+ All Categories
Home > Documents > WP3 progress report

WP3 progress report

Date post: 09-Jan-2016
Category:
Upload: nevaeh
View: 33 times
Download: 2 times
Share this document with a friend
Description:
WP3 progress report. SEE-GRID-2 PSC06 Meeting, 22 November 2007 Sarajevo, Bosnia and Herzegovina. Antun Balaz WP3 Leader Institute of Physics, Belgrade [email protected]. Overview. WP3 deliverables and milestones WP3 schedule WP3 activities status WP3 issues WP3 action points. - PowerPoint PPT Presentation
28
www.see-grid.eu SEE-GRID-2 The SEE-GRID-2 initiative is co-funded by the European Commission under the FP6 Research Infrastructures contract no. 031775 WP3 progress report Antun Balaz WP3 Leader Institute of Physics, Belgrade [email protected] SEE-GRID-2 PSC06 Meeting, 22 November 2007 Sarajevo, Bosnia and Herzegovina
Transcript
Page 1: WP3 progress report

www.see-grid.eu

SEE-GRID-2

The SEE-GRID-2 initiative is co-funded by the European Commission under the FP6 Research Infrastructures contract no. 031775

WP3 progress report

Antun BalazWP3 Leader

Institute of Physics, [email protected]

SEE-GRID-2 PSC06 Meeting, 22 November 2007Sarajevo, Bosnia and Herzegovina

Page 2: WP3 progress report

SEE-GRID-2 PSC06 Meeting - Sarajevo, 22 November 2007 2

Overview

WP3 deliverables and milestonesWP3 scheduleWP3 activities statusWP3 issuesWP3 action points

Page 3: WP3 progress report

SEE-GRID-2 PSC06 Meeting - Sarajevo, 22 November 2007 3

WP3 Deliverables & Milestones (1)

D3.1a - Infrastructure Deployment Plan, M04 (CERN) Describes the envisaged infrastructure deployment execution plan

to be followed in the region. Prepared and submitted on time

D3.2 - CA and RA guidelines for new candidates, M05 (GRNET/AUTH) This deliverable describes the guidelines and best practices of the

per-country CA and RA organization and policies. Prepared and submitted on time

D3.3 - Portal specifications and functionality, M06 (SZTAKI) This deliverable provides the characteristics and structure of the

multi-grid user-oriented portal. Prepared and submitted on time

Page 4: WP3 progress report

SEE-GRID-2 PSC06 Meeting - Sarajevo, 22 November 2007 4

WP3 Deliverables & Milestones (2)

D3.1b - Infrastructure Deployment Plan, M14 (CERN) Final version of D3.1. Prepared and submitted on time

We are currently in M19Future: D3.4 - Infrastructure overview and assessment, M23 (UOB-IPB) This deliverable presents an overview and assessment of the

progress in the regional infrastructure and operations in the life of the project

TOC will be circulated soon

Page 5: WP3 progress report

SEE-GRID-2 PSC06 Meeting - Sarajevo, 22 November 2007 5

WP3 Deliverables & Milestones (3)

M3.1 - Infrastructure Deployment Plan Defined M04, Status: OK

M3.2 - CA and RA guidelines for new candidates defined M05, Status: OK

M3.3 - Portal operational across the pilot Grid M12, Status: OK

Page 6: WP3 progress report

SEE-GRID-2 PSC06 Meeting - Sarajevo, 22 November 2007 6

WP3 schedule

M01 - Start of WP3M04 - Infrastructure Deployment Plan (M3.1, D3.1a)M05 - CA and RA guidelines for new candidates (M3.2, D3.2)M06 - Portal specifications and functionality (D3.3)M12 - Portal operational across the pilot Grid (M3.3)M14 - Final Infrastructure Deployment Plan (D3.1b)M19 – We are currently hereM23 - Infrastructure overview and assessment (D3.4)M24 - End of WP3 (and of the project)

Page 7: WP3 progress report

SEE-GRID-2 PSC06 Meeting - Sarajevo, 22 November 2007 7

WP3 activities overview

A3.1: Implementation of the advanced SEE-GRID infrastructure (UOB-IPB/IPP)A3.2: Network Resource Provision and BoD requirements (IPP)A3.3: Deploy and operate Grid CAs (GRNET)A3.4: Provide a user portal (SZTAKI)

Page 8: WP3 progress report

SEE-GRID-2 PSC06 Meeting - Sarajevo, 22 November 2007 8

A3.1: Overview

Infrastructure status Infrastructure size and gLite deployment status

Operations SLA conformance monitoring per site MPI support on SEE-GRID sites

Operational & monitoring tools deployment & integration Accounting Portal / R-GMA

SEE-GRID Wiki statusWP3 developmentsInfrastructure, Site and VO metrics

Page 9: WP3 progress report

SEE-GRID-2 PSC06 Meeting - Sarajevo, 22 November 2007 9

Infrastructure status (1)

SEE-GRID total and free CPUs in the last year

Page 10: WP3 progress report

SEE-GRID-2 PSC06 Meeting - Sarajevo, 22 November 2007 10

Infrastructure status (2)

SEE-GRID infrastructure contains currently the following resources: 35 sites in SEE-GRID production Over 1150 CPUs available Storage: 42 TB + 27 TB in preparation

All sites on gLite-3, with 12 sites on gLite-3.1 and the rest on gLite-3.0glite-WMSLB actively used (its 3.1 version)Guides provided for deployment of gLite-3.1 WNs on SL4.5, for both 32-bit and 64-bit architecturesOther 64bit guides in preparation (SE_dpm will be first)Migration to YAIM-4 in progress

Page 11: WP3 progress report

SEE-GRID-2 PSC06 Meeting - Sarajevo, 22 November 2007 11

Operations

SLA conformance monitored per site; tools used: HGSM, SAM, GStat, WiatG, Helpdesk

SLA conformance analysis: SEEGRID2-WP3-RS-023-SLA-Q6-a-2007-11-16.xls

Availabilities have declined compared to Q5!Red group (availability < 50%) has grown to 7 sites RO-03-UPB RO-05-INCAS RO-06-UNIBUC RO-09-UTCN RO-10-TUIASI AL-02-FIE AEGIS06-AOB (in maintenance)

Page 12: WP3 progress report

SEE-GRID-2 PSC06 Meeting - Sarajevo, 22 November 2007 12

Comparison of CE availabilities

Page 13: WP3 progress report

SEE-GRID-2 PSC06 Meeting - Sarajevo, 22 November 2007 13

MPI support

MPI WG establishedIt will produce a set documents, recommending MPI setup of SEE-GRID sites Tests for MPI setup of SEE-GRID sites Submission of MPI jobs to SEE-GRID infrastructure

Currently MPI setup is checked once a week by Grid-Operator-on-Duty, and tickets are opened to sites that advertise MPI, but MPI jobs fail

Page 14: WP3 progress report

SEE-GRID-2 PSC06 Meeting - Sarajevo, 22 November 2007 14

Operational & monitoring tools

Operational & monitoring tools deployment status Hierarchical Grid Site Management (HGSM) – Turkey Service Availability Monitoring (SAM) (+ porting to MySQL) – Bosnia

and Herzegovina with CERN support Helpdesk - Romania BBmSAM - Bosnia and Herzegovina GridICE – FYR of Macedonia SEE-GRID GoogleEarth – Turkey + Gidon Moont (ic.ac.uk) SEE-GRID GoogleMaps - Turkey Global Grid Information Monitoring System (GStat) – Min-Hong Tsai

(ASGC, Taiwan) Nagios - Bulgaria Real Time Monitor (RTM) – Gidon Moont (ic.ac.uk) and Turkey (HGSM) MONitoring Agents using a Large Integrated Services Architecture

(MonALISA) – Romania What is at the Grid (WiatG) – CERN with support from Serbia Accounting Portal / R-GMA – Bulgaria Pakiti - Greece

Page 15: WP3 progress report

SEE-GRID-2 PSC06 Meeting - Sarajevo, 22 November 2007 15

Accounting Portal / R-GMA (1)

Provides full accounting data Per site/institution Per country Per VO

Provides full statistics for usage Per institution Per application (in progress)

Provides job statistics (success rates etc.)Accounting portal is based on SEE-GRID R-GMA dataPublishing of site accounting data to R-GMA done by the deployed Java publisher, developed by IPP

SEE-GRID-2 PSC05 meeting, Thessalonica, Greece - September 11-12, 2007

Page 16: WP3 progress report

SEE-GRID-2 PSC06 Meeting - Sarajevo, 22 November 2007 16

Accounting Portal / R-GMA (2)

Accounting views for SEEGRID-only sites per site accounting:

●https://gserv1.ipp.acad.bg:8443/Accounting

Page 17: WP3 progress report

SEE-GRID-2 PSC06 Meeting - Sarajevo, 22 November 2007 17

Accounting Portal / R-GMA (3)

Accounting views for SEEGRID and EGEE sites that support SEEGRID – per country/institution user accounting

https://gserv1.ipp.acad.bg:8443/Accounting-2

Page 18: WP3 progress report

SEE-GRID-2 PSC06 Meeting - Sarajevo, 22 November 2007 18

Accounting Portal / R-GMA (4)

Accounting views for Job success rates and other statistics –in progress, currently running on our own data only. https://gserv1.ipp.acad.bg:8443/Jmon

Page 19: WP3 progress report

SEE-GRID-2 PSC06 Meeting - Sarajevo, 22 November 2007 19

SEE-GRID Wiki

Available at http://wiki.egee-see.org/index.php/SEE-GRID_Wiki

Many documents still missingUKIM should be coordinatingEffort needed by all partners

Page 20: WP3 progress report

SEE-GRID-2 PSC06 Meeting - Sarajevo, 22 November 2007 20

WP3 developments

HGSMWiatG, WsbatGAccounting portalglite-yaim-seegrid customizations and packagingapt/yum repository of SEE-GRID customized packagesSVN repository developmentRB/WMS monitoring tool development, packaging and deploymentGridMap customizations and deployment

Page 21: WP3 progress report

SEE-GRID-2 PSC06 Meeting - Sarajevo, 22 November 2007 21

Infrastructure, Site and VO metrics

Infrastructure growth over time (sites, CPUs, storage, memory?)Bandwidth growth?Site availabilities and downtimes (CE, SE)Accounting data (per site, per country, per application, per VO, per user community, time distribution); SEEGRID VO + national VOsJob success rates (per site, per country, per application, per VO, per user community, time distribution); SEEGRID VO + national VOsVO membership time evolution, distribution per country, per application, per user community; SEEGRID VO + national VOs

Page 22: WP3 progress report

SEE-GRID-2 PSC06 Meeting - Sarajevo, 22 November 2007 22

A3.2: Status

IPPStatus of the infrastructure and plan for expansion 5 sites infrastructure – significantly stable with good up-time All sites upgrading now to SL4 WNs and gLite 3.1.0. New grid site in progress with 12 WNs in Geophysical Institute. Core services, monitoring tools:

R-GMA: graphical on-line user interface Accounting information:

https://gserv1.ipp.acad.bg:8443/Welcome – Accounting by SEEGRID-only sites– Application Accounting– Job monitoring Accounting (need to add the data from all RB and WMS) .

FTS: used in production by SALUTE WMS – run stable using a better hardware. BDII stability and capability improvements

Page 23: WP3 progress report

SEE-GRID-2 PSC06 Meeting - Sarajevo, 22 November 2007 23

A3.3: Status

New accredited CAs in the Region Romanian CA (ROSA CA)

Accreditation request on January 25, 2006 Under review by GridAUTH team, PK-GRID CA and CESNET CA (on behalf of

EUGridPMA) Accredited on August 1, 2007 Fully operational

Grid CA candidates Montenegro CA (MREN CA)

CP/CPS reviewed by GridAUTH (via see-ca-incubation mailing list) on July 10, 2007

F.Y.R.O.M. CA (MARGI CA) Accreditation request on May 4, 2007 First CP/CPS not yet available

Page 24: WP3 progress report

SEE-GRID-2 PSC06 Meeting - Sarajevo, 22 November 2007 24

A3.4: Status

SZTAKISEE-GRID user portal is operational Maintenance/portal user support

Collaboration with Turkish partner (P-GRADE Portal Developer Alliance) METU finished the Certificate and File manager portlet It is merged with P-GRADE 2.5v Testing is ongoing task

Problems with accounting (Action Point)P-GRADE Portal received attention on Supercomputing'07P-GRADE Portal 2.5 goes open source (announced on EGEE'07)

Page 25: WP3 progress report

SEE-GRID-2 PSC06 Meeting - Sarajevo, 22 November 2007 25

WP3 issues and action points (1)

Deployment of the Moldova site (MD) MD-01-TUM certified last weekend Other sites?

Deployment of all Albanian sites (AL) Difficult due to organizational changes; status?

SLA conformance needs to be improved (RO – 5 sites)MPI WG should produce recommendation documents End of November

Helpdesk improvements needed – statistics extraction needs to be perfected (RO) End of November

Wiki reorganization and updates ASAP finished (UKIM) End of November

Page 26: WP3 progress report

SEE-GRID-2 PSC06 Meeting - Sarajevo, 22 November 2007 26

WP3 issues and action points (2)

Migration to SL4 gLite-3.1 on WNs, since gLite-3.0 will not be supported after December (ALL)Application SEEGRID VO VOMS groups to be used by WP4 application developers (ALL) The use is documented on the Wiki

HGSM further developments (TR) Site application support

Knowledge base of helpdesk tickets relevant for application development Initial set of tickets selected and put to the knowledge base by

WP4 leader From now on, GOODs should put all tickets that may be relevant

for application development to the knowledge base

Page 27: WP3 progress report

SEE-GRID-2 PSC06 Meeting - Sarajevo, 22 November 2007 27

WP3 issues and action points (3)

SEEGRID VO commitments (RS-IPB) End of November

Review of critical SAM tests (RS-IPB) End of November R-GMA test will become critical

Metrics for final review to be specified Proposal to be discussed End of November

Further development of Accounting Portal, so that the metrics and graphs specified can be obtained directly (BG) Tables and graphs should give data by VOs (all VOs supported by

SEE-GRID sites, not only some combinations; set of VOs should be selectable), applications (by name!), institution, country

Mid-December?

Page 28: WP3 progress report

SEE-GRID-2 PSC06 Meeting - Sarajevo, 22 November 2007 28

WP3 issues and action points (4)

Core services deployment Status

FYROM (WMS+LB and LFC already deployed for SGDEMO?) Bosnia and Herzegovina (LFC already deployed; BDII) Montenegro (WMS+LB)

Mid-December?

Broker stability Tested at AEGIS01-PHY-SCL (wms.phy.bg.ac.yu) New 3.1 WMS+LB shows improved stability over the old 3.0

WMS+LB RB/WMS monitoring tool used for on-line status check and

problems detection


Recommended