL 218, PL 220, AND PL 238POLYMER COUPON INSTALLATION

    601401/3004/C/PRC/1056 REV 0 / FEB 2015

    TABLE OF CONTENTS

    1.0  INTRODUCTION .............................................................................................................. 4 

    2.0 

    RESPONSIBILITY ............................................................................................................ 4 

    3.0  REFERENCES ................................................................................................................. 4 

    4.0  DEFINITIONS ................................................................................................................... 4 

    5.0  PROCEDURE DETAILS .................................................................................................. 5 

  • 8/19/2019 Workpack for Punch List Close Out and Polymer Coupon Installation Rev. 0

    32/62

    PROVISION FOR EPCIC FOR IFLTM

      – PL 221, PL 218, PL 220, AND PL 238POLYMER COUPON INSTALLATION

    601401/3004/C/PRC/1056 REV 0 / FEB 2015

    1.0 INTRODUCTION

    This procedure outlines the specific job steps only on pre-assemble and installation ofpolymer coupon at offshore. One (1) set of polymer coupon consists of parts as follows:

    a) 2” x 600# WNRF Flanged Access Fitting b) Heavy Duty Cover complete with Pressure Gaugec) Disk Rack Coupon Holder Body and Coverd) 10 nos of Disc Coupons

    Detail Material Take-Off (MTO) of Polymer Coupon assembly can be referred to Appendix A – Polymer Coupon General Arrangement Drawing

    2.0 RESPONSIBILITY

    2.1 Project Management Team (PMT)

      Briefly explain on the task to be done, expectation, safety precautions and adviseteam on technical requirements highlighted by client.

    2.2 General Supervisor

      Oversee installation activity from preparation to commissioning work in terms ofnecessity of scaffolding, manpower, ensure erection material availability andsufficiency.

    2.3 Rigger

      With respect to the onshore pre-assembly of the polymer coupon set, riggershall, by means of appropriate tools, tighten all the parts together and leave onlythe bolt tightening part that has to be done on site / offshore.

      Upon arrival of materials and erection of scaffolding, if necessary, for installationaccess, rigger is responsible to rig up the pre-assembled polymer coupon sets atthe designated area and subsequently tighten corresponding stud bolts at flange joints.

    3.0 REFERENCES

    3.1 CSP-13 - Bolt Tightening Procedure3.2 601401/3002/E/DOC/1007 - Specification for Polymer Coupon3.3 601401/3004/C/PRC/1023 - Scaffolding Procedure3.4 601401/3004/C/PRC/1046 - Leak Test Procedure

    4.0 DEFINITIONS

    CSP - Carigali Standard Procedure

    CSR - Client Site RepresentativeSOR - Site Operations Representative

  • 8/19/2019 Workpack for Punch List Close Out and Polymer Coupon Installation Rev. 0

    33/62

    PROVISION FOR EPCIC FOR IFLTM

      – PL 221, PL 218, PL 220, AND PL 238POLYMER COUPON INSTALLATION

    601401/3004/C/PRC/1056 REV 0 / FEB 2015

    5.0 PROCEDURE DETAILS

    5.1 Assembly of Polymer Coupon

    5.1.1 Polymer coupon is initially assembled onshore to minimize working activity offshoreduring shutdown window. All ten (10) polymer coupon sets, five (5) each for platformWLDP-A and WLP-A respectively, whose parts are tightened together with referenceof Polymer Coupon General Arrangement Drawing.

    5.1.2 All threads shall be applied with grease before installation in order to avoid corrosionthat may make them difficult to be loosened during disc coupon retrieving process.

    5.2 Installation of Polymer Coupon

    5.2.1 As provisions for polymer coupon tie-in, 6” pipe with 2” flangeolet has been fabricatedand installed on-site. Flange type connection gives an easier maintenance and disccoupon retrieving process rather than welded type.

    5.2.2 At all time, Personnel Protective Equipment (PPE) shall be put on to ensure safety ofpersonnel.

    5.2.3 Permit applicant shall prepare the Job Hazard Analysis (JHA) and Permit-To-Work(PTW). This shall be verified by CSR and approved by SOR of respective platformsprior to work execution.

    5.2.4 Scaffolding shall be erected when working at height. General Supervisor shall instructthe Rigger Foreman and team on exact task to be done and job area intended.

    5.2.5 Scaffolding erection shall be executed adhering to 601401/3004/C/PRC/1023  – Scaffolding Procedure

    5.2.6 Appointed riggers shall check on the tools availability and compatibility before use.Manual torque wrench with appropriate size is to be provided to tighten all stud boltsat flange joints as per CSP requirements.

    5.2.7 Prior to tightening the stud bolts, marking in-line with series of inlet bores of disc rackcoupon holder shall be prepared with permanent marker at visible location, preferablyat the heavy duty cover. This marking is anticipated to guide and ensure the inletbores are facing the product flow direction.

    5.2.8 All threads shall be applied with grease before installation in order to avoid corrosionthat may make them difficult to be loosened during disc coupon retrieving process.

    5.2.9 Pressure Gauge (PG) shall be installed with its dial facing towards readable andvisible position whereby it is easier for the Operations to take the reading.

    5.2.10 It is also to ensure that all polymer coupons are installed according to polymercoupon part / identification number as per isometric drawings. Identification plateshall be tied anywhere visible at the polymer coupon body using aluminium wire.

  • 8/19/2019 Workpack for Punch List Close Out and Polymer Coupon Installation Rev. 0

    34/62

    PROVISION FOR EPCIC FOR IFLTM

      – PL 221, PL 218, PL 220, AND PL 238POLYMER COUPON INSTALLATION

    601401/3004/C/PRC/1056 REV 0 / FEB 2015

    5.3 Service Leak Test

    5.3.1 During pre-commissioning and upon introduction of product, polymer coupon flangeand thread joints shall be tested with leak test liquid detector.

    5.3.2 Appointed QC Inspector shall execute the leak test and it is witnessed by client’srepresentative. Any built-up bubbles produced due to potential leaks shall be visuallymonitored and inspected for five (5) minutes.

    5.3.3 Details on leak test methods can be referred to 601401/3004/C/PRC/1046  –  LeakTest Procedure

    5.3.4 Upon completion of service leak test, area between mating flanges shall be filled upwith sufficient grease to protect stud bolts and gaskets. Flange joints are thenwrapped with Polyken Tape.

    5.4 Housekeeping

    5.4.1 Riggers are to make sure all unused erection materials, tools and consumables aresecured and well-kept in intended containers / packing. General Supervisor needs tocheck the cleanliness of working place before leaving the worksite.

    5.4.2 Housekeeping shall be done every end of the day and work completion.

  • 8/19/2019 Workpack for Punch List Close Out and Polymer Coupon Installation Rev. 0

    35/62

    PROVISION FOR EPCIC FOR IFLTM

      – PL 221, PL 218, PL 220, AND PL 238WORKPACK (PUNCH LIST CLOSE OUT AND POLYMER COUPON INSTALLATION)

    601401/3004/C/PRC/1055 REV 0 / FEB 2015

    9.0 JOB HAZARD ANALYSIS (JHA)

  • 8/19/2019 Workpack for Punch List Close Out and Polymer Coupon Installation Rev. 0

    36/62

     

    JOB HAZARD ANALYSIS [JHA] WORKSHEET

    HA NO. PTW NO WORK PERMIT TYPE HOT/ COLD

    ACILITY LOCATION SPECIFIC WORKSTATION

    QUIPMENT NO. WORKDESCRIPTION

    To conduct rigging and slinging work for lifting activity

    JOBSTEP

    DESCRIPTION OF JOB STEP POTENTIAL HAZARDPOTENTIAL

    CONSEQUENCESCONTROL BARRIERS ACTION PARTY RECOVERY BARRIERS ACTION PARTY

    age 1

    1 Preparation of PTW

      Fail to identify allthe potentialhazard associatedwith the activity

      Incident may occurand personnel may getinjured

    1.  Personnel applying the PTW musthave PTW training

    2.  Competent personnel to conduct theoperation

    1.  Constantly up-dating JHA

    2To conduct visual/pre inspection of

    lifting equipment

      Pinch point

      Sharp object

     

    Congested workingarea

      Pinch point

      Sharp object

     

    Congested workingarea

    1.  Ensure lifting accessoriestagged/marked with SWL, ID no,

    valid certificate and in good condition2.  Replace unsuitable lifting gear

    1.  Medical attention

    2. 

    Wear hand gloves

    3Barricade lifting area and put up

    lifting signage

      Congested workingarea

      Trespassing by 3rdparty.

      Finger injury

      Body injury1.

     

    To put up adequate signage2.

     

    Clear emergency escape route1.

     

    Proper communication2.

     

    Medical attention

    4Move load to be lifted to crane

    lifting radius/reach

      Manual handling  Heavy Equipment

      Dropped object

      Miscommunication

      Back injury / Musclespasm

      Hand injury

      Body injury

    1.  Use hand glove2.  Use “Buddy “ system and correct

    lifting technique3.   Aware of pinch point

    1. 

    Using proper PPE2.

     

    Standby first aid kit3.  Proper & clear communication

    5 To attach load to hook  Pinch point

      Sharp object  Finger injury 1.  Proper hooking and follow lifting

    procedure1.

     

    Medical attention2.  Wear hand gloves

    6 To lift up loads/equipment

       Adverse weather /rough sea

      Swinging load  Suspended load

      Load moves out ofcontrol

      Dropped objects /property damage

    1.  Do lifting during good weather2.   Assign banksman3.  Follow lifting procedure

    1.  Medical attention2.  Use proper PPE3.  Experienced banksman

    7Guide load to landing position

    (using tagline) & unhook load uponlanding

     

    Suspended load  Dropped objects  Swinging load

     

    Body injury  Struck by moving

    object

    1. 

    Do lifting during good weather2.  Follow lifting procedure

    1. 

    Wear hand gloves2.  Medical attention3.  Clear communication

    8 Housekeeping  Loose tools and

    materials scatteredat work area

      Slip, trip & fall1.  Ensure loosed tools & materials are

    removed & kept in proper place  – tool box/open tray

    1.  First aid2.  Restore work area to safe condition

  • 8/19/2019 Workpack for Punch List Close Out and Polymer Coupon Installation Rev. 0

    37/62

    age 2

    PRE-PREPARED JHA PREPARED BY

    DATE

    Name(s) Designation 

    JHA APPROVAL DURING PTW APPLICATION

    WORK LEADER APPROVED BY

    NAME NAME

    DESIGNATION DESIGNATION PRODUCTION SUPERVISOR / MAINTENANCE SUPERVISOR/OIM 

    SIGNATURE SIGNATURE

    DATE DATE

    ORK TEAM (CONFIRMATION THAT JHA HAS BEEN COMMUNICATED TO WORK TEAM AS PART OF PRE-JOB/TOOLBOX MEETING)

    Name(s) Designation Signature Name(s) Designation Signature

    JHA NO.

    PTW NO

    WORK PERMIT TYPE

    FACILITY

    LOCATION

    SPECIFIC WORKSITE

    EQUIPMENT NO.

    WORK DESCRIPTION

  • 8/19/2019 Workpack for Punch List Close Out and Polymer Coupon Installation Rev. 0

    38/62

    age 3

  • 8/19/2019 Workpack for Punch List Close Out and Polymer Coupon Installation Rev. 0

    39/62

     

    JOB HAZARD ANALYSIS [JHA] WORKSHEET 

    HA NO. e.g. 1234/JHA (JHA No. shall follow PTW No. f ollowed by ‘/JHA’) 

    PTW NO e.g. 1234 WORK PERMIT TYPE HOT/ COLD

    ACILITY (as written in PTW) LOCATION (as written in PTW) SPECIFIC WORKSTATION (as written in PTW)

    QUIPMENT NO. (as written in PTW) WORKDESCRIPTION

    Dismantling Of scaffolding

    NOTE.  JHA shall be applicable for all work activities which requires PTW..  The pre-prepared JHA and JHA prompters will be used as a reference/guide during the development of JHA..  Personnel carrying out the work shall be fully familiar with the written Work/Operating Procedures developed for the job. The Work/Operating Procedures shall describe, in step-by-step instructions, the correct method of executing the specified work..  Prior to commencement of work (after PTW has been approved), the task-specific JHA shall be discussed amongst all personnel involved in the execution; and requirements contained therein shall be fully understood and agreed by a ll involved

    personnel.

    age 1

    JOBSTEP

    DESCRIPTION OF JOB STEPPOTENTIAL

    HAZARDPOTENTIAL CONSEQUENCES CONTROL BARRIERS  ACTION PARTY RECOVERY BARRIERS  ACTION PARTY

    1Climb up ladder and scaffoldings

    that required to be dismantled.  Slip and fall   Personnel injury

    1.   Areas beneath platforms where equipmentor materials could fall will be provided withbarriers, nets or other equipment to protectpersons underneath or prevent personsaccessing hazardous areas.

    2. 

    Proper PPE (Safety Helmet, Safety Shoes,Safety Glass, Glove, safety harness)

    3.  Secure tool and equipment used4.  Barricade and signages5.  The use and storage of equipment and / or

    materials at height will be kept to aminimum.

    6.   All hand tools, portable electrical equipmentwill be secured such as to preventunintentional fall during storage and / oruse.

    7.   Areas beneath platforms where materialscould fall will be provided with barriers, netsor other equipment to protect personsunderneath or prevent persons accessingareas.

    1.  Medic/ First Aider onstandby

    2.  ERP

    2Remove securing tie-down wires

    and timber planks.

      Hand/finger caught

    in or struck by

    scaffold material.

      Personnel hand cuts

    1.   Areas beneath platforms where equipmentor materials could fall will be provided withbarriers, nets or other equipment to protectpersons underneath or prevent personsaccessing hazardous areas.

    2.  Proper PPE (Safety Helmet, Safety Shoes,Safety Glass, Glove, safety harness)

    3.  Secure tool and equipment used4.  Barricade and signages5.  The use and storage of equipment and / or

    materials at height will be kept to aminimum.

    6.   All hand tools, portable electrical equipmentwill be secured such as to preventunintentional fall during storage and / oruse.

    7. 

     Areas beneath platforms where materials

    1.  Medic/ First Aider onstandby

    2.  ERP

  • 8/19/2019 Workpack for Punch List Close Out and Polymer Coupon Installation Rev. 0

    40/62

    age 2

    JOBSTEP

    DESCRIPTION OF JOB STEPPOTENTIAL

    HAZARDPOTENTIAL CONSEQUENCES CONTROL BARRIERS  ACTION PARTY RECOVERY BARRIERS  ACTION PARTY

    could fall will be provided with barriers, netsor other equipment to protect personsunderneath or prevent persons accessingareas.

    3

    Handling and transfer of timber

    planks from height down to deck

    area.

      Timber slip and

    fall.  Personnel head injury

    1.   Areas beneath platforms where equipmentor materials could fall will be provided withbarriers, nets or other equipment to protectpersons underneath or prevent personsaccessing hazardous areas.

    2.  Proper PPE (Safety Helmet, Safety Shoes,Safety Glass, Glove, safety harness)

    3. 

    Secure tool and equipment used4.  Barricade and signages5.  The use and storage of equipment and / or

    materials at height will be kept to a

    minimum.6.   All hand tools, portable electrical equipmentwill be secured such as to preventunintentional fall during storage and / oruse.

    7.   Areas beneath platforms where materialscould fall will be provided with barriers, netsor other equipment to protect personsunderneath or prevent persons accessingareas.

    1.  Medic/ First Aider onstandby

    2. 

    ERP

    4Removing and handling of couplers

    and tubes at height.

      Off balance and fall

    from height, falling

    of tubes and

    couplers.

      Personnel severe injury

    1.   Areas beneath platforms where equipmentor materials could fall will be provided withbarriers, nets or other equipment to protectpersons underneath or prevent personsaccessing hazardous areas.

    2.  Proper PPE (Safety Helmet, Safety Shoes,Safety Glass, Glove, safety harness)

    3.  Secure tool and equipment used4.  Barricade and signages5.  The use and storage of equipment and / or

    materials at height will be kept to aminimum.

    6.   All hand tools, portable electrical equipmentwill be secured such as to prevent

    unintentional fall during storage and / oruse.

    7.   Areas beneath platforms where materialscould fall will be provided with barriers, netsor other equipment to protect personsunderneath or prevent persons accessingareas.

    1.  Medic/ First Aider onstandby

    2.  ERP

  • 8/19/2019 Workpack for Punch List Close Out and Polymer Coupon Installation Rev. 0

    41/62

    age 3

    JOBSTEP

    DESCRIPTION OF JOB STEPPOTENTIAL

    HAZARDPOTENTIAL CONSEQUENCES CONTROL BARRIERS  ACTION PARTY RECOVERY BARRIERS  ACTION PARTY

    5Remove the last main standards of

    scaffoldings

      Off balance and fall

    from height, falling

    of tubes and

    couplers.

      Personnel severe injury

    1.   Areas beneath platforms where equipmentor materials could fall will be provided withbarriers, nets or other equipment to protectpersons underneath or prevent personsaccessing hazardous areas.

    2.  Proper PPE (Safety Helmet, Safety Shoes,Safety Glass, Glove, safety harness)

    3.  Secure tool and equipment used4.  Barricade and signages5.  The use and storage of equipment and / or

    materials at height will be kept to aminimum.

    6.   All hand tools, portable electrical equipmentwill be secured such as to preventunintentional fall during storage and / oruse.

    7. 

     Areas beneath platforms where materialscould fall will be provided with barriers, netsor other equipment to protect personsunderneath or prevent persons accessingareas.

    1.  Medic/ First Aider onstandby

    2.  ERP

    6Manual handling of scaffolding

    material to laydown/storage area

      Hand / finger

    caught in or struck

    by scaffold

    material

      Personnel hand cuts

    1.   Areas beneath platforms where equipmentor materials could fall will be provided withbarriers, nets or other equipment to protectpersons underneath or prevent personsaccessing hazardous areas.

    2.  Proper PPE (Safety Helmet, Safety Shoes,Safety Glass, Glove, safety harness)

    3.  Secure tool and equipment used4.  Barricade and signages5.

     

    The use and storage of equipment and / ormaterials at height will be kept to aminimum.

    6.   All hand tools, portable electrical equipmentwill be secured such as to preventunintentional fall during storage and / oruse.

    7. 

     Areas beneath platforms where materialscould fall will be provided with barriers, nets

    or other equipment to protect personsunderneath or prevent persons accessingareas.

    1. 

    Medic/ First Aider onstandby

    2.  ERP

  • 8/19/2019 Workpack for Punch List Close Out and Polymer Coupon Installation Rev. 0

    42/62

    age 4

    JHA APPROVAL DURING PTW APPLICATION

    REVIEWED BY APPROVED BY

    NAME NAME

    DESIGNATION WORK LEADER   DESIGNATION PRODUCTION SUPERVISOR / MAINTENANCE SUPERVISOR  

    SIGNATURE SIGNATURE

    DATE DATE

     AFTER PTW HAS BEEN APPROVED 

    ORK TEAM (CONFIRMATION THAT JHA HAS BEEN COMMUNICATED TO WORK TEAM AS PART OF PRE-JOB/TOOLBOX MEETING - AFTER PTW HAS BEEN APPROVED)

    Name(s) Designation Signature Name(s) Designation Signature

    JHA NO.

    PTW NO

    WORK PERMIT TYPE

    FACILITY

    LOCATION

    SPECIFIC WORKSITE

    EQUIPMENT NO.

    WORK DESCRIPTION

  • 8/19/2019 Workpack for Punch List Close Out and Polymer Coupon Installation Rev. 0

    43/62

     

    JOB HAZARD ANALYSIS [JHA] WORKSHEET 

    HA NO. e.g. 1234/JHA (JHA No. shall follow PTW No. f ollowed by ‘/JHA’) 

    PTW NO e.g. 1234 WORK PERMIT TYPE HOT/ COLD

    ACILITY (as written in PTW) LOCATION (as written in PTW) SPECIFIC WORKSTATION (as written in PTW)

    QUIPMENT NO. (as written in PTW) WORKDESCRIPTION

    Erection and modification of scaffolding

    NOTE.  JHA shall be applicable for all work activities which requires PTW..  The pre-prepared JHA and JHA prompters will be used as a reference/guide during the development of JHA..  Personnel carrying out the work shall be fully familiar with the written Work/Operating Procedures developed for the job. The Work/Operating Procedures shall describe, in step-by-step instructions, the correct method of executing the specified work..  Prior to commencement of work (after PTW has been approved), the task-specific JHA shall be discussed amongst all personnel involved in the execution; and requirements contained therein shall be fully understood and agreed by a ll involved

    personnel.

    age 1

    JOBSTEP

    DESCRIPTION OF JOB STEPPOTENTIAL

    HAZARDPOTENTIAL CONSEQUENCES CONTROL BARRIERS  ACTION PARTY RECOVERY BARRIERS  ACTION PARTY

    1Inspect the site where the scaffolds

    to be erected.  Trip and fall   Personnel injury

    1.  Use handrail when going up/down Stairway2.   Areas beneath platforms where equipment

    or materials could fall will be provided withbarriers, nets or other equipment to protectpersons underneath or prevent personsaccessing hazardous areas.

    3.  Proper PPE (Safety Helmet, Safety Shoes,Safety Glass, Glove, safety harness)

    4.  Secure tool and equipment used5.

     

    Barricade and signages6.

     

    The use and storage of equipment and / ormaterials at height will be kept to aminimum.

    7.   All hand tools, portable electrical equipmentwill be secured such as to preventunintentional fall during storage and / oruse.

    8. 

     Areas beneath platforms where materialscould fall will be provided with barriers,nets or other equipment to protect personsunderneath or prevent persons accessingareas.

    1.  Medic/ First Aider onstandby

    2.  ERP

    2Sort out the scaffold material

    needed for the job.

      Hand / finger caught

    or struck by

      Scaffold materials

      Personnel injury

    1.   Areas beneath platforms where equipmentor materials could fall will be provided withbarriers, nets or other equipment to protectpersons underneath or prevent personsaccessing hazardous areas.

    2.  Proper PPE (Safety Helmet, Safety Shoes,Safety Glass, Glove, safety harness)

    3.  Secure tool and equipment used4.  Barricade and signages5.  The use and storage of equipment and / or

    materials at height will be kept to aminimum.

    6.   All hand tools, portable electrical equipmentwill be secured such as to preventunintentional fall during storage and / oruse.

    7. 

     Areas beneath platforms where materials

    1.  Medic/ First Aider onstandby

    2.  ERP

  • 8/19/2019 Workpack for Punch List Close Out and Polymer Coupon Installation Rev. 0

    44/62

    age 2

    JOBSTEP

    DESCRIPTION OF JOB STEPPOTENTIAL

    HAZARDPOTENTIAL CONSEQUENCES CONTROL BARRIERS  ACTION PARTY RECOVERY BARRIERS  ACTION PARTY

    could fall will be provided with barriers,nets or other equipment to protect personsunderneath or prevent persons accessingareas.

    3Manual transfer of scaffold

    materials to the desired locations.

      Trip and fall.

      Excessive weight

      Personnel injury

      Equipment Damage

    1.  Use handrail when going up/down Stairway2.   Areas beneath platforms where equipment

    or materials could fall will be provided withbarriers, nets or other equipment to protectpersons underneath or prevent personsaccessing hazardous areas.

    3.  Proper PPE (Safety Helmet, Safety Shoes,Safety Glass, Glove, safety harness)

    4.  Secure tool and equipment used5.  Barricade and signages6.  The use and storage of equipment and / or

    materials at height will be kept to aminimum.

    7.   All hand tools, portable electrical equipmentwill be secured such as to preventunintentional fall during storage and / oruse.

    8. 

     Areas beneath platforms where materialscould fall will be provided with barriers,nets or other equipment to protect personsunderneath or prevent persons accessingareas.

    1.  Medic/ First Aider onstandby

    2. 

    ERP

    4

    Scaffolders climb up / down

    structure and prepare to secure

    anchoring foundation.

      Fall from height   Personnel injury

    1.   Areas beneath platforms where equipmentor materials could fall will be provided withbarriers, nets or other equipment to protectpersons underneath or prevent personsaccessing hazardous areas.

    2. 

    Proper PPE (Safety Helmet, Safety Shoes,Safety Glass, Glove, safety harness)

    3.  Secure tool and equipment used4.  Barricade and signages5.  The use and storage of equipment and / or

    materials at height will be kept to aminimum.

    6.   All hand tools, portable electrical equipment

    will be secured such as to preventunintentional fall during storage and / oruse.

    7.   Areas beneath platforms where materialscould fall will be provided with barriers,nets or other equipment to protect personsunderneath or prevent persons accessingareas.

    1.  Medic/ First Aider onstandby

    2.  ERP

  • 8/19/2019 Workpack for Punch List Close Out and Polymer Coupon Installation Rev. 0

    45/62

    age 3

    JOBSTEP

    DESCRIPTION OF JOB STEPPOTENTIAL

    HAZARDPOTENTIAL CONSEQUENCES CONTROL BARRIERS  ACTION PARTY RECOVERY BARRIERS  ACTION PARTY

    5

    Handling of scaffolding tubes,

    couplers and others fittings at

    height.

      Falling objects  Personnel injury

      Equipment Damage

    1.   Areas beneath platforms where equipmentor materials could fall will be provided withbarriers, nets or other equipment to protectpersons underneath or prevent personsaccessing hazardous areas.

    2.  Proper PPE (Safety Helmet, Safety Shoes,Safety Glass, Glove, safety harness)

    3.  Secure tool and equipment used4.  Barricade and signages5.  The use and storage of equipment and / or

    materials at height will be kept to aminimum.

    6.   All hand tools, portable electrical equipmentwill be secured such as to preventunintentional fall during storage and / oruse.

    7. 

     Areas beneath platforms where materialscould fall will be provided with barriers,nets or other equipment to protect personsunderneath or prevent persons accessingareas.

    1.  Medic/ First Aider onstandby

    2.  ERP

    6Scaffolders set out tubes (erect)

    and tighten couplers in place

      Off balance and fall

    from height

      Personnel injury

      Equipment Damage

    1.   Areas beneath platforms where equipmentor materials could fall will be provided withbarriers, nets or other equipment to protectpersons underneath or prevent personsaccessing hazardous areas.

    2.  Proper PPE (Safety Helmet, Safety Shoes,Safety Glass, Glove, safety harness)

    3.  Secure tool and equipment used4.

     

    Barricade and signages5.  The use and storage of equipment and / or

    materials at height will be kept to aminimum.

    6.   All hand tools, portable electrical equipmentwill be secured such as to preventunintentional fall during storage and / oruse.

    7.   Areas beneath platforms where materialscould fall will be provided with barriers,

    nets or other equipment to protect personsunderneath or prevent persons accessingareas.

    1.  Medic/ First Aider onstandby

    2.  ERP

    7Handling of scaffolding timbers at

    height

      Off balance and fall

    from height

      Excessive weight

      Personnel injury

      Equipment Damage

    1.   Areas beneath platforms where equipmentor materials could fall will be provided withbarriers, nets or other equipment to protectpersons underneath or prevent personsaccessing hazardous areas.

    2.  Proper PPE (Safety Helmet, Safety Shoes,Safety Glass, Glove, safety harness)

    3.  Secure tool and equipment used4.  Barricade and signages5.  The use and storage of equipment and / or

    materials at height will be kept to a

    1.  Medic/ First Aider onstandby

    2.  ERP

  • 8/19/2019 Workpack for Punch List Close Out and Polymer Coupon Installation Rev. 0

    46/62

    age 4

    JOBSTEP

    DESCRIPTION OF JOB STEPPOTENTIAL

    HAZARDPOTENTIAL CONSEQUENCES CONTROL BARRIERS  ACTION PARTY RECOVERY BARRIERS  ACTION PARTY

    minimum.6.   All hand tools, portable electrical equipment

    will be secured such as to preventunintentional fall during storage and / oruse.

    7.   Areas beneath platforms where materialscould fall will be provided with barriers,nets or other equipment to protect personsunderneath or prevent persons accessingareas.

    8

    Install ladder for safe access,

    inspect and display ‘scaff tag’ at the

    accepted bays

      Finger injuries

      Trip and fall  Personnel injury

    1.   Areas beneath platforms where equipmentor materials could fall will be provided withbarriers, nets or other equipment to protectpersons underneath or prevent personsaccessing hazardous areas.

    2. 

    Proper PPE (Safety Helmet, Safety Shoes,

    Safety Glass, Glove, safety harness)3.  Secure tool and equipment used4.  Barricade and signages5.  The use and storage of equipment and / or

    materials at height will be kept to aminimum.

    6. 

     All hand tools, portable electrical equipmentwill be secured such as to preventunintentional fall during storage and / oruse.

    7.   Areas beneath platforms where materialscould fall will be provided with barriers,nets or other equipment to protect personsunderneath or prevent persons accessingareas.

    1.  Medic/ First Aider onstandby

    2.  ERP

  • 8/19/2019 Workpack for Punch List Close Out and Polymer Coupon Installation Rev. 0

    47/62

    age 5

    JHA APPROVAL DURING PTW APPLICATION

    REVIEWED BY APPROVED BY

    NAME NAME

    DESIGNATION WORK LEADER   DESIGNATION PRODUCTION SUPERVISOR / MAINTENANCE SUPERVISOR  

    SIGNATURE SIGNATURE

    DATE DATE

     AFTER PTW HAS BEEN APPROVED 

    ORK TEAM (CONFIRMATION THAT JHA HAS BEEN COMMUNICATED TO WORK TEAM AS PART OF PRE-JOB/TOOLBOX MEETING - AFTER PTW HAS BEEN APPROVED)

    Name(s) Designation Signature Name(s) Designation Signature

    JHA NO.

    PTW NO

    WORK PERMIT TYPE

    FACILITY

    LOCATION

    SPECIFIC WORKSITE

    EQUIPMENT NO.

    WORK DESCRIPTION

  • 8/19/2019 Workpack for Punch List Close Out and Polymer Coupon Installation Rev. 0

    48/62

     

    JOB HAZARD ANALYSIS [JHA] WORKSHEET 

    HA NO. e.g. 1234/JHA (JHA No. shall follow PTW No. f ollowed by ‘/JHA’) 

    PTW NO e.g. 1234 WORK PERMIT TYPE HOT/ COLD

    ACILITY (as written in PTW) LOCATION (as written in PTW) SPECIFIC WORKSTATION (as written in PTW)

    QUIPMENT NO. (as written in PTW) WORKDESCRIPTION

    Installation of bolted pipe spools

    NOTE.  JHA shall be applicable for all work activities which requires PTW..  The pre-prepared JHA and JHA prompters will be used as a reference/guide during the development of JHA..  Personnel carrying out the work shall be fully familiar with the written Work/Operating Procedures developed for the job. The Work/Operating Procedures shall describe, in step-by-step instructions, the correct method of executing the specified work..  Prior to commencement of work (after PTW has been approved), the task-specific JHA shall be discussed amongst all personnel involved in the execution; and requirements contained therein shall be fully understood and agreed by all involved

    personnel.

    age 1

    JOBSTEP

    DESCRIPTION OF JOB STEP POTENTIAL HAZARDPOTENTIAL

    CONSEQUENCESCONTROL BARRIERS  ACTION PARTY RECOVERY BARRIERS  ACTION PARTY

    1Handling and erection of pipe

    spools

      Hand / finger caught

    in or struck

      by pipe spools

      Personnel injury

    1.  Foreman to ensure handling of pipe spool iswell coordinated.

    2.  Proper PPE (safety helmet, safety shoes,safety glass, gloves, wear double lanyardsafety harness /work vest)

    1. First aider

    2. Medivac

    2 Working overboard   Slip / fall   Personnel injury

    1.  Standby man2.  Proper PPE (safety helmet, safety shoes,

    safety glass, gloves, wear double lanyardsafety harness /work vest)

    1. First aider

    2. Medivac

    3

    Fit & box-up flange connection of

    pipe support in the right orientation

    & position

      Hand / finger caught

    in or struck by pipe

    spools

      Personnel injury

    1.  Foreman to ensure handling of pipe spool iswell coordinated.

    2.  Proper PPE (safety helmet, safety shoes,safety glass, gloves, wear double lanyardsafety harness /work vest)

    1. First aider

    2. Medivac

      Trip and fall   Personnel injury

    1.  Watch out of any tripping hazards.2.  Plan the route.3.  Proper PPE (safety helmet, safety shoes,

    safety glass, gloves, wear double lanyardsafety harness /work vest)

    1. First aider

    2. Medivac

    4Rigging & stringing line pipe

    support into position

      Hand / finger caught

    in or struck by pipe

    spools

      Personnel injury

    1.  Foreman to ensure handling of pipe spool iswell coordinated.

    2.  Use chain block to rig/pull the pipe spools3.  Proper PPE (safety helmet, safety shoes,

    safety glass, gloves, wear double lanyardsafety harness /work vest)

    1. First aider

    2. Medivac

      Excessive weight of

    pipe support  Personnel injury

    1.  Carry reasonable weight and not excessive

    1. First aider

    2. Medivac

  • 8/19/2019 Workpack for Punch List Close Out and Polymer Coupon Installation Rev. 0

    49/62

    age 2

    JHA APPROVAL DURING PTW APPLICATION

    REVIEWED BY APPROVED BY

    NAME NAME

    DESIGNATION WORK LEADER   DESIGNATION PRODUCTION SUPERVISOR / MAINTENANCE SUPERVISOR  

    SIGNATURE SIGNATURE

    DATE DATE

     AFTER PTW HAS BEEN APPROVED 

    ORK TEAM (CONFIRMATION THAT JHA HAS BEEN COMMUNICATED TO WORK TEAM AS PART OF PRE-JOB/TOOLBOX MEETING - AFTER PTW HAS BEEN APPROVED)

    Name(s) Designation Signature Name(s) Designation Signature

    JHA NO.

    PTW NO

    WORK PERMIT TYPE

    FACILITY

    LOCATION

    SPECIFIC WORKSITE

    EQUIPMENT NO.

    WORK DESCRIPTION

  • 8/19/2019 Workpack for Punch List Close Out and Polymer Coupon Installation Rev. 0

    50/62

     

    JOB HAZARD ANALYSIS [JHA] WORKSHEET 

    HA NO. e.g. 1234/JHA (JHA No. shall follow PTW No. f ollowed by ‘/JHA’) 

    PTW NO e.g. 1234 WORK PERMIT TYPE HOT/ COLD

    ACILITY (as written in PTW) LOCATION (as written in PTW) SPECIFIC WORKSTATION (as written in PTW)

    QUIPMENT NO. (as written in PTW) WORKDESCRIPTION

    Touch-up Painting 

    NOTE.  JHA shall be applicable for all work activities which requires PTW..  The pre-prepared JHA and JHA prompters will be used as a reference/guide during the development of JHA..  Personnel carrying out the work shall be fully familiar with the written Work/Operating Procedures developed for the job. The Work/Operating Procedures shall describe, in step-by-step instructions, the correct method of executing the specified work..  Prior to commencement of work (after PTW has been approved), the task-specific JHA shall be discussed amongst all personnel involved in the execution; and requirements contained therein shall be fully understood and agreed by all involved

    personnel.

    age 1

    JOBSTEP

    DESCRIPTION OF JOB STEP POTENTIAL HAZARDPOTENTIAL

    CONSEQUENCESCONTROL BARRIERS  ACTION PARTY RECOVERY BARRIERS  ACTION PARTY

    1 Preparation of PTW  Miscommunication

     

    Work area not prepared

    for safe execution

      Personal injury

      Property damage

    1. 

    To carry out site visit before start work toensure location of the scaffolding

    2.  To ensure permit is available before startwork

    3.  Perform toolbox talk and brief the activitiesto staffs

    4. 

     All workers shall possess EOSP cards

    2 Working at height   Falling from height

      Tool falling

     

    Personal injury

      Equipment damage

    1.  Only scaffolds with green tag are allowed tobe used

    2.  Full body safety harness complete withdouble lanyards are to be worn whenworking 2m or more above ground level ontemporary or unguarded platforms and shallensure 100% tie off.

    3.  Surrounding ground area shall be barricadedwith signage.

    4.  To use tray to keep tools / materials fallingfrom height.

    1.  Medic/ First Aider onstandby

    2.  ERP

    3 Touch-up painting work   Fume inhalation

     

    Fire / explosion

      Personal injury

      Health issue

     

    Equipment damage

    1.  To wear proper PPE such as dust mask toprotect from fume on top of mandatory PPE.

    2.  To wear hand gloves.3.  To barricade work area with proper signage.4.

     

    To store paint material and ensure they areaway from source of ignition with properbarricade.

    1.  Medic/ First Aider onstandby

    2. 

    ERP

    4 General housekeeping  Tripping

      Personal injury

     

    Equipment damage

    1.  To separate schedule waster and generalwaste.

    2.  To clear surrounding debris before, duringand after the activities.

    3.  To clear or eliminate any slippery surfacebefore work commencement.

    4.  Material shall be properly kept at one (1)location and barricaded to prevent accidentalentrance and tripping.

    5.  Storage area shall be barricaded withsignage.

    1.  Medic/ First Aider onstandby

    2.  ERP

  • 8/19/2019 Workpack for Punch List Close Out and Polymer Coupon Installation Rev. 0

    51/62

    age 2

    JOBSTEP

    DESCRIPTION OF JOB STEP POTENTIAL HAZARDPOTENTIAL

    CONSEQUENCESCONTROL BARRIERS  ACTION PARTY RECOVERY BARRIERS  ACTION PARTY

    5 Close PTW 

    Miscommunication  Personnel injury

      Equipment damage

    1.  To ensure proper housekeeping.2.  To sign off the PTW after work completion.

  • 8/19/2019 Workpack for Punch List Close Out and Polymer Coupon Installation Rev. 0

    52/62

    age 3

    JHA APPROVAL DURING PTW APPLICATION

    REVIEWED BY APPROVED BY

    NAME NAME

    DESIGNATION WORK LEADER   DESIGNATION PRODUCTION SUPERVISOR / MAINTENANCE SUPERVISOR  

    SIGNATURE SIGNATURE

    DATE DATE

     AFTER PTW HAS BEEN APPROVED 

    ORK TEAM (CONFIRMATION THAT JHA HAS BEEN COMMUNICATED TO WORK TEAM AS PART OF PRE-JOB/TOOLBOX MEETING - AFTER PTW HAS BEEN APPROVED)

    Name(s) Designation Signature Name(s) Designation Signature

    JHA NO.

    PTW NO

    WORK PERMIT TYPE

    FACILITY

    LOCATION

    SPECIFIC WORKSITE

    EQUIPMENT NO.

    WORK DESCRIPTION

  • 8/19/2019 Workpack for Punch List Close Out and Polymer Coupon Installation Rev. 0

    53/62

    PROVISION FOR EPCIC FOR IFLTM

      – PL 221, PL 218, PL 220, AND PL 238WORKPACK (PUNCH LIST CLOSE OUT AND POLYMER COUPON INSTALLATION)

    601401/3004/C/PRC/1055 REV 0 / FEB 2015

    10.0 APPENDIX

  • 8/19/2019 Workpack for Punch List Close Out and Polymer Coupon Installation Rev. 0

    54/62

  • 8/19/2019 Workpack for Punch List Close Out and Polymer Coupon Installation Rev. 0

    55/62

  • 8/19/2019 Workpack for Punch List Close Out and Polymer Coupon Installation Rev. 0

    56/62

  • 8/19/2019 Workpack for Punch List Close Out and Polymer Coupon Installation Rev. 0

    57/62

  • 8/19/2019 Workpack for Punch List Close Out and Polymer Coupon Installation Rev. 0

    58/62

  • 8/19/2019 Workpack for Punch List Close Out and Polymer Coupon Installation Rev. 0

    59/62

  • 8/19/2019 Workpack for Punch List Close Out and Polymer Coupon Installation Rev. 0

    60/62

  • 8/19/2019 Workpack for Punch List Close Out and Polymer Coupon Installation Rev. 0

    61/62

  • 8/19/2019 Workpack for Punch List Close Out and Polymer Coupon Installation Rev. 0

    62/62


Recommended