+16 FT.
- 30 FT.
- 14 FT.
± 0 FT.
+ 30 FT.
+ 44 FT.
+ 58 FT.
+ 72 FT.
+ 86 FT.
L5
L6
Roof
L4
L3
L2
L1
LG
B1
+ 90 FT.Detail 01
Detail 02
New Student Health Center of USC Graduate Studio| Spring 201301
Raised Flooring
Wood Ceiling
Glazing Railing Panel
Outdoor Wood Flooring
Grid Ceiling
Steel Truss
Heating Tube
Wood Panel
Sandstone Panel
Stud Wall w/ Insulation
Openable Window
Vertical Timber Wings
HVAC Duct w/ Terminal
Sandstone Panel
Concrete BlockSteel Coping
Wings Hinge
Aluminum Frame
Aluminum Frame
Aluminum Frame
Aluminum Frame
Steel Column
Glazing Door
Dirt Filter
Double Layer Low-E Glass
Opaque Glazing w/ Insulation
Sunblind Rotated Louver
Aluminum Frame
Raised Flooring
Louver Connector
Gravel
Metal Coping
Double Layer Low-E Glass
Suspended Ceiling
Rotated Louvers
Steel Connector
+ 30 FT.
+ 16 FT.
+ 11 FT.
+ 26 FT.
+ 26.5 FT.
+ 19 FT.
Gravel
Ceiling
+ 58 FT.+ 72 FT.
+ 54 FT.
+ 81 FT.+ 67 FT.
+ 81.5 FT.+ 67.5 FT.
+ 61 FT.+ 75 FT.
+ 86 FT.
+ 90 FT.
+ 72 FT.
+ 86 FT.
+ 90 FT.
+ 82 FT.
i=2% Slope - 14 FT.
+ 16 FT.
+ 11 FT.+ 11 FT.
Raised Flooring
Wood Ceiling
Glazing Railing Panel
Outdoor Wood Flooring
Grid Ceiling
Steel Truss
Heating Tube
Wood Panel
Sandstone Panel
Stud Wall w/ Insulation
Openable Window
Vertical Timber Wings
HVAC Duct w/ Terminal
Sandstone Panel
Concrete BlockSteel Coping
Wings Hinge
Aluminum Frame
Aluminum Frame
Aluminum Frame
Aluminum Frame
Steel Column
Glazing Door
Dirt Filter
Double Layer Low-E Glass
Opaque Glazing w/ Insulation
Sunblind Rotated Louver
Aluminum Frame
Raised Flooring
Louver Connector
Gravel
Metal Coping
Double Layer Low-E Glass
Suspended Ceiling
Rotated Louvers
Steel Connector
+ 30 FT.
+ 16 FT.
+ 11 FT.
+ 26 FT.
+ 26.5 FT.
+ 19 FT.
Gravel
Ceiling
+ 58 FT.+ 72 FT.
+ 54 FT.
+ 81 FT.+ 67 FT.
+ 81.5 FT.+ 67.5 FT.
+ 61 FT.+ 75 FT.
+ 86 FT.
+ 90 FT.
+ 72 FT.
+ 86 FT.
+ 90 FT.
+ 82 FT.
i=2% Slope - 14 FT.
+ 16 FT.
+ 11 FT.+ 11 FT.
Raised Flooring
Wood Ceiling
Glazing Railing Panel
Outdoor Wood Flooring
Grid Ceiling
Steel Truss
Heating Tube
Wood Panel
Sandstone Panel
Stud Wall w/ Insulation
Openable Window
Vertical Timber Wings
HVAC Duct w/ Terminal
Sandstone Panel
Concrete BlockSteel Coping
Wings Hinge
Aluminum Frame
Aluminum Frame
Aluminum Frame
Aluminum Frame
Steel Column
Glazing Door
Dirt Filter
Double Layer Low-E Glass
Opaque Glazing w/ Insulation
Sunblind Rotated Louver
Aluminum Frame
Raised Flooring
Louver Connector
Gravel
Metal Coping
Double Layer Low-E Glass
Suspended Ceiling
Rotated Louvers
Steel Connector
+ 30 FT.
+ 16 FT.
+ 11 FT.
+ 26 FT.
+ 26.5 FT.
+ 19 FT.
Gravel
Ceiling
+ 58 FT.+ 72 FT.
+ 54 FT.
+ 81 FT.+ 67 FT.
+ 81.5 FT.+ 67.5 FT.
+ 61 FT.+ 75 FT.
+ 86 FT.
+ 90 FT.
+ 72 FT.
+ 86 FT.
+ 90 FT.
+ 82 FT.
i=2% Slope - 14 FT.
+ 16 FT.
+ 11 FT.+ 11 FT.
Raised Flooring
Wood Ceiling
Glazing Railing Panel
Outdoor Wood Flooring
Grid Ceiling
Steel Truss
Heating Tube
Wood Panel
Sandstone Panel
Stud Wall w/ Insulation
Openable Window
Vertical Timber Wings
HVAC Duct w/ Terminal
Sandstone Panel
Concrete BlockSteel Coping
Wings Hinge
Aluminum Frame
Aluminum Frame
Aluminum Frame
Aluminum Frame
Steel Column
Glazing Door
Dirt Filter
Double Layer Low-E Glass
Opaque Glazing w/ Insulation
Sunblind Rotated Louver
Aluminum Frame
Raised Flooring
Louver Connector
Gravel
Metal Coping
Double Layer Low-E Glass
Suspended Ceiling
Rotated Louvers
Steel Connector
+ 30 FT.
+ 16 FT.
+ 11 FT.
+ 26 FT.
+ 26.5 FT.
+ 19 FT.
Gravel
Ceiling
+ 58 FT.+ 72 FT.
+ 54 FT.
+ 81 FT.+ 67 FT.
+ 81.5 FT.+ 67.5 FT.
+ 61 FT.+ 75 FT.
+ 86 FT.
+ 90 FT.
+ 72 FT.
+ 86 FT.
+ 90 FT.
+ 82 FT.
i=2% Slope - 14 FT.
+ 16 FT.
+ 11 FT.+ 11 FT.
1
3
2 1
1
4
56
7
9
10
10
8
1 create balcony,terrace and courtyard to access to nature
2 90 percent of rooms have nature daylight
3 cantiliver canopy provides shadow for entrance
4 double-layer low-E glass buffer the noise, isulate cool air and gain heat in winter / the transparent facade also maximize the south view
5 horizontal louver system provide shading for south
6 vertical timber rotated louvers for west and east shading
7 roof cover integrated with solar panels
8 passive chilled-beam cooling system
9 radiant heating coiling embed in the flooring
10 natural ventilation by convention and air chimney
space envelope air
SS Credit 7.1/9.1/9.2 | IEQ Credit 8.1/8.2 *
EA Credit 2 | IEQ Credit 2/6.1/8.1/8.2 *
IEQ Credit 1/7 * * LEED for Healthcare 2009
open tobelow
open tobelow
staffbreaking
nurseclinic
soiled ster
rehab gym
changing
changing
gaitanalysis clean supply
treatment
treatment
treatment
treatment
treatment exam office exam exam office exam
workstationofficeofficeofficeworkstation
conferenceroom
office
bath quiteroom
forensicexam
receptionworkstation
waitingarea
sky garden
Floor Plan
Section
Diagram
Facade Section
Space Envelope Energy Strategies
Exterior
Entrance
Sky Graden
To BMTParking
Recep.
Janitor
AdiministrationZone
PrivateResident
SharingResident
SharingResident
FamilySuite
GrievingRoom
Multi-Sensory
MECH
ActivityRoom
Pet Sleep
N.S.N.S. STO.
Egress
Library DayRoom
Healing Gerden
SPA
LockerRoom
Fine ArtsTherapy
Pool
Up
CommunityRoom
MedicineRoom
H.K.
BridgeMediationPavillion Chapel
SecurityOffice
LockerRoom
BreakRoom
MECH
Dining Hall
Living Room Lobby
DN.
Office
C B A
C B A
D
E
D
E
Drop-Off
Hospice of Western North Carolina at Asheville Graduate Studio| Fall 2012
Floor Plan Level 1
Diagram
Resident Room
Balcony
Chapel02
Volume Courtyard Public Space Integrated
site
ENTRY
LOBBY
DN.
1
F
E
D
C
B
A
2
34
5
1
F
E
D
C
B
A
2
34
5
1
F
E
D
C
B
A
2
34
5
IMMERSIONTHEATER
IMMERSIONRM 木
IMMERSIONRM 火
IMMERSIONRM 金
STAFFENTRY
EXIT
IMMERSIONRM 土
IMMERSIONRM 月
STO.
TECH.CONTROL
RECEPTION
DIRECTOR
PANTRY
OFFICE
WAITINGLOUNGE
PATIO
ART GALLERY
ARTSTO.
Bath M
Bath F
MECH.
UP
HK.
MECH.
IMMERSIONRM 水
IMMERSIONRM 日
a
c
d
b
c
d
a
b
- 16’ -0”
Floor Plan
Diagram
West Facade Immersion Theater
Art Gallery
Reception Lounge
Facade Model Duke Foundation of Immersion Art Pavillion Graduate Studio| Fall 201203
Patient Room
Floor Plan
Footwall Explorsive
Interior Rendering
Footwall Mockup
Footwall Build
Section
Patient Room Prototype Design and Buil Graduate Studio| Spring 201204