K~ - 39 'l ~E URN T~ RESTRlICTED RF-P%",d>RTS DESK Uoport No. TO=446a ONE WEEW This report was prepared for use within the Bank and its afflhiatod organizations. They do not accept responsibility for its accuracy or completeness. The report moy not be published nor may it be quoted as representing their views. INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT INTERNATIONAL DEVELOPMENT ASSOCIATION ME KLONG IRRIGATION PROJECT THAILAND November 16, 1964 Department of Technical Operations Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized
Transcript
  • K~ - 39 'l

    ~E URN T~ RESTRlICTEDRF-P%",d>RTS DESK Uoport No. TO=446a

    ONE WEEW

    This report was prepared for use within the Bank and its afflhiatod organizations.They do not accept responsibility for its accuracy or completeness. The report moynot be published nor may it be quoted as representing their views.

    INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

    INTERNATIONAL DEVELOPMENT ASSOCIATION

    ME KLONG IRRIGATION PROJECT

    THAILAND

    November 16, 1964

    Department of Technical Operations

    Pub

    lic D

    iscl

    osur

    e A

    utho

    rized

    Pub

    lic D

    iscl

    osur

    e A

    utho

    rized

    Pub

    lic D

    iscl

    osur

    e A

    utho

    rized

    Pub

    lic D

    iscl

    osur

    e A

    utho

    rized

    Pub

    lic D

    iscl

    osur

    e A

    utho

    rized

    Pub

    lic D

    iscl

    osur

    e A

    utho

    rized

    Pub

    lic D

    iscl

    osur

    e A

    utho

    rized

    Pub

    lic D

    iscl

    osur

    e A

    utho

    rized

  • CURRENCY EQUIVALENTS

    20. 84 bahts (1[) = I dolz.r (USI,TS320. 84 million US $ 1 million

    AREA EQUIVALENTS

    1 Hectare (ha) = 2. 47 acres1 Hectare = 6. 25 rai

  • T H A I L A N D

    IE J"LOflG IRRIGATION PROJECT

    TABLE OF CU1TTENITS

    PAGE NO.

    SUMMARY i-ii

    I IETRODUCTION 1

    II BACKGROUID 1

    III THE PROJECT AREA 2Location 2Area 2Climate 3Topography and Surface Drainage 3Soils 3Present System of Cultivation 4Land Tenure 5Marketing 5Transportation 5Agricultural Production 5

    IV t'JATER SUPPLY AND REQUIRE-7iENTS 6

    V THE PROJECT 7General 7Proposed Works 7Status of Engineering 9Construction Equipment 10Construction Cost Estimates 10Operation and Piaintenance Cost Estimates 11Financing 11

    VI ORGrANIZATION Nd'D ,1ANAGEJENT 12Construction 12Land Classification 12Operation and M1aintenance 12Technical Assistance 13Uater Charges 14

    VII BENEFITS AND JUSTIFICATION 14

    VIII CONCLUSION7S A4D RECOMvENDATIONS 15

    ANNEXES:1. Crop Yields, Gross and Net Returns Present and Future2. Water Supply and iRequirements3. Construction Schedule4. Estimate of Construction Equipment Required5. Cost Estimate6. Rice Taxes and Export Price of Rice

    Map1. Mie Klong Irrigation Project Stage I

  • T H A I L A N D

    Mle Klong Irrigation Project

    Summary

    i. The Government of Thailand has requested a Bank loan to as:sistin financing the development of an irrigation project on the I'e KlongRiver in Western Thailand. The poroject proposed for Bank financing is SStage I comprising about 175,000 ha out of the proposed ultimate developmentof up to 390,000 ha.

    ii. The project would supply a regulated water supply for riceproduction during the rainy season and for a limited area of multiple crop-ping of vegetables, fruits, sugar cane and oil seeds during the dryseason. Other project benefits would involve partial flood control,improved surface drainage and navigation. With the regulated water supply,additional surface drainage and improved cultural techniques, yields wouldbe substantially increased.

    iii. The estimated expenditure necessary to complete the project(Stage I), including costs of construction, pLurchase of equipment andconsulting services, would be X 1207.0 million (us$ 57.9 million) of whichUS$ 22.0 million would be in foreign exchange. The amount of the proposedBank loan would be US$ 22 million or about 38 percent of the total estimatedcost. The Bank loan would be used for purchase of equipment, importedmaterials and consulting services.

    iv. Construction and operation of the project would be the respon-sibility o, the Royal Irrigation Department (RID) of the iNinistry ofNational Development. Consultants acceptable to the Bank would be employedby the Thailand Government to assist and to advise on design and construc-tion procedures. The RID would be responsible for the operation andmaintenance of the project. There is currently underway a review of allthe RID's operation and maintenance activities under the terms of theBank's twfo recent loans for the Petchburi and Third Chao Phya Projects.

    V. A semi-detailed land classification is reouired for all landsin Stage I as well as lands in the balance of the proposed development.To accomplish this task in sufficient time to lhave the necessary dataavailable, RID would employ land classification consultants or other quali-fied experts satisfactory to the Bank to expedite the completion of theland classification of the Me Klong Project. Land Classification andDrainage Units would be maintained in the RID for supervision and admin-istration of all such work on RID projects. A foreign technician satis-factory to the Bank has recently been employed by the RID to advise onall phases of the land classification and drainage program on the RIDprojects and to assist in training Thai personnel.

  • - ii -

    vi, Technical services to farmers would be reorganized and intensi-fied. The iviinistry of Agriculture would place a minimum of 20 extensionoff-cers on the project not later than one year before water becomesavailable to instruct farmers in irrigation practices and new culturalmethods and to establish demonstration areas. Marketing and transportationfacilities are adequate for the additional production expected to resultfrom Stage I of the project.

    vii. A measure of the economic benefits of the project is an increasein the annual net value of production of % 135.3 million. Rice premiumand export taxes on all rice produced would amount to about % 90.0 million,thus the annual incremental net value would be about X 225 million. Atthis level the average annual net return on Stage I investments would beabout 15 percent. If total costs of construction were charged againstStage I the average annual net return would still be above 13 percent.

    viii. The project is sound and is suitable for a Bank loan ofUS$ 22 million. The Borrower would be the Kingdom of Thailand and anappropriate term would be 20 years, -ncluding a grace period of six years.

  • T H A I L A N D

    I,TE KLOiNG ThRIGATIO:I PROJICT

    I. I;TRODUCTION

    1. *The Government of Thailand has submitted a request for a Bankloan to assist in financing the development of an irrigation project onthe Me laong River in w'estern Thailand for the irrigation of up to390,000 ha.

    2. Ai appraisal mission visited Thailand in January and February,1964 for the purpose of selecting and appraising for possible iinancingthe first stage in the development of the proposed project. This reportis based on material and project reports prepared and supplied by theIloyal Irrigation Department (RID) of Thailand and on the findings of tnemission.

    II. BACKGROUND

    3. The He lcIong IRiver is formed by the junction of its two maintributaries the Kwae iNoi and the Kwae Yai near tle town of Kanchanaburi.These tributaries rise in the mountains along the Burma border ana flowin a southeasterly direction through narrow valleys for a distance ofabout 315 and 380 kiloreters respectively. A nunmer of damn sites forproject waterstorage have been investigated on both rivers and construc-tion of storage reservoirs are contemaplated for future developm.ent ofthe project.

    4. The potentials of the ri'e Kiong River were recognized as earlyas 1905 when a streain gage w;as installed near Ban Pong, and records havebeen maintained continuously since that time. A number of consultingengineers and consulting firms have, from t.ime to time, investigated thestorage and hydroelectric possibilities of the two main tributaries.Various sites have been selected ordy later to be abandoned because ofcavernous limestone conditions. However, there are other storage sitesthat appear favorable and investigations on these are going forward.

    5. Present plans for the development of the 1-iHe Uaong Rtiver basinhave been formulated by the Royal irrigation Department and published ina report entitled, "Feasibility Report on the Greater 1:e Klong Kulti-Purpose Project", dated September 1962. This report proposes that thedevelopment of the Me laong River be undertaken in three stages:

    (a) the construction of a diversion dam and navigation lock cn theMe Klong River at Tha Muang together with main canals and distributionsystems on both sides of the river to furnish irrigation water, mainly

  • -2-

    during the monsoon season, to about 390,OCO ha;

    (b) at the end of the fourth year of construction oni Stage I, workwould be started on Stage II, the construction of a reservoir on theKwae Noi. The reservoir would serve for flood control and as storagefor dry season cropping and possibly in the future for some hydro-polwerdevelopment;

    Cc) the construction of a reservoir on the Kwae Yai for additionalflood control, dry season cropping and future power developmenit.

    6. After studying the feasibility report and reviewing additionaldata available in Thailand and making a field inspection of the projectthe mission concluded that a staged development (see map) slightlyrevised from that pronosed by the RID appeared rnore desirable for thefollowirng reasons:

    (a) although the project appears technically sound the lack ofbasic data, particuul-arly land classification and drainage data,dictates that construction of canals and distribution systems beaporoached more slowly than proposed by RID; in particular, Stage Ishould be limited to develo-pment of irrigation facilities for175,000 ha;

    (b) because of the lack of land classification and engi,neerirgdata, it is premature to decide future stages at this time; and

    (c) the length of the construction period of the f4rnt st< :e wuld bel`ve years as Con,ar-o uith stenIe.rs Ivit L: ,ol rO.;eaed. This is a

    chang_ ;"lich -..ould be desirable from a financial standpoint.

    III. THE PrOii0JECT AeREA

    Location

    7. The lile KlonIg River Plai:i comprises the southwestern part of thegreat Central .ilain of Thailand. The i4e Klong portion of the plain is arnextensive area reaclhing from Kanchanaburi, on the west where the riveremerges from the hills, south to the Gulf and also northeast from K'anchana-buri to U-Thong thence south along the Nakorr Chl.aisri River to the Gulfof Thailanld, covering about 435,000 hectares , of which up to 390,000 hamay be irrigable depending upon soil conditions and the ciesign of theproposed irrigation system (see map).

    Area

    8. The total area now cultivated o01 the plain under present con-ditions' is albout 282,000 lha. Althouglh reliable inforivtion about presentcropping piatterns ant' ;.-ields of vario;s crops, is noli availabie it h;bLsbeen estimated bVr RID that of the 2f2,2 O0 ha no-: .under cultivation, rlorethan 70 percent is under rice production with the balance devoted to other crops,

  • - 3 -

    The land now being farmed depenids on rainfall and annual inunuationfromrr the river during the rainy season. Cnly about 61,000 ha have anyform of irrigation system,

    Climate

    9. The iie Klong Plain as well as the whole of Thailand has atropical clinate controlled by two distinct air masses, one moving infrom the north, the other from the south. The air mass from the rnorthstarts in October or November and continues until hpril, is cool andbrings little or no moisture. The southern monsoon begins in iHay andlasts until October. This air mass is warm and carries large quantitiesof moisture.

    10. Rainfall within the project area is ouite variable, averagingfor various parts of the area from 900 to over 1200 mm. per year andfrom 3050 to 50% variation from year to year. Short but damnaging droughtsoften occur in June and July. Very little rainfall occurs during themonths of December, January and February.

    11. Annual fluctuations of temperature in the project area rangefrom 37.50 C (99.50 F) in April to 170 C (62.60 F) in December and January.The lo-westi daily temperature recorded is 5.50 C (41.5° F) in January atKanchanaburi wshile the highest temperature recorded is 42.50 C (1080 F)in April.

    Topography and Surface Drainage

    12. The project area on the left banlc of the Mle Kiong River has ageneral slope from west to east. -ear the H,e laong River the slope ofthe plain is about 1 in 4,000 but this soon changes to a flatter slopeof about 1 in 10,000 as one proceeds eastward toward the lKakorn ChaisriRiver, the eastern boundary of the project area. The area on the rightbank of tne river generally follows the slope of the river which isabout 1 in 5,000.

    13. There are a number of large natural drainage channels on bothsides of the He Klong River. Those on the left bank drain into theNakorn Chaisri River while those on the right bank parallel the riverdown to about the town of Rajburi where by either natural or artificialmeans they discharge into the Me Klong River for an outlet to the Gulf.

    Soils

    14. Soils within the project, from all indications, are generallyproductive. Lven assuming a minimum of control over the application of

  • - 4 -

    irrigation water with improved surface drainaee conditions, the net returnsfrom crop production should, as a conservative estinate, be .nore thandoubled as has been demonstrated in the Central Plain. To attemnpt to forecastproduction beyond this point on the basis of available data involves toomuch speculatioin. The only soils data available is a reconnaissance surveywhich subdivides the area into 5 zones on the basis of soil characteristics.Such an exploratory survey is not adequate as a basis for formulatingcropping patterns nor for planning an irrigation and drainage system. Fur-thermore, data concerning present cultivated areas with production estimatesare generally conceded to be unreliable.

    15. On the basis of the reconnaissance soil survey and the fieldinspection made at the time of project appraisal when numerous soil boringswere made throughout the proposed project area, it is concluded that theirrigable area can be divided into three broad categories: (1) light andmedium textured soil areas (included in Soil Area "C" Arnex 1) that arewell adapted to a wide range of crops other than rice such as fruits,vegetables, cotton, oil seeds, forage, etc.; (2) dense, heavy, very slowlypermeable clay areas (included in Soil Areas "D" and "G" Annex 1) welladapted to the production of one rice crop per year; subsurface drainagein these soils would probably not be economical; (3) soils of thetransition zones between these twfo extremes comprising medium to heavytextured soils where drainage would be economical and thus the productionof more than one crop per year would be possible; such areas would beadapted to rice followed by another crop of rice or by crops such asoil seeds, vegetables, forage, etc.

    16. Soils in Stage I of the project are limited prinarily tocategories one and two. There is included about 68,000 ha of category one,the light and medium textured soils,and the balance or about 107,00 haof the heavy, slowly permeable clay textured soils. A more exact delin-eation of the soils of the entire area and of Stage I is impossiblewithout a semi-detailed land classification, the carrying out of whichshould be rnade a condition of the loan for Stage I.

    Present System of Cultivation

    17. The principal crop is rice which is planted in June and harvestedin lNovember. With minor exceptions, crop production within the projectarea depends entirely on rainfall and inundation from the river during therainy season and consequently droughts are common particularly in Juneand July. Floods are another hazard to crop production and losses of from15 percent to 25 percent of the planted hectarage are not uncommon fromdrought or floods or both.

  • - 5 -

    18. The srmall amount of irrigation within the project area,about 61,000 ha is located mostly adjacent to the river and is servicedby gravity or in sore instances by pumps fromli the groundwater. Onlyabout 1,000 ha of irrigated land is in Stage I of the project. Irrigatedland is devoted to the production of fruits, veget abies, suga;'canie,coconuts and oil seeds.

    Land Tenure

    19. Based upon information supplied by the Rice Department andthe R.I.D., about 70 percent of the farns in the project area are family-sized, owner operated. The farm unit averages about 5 ha and is operatedby the owner without hired labor or machinery. Very few of the farms arelarger than about 10 ha except possibly in the northwest sector oi theproject and many of these holdings are not yet cultivated to any greatextent.

    h-arketinlg

    20. The farmer sells his rice crop, after retaining enough for hisown consumption and for seed, through private dealers in the form ofpaddy. These dealers may be itinerant buyers who travel through the areaor local iaerchants who have sold the farmers goods on credit. There area number of rice mills in the area and far-ners also may sell directly tothe mills. Most other crops grown at present are consumed locally, butsome fruit and vegetables are marketed in Bangkok. iiarketing facilitiesare fully adequate for the additional production expected to result fromStage I of the project

    Transportation

    21. The project area has good transportation facilities consistingof railroads, highways and navigable canals and rivers. Nakorn Pathomabout t he center of the project area is 130 km west of Bangkok and a goodsurfaced highway and the Southern Railroad connect these points. Thehighway and railroad both continlue westward to Ban Pong on the riverwhere both divide with divisions of both conitinluing north and south al4ngthe left bank o.L the Me :Klong 2iver. f; number of local roads are alsoavailable in the area. adequate transportation facilities are availablefor Stage I of the project.

    Agricultural Production

    22. Statistics of crop production in the area are not reliable.Hlowever, based on information available t o the ruission includinig statisticsof the Rice Department, sampl'e surveys and the data available on the Chao

  • - 6 -

    Phya Plain it appears that paddy prociuction under pre-project conditionsaverages about 1.5 tons per hectare on the mediurn to heavy texturedsoils. On the lighter textured well drained soils present yields averageabout 1.0 ton per hectare.

    23. On the basis of information furnished by R.I.D. which wasobtained from the Iinistry of Agriculture and sample surveys in the areaand on the Chao Phya Plain, the farmer receives an average of Y 850per metric ton for paddy. Prices paid to the farmers vary from X 800to $ 1,000 per ton depending on quality and the time of year at wihichthe paddy is sold.

    24. The Government of Thiailand make no direct charge to fariimers forirrigation *^water, consequently only the value of seed and cash expensesare included in production costs. Based on information made availableto the mission which included data from interviewis with farmers and dataavailable from the Chao Phya P2 ain, production costs under existing con-ditions average about f 325 per ha. See Annex 1 for a summary of projectyields, gross ancl net returns under present conditions.

    IV. IiATER SUPPLY AND RKUIR-IIThTS

    25. Records of stream flow on the IMie Klong River have been takenfor almost 25 years at the site of the proposed diversion daim and inaddition records are available from 10 other stations on the river.Studies of these records show that an average annual flow of 13,000 millioncubic meters of runoff can be expected at the diversion darn site. Duringthe maonsoon season and rice growing period, extending from June throughCctober, reliable, flows of approximately 300 c.m.s. or greater are main-tained in the river. Durir1g other portions of thle year substantiallylower flows occur in the river particularly during the period Januarythrough aiy when runoff is generated largely from groundwater and pre-monsoon showers.

    26. A total annual water requirement of approximately 2,960 millioncubic meters would be necessary annually to produce one crop of rice onthe 390,000 ha that are estimated to be irrigable, to irrigate 8,000 haof other crops during the dry season and to maintain a donmstream flow of50 c.m.s. in the river. Ihis is well below thie average annual runoff of13,000 million cubic meters. It is safe to conclude that there is amplewater for the 175,000 ha in Stage I including the 8,000 ha to be used formultiple cropping. See Annex 2.

  • - 7 -

    V. THE PPROJECT

    General

    27. The project wjhich it is proposed the Bank should help financewould be Stage I of the Me Klong Irrigation Project. It would providefor regulated irrigation, surface drainage, and partial flood control to175,000 ha, land classification of the entire development of about 390,000 haand the investigations and feasibility studies for the balance of the de-velopment. Stage I would be completed within five years. The full devel-opment would provide irrigation and flood protection to an irrigable areaof up to 390,000 ha and furnish water for dry-season, multiple croppingto a substantial portion of the land by storing excess flood waters in tworeservoirs on the tributary streams, the Kwae Yai and the Kwae Noi whichjoin to form the Me Klong River. The full development would be constructedin stages extending over a period of 10 or more years.

    28. All resources at the disposal of the Thailand Government fordevelopment of the Me Klong Project, including a proposed Bank loan ofUS-`; 22 million equivalent, would be concentrated on Stage I. Constructionon the remainder of the development would be started only after completionof land classification and feasibility studies for the balance of theproposed development, and after satisfactory progress had been made onthe construction of Stage I.

    Proposed Works

    29. The principal features of Stage I would include: a diversionbarrage across the Me Klong River at Tha liuang, 14 km southeast of thetown of Kanchanaburi; canal intake structures on the right and left sidesof the River; a main feeder canal to the left side of the River; main anddistributary canals to the irrigated area on the left side of the River;a flood protection dike 98 km long extending along the left bank of theRiver from the barrage to the Dam Nern Saduak canal below the southernboundary of the project; a flood protection dike with emergency spil'Lwayextending approximately b km upstream from the right abutment of the di-version dam; a navigation lock in the right abutment of the dam; an earthclosure dam in the old river channel; the improvement of natural drainagechannels in and adjacent to the irrigated area; construction of approxi-mately LO km of feeder roads; and associated office buildings, workshops,warehouses, garages and houses for construction, operation and maintenanceof the project.

    30. The barrage of reinforced concrete construction would be con-structed in a channel 150 meters wide excavated for a length of 1,600 metersacross a bend in the river at Tha Muang. The concrete dam would extendacross the full width of the channel and earth embankrments -would extendfrom each abutment of the barrage. Eight openings controlled by radial

  • - 8 -

    gates would be provided to pass floods up to 3,100 c.mes. and each gatewould be 7.5 meters high and 12.5 meters wide operated with electricallydriven hoists. The normal level of water upstream from the barrage wouldbe raised approximately 7 to 8 meters to 22.0 MSLo A bridge would beprcvided across the barrage and floud protection dikes would extend fromthe abutments of the barrage and be used as roadways. The total heightof the structure from foundation excavation to bridge deck would be approxi-mately 15 meters, exclusive of the steel sheet-piling cut-of" whlich wouldextend approximately 10 meters into the earth foundation.

    31. Adjacent to the barrage site there would be constructed earth-fill flood protection dikes to control the flood waters, to protect asmall area of low lying land, and to be used as roadways. At the end ofthe flood protection dike on the right bank of the river a breaching dikewould be cm structed wihich would by-pass floods exceeding 3,100 c.m.s.which could not be passed through the diversion barrage. A flood of6,100 c.m.s. would have a frequency of once in 50 years and the spillwaycapacity would be inadequate without the upstream storage dams, which wouldsubstantially reduce the floods at the barrage. Until the dams are completed,additional capacity to pass flood flows would be provided by an emergencyspillway through the flood protection dike on the right abutment of thediversion dam. An additional 5,000 c,m.s, could be discharged in thismanner, to provide a total spillway capacity of approximately 8,000 cIm.s0Downstream from the barrage on the left side of the river are approximately100,000 ha of irrigable land now subject to periodic flooding. This landwould be protected from most floods by a dike on the left bank of the riverbeginning near the barrage and extending to a point on the Dam Nern Saduakcanal approximately 15 km downstream from the town of Rajburi. The dikewould be 6 meters wide at the top and its height would be sufficient toprotect the land on the left bank from flooding with a flood flow of6,000 c.m.s whichi is the maximum flood of record. The right bank- of theriver would remain unprotected and would be subject to flooding until theupstream storage dams on the tributaries are constructed.

    32. A reinforced concrete navigation lock through the right abutmentof the concrete barrage would permit the passage of boat and barge trafficon the river. The lock would be 14 m wide and 135 m long with electricallyoperated mitre gates, and valves which would permit filling or emptying ofthe lock to be accomplished in 8 to 10 minutes.

    33. After the completion of the diversion barrage and channel, anearth closure darn 12.5 meters high and 180 meters long would be constructedof selected earth materials in the old river channel. The crest of thedam would be 10 rmeters wide and would be used as a roadway.

    34. The main canals and laterals have been designed by RID to meetthe flow-capacity requirements throughout the various parts of the systemand satisfy the proper relationship between bottom width, water depth, sideslopes, free board, bank dimension and future operation and maintenance.Adequate structures have been provided. The main feeder canal would be

  • _ 9 -

    constructied to its full capacity of 260 c.m.se required to serve the entirefuture development on the left side of the river. The left main feedercanal would extend from the diversion barrage to the connection with theleft main diversion canal at the bifurcation point for the future canals1L and 2L. From here the left main diversion canal wiould extend along theleft side of the iHe niong River to connect with and supply the main canalsand distributaries in the irrigable area. ADproximately 400 km of maincanals and distributaries would be constructed in addition to associatedlateral and canal structures. The canal banks of most of the main canalswould be constructed to be used as roadways.

    35. In the past when the Me Klong River was in flood, excess watersoverflowed the left river bank and moved in an easterly direction to draininto the Nakorn Chaisri River. A number of drainage channels have developednaturally from this flood action and in addition some drains have been ex-cavated to improve the flow. Inasmuch as the capacity of the Nakorn ChaisriRiver is small, quite a problem developed during the flood period. For im-provement of' this condition the floodwaters would be directed southward tothe Gulf of Thailand, by reshaping, straightening and deepening the naturaland constructed waterways to establish a complete surface drainage networkdraining into the Mle Klong canal to the south of the project area. Extensiveimlprovetments would also be made to the Me Klong canal and to the channel oftne He Klong River near the town of Rajburi where the river channel is in-adequate to pass floods of even moderate magnitude. A total of approximately200 km of improvement in minor channels would be undertaken. In addition, 4drainage channels each 20 meters wide and 2 meters deep for a total lengthof approximately 68 km would be constructed to connect the Me Klong canalwith the sea. Each connecting channel would be provided with a sea lockto prevent saline waters from backing into the drains. The ConstructionSchedule is shown in Annex 3.

    36. Satisfactory sources of sand, gravel, rock, earth materials andtimber are readily available near the barrage site. Cement, steel, equip-ment and other items can be transported to the site by road or by boatduring the monsoon season.

    Status of Engineering

    37. Planning and preparation of the report on the project was doneby the RID. The RID has under construction a number of irrigation projectsand has in the past designed, constructed and operated other projects ofa similar type, although in most instances it has employed consultants toperform and supervise certain aspects of the work where assistance wasneeded. Based upon past experience, the RID is ful'y capable of nerformingthe design and construction of the canal and lateral systems with structures.The RID would also like to design and construct the main diversion dam usingits own staff in this work insofar as practicable and supplementing it withconsulting services where necessary. In view of the further investigationsrequired to plan future stages of the development, particularly with largeupstream storage dams it would seem that the employment of consultants or

  • " 10 -

    qualified experts would be advisable to assist in the design and supervisionof construction of the barrage and to investigate and prepare a feasibilityreport for the future stages of deve'lopment. Accordingly, the RID wouldemploy consultants or qualified experts satisfactory to the Bank to assistand advise on design and construction procedures,

    Construction Equipment

    38. For construction of the project substantial quantities of equipmentand spare parts would be needed in addition to that which is now availableto RID. A list of the various items and types of equipment and their costis given in Annex 4. The cost of such equipment including insurance andfreight to Bangkok is estimated to be approximately USI 11.3 million. Thecost estimates are based upon current vendor quotations and the recent ex-perience of RID in the purchase of similar equipment. The equipment require-ments were prepared by the RID and are based upon the performance of con-struction by the RID in accordance with their past methods and practiceswhich have been satisfactory, It is estimated that the salvage value ofthe construction equipment after completion of the project would be approxi-mately US$ 3 million.

    Construction Cost Estimates

    39. The cost estimates for the various construction features of theproject are based upon preliminary designs prepared by the design staffof RID. Designs of the major works and centerline profile surveys of thecanals are in sufficient detail to provide a satisfactory basis for makingwork quantity estimates. To the quantity estirriates unit prices have beenapplied to compute the costs of the work. The unit prices were establishedin accordance with the recent experience of RID in performing similar workin Thailand. To such total costs have been added adequate provisions forcontingencies, operation and maintenance during construction, supervisionand overhead, consulting engineer costs and interest during construction.Details of the cost estimate are given in Annex 5 and are summarized below:

    Local ForeignCurrency Ezchange Total

    Estimated cost (baht millions) 7h8.5 458.5 1207.0In US$ million equivalent 35.9 22.0 57.9

  • - 11 -

    Operation d. Maintenance Cost Estimates

    4o. At the present time irrigation projects supervised by RID arenot being provided with sufficient funds for satisfactory operation andmaintenance., Based upon estimates, by RID an adequate annual allowancefor operation and maintenace would be about $ 88 per hectare. This wou2acover regular operation and maintenance, anz±ual repairs and a reasonableamount for engineering and administration, but in accordance wrth Thaipractice, would not include depreciation on maintenance equipment whichis esti-mated at approximately 0 12 per hectare per year. The future costof annual operation and maintenance for Stage I, 175,000 ha is thereforeestimated at X 15.h million, or X 17.5 million when allowance is made forequipment depreciation0 This estimate is reascnable and compares withcosts of other comparable projects in other countries. Funds and otherresources would be allocated as reouired for the satisfactory maintenanceof the project.

    Financing

    41. The proposed Bank loan would cover the foreign exchange cost ofimported equipment, spare parts, materials, fuel and foreign consultingservices, The amount of the proposed loan would be US$ 22 million($ 458.5 million).

    42. The remainder of the cost totaling about $ 748.5 million wouldbe met by budget allocations,

    )3. The expenditure schedule, including disbursement of the Bankloan, would be approximately as follows:

    Fiscal Years 1st 2nd 3rd 4th 5th TotalMiillion of Bahts . 0*

    Local Expenditures 53 170 207 196 122.5 748.5Foreign Expenditures 24h 63 69 66 16e5 458.5

    TOTALS 297 233 276 262 139.0 1207.0

    Equivalent Millions US$ 14.2 11.2 13.2 12.6 6.7 57.9

  • - 12 -

    VI. ORGANIZATION AND MANAGIEMNT

    Construction

    44. The project works would be constructed by RID by force account.RID has had experience in construction of dams of similar type and in theconstruction of canals, laterals and drainage works. RID has prepared pre-liminary designs for the project. However, the engineering consultants orqualified experts to be employed would revlew the designs of the projectworks and assist the RID in preparing the final designs before constructionis started. In addition the consultants would supervise the constructionof the diversion barrage and appurtenent works, assist in selection ofconstruction equipment and certify to the appropriateness of the withdrawalsfrom the loan account relating to the dam.

    45. Except as required above for review of project plans, assistancein preparation of final designs and supervision of construction on thediversion barrage, the RID would have full responsibility for carryingout the work on the project. RID is considered competent to carry outthe duties effectively.

    Land Classification

    h6. A semi-detailed land classification is required for all landincluded in Stage I as well as all land in the balance of the proposeddevelopment. To accomplish this undertaking in sufficient time to havethe necessary data available for the location and design of the distribu-tion system in the light textured soil area (8,000 ha) in Stage I, theRID would employ land classification consultants or qualified personnelsatisfactory to the Bank. The RID has employed a satisfactory land classi-fication and drainage expert. The RID would retain such a qualified foreignexpert satisfactory to the Bank for a period of two years to assist in andadvise on all technical and administrative phases of the land classificationand drainage program and to assist in training Thai personnel. Land Classi-fication and Drainage Units would be maintained in the RID and a land classi-fication and drainage program would be formulated and pursued expeditiously.Financing in an amount of US$ 200,000 is provided in the loan for thesepurposes.

    Operation and Maintenance

    47. The plans for the establi;.hment of an operation and maintenanceorganizaticn have not been oompletely formulated. Under the terms of theBankts two recent loans for the Petchburi and Chao Phya projects, there iscurrently underway a review of all of RID's operation and maintenance activi-ties, A foreign consultant has been employed to make the review and to makerecommendations regarding changes ancd improvements with a view to establishingan efficient and adequately staffed 0 & R branch in the RID, In addition tothe foreign consultant, an accountant is also to be employed to review theprocedures for cost accounting of 0 & M expenditures and to make recommenda-tions for improvement in the methods.

  • - 13 -

    48. Under a proposed organization, which maybe modified when theconsultantt s recominendations are received, the Chief Engineer in chargeof operation and maintenance, working under the Director General of theRoyal Irrigation Department, would have three experienced senior engineersworking under him. One would be in charge of dikes and ditches; another,in charge of canal operation and regulation; and the third, in charge ofmaintenance. The engineer in charge of dikes and ditches would be respon-sible for training the zone technicians. An engineer with experience inother countries has already been employed to work with the engineer incharge of dikes and ditches to assist in developing proper water deliverymethods and irrigation practices at the farm level, It is planned thatthis engineer would be assisted by one or more suitably experienced engineers.

    49. A project superintendent, responsible to the Chief Engineer ofOperation and Maintenance of RID, would be in charge of operation and main-tenance of the Ma[e Klong Irrigation Project. A headworks superintendentand four or more area superintendents would be responsible for sections ofthe project up to bO,000 ha in size. The area superintendents would super-vise zone technicians who would have been trained in certain aspects ofirrigation engineering, each responsible for about 1,6CO ha. The zoneir.spectors would each supervise from 10 to 20 farm "cooperators" or in-spectors. These inspectors would each have the responsibility of waterdelivery and management among 20 to 40 farmers receiving water from oneditch, Farmers would be required to maintainthe dikes and ditches ontheir land in good working order. If they fail to do so, RID has thepower to carry out this work and charge the cost to the farmer.

    Technical Assistance

    5o. To make the best utilization of the irrigation water to beprovided to farms it would be necessary for the farmers in Stage I of theproject to learn improved water management techniques in order to improveyields of paddy and in suitable areas to produce for the first time cropsother than paddy.

    51. Technical services to farmers would be reorganized and intensified.The Government would provide for Stage I of the project a minimum of 20extension officers to be assigned not later than one year before water isto be made available. These extension officers with appropriate assistar,tsand technicians iwould be responsible for: (1) instructing farmers how toprepare their lands to receive the new irrigation water supply; (2) instruc-ting the farmers in new cultural practices including the use of fertilizers;(3) instructing the farmers in irrigation practices to be employed; and(4) establishing demonstration areas throughout Stage I of the project.

  • - JL -

    52. The Government within two years following the execution of theloan for Stage I of the project, would establish an experimental and dem-onstration farm comprising about LO ha in the proposed Stage II of theproject. This farm w.ould be for experinientation and demonstration ofcrops other than rice that would be suitable fo-r the light textured soilswithin the project and would be located in the northwest portion of thedevelopment. Its precise location and plan of operation would be subjectto the approval of the Bank.

    Water Charges

    53. The Government of Thailand at present collects a nominal landtax, but its policy is not to make a charge for irrigation water.

    54. The introduction of a water charge has been discussed by theBank with the Government from time to time since 1950 The Government isreluctant tc charge a water rate for amortization of the investment inproject works or for annual operation and maintenance costs because ricefarmers are indirectly taxed heavily through the application of the exporttax and Rice Premium0 As shown in Annex 6, these tax levies would resultin an indirect tax paid by farmers of about 0 1,092 per ha.

    55. In view of the tax policies now existing in Thailand, theintroduction of a water charge for this project could not validly beconsidered in isolation of the over-all questions of taxation and watercharges for other projects.

    VII. BENEFITS AND JUSTIFICATI'ON

    56. The project would be Stage I of the Me Klong Irrigation Projectand foresees the future development of subsequent stages. However, ifStage I would not be complemented by further development, Stage I wouldstill appear economically justified as shown below. The greatest benefitsfrom Stage I would be the provision of some regulation of river flows, theconveyance of this water to existing farms to increase rice production, andpartial flood control. Investments allocable to Stage I would be 0 917 mil-lion (US$ 44.0 million) equivalent to USIP 250 per net irrigable hectare(Annex 5).

    57. On-farm development necessary to utilize the project facilitieswould be limited to some additional field diking and the construction ofon-farm distribution systems. Very little land leveling is expected becauseproject lands are already under rice cultivation and have been satisfactorilyleveled over the years. Farmers are anxious to obtain flood control andwater control facilities afforded by the project. They would be expectedto make maximum use of the facilities in a relatively short time. Forthese reasons, i-t is expected that full benefits would be obtained withina period of 9 years after start of construction.

  • - 15 -

    58. With the water regulation provided by the project, 95 percentof the project area is expected to continue under rice production. Becauseof lack of storage and the very low river flow during the months of Marchand April, the 'Lard that can be irrigated in Stage I throughout the yearfor multiple cropping amounts to only about 8,000 ha. Even on this areawater supply shortages must be expected and consequently benefits frommultiple cropping, such as vegetables, fruits, sugar cane and oil seeds,in Stage I would be limited.

    59. The annual gross value of production at farm prices (see para. 23)is expected to increase by about $ 199.7 million. incremental costs ofproduction are estimated to be about g 46.9 million (see para. 24 and Annex 1).Allowing for operation and maintenance expenditures of about 0 17.5 millionannually the net value of incremental production at farm prices would beabout $ 135.3 million at full development. Rice premium and export taxeson total rice production would amount to about $ 90.0 milliou. The totalannual incremental net value would thus be about $ 225 million. At thislevel the average annual net return on the Stage I investments would beabout 15 percent. If total costs of construction were charged to Stage Ithe average annual net return would still be above 13 percent. However,farmers pay virtually no taxes other than rice premium and expo:t taxesand this return does not allow for additional costs to the Government forservices and administration resulting from the project. If these additionalcosts were allowed for the average annual net return would be reduced butmoderately and the project would remain economically fullyr justified.

    VIII. CONCLUSIONS AND RECCMhENDATIONS

    60. Stage I is an essential and integral part of the over-alldevelopment of the Me Klong Irrigation Project and would provide partialflood control, improved surface drainage and some regulation of the watersupply for increased rice production and for a limited area of intensivecropping not now possible. Insufficient data are available to adequatelyformulate a plan for development of the whole scheme at tiLs time. Theproject should therefore be limited to constructing Stage I while investiga-tions and planning continue on the balance of the proposed development.

    61. The project is technically sound and is economically justified.It is suitable for a Bank loan equivalent to US$ 22 million. The borrowerwould be the Kingdom of Thailand and an appropriate term would be 20 yearsincluding a grace period of six years.

    LWBartsch:LMitchell:ep:lcvIERD/IDA

    November 16, 1964

  • MeKLONG IRRIGATION PROJECT - THAILAND - STAGE I

    Crop Yields, Gross and Net Returns under Present Conditions

    Soil Areas Gross Total ReturnsPeconraiss- Irrigable Harvested Yield Metric Prico g Value Production Net Return Millions of 0ance Survey Crops Hectares Hectares tons / ha /n.etric ton /ha. Cost % /ha. $ /ha. Gross Net

    C Paddy 68,0O0 (15200 10 85o 850 325 525 52.0 32.1

    D 96,ooo 86,400 l.5 850 1275 325 950 110.2 82.0

    G 11900C0 9,7co 1.4 850 1190 325 865 11.5 8.4

    TOTALS 1759000 157,300 -- - - - 173.7 122.5

    Crop Yields, Gross and Net Returns under Future Conditions

    C Paddy 60,000 60,000 1.7 850 1445 560 885 86.7 53.1

    C OtherCraps 8,000 8. 00-. - - 4000 560 3440 32.0 27.5

    D Paddy 96,ooo 96,000 2.8 850 2380 560 1820 228.5 174.7

    G Paddy 11,000 11,000 2.8 850 2380 560 1820 26.2 20.0

    TOTALS 175,000 1759000 - - -_ 373.4 275.3

    g/ See para. 24 for explanation of present production costs. Future production costs are based on increased

    use of fertilizers and improved cultural methods.

    No benefits have been assumed for second crops.

  • Al-iKEX 2

    i.iKL0ONG IRRtGATIOINT PROJECT S'AGE I

    THAIILMTD

    UIATER SLTPPjUY r r7 11; -; Fw4!,'r, S

    In a. detailed study of the requirements and availability of waterCor the full development of 39U,000 ha, the RID has used the available rain-Eall data collected over the developrment area. to determine the effectiverainfall and ha.s utiliz6d the actual river runioff records to analyze theavailability of' river water. Irrigation water reciuirements were determinedby using an assumed pattern of rice cultivation, based upon eperim.entaldata. substpti.oted by theoreticEl computations of consuipt-vc use, andrealis td ca.nal andr fa.rm iwater losses. Computations were m2de for monthlytotal irriga.tion diversion requirements. The results of these studies iwithrespect to seasoDnal and peak diversions and available water supplies may besummarized as follows for the deca,de 1952 through 1961 which is ccnsidereda representa.tilre period:

    (a.) during the rice growing season frcm June through October there areoccasional minor shortages in the early season in June and Julywhich are insignificant because of' their short duration except forone severe year in which a. s-hortage of approximiately 40 percentextended over 30 days in June;

    (b) shortages occurred on two occasions in August, one of 32 percentextending over a 29 da.y period and another of 22 percent over a1 da.y period.

    (c) during the dry season January through i4a.rch deficiencies of waterare indicated ->or tlie 8,000 ha, of dry season cro). In February aminor deiicie!!cy occurs in 4 out of 10 years in the amount of 3 to5 c.m.s. out of a total diversion requirement of 57 c.i.s. (in-cluding 50 c.ni. s. for dowinstrsam. requirer,a.ents). In iviarch a.silortage of 10 c.m.s. occurs in 6 out of 10 years.

    It is expected tha.t the severity of the shortages could be a.llevi-ated through the adoption of rotational irrigation methods.

    Although the shortages demonstrated by the above study wouldindicate a. reduction in bencfits they are not considered of sufficientimportance to adversely affect the feasibility of the full development. How-ever, they do indicate that it may be advisahle to initiate construction ofstorage facilities with any future stages of develoDment to minim-iize thewater shortaees and to make possible the irrigation of a larger area. formultiple cropping.

    IWith respect to S-tage I it is apparent that no water shorta,eswrill develo; during the June through October period inasmuch as only 175,00

  • A!NEX 2Page 2

    ha or approximately 45 percent of the total area of 390,000 ha would beirrigated. There would oe water shortages during the dry season cropping.However, as these are relativeyr minor deficiencies with respect to thewhole project and inasnuch as the future de-velopment of storage reservoirswould 3ubs-a.ntially rmodify the dry season cropping pattern these watordeficiencies are not si.gnificant. It can therefore be conc2uded thatadequate water supplies a.re available to the project (Stage I).

  • CONSTRUCTION SCHEDULEME KLONG IRRIGATION PROJECT (STAGE I)

    THAILAND

    | _________FISCAL YEARSFEATURE 1 st 2nd 3rd 4th 5th

    YEAR YEAR YEAR YEAR YEAR

    I MOBILIZATION

    2 HEADWORKS

    3 CANALS AND STRUCTURES

    FEEDER CANAL AND LEFT MAIN CANAL

    3L, 4L, 5L, AND 6L CANALS AND LATERALS

    4 FLOOD PROTECTION DIKES

    5 IMPROVEMENT OF SURFACE DRAINAGE

    6 LAND CLASSIFICATION

    zz

    (R) IBRD-2347 xa

  • CONSTRUCTION EqUIMERT. ~SPAIRE PARTS iDOS & MISCELLANEOI'S ARIa 4

    TIAILAND

    C3P' Bangkk in U.S. ID.llac

    Ie Nacription Quantities Unit CotTotal Cos t Me-afl,

    A. Egoipent Used for Cut-off Conatrmction

    I Motor Scrper of i4 co. yd. atruck, 18 cn. yd. heap capa city 10 42,000 42o,ooo

    2 Buildozer, anglar blade type, Cat. D-8H or eqoialent 6 40,000 24o,ooo

    3 Motor Grader, Cat. So. 12 or eqivalent 3 1T,500 52,500

    4 2-1/2 en. yd, Dragline S 9,0 0( 180,000

    5 2-1/2 en. yd. Dragline and Shovel Combilationo S 1G,000 220,000

    6 4 on. yd. Scooper and Hoe Combination 1 95,000 95,000

    7 7,00C0#VW. Pick-Up Trick, 4 a 2 3 2,60o 7.8CC

    8 21,000#05W. Trock, 4 a 2, n/Cab and Platform Body 2 4,700 9,40o

    9 60,00O#VW. Truck, 6 n 4, nCab and 10 cu. yd. Ser- Ump Body 20 22,000 440,ooo

    10 Extra Eqoipsant (Engine., Tranaisnioni, etc.) - -6,ooo

    11 Greasing and Oiling Trock 2 15,000 30,00-0

    12 Miscellane ous Equipoent (Filwd Light, Foal-Oil Tac.k Track, etc.) -- 50,000

    13 Dredger- - Exicting

    14 Spare Parta for firat two ear aerice - -175,100

    Sob-total 1,925,600

    B. Eqnip-.et Used for Flood Protection Dikts Conatrmctioc

    15 Motor Scraper of i4 co. yd. atrock, 18 no. yd. heap capacity 5 42,000 210,000

    16 BUidocer, angolar blade type, Cat. D-8H or equivalent 2 40,000 80,000

    17 Motor Grader, Cat. Sio. 12 or eqoivalent 1 17,500 17,500

    iS 15 Ton Self-Propelled Robber Tire Roller 2 6,500 13,000

    19 5 A iDouble Drone Sheepafoot Roller 2 2,500 5,000

    20 7,00~0#W. Pick-Up Trac.k, 4 a 2 2 2,600 5,200

    Si 21,000QGVW. Troci, 4 a 2, n/Cab and Platform Body 3 4,700 14,100

    22 8,000 1. Water Tan.k Trock 1 14,oo0 14,o00

    23 Greasing and Oiling Track 1 i5,000 15.0(0

    St Spare Parts for too yearo neroice - 35,200

    Sob-total 409,0oo

    C. Miscellsneoos Eqoipsnt Used at Meadvorks

    15 Pover PlacE 1 Plant -ippile.d by YEA

    26 Transformer -40,0oo

    Ž7 Batching Plant 1 plant -- Exitin,g

    28 28 00. ft. Concrete Mine - Rotor Driven 4 7,000 14,000 2-E.intin,g

    29 1 co. yd. Concrete Bucket 6 1,00 6,ooo

    30 1-1/2 no. yd. Dragline and Shovel Cosbination S -- titn

    31 1-1/2 on. yd. Dragline and Shovel Combination n/Pile Driver Pron Attanhoent 1 73,000 73,000

    32 48 MP. Diesel Loconotive 4 - -Eitn

    33 1 co, yd. Tipping Wagon 50 100 5,000

    34 20 lbs. Sains and Snitches 8 kmo 4,00o 32.000

    35 Air Tools and Moses --50.000

    36 Wellpoint Sontion Pomp, 1800 GPM B 20 ft. Road, electric motor driven i1

    8,000O 112,000

    37 Jetting Pomp, 200 psi, electric aotor driven 3 5,000 15,00

    38 Ac-esories for it-en 36-37 -- 152,00-0

    39 1400 GPM! B 70 ft. Mead, centrifugal peap -electric notor driven 8 3,030 24,000o

    40 750 0PM B 70 ft. Mead, centrifugal ponp - lectric meter driven 12 1,200 14,4o00

    41 500 GPM@~70 ft. Head, cestrifugal poop -electric notor driven 12 600 7,200

    42 500 OFPM B 70 ft. Mend, s.bnbs ible soap poop - lectric notor driven 3,300 6,600

    43 250 3PM 0 70 ft. Read, sub--rible suop poop elsectric notor driven 3 2,000 6,000

    44 Anbulasce 1 4,000 4,000

    45 Pira Engine Track I 6,000 6,oo0

    46 Pass enger Car - Sedan 10 2,800 28,000

    47 Station Wagon, 4m.2 5 3,0( 15,000

    48 5,900jiGVW Field VPebble, 4 n 4 9 3,200 28,000

    49 5,900=V Pick-Op Track, 4 a 4 7 2,700 i8,900

    50 7, 0#WPick-Up Track, 4 a 2 16 2,60o 4i,6oo

    51 2S1,00 WTrack, 4 a2, u/Cab and Platform Body 16 4,700 75,200

    52 21,O0GGWirck, 4 n4, n/Cab and Platform Body 1 6,500 13,000

    53 39,O#GWTrac k, 6 a4,n/Cab and Platform Body 6 7,850 47,100

    54 21,O0#OWTrack ,4 n2, n/Cab and 4 cn. yd. Sear Nup Body 10 5,200 52,000

    55 50,O0 EWTrack Tractor 18,000 36,o00

    56 50-ton Track Trailer, Lover Bad I ll,ooo 11,000

    57 20-Ton Track Trailer, Flat Bed I 6,40o 6,40o

    5M Extra Eqoipeent (Engine, Winch, etc.) - -i15, 40o

    59 8,000 1. Water Tank Track 214,o00 28,000

    60 4 1/2 c.. Yd, Mobile Plixer Track 4 5,500 22,00

    61 65 ft. Pile Driver Frme I - - Eainting62 File Driver Maimr 24,0oo

    8,0cc

    63 600 CFM - Engine Drive Air Compresor 4 20,000 80,00064 365 C20 - Engine Drives Air Compressor 4 14,ooo

    56,000

    65 365 CFM - Motor Drives Air Cmnprasor 2 9,400 i8, MOO

    66 7-ton terick Crane 1 45,000 45,00c67 25-Son Mobile Track Crane v/Dr.sgline Attackhzat 5 41,000 82,000

    68 b-ton Forklift Track 2 8,000 16,o0o

    69 Worksbop Eqoipsmnt - - 320,000

    70 XiMlacllaneen Eqoipenct -- 78,0(

    71 Spare Parts for two flare serice IT 11,140

    S.t-total 1,880,540

  • 4-4.04- 00-' 040244 �. � 4-4.4-00 §400.'4, 0 4,0.-' �4'-'�r21 4tsr 4,;4M t

    00 c*Y 4. 4-4-44-20005.5 00000 � �C4 -'00

    oc-o.-.o 0 o40o��ggo�g� fl�4404fl 0) '54-0 40)00 4-.0 '00)49/ � 0-9�0-400 - - '0 0)40040000-04 000)0-04' 0- 0-9/440 0) 'I2 ..' o .4

    = 5 40 0 0 0

    0 0 00 0 00 0 0

    S 8�§§ , ,§§§§§§, ,§*§�}*§§�, §S§§§ §2�§8§§R8§ **,0000) .4 004-4--Ct- 0 04-4040400'0 '04-0 0,-00.o"0.0,o 400400) HO 4.04000- 4-C o.O

    4 0%3g�oo'0o

    0 �. 40.-40-'04040 - .0,4 0-4 -40.0.4.4 -0 0)00,-) �,-4

    40-400-0 4 '0-044- � 4 4) fl�4 0-0) 040 4 0-00- 4004040 '0-40.00)0-000-40400000404400-0 4 ' 4 4 0- 4'40 00 0-i ,-40-4---4400 0.0.4 40 .4 .4�00 .4.0,4 440 -4

    10 4.

    '0 0 0.44, 2 o S0 110. -� 000 2

    0)0 0 00 Oo .54,0 -25 0)0)

    0 0 4,0 4.0 -4 04, 0 4000 54)' 22 �z 0 4-4- 0 4- - 4,

    00 4- S��o o S2 � 50.4 '04-. � 0 -� ��0,c 0.5 4-0, 0 .' 00 . 4,4,0 0 4, .) 4.4,4 0 �----o otOs 2 t- 0 0 � ft 0 00> '0 0-' -21 -4.004, 4� 0 �4,=�-0 .50 '4 4,�� 004-4-4- �OK&S50 4 'S 0 4,000 4,4,4, - 0,0,04, 0,oO 0

    0,0,0 .2 0 4,4-) 0 0 4,-4 4, 4, 4 .� 0 4 ,-h'� 4,0 '0'00 4- '0 a'0 4, 4-4 1000 '00)4,4, 4,0 0 �0�5 0� ..� 550 4, '0 '0: �: 0 4- �040 004, 0 _� ooo 4,0 o � 22 4,00.00 22 74, � ½

    '0 0 4, 0 � � V4 0) 4,4,004,4) ooo.2� 0 0 � Q3 2...-..- �4, 4, '0 '0�5�4 . 1 � >��>-�-' S 04-4-4-04,4,4,0.4,4,00 �0000

    4,0 � s; 0.-.�.4 4,4- .004,4,54, 0 - .t.. 0'...-014 ,t .. � 4,4,.40)0,4,M

    44,. '�

    00) 0 0 - - 4,0 4,0-44, 0 4,4,4,4, 5 04)000440 5 '0-4000.... .550)0)... .4.40 0 0 '04, 4,0 .0 00.).004,0�440000.0-4 A 4,0-4-4- 000)0)0)000 00-4 0'0 4 000)43 004-�- AAAA4, 24,4,4,0 '0000 00555 04,4,4,4) 4,4,4,040 004- 4444.400002 4� S �-0- ��440 .00 00 &0.0S00)2 0000 0004,4, 004,4,4,000 0-i o

    000 04-.4, 4, 4, 4, 0 0 0-4,0))0000 0 0 00 4-..10-0 4'�0- 0,..-' 0 04,4'''

    00 .5-400 000 A .44 '00- 04,o C40)'0100.-'0 4- 4-4 04,4,4,0-4-0 0)0) 400.'0.-44- '000-44, 0 02 o5�E0210.5 2-40000 4,4,4,4,�4- � 2 4, 00 4,

    OF-SE-S - 0 0.4,40 00 00 4,0,0,0. 0, 4-04, 4,. 0 000,.� 4-0 � � S -'00)0)0) .4.0) 0 4,0,-.' @0) 5 20)24)00»»0.o00 0400 � ��O§O

    2t�1.,

    4.

    4, 40 400 0-3 0-0 0-0.40400 0-'00-04000-)0� 004440 '8' 3�3 0.-404000-3 oo-o400.4'0o-0 02.40

    4, �.-43 0- 0-0.00)4000- 0- 00000 000.00 .4.4 0004400 04440400-440-40404040 00-4.

  • AN'H,EX 5

    ME KLOI'JG IRRIGATIOM PROJECT - STAGE I

    Estimate of Costs

    Local Foreign Total Cost Allocation 1/Currency Exchange Stage I Stage 1Bahts Dollars Bahts Bahts

    . Millions . . . . . .

    Headworks 128.3 3.2 195.0 109.0

    Canals, Distributaries,Structures L: Buildings 143.3 5.0 247.5 229.0

    Flood Protection Dike 33.0 - 33.0 33.0

    Improvement of Surface Drainage 68.0 - 68.0 68.0

    Feeder Roads 22.0 - 22.0 10.0

    Land Appropriation 67.0 - 67.0 40.0

    Land ClassificationIncluding Consultants 5.8 0.2 10.0 6.o

    Equipment & Spare Parts 11.3 235.5 166.0 2/

    467.4 19.7 878.0 661.0

    Contingencies 15 percent 70.1 0.9 31 89.0 60.0

    0 & M During Construction 23.0 - 23.0 20.0

    Supervision & Administration 47.0 - 47.0 40.0

    Overhead 47.0 - 47.0 40.0

    Consultants & Aerial Surveys - 1.4 4/ 29.0 22.0

    Interest During Construction 5/ 94.0 - 94.0 74.0

    748.5 22.0 1207.0 917.0

    Investment for Economic Analysis 6/ 1113.0 843.0

    1/ Allocation made on basis of area for purpose of calculating costattributable to Stage I.

    2/ Takes into account equipment salvage $3.0 million.3/ Estimates of foreign exchange based on recent prices in Thailand

    therefore contingency of about 11 percent used on civil works only.4/ Includes consultants for Stage I and for investigation and feasibility

    studies Stage II.5/ Interest on I.B.R.D. loan @ 5-2 percent.~/ Interest during construction not included because investment and benefits

    are discounted back to the beginning of the construction period.

  • ANIJEX f

    ilE KLO.1G I!.RIGATION PROJECT STAGE I

    Rice Taxes and Exp)ort Price of Rice

    A "Rice Premium" and an export tax are levied on all exported rice.These taxes are levied for the dual purpose of providing revenue and forkeeping the price for domestic consumption at a level wi-ichn is now; about53 percent of the export price. Although applied only to rice exported,these levies tend to Set the level of piices paid to farmers.

    In 1963, the Rice Premium averaged about $ 550 and the export taxabout $ 100, or a total of $ 650 per metric ton of milled rice. I.ith amilling yield of 70 percent, this is equivalent to $ 455 per ton of paddy.Assuming an average yield of 2.4 tons of paddy per hectare, the equivalentof an indirect tax paid by the farmerE iE 2.4 x 0 455 or approximately$ 1,092 per hectare.

    Based on an average price of $ 850 per metric ton of paddy and amilling yield of 70 percent, the components, which make up the export priceof one ton of milled rice FOB Bangkok in 1963, are as followis:

    Bahts Percentage

    Farmers' share 1,215 53Rice premium $50 24Export tax 100 650 4 28Intermediaries, milling, transport 435 _ 19

    Export price per ton of white riceFOB Bangkok 2,300 100

    (uS$10o)

    The Rice Premium is adjusted periodically in accordance with changesin world market prices. If the present levies of $ 650 per ton representa reasonable expected average,total export of the incremental rice productionof proposed Stage I of the Me Klong Irrigation Project would yield annualrevenues to the government of about / 90.0 million. Howrever, part of theincremental production (about 350 kg/ha) is likely to be retained by thefarmers. Incremental exports from the project would thus be about 117,300tons per year and the annual revenue to government on this basis would beabout $ 76.2 million or US$ 3.65 million equiiValeht.

  • YT S.ph-tbu-i

    T H0 A I L A N D .

    (9KLONGPROJECT (

    ;nhoKKTKKOS B ANGK CK J> 8 R

    F.t.reScRuo .2 h 9

    Future Kang Rieng gas D..-.cte , I 0 -

    1,~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~l

    i \ 4~~~~~~~~~~~~~~P0 Tom <

    THA M4UANG DIVERSION BARRAGE *a _ \ g _

    t S?) A l N4KORN Fs ~ ~ NKOR H

    Tnn 0 N\ A Sw

    ._ _ irrigation ro, c tnl boun,dary5 / .

    ------ _. Nral waterwhayllels \t 1 1 'PSNNSIV / + .S .P.:':':'

    o HRighulaytors Gd/ of/ %.5

    ch- ~ ~ ~ ~ ~ ~ ~~oPacbr

    NOVEMBER= 1964er road 11THAILANDRArR

    MECN KLONG\ J¢1

    Irigationcnl

    - g. .R i .Iway s 9< . i

    F-1-~~~~~~~~~~~r r,cbai11 t A |[

    NOVEMBER 1964 IBCOND1STAGE


Recommended