3
This project has received funding from the European Union’s Seventh Programme for research, technological development and demonstration under grant agreement No 608702. WP2 - Project Initiation Key Innovation Form E ND -2-E ND S MARTIFICATION DELIVERABLE INFORMATION Number D2.1 Reviewers Benjamin Giron (HESP) Title Key Innovation Forms Nature R – Report Lead organization Hespul Dissemination level PU – Public; Main author(s) Ruben van Loon Delivery Date 31-12-2017 Contributors Jan Willem Eising, Paul Bierman, Celina Kroon Reviewers Y Araghi VERSION HISTORY Version Date Author/Reviewer Description 1.0 30/9/2016 Ruben van Loon Author 1 st draft 2.0 30/9/2016 Jan Willem Eising, Paul Bierman, Celina Kroon Contributors 3.0 10/10/2016 Y Araghi Review 4.0 5.0 Smart - Grids
Transcript
  • ThisprojecthasreceivedfundingfromtheEuropeanUnion’sSeventhProgrammeforresearch,

    technologicaldevelopmentanddemonstrationundergrantagreementNo608702.

    WP2 - Project Initiation

    Key Innovation

    Form

    E N D -2 -E N D S M A R T I F I C A T I O N

    DELIVERABLE INFORMATION

    Number D2.1 Reviewers BenjaminGiron(HESP)Title KeyInnovationForms Nature R–Report

    Leadorganization Hespul Disseminationlevel PU–Public;Mainauthor(s) RubenvanLoon DeliveryDate 31-12-2017Contributors Jan Willem Eising,

    Paul Bierman, Celina

    Kroon

    Reviewers YAraghi

    VERSION HISTORY

    Version Date Author/Reviewer Description1.0 30/9/2016 RubenvanLoon Author1

    stdraft

    2.0 30/9/2016 JanWillemEising,Paul

    Bierman,CelinaKroon

    Contributors

    3.0 10/10/2016 YAraghi Review

    4.0

    5.0

    Smart-Grids

  • Cityzen-KIf-LIAN-E2ESmartification.docx p.2/3

    Keyinnovationform:End-2-EndSmartificationNON-TECHNICALSUMMARY

    MAIN INFORMATION

    • Principle:

    ObjectiveinthisprojectistodevelopandimplementafullyfunctionalinnovativemediumandlowvoltagedistributiongridinAmsterdamNieuwWestarea.Thisincludesadvancedfaultdetectiontechnology,bidirectionalenergyflowfacilitation,anddemandresponsefeatus.Thiswillbeademonstrationgridforinnovativeelectricityproductionandconsumptionservices.WithintheCity-zenprogramme,anumberofspecifictechnologydemonstratorsaredefined:•Todemonstratethefeasibilityofdecentralizedelectricitystoragesystemsincombinationwithphoto-voltaicinstallations;•TotestthebenefitsofVehicletogrid(V2G)applicationsandtechnologyontheAmsterdam(NieuwWest)smartgrid.Thisisdoneonthegridthatservesabout10,000ofhouseholdsmakingitthelargestintelligentgridinTheNetherlands.Specificfocusisonenablingthedeliveryofsmartserviceswithanattractivebusinesscase.

    • Location:

    Amsterdam

    • District:

    AmsterdamNieuwWest

    • WorkProgress?Start-up phase of the project. First levels of the E-grid are accommodatet with so called ‘smart grid’technology.

    • Tobevisited?

    AllianderandLianderastheDSOinthearea.

    OPPORTUNITIES, BARRIERS AND SOLUTIONS

    Opportunities Barriers/Challenges Solutions

    Technical(/Geographical)

    • Digitalizationofthesecondaryelectricalgridcomponentsinanexistingsituationistheidealfieldtestofsmartgridtechnology.

    • Combininggridtechnologywithdistributedenergygeneration(DEG)technologygivesinsightinthevalueofanintegratedsystem.

    • Theexistingelectricalgridisinsomecasesolderthan10-20yearsandthelay-outanddesigncancausedifficulties.

    • LV-monitoringiscostelyandthevalueisundetermined.

    • Challengeproducersofsecundairygridcomponentstocomeupwithmatchingsolutions.

    Political/Legal • Residentshavethepossibilitytohaveasmartmeterinstalled• Residentscanrefusetoacceptthesmartmeter. • none

    Financial/Economic

    • Thebusinesscaseforaend-2-endsmartgridcanbevalidatedinpractice.

    • Theinitialbusinesscaseisnotconclusive

    • Testandenrichthebusinesscasewithempiricaldata.

    Social• CityZensbenefitfromamorestablegrid,withfasterresolverdpoweroutages

    • None • Notapplicable

    Environmental• BetterknowledgeoftheimpactonthegridofDEGtechnology,andbetterabletoadapttothis

    • None • None

    NEWS & LINKS

    • http://energeia.nl/nieuws/354249-1607/amsterdams-accuproject-pv-sims-nieuw-leven-in-city-zen Link to newsitemonCity-zenwebsite

    • http://www.greenspread.nl/nieuws/deelnemerscityzen• http://oud.amsterdamsmartcity.com/projects/detail/id/78/slug/city-zen• http://oud.amsterdamsmartcity.com/projects/detail/id/17/slug/city-zen-intelligent-net

  • Cityzen-KIf-LIAN-E2ESmartification.docx p.3/3

    Keyinnovationform:End-2-EndSmartificationTECHNICALSUMMARY

    DESCRIPTION OF THE INNOVATION AND RATIONALE FOR THE SELECTION

    Insightin(near)real-timepowerflowsandvoltageprofilemakesitpossiblefortheDSOtoactquickerandmoreproactiveregardingcustomerserviceandfacilitation.Furthermore,thisinsightenablesustodevelopcapabilitieswhichwillenabletheDSOtooperatethegridmorecloselytoitslimitsinasafeandreliableway.MonitoringlocaltrendsanddevelopmentsenablestheDSOtoplangridinvestmentsbetterandmoreefficiently.Partofthisinvolvesthecollectionofassetconditiondataforcondition-basedmaintenance.Furthermore,thisinsightisneededforthedevelopmentoffuturesmartenergy/customerservices.

    LEVEL OF DEVELOPMENT

    TRL 1: Basic principles observed x

    TRL 2: Technology concept formulated x

    TRL 3: Experimental proof of concept x

    TRL 4 Technology validated in lab x

    TRL 5 Technology validated in relevant environment

    TRL 6 Technology demonstrated in relevant environment

    TRL 7 System prototype demonstration in operational environment

    TRL 8 System complete and qualified

    TRL 9 Actual system proven in operational environment

    Thebasicassumptionisthatinsightonallgridlevelswillbeachievedwithnetworkmodelling/stateestimationwithminimal,butsufficient,measurementsonstrategiclocationstoachievetherequireddataaccuracy.

    WHAT ARE THE MOST RELEVANT DEMONSTRATION PROJECTS?

    § LianderLiveLab–forsecundairygridcomponent,data&ITarchitecturetesting.§ LianderControlLab–forgridmonitorin&controlofthefuture§ VehicletoGridLochem–testforbi-directionalcharingofelectricvehicles.

    EXPECTED IMPACTS OF THE INNOVATION

    Thissectionpresentstheinformationonimpactssuppliedintheinnovation/solutionproposalaswellastheexpertassessmentbytherelevantworkinggroupmembers.Ifthesolutionproposaldoesnotpresentthisinformation,theproviderofthesolutionhastobecontactedtoassistintheprovisionofthisinformation.Wherepossible,thedraftingoftheKIFs,shouldinvolvethestakeholderthatsubmittedtheproposedsolution.

    ¨ ImpactonEnergy(supplyorsavings)&greenhousegasreductionexpected

    FacilitationofPVgeneratedenergywillreducetheuseofcarbon(gas/coal)generatedenergy,thusreduceCO2emmisions.Thisquantityisnotpre-determined.

    ¨ Widerpotentialbenefitsforcities

    ThemoreadvancedelectricalgridisaimedtoprovidethecustomerandthusthecitizensofAmsterdamwithabetterandmorepro-activeservicelevel.Nexttothistheinnovationsinthegridaimtoreducethedurationandthenumberoffaultsandblackouts.

    ¨ Otherimpacts

    Facilitation of innovations regarding a digital workforce, trading possibilities for decentralized energy generation andbetterserviceregardingpowerqualitydemandsforlargescaledatacenters.

    TECHNICAL FEASIBILITY AND SOCIO-ECONOMIC VIABILITY

    Themore(household)datathecitizensintheareaarewillingtoshare,thebroaderarethepossibilitiesforoptimalgridmonitoring, control and analysis. For the DSO the grid and meter data is available, but the energy usage within thehouseholdbydiffentappliancesisamoreblindspot.Again,Thebasicassumptionisthatinsightonallgridlevelswillbeachievedwithnetworkmodelling/stateestimationwithminimal,butsufficient,measurementsonstrategic locationstoachievetherequireddataaccuracy.

    INTEGRATED MEASURES

    ¨ Integratedmeasurescombiningmultipleofthedomains:buildings,smartgridsanddistrictheatingandcooling

    Integration inthegridofdecentralizedenergygenerationcombinedwith localstorageanduseofelectricalenergy.Andmatchedwithgridcapacityoptimizationandpowerqualitymonitoringandcontrolfeatures.

    ¨ Whichotherstakeholderswouldneedtobeinvolvedintheimplementationofthekeyinnovation?

    For far reaching grid insights a large part of the customers need to have a smart electrical meter installed. In theNetherlandsthecustomerisintheleadtoacceptthismetertobeinstalled.Soforsuccessofthisprojectweestimatethat80%ormoreofthecustomersneedtohaveasmartmeterinstalled.

    CHALLENGES TO BE ADDRESSED BY CITY- ZEN

    Inthelowestlevelofthethegrid,thesmartmetersinthehousesofthecustomersarethesuggestedsecondarycomponentsformonitoringandcontrolpurposes.TheusageofsmartmeteringdataforadvancedgridoperatorpurposesintheNetherlandsisafairlynewdomain,andlegislationsarestillindevelopment,bothinternallyatgridoperatorsandonanationallevelandtherelevantlegalauthorities.TheprojectEnd-2-EndSmartificationhasalighthousefunctionforthesedevelopmentsanditiscrucialtohandlethelegalprescriptionswithcautionandcare.