+ All Categories
Home > Documents > Workshop - HERUG 2019

Workshop - HERUG 2019

Date post: 18-Dec-2021
Category:
Upload: others
View: 1 times
Download: 0 times
Share this document with a friend
56
Workshop S/4 HANA - Added Value by Enterprise Architecture Management“ 22ND International SAP HERUG Conference – TU Berlin – 16 May 2019
Transcript

4.53

1.54

2.32

4.61

Workshop

„S/4 HANA - Added Value by Enterprise Architecture Management“

22ND International SAP HERUG Conference – TU Berlin – 16 May 2019

LET´S GET STARTED!

4.53

1.54

2.32

4.61

Speakers

Markus GRONERAD SCHEER – Management Consulting

3

Dirk SCHOSSIGSCHEER - HE&R

Michael WILMESTU BERLIN – Strategic SAP Initiatives

Julian WÖSTESCHEER – SAP Consulting

International SAP HERUG Conference 2019 – TU Berlin | Workshop : S/4HANA - Added Value by Enterprise Architecture Management 16 May 2016

4.53

1.54

2.32

4.61

4

14:00 16:00

StartWarm-Up Workout

Welcome

Intro

What is EAM?

EAM + S/4HANA

Scenario

Excercises

Summary

Q&A / next steps

Closing

Agenda

International SAP HERUG Conference 2019 – TU Berlin | Workshop : S/4HANA - Added Value by Enterprise Architecture Management 16 May 2016

4.53

1.54

2.32

4.61

INTRO

4.53

1.54

2.32

4.61

Stakeholder & IT-systems of universities

6 International SAP HERUG Conference 2019 – TU Berlin | Workshop : S/4HANA - Added Value by Enterprise Architecture Management 16 May 2016

4.53

1.54

2.32

4.61

SCHEER. Architect of future-proof SAP-solutions for HE&R

7 16 May 2016International SAP HERUG Conference 2019 – TU Berlin | Workshop : S/4HANA - Added Value by Enterprise Architecture Management

4.53

1.54

2.32

4.61

SCHEER. S/4HANA-implementation methodology

8

✓ Define SAP- and S/4HANA-strategy

✓ Check & optimize IT / SAP, processes, organisation

✓ Define SAP-deployment (cloud / on-prem) &

S/4HANA-migration szenario (green, brown, blue)

✓ Plan S/4HANA-Roadmap / -project

✓ Execute S/4HANA-Migration

✓ Complete SAP-project (for all

migration szenarios) with project

plan, project organization, etc.,

✓ Average duration: 6 mths – 2 yts.

✓ S/4/HANA-

Operations

✓ S/4HANA

Application

Support

now Jan. 2026*

*31.12.2025 – current end of SAP ERP / ECC maintenance

16 May 2016International SAP HERUG Conference 2019 – TU Berlin | Workshop : S/4HANA - Added Value by Enterprise Architecture Management

S/4 HANA-Assessment / preliminary

study (HANA-Strategy, Business Case,

Analysis, Roadmap)

Conce

ption

Imple

mentat

ion

Change Management / Qualification

Project Management

4.53

1.54

2.32

4.61

SCHEER. Service offering for your S/4HANA-implementation

9

S/4 HANA-Assessment / preliminary

study (HANA-Strategy, Business Case,

Analysis, Roadmap)

Conce

ption

Imple

mentat

ion

Change Management / Qualification

Tried and tested Scheer modell: S/4 HANA preliminary study, S/4 HANA implementation & migration

Process driven Scheer university master: Preconfiguered SAP S/4 HANA reference system with university business processes

Documented Knowledge: Templates, SAP concepts, customizing / development doc., training material, test cases

16 May 2016International SAP HERUG Conference 2019 – TU Berlin | Workshop : S/4HANA - Added Value by Enterprise Architecture Management

Project Management

4.53

1.54

2.32

4.61

SCHEER. Process-driven SAP S/4HANA-master for HE&R

Reliability & acceleration for your SAP S/4HANA-implementation!

10

▪ Concept

▪ Documentation

▪ Templates

▪ PM-Tools

▪ Preconfigured SAP S/4 HANA

university reference system

▪ Extensive data bank with

university reference processes

▪ Scheer process-driven SAP:

Proven modell for process

driven SAP implementation

Professional Concept Migration concept Customizing documentation Test concept Training documents templates

University-reference-processes SAP S/4 HANA-university-reference-system

Scheer process-driven for SAP;

Integration of methods, content and tools

16 May 2016International SAP HERUG Conference 2019 – TU Berlin | Workshop : S/4HANA - Added Value by Enterprise Architecture Management

4.53

1.54

2.32

4.61

SCHEER. Process-driven SAP S/4HANA-master for HE&R

SAP S/4HANA HE&R reference-system

HE&R reference-process-architecture / models

Process-driven SAP Implementation methodology

Individual SAP

S/4HANA-solution

Templates, documents, blueprints, etc.

Fundament & guidance for your specific SAP S/4HANA-solution!

University-specific

SAP S/4HANA-system

11 16 May 2016International SAP HERUG Conference 2019 – TU Berlin | Workshop : S/4HANA - Added Value by Enterprise Architecture Management

Scheer process-based SAP

implementation methodology

Scheer SAP S/4

HE-Master

4.53

1.54

2.32

4.61

WHAT IS ENTERPRISE ARCHITECTURE MANAGEMENT (EAM)?

4.53

1.54

2.32

4.61

What is Enterprise Architecture (Management)?

13 16 May 2016International SAP HERUG Conference 2019 – TU Berlin | Workshop : S/4HANA - Added Value by Enterprise Architecture Management

4.53

1.54

2.32

4.61

Enterprise Architecture Management …

▪ ensures controled changes of the IT-architecture

▪ is a holistic approach

▪ is flexible: allows both - strategic proceeding and local optimisation

▪ allows an target-oriented change in the IT landscape (aligned to strategy and rules)

▪ provides transparency

▪ describes the interaction between business (processes) and IT = business-IT-alignment

EAM helps to achieve objectives, to keep the overview and to steer to the target.

14

Benefits of Enterprise Architecture Management

What is Enterprise Architecture (Management)?

16 May 2016International SAP HERUG Conference 2019 – TU Berlin | Workshop : S/4HANA - Added Value by Enterprise Architecture Management

4.53

1.54

2.32

4.61

15

What is Enterprise Architecture (Management)?

EAM procedere model – TOGAF* ADM

▪ The ADM (Architecture

Development Method) shows

how to proceed with

architecture changes

▪ It considers different layers,

governance, dependencies etc.

▪ But: It is not easy to

understand for a layperson

* TOGAF is the most common EAM framework.

16 May 2016International SAP HERUG Conference 2019 – TU Berlin | Workshop : S/4HANA - Added Value by Enterprise Architecture Management

4.53

1.54

2.32

4.61

16

What is Enterprise Architecture (Management)?

EAM procedere model – lean SCHEER project approach

Input

• Key Success Factors

University

• Strategy University

• SWOT of EA – BU*

Result

• EA Objectives

• Analyse IT-layers

• SWOT of EA – by

IT Department

• Consider business

requirements

• Processes

• Data

• Applications

• Technology

• Consider EA governance / rules

• Consider crucial requirements

• Consider complete landscape /

dependencies

• EA Operations

• EA Support

• EA Change

Management

EAM-Strategy EAM-Analysis EAM-Design EAM-Realisation EAM-Operations

* Managers / Key Users of the Business Units do the SWOT analysis of the University‘ s EA

16 May 2016International SAP HERUG Conference 2019 – TU Berlin | Workshop : S/4HANA - Added Value by Enterprise Architecture Management

4.53

1.54

2.32

4.61

17

EA diagrams – examples (1/5) – University process map*

What is Enterprise Architecture (Management)?

SCHEER SAP

S/4HANA-master

for HE&R

* The figure shows the first layer. Second layer shows all processes of process areas and layer three and four detailed processes with process steps.

16 May 2016International SAP HERUG Conference 2019 – TU Berlin | Workshop : S/4HANA - Added Value by Enterprise Architecture Management

4.53

1.54

2.32

4.61

18

EA diagrams* – examples (2/5) – Application landscape

What is Enterprise Architecture (Management)?

* The diagrams help to better document, analyse and design the IT-architecture: „a picture is worth a thousand words”.

16 May 2016International SAP HERUG Conference 2019 – TU Berlin | Workshop : S/4HANA - Added Value by Enterprise Architecture Management

4.53

1.54

2.32

4.61

19

EA diagrams – examples (3/5) – Process support map

What is Enterprise Architecture (Management)?

16 May 2016International SAP HERUG Conference 2019 – TU Berlin | Workshop : S/4HANA - Added Value by Enterprise Architecture Management

4.53

1.54

2.32

4.61

20

EA diagrams – examples (4/5) – data flow diagram

What is Enterprise Architecture (Management)?

16 May 2016International SAP HERUG Conference 2019 – TU Berlin | Workshop : S/4HANA - Added Value by Enterprise Architecture Management

4.53

1.54

2.32

4.61

21

EA diagrams – examples (5/5) – IT infrastructure core components

What is Enterprise Architecture (Management)?

16 May 2016International SAP HERUG Conference 2019 – TU Berlin | Workshop : S/4HANA - Added Value by Enterprise Architecture Management

4.53

1.54

2.32

4.61

HOW CAN EAM BOOST YOUR S/4HANA-IMPLEMENTATION?

4.53

1.54

2.32

4.61

Strong connection between EAM and S/4HANA!

23

EAM

SAP*

* The SAP procedure model fits into the general EAM model, which is more extensive and gives rules.

16 May 2016International SAP HERUG Conference 2019 – TU Berlin | Workshop : S/4HANA - Added Value by Enterprise Architecture Management

4.53

1.54

2.32

4.61

▪ Use a holistic approach and work lean

▪ Take care of Business-IT-alignment (consider strategy, crucial IT requirements…)

▪ Consider all layers of EA (Business processes … technology) and consider

dependencies

▪ Do process harmonisation / standardisation

▪ Optimize master data management

▪ Optimize research information and research data system

▪ Use full potential of SAP and non-SAP

24

Principles for effective S/4 migration:

Not just upgrade to S/4, make use of full EAM potential! Do an effective lean EAM to add value!

16 May 2016International SAP HERUG Conference 2019 – TU Berlin | Workshop : S/4HANA - Added Value by Enterprise Architecture Management

4.53

1.54

2.32

4.61

THE WORKOUT!

4.53

1.54

2.32

4.61

26

Workout-Scenario (1/2)

S/4HANA-Migration @ BIG CIVIC University (BCU)MISSION

BCU decided to migrate from SAP ECC to S/4HANA.

You, the BCU-S/4-Team, suggested not only to migrate the

current SAP to the new release S/4HANA one-to-one.

You follow an EAM-based approach and want to consider the

full range of HANA & also the non-SAP application landscape,

to do optimization, standardization and to expand a solution for

research management, which is existing only rudimentary today.

Additionally, you suggest to implement an Enterprise Service

Bus (SAP Process Orchestration) for better integration.

INITIAL

16 May 2016International SAP HERUG Conference 2019 – TU Berlin | Workshop : S/4HANA - Added Value by Enterprise Architecture Management

4.53

1.54

2.32

4.61

27

Workout-Scenario (2/2)

S/4HANA-Migration @ BIG CIVIC UniversityMISSION

Create project-plan for S/4HANA-Migration!

Consider a EAM-based approach!

Analyze the as-is-IT-architecture!

Design the to-be-IT-/ SAP-landscape!

TASKs

16 May 2016International SAP HERUG Conference 2019 – TU Berlin | Workshop : S/4HANA - Added Value by Enterprise Architecture Management

4.53

1.54

2.32

4.61

Task 1 / 2: Create EAM-based-project-plan for S/4HANA

28

Strategy Analysis Design Realisation Operation

16 May 2016International SAP HERUG Conference 2019 – TU Berlin | Workshop : S/4HANA - Added Value by Enterprise Architecture Management

4.53

1.54

2.32

4.61

Task 3: Analyze the as-is-IT-architecture!

16 May 201629

Strategy Analysis Design Realisation Operation

EAM-Strategy

International SAP HERUG Conference 2019 – TU Berlin | Workshop : S/4HANA - Added Value by Enterprise Architecture Management

4.53

1.54

2.32

4.61

30

Task 3: Results of phase “EAM-Strategy” - Example

16 May 2016International SAP HERUG Conference 2019 – TU Berlin | Workshop : S/4HANA - Added Value by Enterprise Architecture Management

Key Success Factors of University

• Good research

• Top reputation

Strategy of the University

• Attract more sponsors/funding

• Foster research data and information

EA objectives

• Standardised and centralised application landscape, e.g. use of

SAP

• Implement EA governance processes and EA board

4.53

1.54

2.32

4.61

Task 3: Analyze the as-is-IT-architecture!

31

Strategy Analysis Design Realisation Operation

As-is IT-

Architecture

16 May 2016International SAP HERUG Conference 2019 – TU Berlin | Workshop : S/4HANA - Added Value by Enterprise Architecture Management

4.53

1.54

2.32

4.61

32

Task 3: Analyze the as-is-IT-architecture!

Document the as-is-IT-architecture

Prepare an application catalog of the as-is

IT- / SAP-application landscape and analyze it

Based on the catalog create additional diagrams of as-is

landscape (e.g. process support map)

16 May 2016International SAP HERUG Conference 2019 – TU Berlin | Workshop : S/4HANA - Added Value by Enterprise Architecture Management

4.53

1.54

2.32

4.61

Task 3: Analyze the as-is-IT-architecture!

33

Create catalog of as-is application landscape

16 May 2016International SAP HERUG Conference 2019 – TU Berlin | Workshop : S/4HANA - Added Value by Enterprise Architecture Management

General Ledger Accounting, Accounts Payable

4.53

1.54

2.32

4.61

Task 3: Analyze the as-is-IT-architecture!

34

Example for a university-as-is-IT-architecture (Teaching / Learning)

16 May 2016International SAP HERUG Conference 2019 – TU Berlin | Workshop : S/4HANA - Added Value by Enterprise Architecture Management

4.53

1.54

2.32

4.61

Task 3: Analyze the as-is-IT-architecture!

35

Example for a university-as-is-IT-architecture (Reseacrh / Transfer)

16 May 2016International SAP HERUG Conference 2019 – TU Berlin | Workshop : S/4HANA - Added Value by Enterprise Architecture Management

4.53

1.54

2.32

4.61

36

SWOT analysis of the University‘ s EA from IT department‘ s point of view - Example

16 May 2016International SAP HERUG Conference 2019 – TU Berlin | Workshop : S/4HANA - Added Value by Enterprise Architecture Management

Strengths

• High stability of IT infrastructure

• Good automation by IT

Weaknesses

• „Zoo“ of applications

• Poor EA governance

(responsibilities, decision

making)

• Central solution for CRM missing

Opportunities

• Standardisation and

consolidation through strong

governance

• Value by doing digitalization

initiative

• Projects with high value by using

a lean and efficient EA method

Threats

• Zoo of applications getting even

worse over time

• Wrong EA decisions waste

resources

4.53

1.54

2.32

4.61

Task 3: Analyse the as-is-IT-architecture!

37

Analyze the as-is-IT-architecture!

How is the situation regarding the IT application landscape

at your institution? Think of coverage of business needs,

automation, standardisation, stability, IT security etc.

• What is good?

• Where is need for action?*

Write your input on cards and discuss [15 min]

* The assessment what is good (strengths) and where is need for action (weaknesses) is part of the SWOT-analysis of the as-is EA.

16 May 2016International SAP HERUG Conference 2019 – TU Berlin | Workshop : S/4HANA - Added Value by Enterprise Architecture Management

4.53

1.54

2.32

4.61

Task 3: Analyze the as-is-IT-architecture!

38

Exercise 1

16 May 2016International SAP HERUG Conference 2019 – TU Berlin | Workshop : S/4HANA - Added Value by Enterprise Architecture Management

4.53

1.54

2.32

4.61

39

Results of Exercise 1 at HERUG workshop

16 May 2016International SAP HERUG Conference 2019 – TU Berlin | Workshop : S/4HANA - Added Value by Enterprise Architecture Management

4.53

1.54

2.32

4.61

Task 4: Design the to-be-IT-/ SAP-landscape!

40

Strategy Analysis Design Realisation Operation

To-be IT-

Architecture

16 May 2016International SAP HERUG Conference 2019 – TU Berlin | Workshop : S/4HANA - Added Value by Enterprise Architecture Management

4.53

1.54

2.32

4.61

41

How to proceed to derive the target IT-architecture?

Input from phases strategy and analysis

• EAM strategy

• Key Success factors University

• Strategy of University

• Documentation of as-is IT-architecture

• SWOT of EA

• Results of documentation and analysis of

to-be IT-architecture

• Important business requirements

• EA governance

Design the to-be

IT-architecture

16 May 2016International SAP HERUG Conference 2019 – TU Berlin | Workshop : S/4HANA - Added Value by Enterprise Architecture Management

4.53

1.54

2.32

4.61

Task 4: Design the to-be-IT-/ SAP-landscape!

42

Derive the to-be landscape from as-is-IT-architecture

Design a sound to-be landscape by standardisation (reduce

number of sw providers) and expanding research

information and data solutions.

• Design to-be applications based on the as-is

IT- / SAP-application catalog [10 min]

16 May 2016International SAP HERUG Conference 2019 – TU Berlin | Workshop : S/4HANA - Added Value by Enterprise Architecture Management

4.53

1.54

2.32

4.61

43

Task 4: Design the to-be-IT-/ SAP-landscape!

Name Provider Functionality To be replaced by

SAP FI SAP SE General ledger accounting, accounts payable, … SAP S/4HANA Finance

DSpace Research Collection DuraSpace Research information and data solution Will not be replaced

Knowledge Portal Individual SW Knowledge base for students and other customers Will not be replaced

. . .

Template of an applications catalog

Instructions:

▪ On the far right column: this is the target application to be implemented during the migration project.

Please look for suitable application systems.

▪ “SAP S/4HANA Finance“ is the chosen to-be application for finance functionality.

▪ “DSpace Research Collection“ will not be replaced.

▪ „Knowledge Portal“ will not be replaced.

as-is to-be

16 May 2016International SAP HERUG Conference 2019 – TU Berlin | Workshop : S/4HANA - Added Value by Enterprise Architecture Management

4.53

1.54

2.32

4.61

Task 4: Design the to-be-IT-/ SAP-landscape!

44

Exercise 2.1

16 May 2016International SAP HERUG Conference 2019 – TU Berlin | Workshop : S/4HANA - Added Value by Enterprise Architecture Management

4.53

1.54

2.32

4.61

45

Task 4: Design the to-be-IT-/ SAP-landscape!

Name Provider Functionality To be replaced by

SAP FI SAP SE Hauptbuchhaltung, Kreditorenbuchhaltung, … SAP S/4HANA Finance

Grants Management SAP SE Grants management SAP S/4HANA Grant Mgt.

SAP BW SAP SE Reporting, Analysis SAP BW4HANA

SAP SLcM SAP SE Student-Lifecycle-Management SAP SLcM

Recruiting Faculty Non – individual system Recruiting employees SAP SuccessFactors

Payroll ADP Payroll management SAP SuccessFactors

Talent Management Oracle Talent management SAP SuccessFactors

Maximo Asset Management IBM Asset management SAP S/4HANA Asset Mgt.

CRM (Excel sheets) Microsoft Customer relationship management SAP C/4HANA

DSpace Research Collection DuraSpace Research information and data solution Will not be replaced

Knowledge Portal Individual SW Knowledge base for students and other customers Will not be replaced

Example: Solution: Application catalog*

as-is to-be

* The applications and providers in the catalog are illustrative. The purpose of the exercise is to show a few templates to do the design.

16 May 2016International SAP HERUG Conference 2019 – TU Berlin | Workshop : S/4HANA - Added Value by Enterprise Architecture Management

General Ledger Accounting, Accounts Payable

4.53

1.54

2.32

4.61

Task 4: Design the to-be-IT-/ SAP-landscape!

46

Design the to-be-IT-/ SAP-landscape!

Design a sound to-be landscape by standardization (reduce

number of sw providers) and expanding research information

and data solutions.

• Draft components of the to-be IT / SAP-landscape.

[10+ min]

16 May 2016International SAP HERUG Conference 2019 – TU Berlin | Workshop : S/4HANA - Added Value by Enterprise Architecture Management

4.53

1.54

2.32

4.61

Task 4: Design the to-be-IT-/ SAP-landscape!

47

Exercise 2.2

16 May 2016International SAP HERUG Conference 2019 – TU Berlin | Workshop : S/4HANA - Added Value by Enterprise Architecture Management

4.53

1.54

2.32

4.61

49

Example Solution: Components of the to-be application landscape*

* The applications in the diagram are illustrative. The purpose of the exercise is to show a few templates to do the design.

16 May 2016International SAP HERUG Conference 2019 – TU Berlin | Workshop : S/4HANA - Added Value by Enterprise Architecture Management

Functionalities are e.g.

4.53

1.54

2.32

4.61

Task 4: Design the to-be-IT-/ SAP-landscape!

50

Draft a data-flow-diagram!

Design a sound to-be landscape by standardization (reduce

number of sw providers) and expanding research information

and data solutions.

• Draft data flow diagram showing the major

interconnections between to-be-application systems and

focus on exchange of research data & information.

[10+ min]

16 May 2016International SAP HERUG Conference 2019 – TU Berlin | Workshop : S/4HANA - Added Value by Enterprise Architecture Management

4.53

1.54

2.32

4.61

Task 4: Design the to-be-IT-/ SAP-landscape!

51

Exercise 2.3

16 May 2016International SAP HERUG Conference 2019 – TU Berlin | Workshop : S/4HANA - Added Value by Enterprise Architecture Management

4.53

1.54

2.32

4.61

52

Example Solution: Data flow diagram of the to-be application landscape*

* The applications in the diagram are illustrative. Only a few data flows with research information/data are shown to demonstrate the principle.

16 May 2016International SAP HERUG Conference 2019 – TU Berlin | Workshop : S/4HANA - Added Value by Enterprise Architecture Management

4.53

1.54

2.32

4.61

SUMMARY

4.53

1.54

2.32

4.61

Variant 1: Usual approach for S/4HANA migration

▪ Migrate existing SAP functionality one-by-one

▪ Focus on SAP and interfaces

Variant 2: Our recommandation

▪ Use a holistic approach based on Enterprise Architecture method

▪ Consider business-IT-alignment

▪ Analyse and design SAP and non-SAP application landscape

▪ Think of MDM and process harmonization also during the migration program

Benefits of variant 2: doing the right things + using full potential of the IT-architecture

54

Summary

16 May 2016International SAP HERUG Conference 2019 – TU Berlin | Workshop : S/4HANA - Added Value by Enterprise Architecture Management

4.53

1.54

2.32

4.61

Q&A, NEXT STEPS

4.53

1.54

2.32

4.61

56

Next steps

✓ Enterprise Architecture Management is increasingly becoming

a (critical) success factor for all universities that rely on SAP and

see digitization strategically

✓ We offer to establish appropriate EAM - S/4HANA-working

groups (within the German and the international HERUG)

✓ These groups should also enable further networking, for

example with the EAM Special Interest Group of EUNIS

✓ If you want to join, please contact us!

Let´s establish EAM @ HERUG!

16 May 2016International SAP HERUG Conference 2019 – TU Berlin | Workshop : S/4HANA - Added Value by Enterprise Architecture Management

4.53

1.54

2.32

4.61

Scheer GmbH

Wendenstraße 130

20537 Hamburg

Germany

M +49 162 293 47 21

[email protected]

Dirk SchossigSENIOR MANAGER

HEAD OF HE&R @ SCHEER

Scheer GmbH supports companies in

their digital transformation. This includes

the development of new business

models, the optimisation of business

processes as well as the reliable

operation of IT.

57

Get in contact:

16 May 2016International SAP HERUG Conference 2019 – TU Berlin | Workshop : S/4HANA - Added Value by Enterprise Architecture Management


Recommended