Works for construcƟon of the road secƟon Norra Lanken 2007-SE-12090-P • Part of Priority Project 12 T his project, as part of the Nordic Triangle railway/road axis (Priority Project 12), concerns Norra Länken, the northern link of the ring road (E20) of Stockholm. It encompasses approximately 11 km between Norrtull and Värtan (Frihamnen/Värta- hamnen) and consists mainly of the execuƟon of nine concrete or rock tunnels and an interchange in Värtan, supplemented by the necessary trac management and telecommunicaƟons installaƟons. The project will lead to a beƩer quality infrastructure, safer and more ecient transport, and a beƩer mulƟmodal link between road and sea. Access and mobility will also improve due to increased road network capacity through the dual tunnel and surface road secƟon. Road safety will also be improved thanks to the diversion of vehicles into tunnels in which there is no oncoming trac. The Mid-Term evaluaƟon conrmed the very good progress made so far by the project, which can be recommended as a model. The main reasons for this progress lie in the robust monitoring system in place, the well performing risk management mechanism, as well as the long term strategy for eciency and results. Good performance has also been noƟced in minimis- ing the environmental impact of the project. The project is expected to be completed in 2013 in line with the original plans. Commission Decision: C(2008)7910 Member States involved: Sweden ImplementaƟon schedule Start date: June 2007 End date: December 2013 EsƟmated end year: 2013 Budget: Total project cost: €986,000,000 EU contribuƟon: €56,150,000 NaƟonal budget: €929,850,000 Percentage of EU support: Works: 5.69% The Mid Term evaluaƟon conrmed the very goo MAP Review 89
Transcript
Page 1: Works for construc on of the road sec on Norra Lanken...Norra Lanken 2007-SE-12090-P • Part of Priority Project 12 MAP Review *Rounded fi gures 986.0 1,009.2 1,009.2 0 200 400 600

Works for construc on of the road sec on Norra Lanken

2007-SE-12090-P • Part of Priority Project 12

This project, as part of the Nordic Triangle railway/road axis (Priority Project 12), concerns Norra Länken, the northern link of the ring road (E20) of Stockholm. It encompasses approximately 11 km between Norrtull and Värtan (Frihamnen/Värta-

hamnen) and consists mainly of the execu on of nine concrete or rock tunnels and an interchange in Värtan, supplemented by the necessary traffi c management and telecommunica ons installa ons.

The project will lead to a be er quality infrastructure, safer and more effi cient transport, and a be er mul modal link between road and sea. Access and mobility will also improve due to increased road network capacity through the dual tunnel and surface road sec on. Road safety will also be improved thanks to the diversion of vehicles into tunnels in which there is no oncoming traffi c.

The Mid-Term evalua on confi rmed the very good progress made so far by the project, which can be recommended as a model. The main reasons for this progress lie in the robust monitoring system in place, the well performing risk management mechanism, as well as the long term strategy for effi ciency and results. Good performance has also been no ced in minimis-ing the environmental impact of the project. The project is expected to be completed in 2013 in line with the original plans.

Commission Decision:C(2008)7910Member States involved:Sweden

Implementa on scheduleStart date: June 2007End date: December 2013Es mated end year: 2013

Budget: Total project cost: €986,000,000EU contribu on: €56,150,000 Na onal budget: €929,850,000

Percentage of EU support: Works: 5.69%

The Mid Term evalua on confirmed the very goo

MAP Review

89

Page 2: Works for construc on of the road sec on Norra Lanken...Norra Lanken 2007-SE-12090-P • Part of Priority Project 12 MAP Review *Rounded fi gures 986.0 1,009.2 1,009.2 0 200 400 600

Works for construc on of the road sec on Norra Lanken

2007-SE-12090-P • Part of Priority Project 12

MAP Review

*Rounded fi gures

986.0

1,009.21,009.2

0

200

400

600

800

1,000

1,200

End2010

End2011

End2012

End2013

Planned, updated and revised cumulative costs (€ Million)*

Planned costs (Decision) Revised costs (MAP review) Updated costs (as reported by the beneficiary)

56.2

56.2

0

10

20

30

40

50

60

End2010

End2011

End2012

End2013

Planned and revised cumulative TEN-T contribution (€ Million)*

Planned TEN-T contribution (Decision) Revised planned TEN-T contribution (MAP review)

When the updated plans are confi rmed by the review, the curve of the updated costs reported by the benefi ciary overlaps the curve of the revised costs (MAP review)For comparison purposes, the updated and revised cost es mates are based on the exchange rate in force at the me of the Decision