Workshop on SDG7 Implementation in Asia and Pacific: National Expert SDG Tool for Energy Planning (NEXSTEP) and the Asian Pacific Energy Resources Modeling Platform. Kingdom of Cambodia Nation Religion King 19-21 March 2019 Ministry of Mines and Energy General Department of Energy
Transcript
Page 1: Workshop on SDG7 Implementation in Asia and Pacific ......power, Importing electricity, biomass and others renewable energies to meet the electricity demand and reduce fuel oil for

Workshop on SDG7 Implementation in Asia and

Pacific: National Expert SDG Tool for Energy

Planning (NEXSTEP) and the Asian Pacific Energy

Resources Modeling Platform.

Kingdom of Cambodia

Nation Religion King

19-21 March 2019

Ministry of Mines and Energy

General Department of Energy

Page 2: Workshop on SDG7 Implementation in Asia and Pacific ......power, Importing electricity, biomass and others renewable energies to meet the electricity demand and reduce fuel oil for

Outline

Structure of Electricity Organization

Cambodia’s Energy Policy and Strategy

Development of Power Generation, Transmission and Rural Electrification

Conclusion

2

1

3

4

Page 3: Workshop on SDG7 Implementation in Asia and Pacific ......power, Importing electricity, biomass and others renewable energies to meet the electricity demand and reduce fuel oil for

5

Structure of Electricity Organization

Page 4: Workshop on SDG7 Implementation in Asia and Pacific ......power, Importing electricity, biomass and others renewable energies to meet the electricity demand and reduce fuel oil for

To provide an adequate supply of energy throughoutCambodia at reasonable and affordable price,

To ensure a reliable and secured electricity supply atreasonable price, which facilitates investment in Cambodiaand development of national economy,

To encourage exploration and environmentally and sociallyacceptable development of energy resources needed forsupply to all sectors of Cambodia economy,

To encourage the efficient use of energy and to minimize thedetrimental environmental affects resulted from energysupply and consumption.

ENERGY POLICY

4

Page 5: Workshop on SDG7 Implementation in Asia and Pacific ......power, Importing electricity, biomass and others renewable energies to meet the electricity demand and reduce fuel oil for

CAMBODIA POWER STRATEGY

A-Development of Generation

B-Development of Transmission lines

C-Development of Rural Electrification

Increasing diversify of power supply such as Hydro, Coal power, Importing electricity, biomass and others renewable energies to meet the electricity demand and reduce fuel oil for power generation.

Develop the national transmission line, GMS & ASEAN power grid, maximize mini-grid to rural areas, upgrading the HV, MV & LV.

Supply from the National Grid, Mini-grid, Grid extension and stand-alone system;

Renewable energy(biomass, solar, hydro)

5

Page 6: Workshop on SDG7 Implementation in Asia and Pacific ......power, Importing electricity, biomass and others renewable energies to meet the electricity demand and reduce fuel oil for

6

Goal of the Rural Electrification Development Program

Policy Target

Page 7: Workshop on SDG7 Implementation in Asia and Pacific ......power, Importing electricity, biomass and others renewable energies to meet the electricity demand and reduce fuel oil for

Action Plan

The main action plan in electricity power development

plan is to reduce the generation cost and increase the

rate of electrification by:

• Import lower cost power source from neighboring

countries

• Construct and put in service the large scale generation

such as hydro, coal, renewable energy: solar biomass…

• Power transmission from the generation source and

interconnected between provincial towns

• Extension distribution network through out the country

7

Page 8: Workshop on SDG7 Implementation in Asia and Pacific ......power, Importing electricity, biomass and others renewable energies to meet the electricity demand and reduce fuel oil for

No. Power-Project Install Capa.MW

IA/PPA/LA Company Country COD Achievement

1 Kirirom 1 Hydro 12 BOT CETIC China 2002 100%

2 Ochum 2 Hydro 1 - EDC Cambodia 1993 100%

4 Kamchay Hydro 194.1 BOT Sinohydro China 2011 100%

5 Kirirom 3 Hydro 18 BOT CETIC China 2013 100%

6 Coal Power Plant 100 BOO CEL Malaysia 2013 100%

7 Atay Hydro 120 BOT CHD China 2014 100%

8 L St. Russei ChhrumHydro

338 BOT China Huadian China 2014 100%

9 Coal Power Plant 270 BOO CIIDG China 2014 100%

10

11

Tatay Hydro

Lower Se San 2

Hydro

246

400

BOT

BOT

CHMC (CTHL)

HPLSS 2

China

Cambodia, China ,VN

2015

2018

100%

100%

12 Solar Farm 10 BOO Sunseap Singapore 2018 100%

Existing Power Generation

Page 9: Workshop on SDG7 Implementation in Asia and Pacific ......power, Importing electricity, biomass and others renewable energies to meet the electricity demand and reduce fuel oil for

9

Data on Different Sources of Power Generation

Power Sources 2017 2018 Plan for 2019

1. Domestic Generation

Hydro power

Renewable Energy

Total Domestic Generation

Captive Generation by Industry

and Licensees

Fuel oil

Coal

2. Import Power Sources

Thailand

Laos

Total Import

Vietnam

3. Total Power Sources

4. Increase over prev. year

Page 10: Workshop on SDG7 Implementation in Asia and Pacific ......power, Importing electricity, biomass and others renewable energies to meet the electricity demand and reduce fuel oil for

Power Development PlanNo Companies Names Power Project Install Capacity

(MW)COD

1 CEL II Coal Power Plant

135 2019

2 CHNEITEC ENERGY CO., LTD

Solar farm 60 2020

3 ADB &EDC Solar farm 60 2021

4 CIIDG II Coal Power Plant

350 2023

5 SPHP Co., Ltd. Hydro Power Plant

Coal Power Plant

80 2023/2024

6 CIIDG II 350 2024

At the moment MME and all stakeholders are under revising the Master

Plan 2020-2030 and we expected that it will be completed at the end of this

year to meet the growing demand.

Page 11: Workshop on SDG7 Implementation in Asia and Pacific ......power, Importing electricity, biomass and others renewable energies to meet the electricity demand and reduce fuel oil for

Existing of National Grid at the end of 2018

11

SubstationsTransmission LinesName

1. Southern System

2. Western System

3. North-East System

4. Northern System

Total of Infrastructures

in operation

18 substation: 6 in Phnom Penh, 1 in Kandal,

1 in Takeo, 3 in Kampong Speu, 2 in

Kampot, 2 in Preah Sihanouk, 1 in Koh

kong, 1 in Prey Veng and 1 in Avay Rieng.

11 substation: 3 in Battambang, 2 in Pursar,

1 in Kampong Chhnang, 2 in Banteay

Meanchey, 1 in Pailin and 2 in Siem Peap.

3. substation: 1 in Kampong Cham, 1 in

Kratie, and 1 in Stung Treng

1 substation in Chheb District, Preah

Vichra

33 substation supply directly to 20 Province and

extends supply to other 5 Provinces.

Page 12: Workshop on SDG7 Implementation in Asia and Pacific ......power, Importing electricity, biomass and others renewable energies to meet the electricity demand and reduce fuel oil for

12

No 230 Kv Transmission line Km Operation Year

Capital Source

1 Battambang-Siemreap-K.thom-K.cham 350 2019 CEIB

2 Phnom Penh Loop line II (Chroy Chong Va) 96 2019 CEIB

3 Tatay Hydropower-Phnom Penh 182 2019 BOT

4 GS Koh kong-Koh kong City 20 2019 AFD

5 GS Chamkar Loung-GS Botumsakor 54 2019 AFD

6 GS Botumsakor-Tatay Hydropower 70 2019 LDP

7 GS Kratie-GS Mondulkiri 170 2019 CEIB

8 GS Ratanakiri-GS stung treng 120 2020 CEIB

9 GS stung treng-Lao Border 48 2020 LDP

10 GS Beak chan-GS5-NCC 20 2021 JICA PhaseII

11 GS Tropang Prasat-GS Siem Reap 30 2022 BOT

Transmission Line Development Plan

Page 13: Workshop on SDG7 Implementation in Asia and Pacific ......power, Importing electricity, biomass and others renewable energies to meet the electricity demand and reduce fuel oil for
Page 14: Workshop on SDG7 Implementation in Asia and Pacific ......power, Importing electricity, biomass and others renewable energies to meet the electricity demand and reduce fuel oil for

Connection Points with Neighboring CountriesO Smach 2 MW

Poipet 5.6 MW

Sampov Loun 1 MW

Phnom Prek 1 MW

Kamrieng 1 MW

Pailin 2.5 MW

Koh Kong 2 MW

Kampong Trach 6 MW

Keo Seima 0.36 MW

Snuol 1 MW

Bavet 10 MW

Svay Rieng 7 MW

Memot 3 MW

Ponhea Krek 5 MW

230 kV TK-PP 120 MW

Chrey Thom 7 MW

Svay Angong

Doun Roth 6 MW

Anlung Chrey 6 MW

Kirivong 1 MW

Touk Meas 1 MW

Banteay Chakrey 4 MWPrek Chrey

Kaom Samnor

Koh Roka

Thmor Bey Dom

Menchey

Trapeang Sre

14

Page 15: Workshop on SDG7 Implementation in Asia and Pacific ......power, Importing electricity, biomass and others renewable energies to meet the electricity demand and reduce fuel oil for

Tool Currently used for Energy Planning

Currently Tool for Preparing Energy Planning used

Tool as follow:

• Tool MEAD-E for estimating energy demand forecasts

• Tool LeaP for formulating the energy balance

• Tool PSSE for calculating load on transmission

operating power system.

•Tool WASP for generation planning.

15

The Challenges in Energy Planning

In Energy Planning some challenges as follow:

• Lack of Data

• Data need to maintain and update

Page 16: Workshop on SDG7 Implementation in Asia and Pacific ......power, Importing electricity, biomass and others renewable energies to meet the electricity demand and reduce fuel oil for

At least 90% of

all households in

Cambodia have

access to grid

quality electricity

by the year 2030.

100% of villages

in Cambodia have

access to any type

of electricity’s

services by 2020.

Presently, 87% of

villages and

72.16% of

households access

to grid quality

electricity.

Electrification Target

15

Year 2030

Year 2020

Year 2018

Target: Improve the current level of electrification by promote electrification

in those areas not serviced yet by grid expansion, cross border supply, mini

grids and renewable energy.

Page 17: Workshop on SDG7 Implementation in Asia and Pacific ......power, Importing electricity, biomass and others renewable energies to meet the electricity demand and reduce fuel oil for

17

Cambodia set priorities to achieve the Government’s

goals:

- By 2020 100% of village access to electricity.

- By 2030 at least 90% of households access to

electricity.

To achieve these goals its required huge investment

from the Government, other multilateral sources

the participation from pravite sector.

Conclusion

Page 18: Workshop on SDG7 Implementation in Asia and Pacific ......power, Importing electricity, biomass and others renewable energies to meet the electricity demand and reduce fuel oil for