+ All Categories
Home > Documents > Works Sample_Shuo Yang

Works Sample_Shuo Yang

Date post: 26-Mar-2016
Category:
Upload: shuo-yang
View: 214 times
Download: 2 times
Share this document with a friend
Description:
 
Popular Tags:
6
M.Arch,Assoc.AIA,LEED AP BD+C SHUO YANG selected works
Transcript

M.Arch,Assoc.AIA,LEED AP BD+C

SHUO YANG se lected works

+16 FT.

- 30 FT.

- 14 FT.

± 0 FT.

+ 30 FT.

+ 44 FT.

+ 58 FT.

+ 72 FT.

+ 86 FT.

L5

L6

Roof

L4

L3

L2

L1

LG

B1

+ 90 FT.Detail 01

Detail 02

New Student Health Center of USC Graduate Studio| Spring 201301

Raised Flooring

Wood Ceiling

Glazing Railing Panel

Outdoor Wood Flooring

Grid Ceiling

Steel Truss

Heating Tube

Wood Panel

Sandstone Panel

Stud Wall w/ Insulation

Openable Window

Vertical Timber Wings

HVAC Duct w/ Terminal

Sandstone Panel

Concrete BlockSteel Coping

Wings Hinge

Aluminum Frame

Aluminum Frame

Aluminum Frame

Aluminum Frame

Steel Column

Glazing Door

Dirt Filter

Double Layer Low-E Glass

Opaque Glazing w/ Insulation

Sunblind Rotated Louver

Aluminum Frame

Raised Flooring

Louver Connector

Gravel

Metal Coping

Double Layer Low-E Glass

Suspended Ceiling

Rotated Louvers

Steel Connector

+ 30 FT.

+ 16 FT.

+ 11 FT.

+ 26 FT.

+ 26.5 FT.

+ 19 FT.

Gravel

Ceiling

+ 58 FT.+ 72 FT.

+ 54 FT.

+ 81 FT.+ 67 FT.

+ 81.5 FT.+ 67.5 FT.

+ 61 FT.+ 75 FT.

+ 86 FT.

+ 90 FT.

+ 72 FT.

+ 86 FT.

+ 90 FT.

+ 82 FT.

i=2% Slope - 14 FT.

+ 16 FT.

+ 11 FT.+ 11 FT.

Raised Flooring

Wood Ceiling

Glazing Railing Panel

Outdoor Wood Flooring

Grid Ceiling

Steel Truss

Heating Tube

Wood Panel

Sandstone Panel

Stud Wall w/ Insulation

Openable Window

Vertical Timber Wings

HVAC Duct w/ Terminal

Sandstone Panel

Concrete BlockSteel Coping

Wings Hinge

Aluminum Frame

Aluminum Frame

Aluminum Frame

Aluminum Frame

Steel Column

Glazing Door

Dirt Filter

Double Layer Low-E Glass

Opaque Glazing w/ Insulation

Sunblind Rotated Louver

Aluminum Frame

Raised Flooring

Louver Connector

Gravel

Metal Coping

Double Layer Low-E Glass

Suspended Ceiling

Rotated Louvers

Steel Connector

+ 30 FT.

+ 16 FT.

+ 11 FT.

+ 26 FT.

+ 26.5 FT.

+ 19 FT.

Gravel

Ceiling

+ 58 FT.+ 72 FT.

+ 54 FT.

+ 81 FT.+ 67 FT.

+ 81.5 FT.+ 67.5 FT.

+ 61 FT.+ 75 FT.

+ 86 FT.

+ 90 FT.

+ 72 FT.

+ 86 FT.

+ 90 FT.

+ 82 FT.

i=2% Slope - 14 FT.

+ 16 FT.

+ 11 FT.+ 11 FT.

Raised Flooring

Wood Ceiling

Glazing Railing Panel

Outdoor Wood Flooring

Grid Ceiling

Steel Truss

Heating Tube

Wood Panel

Sandstone Panel

Stud Wall w/ Insulation

Openable Window

Vertical Timber Wings

HVAC Duct w/ Terminal

Sandstone Panel

Concrete BlockSteel Coping

Wings Hinge

Aluminum Frame

Aluminum Frame

Aluminum Frame

Aluminum Frame

Steel Column

Glazing Door

Dirt Filter

Double Layer Low-E Glass

Opaque Glazing w/ Insulation

Sunblind Rotated Louver

Aluminum Frame

Raised Flooring

Louver Connector

Gravel

Metal Coping

Double Layer Low-E Glass

Suspended Ceiling

Rotated Louvers

Steel Connector

+ 30 FT.

+ 16 FT.

+ 11 FT.

+ 26 FT.

+ 26.5 FT.

+ 19 FT.

Gravel

Ceiling

+ 58 FT.+ 72 FT.

+ 54 FT.

+ 81 FT.+ 67 FT.

+ 81.5 FT.+ 67.5 FT.

+ 61 FT.+ 75 FT.

+ 86 FT.

+ 90 FT.

+ 72 FT.

+ 86 FT.

+ 90 FT.

+ 82 FT.

i=2% Slope - 14 FT.

+ 16 FT.

+ 11 FT.+ 11 FT.

Raised Flooring

Wood Ceiling

Glazing Railing Panel

Outdoor Wood Flooring

Grid Ceiling

Steel Truss

Heating Tube

Wood Panel

Sandstone Panel

Stud Wall w/ Insulation

Openable Window

Vertical Timber Wings

HVAC Duct w/ Terminal

Sandstone Panel

Concrete BlockSteel Coping

Wings Hinge

Aluminum Frame

Aluminum Frame

Aluminum Frame

Aluminum Frame

Steel Column

Glazing Door

Dirt Filter

Double Layer Low-E Glass

Opaque Glazing w/ Insulation

Sunblind Rotated Louver

Aluminum Frame

Raised Flooring

Louver Connector

Gravel

Metal Coping

Double Layer Low-E Glass

Suspended Ceiling

Rotated Louvers

Steel Connector

+ 30 FT.

+ 16 FT.

+ 11 FT.

+ 26 FT.

+ 26.5 FT.

+ 19 FT.

Gravel

Ceiling

+ 58 FT.+ 72 FT.

+ 54 FT.

+ 81 FT.+ 67 FT.

+ 81.5 FT.+ 67.5 FT.

+ 61 FT.+ 75 FT.

+ 86 FT.

+ 90 FT.

+ 72 FT.

+ 86 FT.

+ 90 FT.

+ 82 FT.

i=2% Slope - 14 FT.

+ 16 FT.

+ 11 FT.+ 11 FT.

1

3

2 1

1

4

56

7

9

10

10

8

1 create balcony,terrace and courtyard to access to nature

2 90 percent of rooms have nature daylight

3 cantiliver canopy provides shadow for entrance

4 double-layer low-E glass buffer the noise, isulate cool air and gain heat in winter / the transparent facade also maximize the south view

5 horizontal louver system provide shading for south

6 vertical timber rotated louvers for west and east shading

7 roof cover integrated with solar panels

8 passive chilled-beam cooling system

9 radiant heating coiling embed in the flooring

10 natural ventilation by convention and air chimney

space envelope air

SS Credit 7.1/9.1/9.2 | IEQ Credit 8.1/8.2 *

EA Credit 2 | IEQ Credit 2/6.1/8.1/8.2 *

IEQ Credit 1/7 * * LEED for Healthcare 2009

open tobelow

open tobelow

staffbreaking

nurseclinic

soiled ster

rehab gym

changing

changing

gaitanalysis clean supply

treatment

treatment

treatment

treatment

treatment exam office exam exam office exam

workstationofficeofficeofficeworkstation

conferenceroom

office

bath quiteroom

forensicexam

receptionworkstation

waitingarea

sky garden

Floor Plan

Section

Diagram

Facade Section

Space Envelope Energy Strategies

Exterior

Entrance

Sky Graden

To BMTParking

Recep.

Janitor

AdiministrationZone

PrivateResident

SharingResident

SharingResident

FamilySuite

GrievingRoom

Multi-Sensory

MECH

ActivityRoom

Pet Sleep

N.S.N.S. STO.

Egress

Library DayRoom

Healing Gerden

SPA

LockerRoom

Fine ArtsTherapy

Pool

Up

CommunityRoom

MedicineRoom

H.K.

BridgeMediationPavillion Chapel

SecurityOffice

LockerRoom

BreakRoom

MECH

Dining Hall

Living Room Lobby

DN.

Office

C B A

C B A

D

E

D

E

Drop-Off

Hospice of Western North Carolina at Asheville Graduate Studio| Fall 2012

Floor Plan Level 1

Diagram

Resident Room

Balcony

Chapel02

Volume Courtyard Public Space Integrated

site

ENTRY

LOBBY

DN.

1

F

E

D

C

B

A

2

34

5

1

F

E

D

C

B

A

2

34

5

1

F

E

D

C

B

A

2

34

5

IMMERSIONTHEATER

IMMERSIONRM 木

IMMERSIONRM 火

IMMERSIONRM 金

STAFFENTRY

EXIT

IMMERSIONRM 土

IMMERSIONRM 月

STO.

TECH.CONTROL

RECEPTION

DIRECTOR

PANTRY

OFFICE

WAITINGLOUNGE

PATIO

ART GALLERY

ARTSTO.

Bath M

Bath F

MECH.

UP

HK.

MECH.

IMMERSIONRM 水

IMMERSIONRM 日

a

c

d

b

c

d

a

b

- 16’ -0”

Floor Plan

Diagram

West Facade Immersion Theater

Art Gallery

Reception Lounge

Facade Model Duke Foundation of Immersion Art Pavillion Graduate Studio| Fall 201203

Patient Room

Floor Plan

Footwall Explorsive

Interior Rendering

Footwall Mockup

Footwall Build

Section

Patient Room Prototype Design and Buil Graduate Studio| Spring 201204

Facade Model

Courtyard Rendering

Courtyard RederingFacade Section

Elevation

Floor Plan

China Life R&D Center Professional Work| 2009 - 201005


Recommended