Workshop – NAP
Angola
August 2011
1. Angola Press release (pages 2-4)
2. Opening statement (pages 5-7)
3. Work plan (page 8)
4. List of participants (9)
5. Agenda (page 10)
6. Technical Summary (pages 11-12)
PLANO DE TRABALHO PARA AS OFICINAS INTERNAS ALARGADA PARA A ELABORAÇÃO DO PLANO NACIONAL DE COMBATE DO TRABALHO INFANTIL
17 a 23-08-2011 OFICINAS INTERNAS PARA A ELABORAÇÃO DOS PLANOS DOS SECTORES
INSTITUIÇÃO/ORGANIZAÇÃO DATA DA OFICINA
HORÁRIO LOCAL PESSOA DE CONTACTO TELEFONE e E-MAIL
INAC – Instituto Nacional da Criança 17/08/11 09Hs Rua dos Quartéis Paulo Kalesi
CGSILA – Central Geral dos Sindicatos
Independentes e Livres de Angola
17/08/11 13Hs30 Bairro Kassenda, Rua 9 Eduardo Gomes
UNTA-CS – União Nacional dos
Trabalhadores de Angola – Confederação
Sindical
18/08/11 09Hs Av. Rainha Ginga nº 23 Maria Luisa 923505388
AIA – Associação Industrial de Angola 18/08/11 13Hs30 Luciano Luís
CCIA – Câmara de Comércio e Indústrias
de Angola
19/08/11 09Hs 1º Andar Kinaxixi nº 14 / Polícia Económica José Alentejo 912661891
ONGs – Organizações Não
Governamentais
19/08/11 13Hs30 Mártires de Kifangondo, rua 14, casa nº 47 Manuel Júlio 923644766
MED – Ministério da Educação 22/08/11 09Hs Largo dos Ministérios Zita Joana
MINARS – Ministério da Administração
Pública Emprego e Segurança Social
13Hs30 Direcção Nacional da Criança e do Adolescente
Departamento de Atendimento à Criança em
Risco
Elizabeth Muginga Neto 924365711
MINFAMU – Ministério da Família e
Promoção da Mulher
23/08/11 09Hs 2º Andar do Palácio de Vidro, Gabinete da Vice-
Ministra do MINFAMU
Marieth Vanuza L. Neto 924171656
MAPESS – Ministério da Administração
Pública Emprego e Segurança Social
23/08/11 13Hs30 Rua 1º Congresso Luís Machado 923439769
25-08-2011 OFICINA ALARGADA PARA CONSOLIDAÇÃO DOS PLANOS INTERNOS E ELABORAÇÃO DO PLANO NACIONAL
INSTITUIÇÃO/ORGANIZAÇÃO DATA DA OFICINA
HORÁRIO LOCAL PESSOA DE CONTACTO TELEFONE e E-MAIL
Representantes das Instituições e
Organizações de acordo com o número
definido na tabela seguinte
25/08/11 8Hs30 – 16Hs30 Centro Polivalente do MAPESS (próximo da
Unicargas)
Francisco Gaspar 923620080
OFICINA ALARGADA PARA CONSOLIDAÇÃO DOS PLANOS ENTIDADE Nº DE PARTICIPANTES OIT 3 Consultor 1 COMISSÃO EUROPÉIA 2 Embaixada do Brasil 1 Embaixada dos Estados Unidos 1 ODEBRECHT 1 Ministério da Administração Pública Emprego e Segurança Social 3 Ministério da Educação 3 Ministério da Assistência e Reinserção Social 3 Ministério do Interior (Comando Nacional) 1 Ministério da Juventude e Desporto (DNJ) 1 Ministério da Família e Promoção da Mulher 3 Instituto Nacional da Criança 3 Conselho Nacional da Criança 2 Governo Provincial de Luanda 1 Agências das Nações Unidas (UNICEF, PNUD, UNPF) 3 Associações Patronais (CCICA e AIA) 8 (5+3) Sindicatos de Trabalhadores (UNTA e GSILA) 8 (5+3) ONG’s (CF, KANDENGUES, CDA, SAVE CHILDREN, ACI) 3 (1x6) TOTAL DE PARTICIPANTE 51
PROPOSTA DE AGENDA PARA O DIA 25 DE AGOSTO
OFICINA PARA A ELABORAÇÃO DO PLANO NACIONAL DE TRABALHO
18 DE AGOSTO DE 2011 Horas Actividades Responsável
08hs:00 Credenciamento Protocolo 09hs:00 Boas vindas
Apresentação dos objectivos e da Metodologia de tr abalho Francisco Gaspar – OIT/ IPEC TACKLE
09hs:30 Abertura: MAPESS MED CE
Ministro António Pitra Neto Ministro Pinda Simão Embaixador João Ferreira
10hs:00 Breves Informações do Workshop MTR Bruxelas e avali ação dos principais resultados Francisco Gaspar – OIT/ IPEC TACKLE 10hs:30 Discussão sobre as prioridades tendo em conta o MTR e workshop da CPLP Francisco Gaspar – OIT/ IPEC TACKLE 10hs:45 Trabalho de Grupo sobre as questões prioritárias (o que tem de ser feito, por quem e para quem?) Facilitadores dos Grupos 13hs:00 Selecção de programas de acção/actividades para a i nclusão no Plano Nacional de Trabalho Técnico/Consultor 14hs:30 Continuação dos trabalhos 15hs:30 Apresentação e aprovação do Plano de Trabalho a ser enviado para HQ da OIT Técnico/Consultor 16hs:30 Encerramento dos trabalhos do dia Francisco Gaspar – OIT Angola
Directora Geral do INAC – Ruth Mixinge
Workshop for the Elaboration of the National Action Plan TACKLING CHILD LABOUR THROUGH EDUCATION IN ANGOLA
Luanda, August, 2011 Activity Report
==========================================================================================
====================================================================================== Mt
1
TECHNICAL SUMMARY
Internal (Individual) Workshops as well as a Join Workshop took place from August 17 to 24 and on August 25, respectively, taking into consideration the need of “coordination of actions to combat child labour in view the achievement of expected results of the TACKLE Project, strongly and efficiently, and, the elaboration of a National Plan with the involvement of the principal stakeholders as well as the sharing of resources through a Quadripartite Intervention (Government, Employers, Employees and Non Government Organizations”. Due to the absence of the Consultant for family reasons, most of the Internal Workshop were followed by Gaspar Estêvão, ILO Local Coordinator, based on a previously discussed and designed matrix (annex 1), and have produced the attached Sector Plans (Annex 2) Through Sector Plans, the Join Workshop focussed on the updating of the current Action Plan (October 2011/February 2012) and the elaboration of the following Plan of Action (March 2012/August 2013) I. METHODOLOGY
1. Compilation of Sector Plans into a Consolidated Plan based on the 4 objectives established in the Project (Annex 3)
2. Presentation of SMART process (annex 4), enhancing the definition of activities or objectives that should be Specific, Measurable, Achievable, Realistic, and Time based and an exemplification with some activities from the Consolidated Plan;
3. Distribution of the participants into 4 Working Groups (1 Objective per Group);
4. And a Plenary Session for the presentation, discussion and agreement on the results.
II. RESULTS
1. A compilation of the Sector Plans and the presentation of a Consolidated Plan allowed the participants to have a Global Perspective of the activities suggested by all and to discuss on the pertinence of each activity as well to decide on its inclusion or its withdraw, based also on the principle of complementarities.
2. The SMART process facilitated the reformulation of the activities in the perspective of their clarity and the targeted objectives.
3. The Groups focussed on 4 specific tasks: a. Analyze and reformulate, if necessary, the activities using the SMART process;
b. Review all the activities based on the principle of complementarities, withdrawing or joining activities, where appropriated;
Workshop for the Elaboration of the National Action Plan TACKLING CHILD LABOUR THROUGH EDUCATION IN ANGOLA
Luanda, August, 2011 Activity Report
==========================================================================================
====================================================================================== Mt
2
c. Include for each activity the IMPACT INDICATORS and the MEANS OF VERIFICATION;
d. And, finally, review the Budget based on the previous results. III. FINAL COMMENTS 1. It could have been better, in terms of time, to present the SMART process during the Internal Workshops, as previously scheduled. This could facilitate mostly the inclusion of the Impact Indicators, which seem to be one of issues that participants need to discuss more deeply.
2. During the debates, participants raised the necessity of including one important issue that have not been looked seriously, the lack of civil registration for children and adults, which could be one of the causes of children entering child labour.
3. In consequence, the participants strongly recommended the understanding of the “Child Labour Situation” in Angola through a NATIONAL STUDY. And, while the process is being organized, all available resources have to be used to call the attention of all in a massive sensitization campaign against visible acts which violate the rights of children and the General Labour Law, in terms of age, moral and physical integrity of the employees.
4. Finally, the Plans agreed during the Workshop (Annex 5) is one step in this process, but, which will need the approval of high responsible of each sector represented in the Workshop.
IV. ANNEX
1. Matrix for Internal Workshops 2. Sector Plans 3. Consolidated Plan 4. SMART process 5. Approved Plans
Luanda, 29 August 2011. Menga Thomas Consultant