www.see-grid.eu
SEE-GRID-2
The SEE-GRID-2 initiative is co-funded by the European Commission under the FP6 Research Infrastructures contract no. 031775
WP3 progress report
Antun BalazWP3 Leader
Institute of Physics, [email protected]
SEE-GRID-2 PSC06 Meeting, 22 November 2007Sarajevo, Bosnia and Herzegovina
SEE-GRID-2 PSC06 Meeting - Sarajevo, 22 November 2007 2
Overview
WP3 deliverables and milestonesWP3 scheduleWP3 activities statusWP3 issuesWP3 action points
SEE-GRID-2 PSC06 Meeting - Sarajevo, 22 November 2007 3
WP3 Deliverables & Milestones (1)
D3.1a - Infrastructure Deployment Plan, M04 (CERN) Describes the envisaged infrastructure deployment execution plan
to be followed in the region. Prepared and submitted on time
D3.2 - CA and RA guidelines for new candidates, M05 (GRNET/AUTH) This deliverable describes the guidelines and best practices of the
per-country CA and RA organization and policies. Prepared and submitted on time
D3.3 - Portal specifications and functionality, M06 (SZTAKI) This deliverable provides the characteristics and structure of the
multi-grid user-oriented portal. Prepared and submitted on time
SEE-GRID-2 PSC06 Meeting - Sarajevo, 22 November 2007 4
WP3 Deliverables & Milestones (2)
D3.1b - Infrastructure Deployment Plan, M14 (CERN) Final version of D3.1. Prepared and submitted on time
We are currently in M19Future: D3.4 - Infrastructure overview and assessment, M23 (UOB-IPB) This deliverable presents an overview and assessment of the
progress in the regional infrastructure and operations in the life of the project
TOC will be circulated soon
SEE-GRID-2 PSC06 Meeting - Sarajevo, 22 November 2007 5
WP3 Deliverables & Milestones (3)
M3.1 - Infrastructure Deployment Plan Defined M04, Status: OK
M3.2 - CA and RA guidelines for new candidates defined M05, Status: OK
M3.3 - Portal operational across the pilot Grid M12, Status: OK
SEE-GRID-2 PSC06 Meeting - Sarajevo, 22 November 2007 6
WP3 schedule
M01 - Start of WP3M04 - Infrastructure Deployment Plan (M3.1, D3.1a)M05 - CA and RA guidelines for new candidates (M3.2, D3.2)M06 - Portal specifications and functionality (D3.3)M12 - Portal operational across the pilot Grid (M3.3)M14 - Final Infrastructure Deployment Plan (D3.1b)M19 – We are currently hereM23 - Infrastructure overview and assessment (D3.4)M24 - End of WP3 (and of the project)
SEE-GRID-2 PSC06 Meeting - Sarajevo, 22 November 2007 7
WP3 activities overview
A3.1: Implementation of the advanced SEE-GRID infrastructure (UOB-IPB/IPP)A3.2: Network Resource Provision and BoD requirements (IPP)A3.3: Deploy and operate Grid CAs (GRNET)A3.4: Provide a user portal (SZTAKI)
SEE-GRID-2 PSC06 Meeting - Sarajevo, 22 November 2007 8
A3.1: Overview
Infrastructure status Infrastructure size and gLite deployment status
Operations SLA conformance monitoring per site MPI support on SEE-GRID sites
Operational & monitoring tools deployment & integration Accounting Portal / R-GMA
SEE-GRID Wiki statusWP3 developmentsInfrastructure, Site and VO metrics
SEE-GRID-2 PSC06 Meeting - Sarajevo, 22 November 2007 9
Infrastructure status (1)
SEE-GRID total and free CPUs in the last year
SEE-GRID-2 PSC06 Meeting - Sarajevo, 22 November 2007 10
Infrastructure status (2)
SEE-GRID infrastructure contains currently the following resources: 35 sites in SEE-GRID production Over 1150 CPUs available Storage: 42 TB + 27 TB in preparation
All sites on gLite-3, with 12 sites on gLite-3.1 and the rest on gLite-3.0glite-WMSLB actively used (its 3.1 version)Guides provided for deployment of gLite-3.1 WNs on SL4.5, for both 32-bit and 64-bit architecturesOther 64bit guides in preparation (SE_dpm will be first)Migration to YAIM-4 in progress
SEE-GRID-2 PSC06 Meeting - Sarajevo, 22 November 2007 11
Operations
SLA conformance monitored per site; tools used: HGSM, SAM, GStat, WiatG, Helpdesk
SLA conformance analysis: SEEGRID2-WP3-RS-023-SLA-Q6-a-2007-11-16.xls
Availabilities have declined compared to Q5!Red group (availability < 50%) has grown to 7 sites RO-03-UPB RO-05-INCAS RO-06-UNIBUC RO-09-UTCN RO-10-TUIASI AL-02-FIE AEGIS06-AOB (in maintenance)
SEE-GRID-2 PSC06 Meeting - Sarajevo, 22 November 2007 12
Comparison of CE availabilities
SEE-GRID-2 PSC06 Meeting - Sarajevo, 22 November 2007 13
MPI support
MPI WG establishedIt will produce a set documents, recommending MPI setup of SEE-GRID sites Tests for MPI setup of SEE-GRID sites Submission of MPI jobs to SEE-GRID infrastructure
Currently MPI setup is checked once a week by Grid-Operator-on-Duty, and tickets are opened to sites that advertise MPI, but MPI jobs fail
SEE-GRID-2 PSC06 Meeting - Sarajevo, 22 November 2007 14
Operational & monitoring tools
Operational & monitoring tools deployment status Hierarchical Grid Site Management (HGSM) – Turkey Service Availability Monitoring (SAM) (+ porting to MySQL) – Bosnia
and Herzegovina with CERN support Helpdesk - Romania BBmSAM - Bosnia and Herzegovina GridICE – FYR of Macedonia SEE-GRID GoogleEarth – Turkey + Gidon Moont (ic.ac.uk) SEE-GRID GoogleMaps - Turkey Global Grid Information Monitoring System (GStat) – Min-Hong Tsai
(ASGC, Taiwan) Nagios - Bulgaria Real Time Monitor (RTM) – Gidon Moont (ic.ac.uk) and Turkey (HGSM) MONitoring Agents using a Large Integrated Services Architecture
(MonALISA) – Romania What is at the Grid (WiatG) – CERN with support from Serbia Accounting Portal / R-GMA – Bulgaria Pakiti - Greece
SEE-GRID-2 PSC06 Meeting - Sarajevo, 22 November 2007 15
Accounting Portal / R-GMA (1)
Provides full accounting data Per site/institution Per country Per VO
Provides full statistics for usage Per institution Per application (in progress)
Provides job statistics (success rates etc.)Accounting portal is based on SEE-GRID R-GMA dataPublishing of site accounting data to R-GMA done by the deployed Java publisher, developed by IPP
SEE-GRID-2 PSC05 meeting, Thessalonica, Greece - September 11-12, 2007
SEE-GRID-2 PSC06 Meeting - Sarajevo, 22 November 2007 16
Accounting Portal / R-GMA (2)
Accounting views for SEEGRID-only sites per site accounting:
●https://gserv1.ipp.acad.bg:8443/Accounting
SEE-GRID-2 PSC06 Meeting - Sarajevo, 22 November 2007 17
Accounting Portal / R-GMA (3)
Accounting views for SEEGRID and EGEE sites that support SEEGRID – per country/institution user accounting
https://gserv1.ipp.acad.bg:8443/Accounting-2
SEE-GRID-2 PSC06 Meeting - Sarajevo, 22 November 2007 18
Accounting Portal / R-GMA (4)
Accounting views for Job success rates and other statistics –in progress, currently running on our own data only. https://gserv1.ipp.acad.bg:8443/Jmon
SEE-GRID-2 PSC06 Meeting - Sarajevo, 22 November 2007 19
SEE-GRID Wiki
Available at http://wiki.egee-see.org/index.php/SEE-GRID_Wiki
Many documents still missingUKIM should be coordinatingEffort needed by all partners
SEE-GRID-2 PSC06 Meeting - Sarajevo, 22 November 2007 20
WP3 developments
HGSMWiatG, WsbatGAccounting portalglite-yaim-seegrid customizations and packagingapt/yum repository of SEE-GRID customized packagesSVN repository developmentRB/WMS monitoring tool development, packaging and deploymentGridMap customizations and deployment
SEE-GRID-2 PSC06 Meeting - Sarajevo, 22 November 2007 21
Infrastructure, Site and VO metrics
Infrastructure growth over time (sites, CPUs, storage, memory?)Bandwidth growth?Site availabilities and downtimes (CE, SE)Accounting data (per site, per country, per application, per VO, per user community, time distribution); SEEGRID VO + national VOsJob success rates (per site, per country, per application, per VO, per user community, time distribution); SEEGRID VO + national VOsVO membership time evolution, distribution per country, per application, per user community; SEEGRID VO + national VOs
SEE-GRID-2 PSC06 Meeting - Sarajevo, 22 November 2007 22
A3.2: Status
IPPStatus of the infrastructure and plan for expansion 5 sites infrastructure – significantly stable with good up-time All sites upgrading now to SL4 WNs and gLite 3.1.0. New grid site in progress with 12 WNs in Geophysical Institute. Core services, monitoring tools:
R-GMA: graphical on-line user interface Accounting information:
https://gserv1.ipp.acad.bg:8443/Welcome – Accounting by SEEGRID-only sites– Application Accounting– Job monitoring Accounting (need to add the data from all RB and WMS) .
FTS: used in production by SALUTE WMS – run stable using a better hardware. BDII stability and capability improvements
SEE-GRID-2 PSC06 Meeting - Sarajevo, 22 November 2007 23
A3.3: Status
New accredited CAs in the Region Romanian CA (ROSA CA)
Accreditation request on January 25, 2006 Under review by GridAUTH team, PK-GRID CA and CESNET CA (on behalf of
EUGridPMA) Accredited on August 1, 2007 Fully operational
Grid CA candidates Montenegro CA (MREN CA)
CP/CPS reviewed by GridAUTH (via see-ca-incubation mailing list) on July 10, 2007
F.Y.R.O.M. CA (MARGI CA) Accreditation request on May 4, 2007 First CP/CPS not yet available
SEE-GRID-2 PSC06 Meeting - Sarajevo, 22 November 2007 24
A3.4: Status
SZTAKISEE-GRID user portal is operational Maintenance/portal user support
Collaboration with Turkish partner (P-GRADE Portal Developer Alliance) METU finished the Certificate and File manager portlet It is merged with P-GRADE 2.5v Testing is ongoing task
Problems with accounting (Action Point)P-GRADE Portal received attention on Supercomputing'07P-GRADE Portal 2.5 goes open source (announced on EGEE'07)
SEE-GRID-2 PSC06 Meeting - Sarajevo, 22 November 2007 25
WP3 issues and action points (1)
Deployment of the Moldova site (MD) MD-01-TUM certified last weekend Other sites?
Deployment of all Albanian sites (AL) Difficult due to organizational changes; status?
SLA conformance needs to be improved (RO – 5 sites)MPI WG should produce recommendation documents End of November
Helpdesk improvements needed – statistics extraction needs to be perfected (RO) End of November
Wiki reorganization and updates ASAP finished (UKIM) End of November
SEE-GRID-2 PSC06 Meeting - Sarajevo, 22 November 2007 26
WP3 issues and action points (2)
Migration to SL4 gLite-3.1 on WNs, since gLite-3.0 will not be supported after December (ALL)Application SEEGRID VO VOMS groups to be used by WP4 application developers (ALL) The use is documented on the Wiki
HGSM further developments (TR) Site application support
Knowledge base of helpdesk tickets relevant for application development Initial set of tickets selected and put to the knowledge base by
WP4 leader From now on, GOODs should put all tickets that may be relevant
for application development to the knowledge base
SEE-GRID-2 PSC06 Meeting - Sarajevo, 22 November 2007 27
WP3 issues and action points (3)
SEEGRID VO commitments (RS-IPB) End of November
Review of critical SAM tests (RS-IPB) End of November R-GMA test will become critical
Metrics for final review to be specified Proposal to be discussed End of November
Further development of Accounting Portal, so that the metrics and graphs specified can be obtained directly (BG) Tables and graphs should give data by VOs (all VOs supported by
SEE-GRID sites, not only some combinations; set of VOs should be selectable), applications (by name!), institution, country
Mid-December?
SEE-GRID-2 PSC06 Meeting - Sarajevo, 22 November 2007 28
WP3 issues and action points (4)
Core services deployment Status
FYROM (WMS+LB and LFC already deployed for SGDEMO?) Bosnia and Herzegovina (LFC already deployed; BDII) Montenegro (WMS+LB)
Mid-December?
Broker stability Tested at AEGIS01-PHY-SCL (wms.phy.bg.ac.yu) New 3.1 WMS+LB shows improved stability over the old 3.0
WMS+LB RB/WMS monitoring tool used for on-line status check and
problems detection