AF - Mercados EMI
AF - Merca dos EMI Ca pac ity Build ing Series: on
The Point of Connec tion:
Charge Mechanism for Transmission in IndiaAug ust 4, 2011, Hote l Shangri - la , New Delhi
Masterclass
Organised by
8/6/2019 Workshop on the New Point of Connection Change Mechanism for Transmission in India Version
2/5
AF - Mercados EMI
The Point of Conne c tion (PoC) cha rg ingmechanism for transmission servicesprov ided by the Inte r Sta te TransmissionSystem operators has been imp lem ented
in Ind ia w ith effe c t from July 1, 2011.
Though the mec hanism is based on strongengineering and economic principles,inputs by va rious sta keholders ac ted as anover lay on these core d isc ip l inef u n d a m e n t a ls. Th is m e t h o d w a sdeveloped after long debates involvingRegula to rs, Policy M akers, TransmissionServic e Provid e rs, Syste m Op erat o r,
Generat ing companies, Distr ibut ionCo mpanies, Consultants, Pow er Trad ersa nd Pow er Excha ng es. This ov erlayhelped satisfy the important requirementof a c cep tab ility, while the c ore disc ip linefundamentals helped the mechanismsatisfy e ffic ienc y - sensitivity o f ta riffs tod istanc e, direc tion a nd qua ntum of flow -requ i remen ts o f the ta r i f f des ignmechanism.
From Sta te networks to Reg iona l grids andfina lly to a n Integ ra ted Nationa l Netwo rk,the power systems in India has physicallyevo lved ove r last tw o d ec ades. This notonly allowed better utilization of naturalresources - fossil fue l, hyd ro, solar and wind- whic h a re g eograp hic a lly dispersed butalso allowed widening of the markets forvarious generators and customers. Withla rge numbers o f genera to rs and
customers - this vast expanse of the inter-connected transmission grid has satisfiedan ideal pre-condition for competitiveelec tric ity m arkets.
Organised by
This p hysic a l developme nt o f p ow ernetworks had to be supported by ac om merc ia l mec hanism to o. The p re-exist ing postage stamp method of
transmission p ric ing had served its purpo sewhen electricity markets in India wereBa lkanized by the sta te bound aries. Thishad to change in view of the physicalexpansion of the grids and to realize theob jec tives of the Elec tric ity Ac t 2003.
Point of Connection (PoC) mechanismhas changed the way markets wil loperate in Ind ia. Artific ial transmission ta riff
based barr iers (pancak ing) to thegeographic outreach by generators,distribution companies and open accesscustomers have been mitigated by thenew mechanism. Further, since theelectricity grid now operates as anintegrated network and is no longer aloose agglomerate of regional and stategrids - inter -state power flows over statelines and the sta te gene ra ting sta tions useISTS netw orks to c onve y their energy.
AF - Merca dos EMI Ca pac ity Build ing Series: on
The Point o f Connec tion:Charge Mec hanism for Transmission in Ind ia
Aug ust 4, 2011, Hote l Shangri - la, New Delhi
Masterclass
8/6/2019 Workshop on the New Point of Connection Change Mechanism for Transmission in India Version
3/5
AF - Mercados EMI
anised by
Ma rkets for Pow er and c ond uc t of va riousp layers in this ma rket w ill be influenc ed byt r a n s m i s s i o n g r i d a n d a t t e n d a n tcommercial mechanisms. It is thereforec ritic al to understand and ap prec iate thechallenges and strategically employalternative conducts to achieve ande x t e n d t h e b e n e f i t s o f t h e n e wtransmission pricing mechanism. Certainkey c ha lleng es a re:
?The d a ta req uirem ents from variousDesigna te d ISTS Custo mers.o G e n e r a t o r s w i l l n o w b e
required to appropriately plantransmission ac c ess
o Some state-owned lines, whic h areb e i n g u se d f o r in t e r st a t etransmission b ut c urrently not beingpa id fo r by ISTS users will now ha vet o b e c o n sid e re d o n d u erepresentat ion from the statetra nsm ission ut ilities. Suc h g ridintegra tio nis a b lessing and wo uld
reflec t the t rue sp irit of the na tiona lgrid.?The sc heduling and loss a lloc a tion
mec hanism will undergo a c hange?The RPCs will be req uired to keep a
record of transmission system usagebased on SEM meter da ta a t the ISTSinterface points and this shall be thebasis of billing any deviations from theapprove d transmission usage.?Realignment of the e xisting BPTAs to the
req uirem ents of the new TSA w ill be achallenge.
?Fina lly, the STU c ha rges may still getpan-caked with the ISTS c ha rges forinter-state OA transactions. In case aPoC mec hanism is imp lem ented a t thesta te leve l also (for which eac h SERCma y take a d ec ision), we could have atruly integ ra ted grid - where one p ric ingmechanism governs open access onthe na tiona l grid .
In this context it becomes pertinent forState Transmission Utilities, DistributionCo mp anies, Genera to rs, Traders, andconsultants to understand the following
a ttributes of the PoC mec hanism:
1. Tec hnic a l (bo th eng inee ring a ndec onomic) underpinnings,
2. Development process - why werevarious assumptions and simplificationsdone,
3. Various agenc ies / c om mittees invo lved
a n d p ro c u re m e n t o f d a t a f o rde termination of PoC c harges
4. Imp lic a tions of transmission pric ing onc ase-I b idd ing p roc ess
5. Implications of PoC mechanism onutilization and hence sharing of IntraSta te Transmission Netw orks
6. Regulatory Framework and the
C o n c e p t o f d e fa u l t m a n d a to r ytransmission servic es agreement
AF Mercad os EMI was involved deep ly in the conc ep tualisation of the fram ework, the
ana lysis for de termining the PoC c harges, and the deve lopment of the regula tions
AF - Merca dos EMI Ca pac ity Build ing Series: on
The Point o f Connec tion:Charge Mec hanism for Transmission in Ind ia
Aug ust 4, 2011, Hote l Shangri - la, New Delhi
Masterclass
8/6/2019 Workshop on the New Point of Connection Change Mechanism for Transmission in India Version
4/5
AF - Mercados EMI
Different Definitions of Utiliza tion.
Flat versus Loc a tiona l Charges.
Ma rg inal versus Ave rage Cost Pric ing.
LMPs and FTR based Transmission Pricing -
Imp lementa tion issues in Indian Context.
Session I: Definition ofUtilization - Distanc e
and Direction Sensitivity
Contrac t Path Me thod
Postage Sta mp s
Loc ation Dep end ent Pric ing Metho ds:
?Long Run ve rsus Sho rt Run Pricing Signa ls
o Investmen t Cost Re la ted Pric ing
a pp lied in Eng land a nd Wa les
(zona l p ricing based o n LRMC);
o C o st Re f le c t iv e Ne tw o rk Pric i n g
applied in Australia (zonal pricing
based on LRMC);
o Pric ing b ased on ma rginal transmission
losses app lied in Norwa y (zona l pric ing
based on SRMC);
Tea / Coffee11:30 AM to
11:45 AM
10:00 AM to
11:30 AM
Session II: PracticalTransmission Pric ingMechanisms - Part I
11:45 AM to1:15 PM
Prog ramme Sc hed ule
Lunch 1:15 AM to2:00 PM
Session III:Prac tic al Transmission
Pricing Mec han isms - Part II
2:00 PM to
3:30 PM
?Hybrid Methodology (PoC) mechanism
evolved in India for sharing of transmission
c ha rges and losses
o Average Part ic ipat ion Method
o Marginal Part ic ipation Method
o Hyb rid Metho d
The ob jec tive of the two sessions is to :
?Te c h n i c a l l y d i sc u ss p r a c t i c a l
transmission pricing mechanisms and their
algorithms
?To a p p rec iat e ho w t he Hyb rid PoC
me c hanism w as evo lved in Ind ia
?Definitions of Approved Injection and
Approved Withdrawa l.
?Trea tme nt o f Long , Med ium and Short
Term Open Ac cess.
?Noda l versus Zona l issues.
?Explanation of Impact on various states
and simp lific a tions.
?Constraints on Da ta Ava ilab ility.
?Billing , Co llec tion and Disbursem ent a t
Intra-Sta te Leve l - some issues.
?Way Forward - Implementation at
the Sta te Level.
Tea / Coffee3:30 PM to
3:45 PM
Session IV: Developmentof Reg ulations, Interestsand Conc erns of VariousStakehold ers, Way Forwa rd
3:45 PM to
5:30 PM
anised by
AF - Merca dos EMI Ca pac ity Build ing Series: on
The Point o f Connec tion:Charge Mec hanism for Transmission in Ind ia
Aug ust 4, 2011, Hote l Shangri - la, New Delhi
Masterclass
8/6/2019 Workshop on the New Point of Connection Change Mechanism for Transmission in India Version
5/5
I would like to register for the workshop. I am enclosing _____________________________________ vide cheque / demand draft no.______
________________________________ drawn on __________________________________ dated ________________________ in favour of
Metis Business Solutions Pvt. Ltd.
Name
Designation
Company
Address
City & Postal Code
Telephone
Mobile
Fax
Booking Details
Registration Fee
Siddhartha SwarupManager- Business DevelopmentT: +91 11 4505 7445, F: +91 11 4505 7446M : +91 9999 221 308E: [email protected]
Siddhanth JainHead - OperationsT: +91 11 45057445, F: +91 11 4505 7446M: +91 9810 233 471E: [email protected]
For registrations please contact :
Get in touch :
www. metisbs.com
[email protected] / [email protected]
91 11 4505 7445 / 9810 233 471 / 9999 221 308
91 11 4505 7446
Payment Detail
Payment Via Cheque Electronic Transfer / RTGS
Cheque to be drawn in favour ofMetis Business Solutions Pvt. Ltd.payable at New Delhi
Account Name: Metis Business Solutions Private LimitedAccount No.: 02072000003413Bank Branch IFSC Code (for RTGS): KKBK0000207Bank Name & Address: Kotak Mahindra Bank Ltd.4893, Phoota Road Opp Westend Cinema, Sadar BazarDelhi-110 006
Registration Form
There is a 10 % team discount for a group of 3 executives from the same company, 15% discount on a group of 5 and 20%discount on a group of 7 or more.
Metis Subscriber INR 18,000 /- Plus TaxNon Subscriber INR 22,500/- Plus Tax
Organised by Metis Business Solutions Private LimitedW-6, IInd Floor, West Patel Nagar, New Delhi 110008
Tel : (91) (11) 4505 7445 Fax : (91) (11) 4505 7446E-mail : [email protected] Website : www.metisbs.com
AF - Merca dos EMI Ca pac ity Build ing Series: on
The Point o f Connec tion:Charge Mec hanism for Transmission in Ind ia
Aug ust 4, 2011, Hote l Shangri - la, New Delhi
Masterclass