WP 5: Project Management & Industrial Liaison
1http://www.nonmet.mat.ethz.ch/research/onebat
Strictly Confidential
NMW
Workpackage 5:
Project Management & Industrial Liaison
Project Meeting, May 11, 2006
Anja Bieberle-Hütter, NMW
WP 5: Project Management & Industrial Liaison
2http://www.nonmet.mat.ethz.ch/research/onebat
Strictly Confidential
Project Management
Thermal System
Fuel Cell
Gas Processing
WP 5: Year 1 Milestones
• performance 200 mW/cm2 @ 550°C• external electrical connections
• butane conversion rate > 90%• post-combustor with gas oxidation
> 98%
• battery expert• industrial partner
• thermal insulation concept with Tinside 550°C, Toutside 50°C, < 10 cm3
• structures for validation critical points• thermal system demonstrator with simulated 2 W heat source
WP 5: Project Management & Industrial Liaison
3http://www.nonmet.mat.ethz.ch/research/onebat
Strictly Confidential
Main Achievements
article
WP 5: Project Management & Industrial Liaison
4http://www.nonmet.mat.ethz.ch/research/onebat
Strictly Confidential
Battery Expert: H.-W. Praas
TeEConTechnology Engineering
Consulting
• Consultancy tasks and identification of potential industrial partners
• 5 meetings together
• Result:
– information on battery world
– market analysis
re-design of system, adjustment of specifications
still in contact, but collaboration currently “on hold”
WP 5: Project Management & Industrial Liaison
5http://www.nonmet.mat.ethz.ch/research/onebat
Strictly Confidential
PR Measures
• Facts sheet elaborated together with
ETH Transfer
• Interview with Darius Nikbin for “Fuel Cell
Review” feature article on micro-SOFC
article May 2006
• “Brennstoffzellen kommen langsam auf
Touren”, Tagi, Dec. 27, 2005
• (10 vor 10 reportage declined)
WP 5: Project Management & Industrial Liaison
6http://www.nonmet.mat.ethz.ch/research/onebat
Strictly Confidential
First Industrial Contacts Established
Mr. Bachmann (contact via P. Muralt)
Dr. A. Ravagni, Vice President Component Coatings
“Thin Films for Energy”board decision expected end of May 2006
Dr. A. Verma
interested in our thin film electrodescollaboration started
WP 5: Project Management & Industrial Liaison
7http://www.nonmet.mat.ethz.ch/research/onebat
Strictly Confidential
Meeting at ETHZ and Email Mr. Bachmann, April 2006:
“Gerne würden wir uns an Ihrem Projekt beteiligen, vor allem mit
Mannstunden, (finanzielle Beteiligung nicht ausgeschlossen) für die Evaluation
der Brennstoffzellen im Felde.”
http://www.msanet.com
diffusive and flow through gas sensors
(photoaccoustic detection principle)
MSA = Mine Safety Appliances Company
MSA is the global leader in the development, manufacture and supply of sophisticated products that protect people's health and safety.
Est. 1914 and headquartered in Pittsburgh, PA, USA
Subsidiary company in Zürich:
interest in portable instruments
WP 5: Project Management & Industrial Liaison
8http://www.nonmet.mat.ethz.ch/research/onebat
Strictly Confidential
Result of Risk Analysis
• Main Risks:
1. Free-standing membrane not dense or cracking
2. Performance of membrane not achieved
3. Heat management fails
4. Energy density not achieved
5. System integration impossible
6. Fuel reforming difficult
7. Cycling sensitivity
8. Long term stabilty not sufficient
9. No industrial partner found
10. Fabrication costs too high
• Measures for lowering highest risks:
1. change material, use of bi-layers
2. different deposition methods, different designs
1
Low Medium High
High
medium
Low
Risk
Con
sequ
ence
s
4
25
6
7 38
109
6. new catalyst and reactor design
WP 5: Project Management & Industrial Liaison
9http://www.nonmet.mat.ethz.ch/research/onebat
Strictly Confidential
Updated Competitors Analysis
Main fuel cell competitors:
1. Lilliputian
2. Tekion
3. Casio
4. Toshiba
5. Medis Technologies
6. NEC
7. Panasonic
WP 5: Project Management & Industrial Liaison
10http://www.nonmet.mat.ethz.ch/research/onebat
Strictly Confidential
WP5: Project Management & Industrial Liaison
• WP 5.1: Industrial Collaboration – Contacting of companies regarding participation in the project
– Finding industrial battery expert for accompanying the project
Milestones:
- Month 3: - List of potential companies for industrial collaboration
- Contact to industrial battery expert established
- Month 6: First contacts with the evaluated industrial partners
- Month 12: Contacts with potential industrial partners interested in taking part in the
project
Several PR tasks: mstnews article, interview with Fuel Cell Review, facts sheet ETH transfer
• WP 5.2 Business Implementation – Setting-up of business model
– Elaboration of concurrence analysis
Milestones:
- Month 6: Presentation of possible business models and competitor analysis
- Month 12: Cost analysis and added value scenarios in view of competing products
and ongoing
()
WP 5: Project Management & Industrial Liaison
11http://www.nonmet.mat.ethz.ch/research/onebat
Strictly Confidential
WP5: PM & IL (continued)
Year 1 Milestone:
• Battery expert from industry is accompanying the project
• At least one industrial partner shows definite interest in joining the project
(industrial partner has to be included in a subsequent project by joining plausible the value chain)
• WP 5.3 Meetings and Reviews – Organisation of meetings: monitor development, check for achievements of milestones, overview of system
development, WP progressing towards unified product
– Organisation of review meetings: Refine effort distribution between partners and definition of deliverables
Milestones:
- Month 3: Meeting + Controlling Report
- Month 6: Meeting + Project Review with KTI
- Month 9: Meeting + Controlling Report
- Month 12: Meeting + Final Report + Financial Report
CCEM proposal submitted Febr. 28, 2006
()
()
WP 5: Project Management & Industrial Liaison
12http://www.nonmet.mat.ethz.ch/research/onebat
Strictly Confidential
Summary
• Detailed competitors and risk analysis
• PR measures successful
• 3 industrial contacts established
WP 5: Project Management & Industrial Liaison
13http://www.nonmet.mat.ethz.ch/research/onebat
Strictly Confidential
Next steps (Year 2)
• WP 5.1: - Industrial partner supports ONEBAT financially
- Evaluation of „back-up“ industrial partners
• WP 5.2: - PR activities enhanced
- Revision of product specifications
- Definition of „killer“ application
• WP 5.3: - Regular project meetings and reports
- Consortium coordination
WP 5: Project Management & Industrial Liaison
14http://www.nonmet.mat.ethz.ch/research/onebat
Strictly Confidential
Next steps (Year 3 / Year 4)
• WP 5.1: - Find industrial partner for prototype development
• WP 5.2: - PR activities
- Cost analysis
- Market analysis
• WP 5.3: - Regular project meetings and reports
- Consortium coordination
WP 5: Project Management & Industrial Liaison
15http://www.nonmet.mat.ethz.ch/research/onebat
Strictly Confidential
Questions ?