WSDPWhole School Development Plan
Gujarat
WSDP• A holistic school development plan
• Combination of educational plan that guides the infrastructure plan and its effective usage in learning processes
• Reflects the vision of a school & ways to achieve it
• Master plan and base document for school educational as well as infrastructure works & its development in phases
WSDP: Guiding Principles• Child as an important stakeholder in the planning
process• Address the goals of SSA-RTE and NCF• Better use of available existing facilities• Verify the available infrastructure as per standards &
norms• Integration of multiple planning inputs• Improve the present and plan for future• Simplified documentation• Ownership by community
WSDP
In
Gujarat
WSDP: Planning
• WSDP for 32749 Govt. schools
• Development of Infrastructure Survey Form
• Survey by In house Engineers
• Measure of school campus
• Online Software development
• Analysis of Data as per RTE
• Data used for WSDP
WSDP: Implementation Process
Development of Infrastructure Survey Form
– Status of built environment
– Compare the status with standard norms
– Form developed with help of Block/District/ SPO
Engineers
– Training given to Engineers
– Pilot Study: 2 Schools per block by each Engineer
– Finalization of Survey Form
WSDP: Implementation ProcessTopics covered in Infrastructure Survey Form
a) General information of School
b) Location of School
c) Campus (Out Door Environment)
d) Each Building Design
e) Each Class Room Environment
f) Toilet Block
g) Drinking Water
h) MDM Kitchen Shed
i) Comments/ RemarksForm
WSDP: Implementation Process
• Survey by In house Engineers
– 25 District Project Engineers
– 20 Architecture at District level
– 387 Block level Engineers
• 32749 Schools surveyed
• Survey period: Sep to Dec’2011
WSDP: Implementation Process
Measure of school campus– Using GPS/DGPS and total station equipment – Preparation of plan showing
• All the structures in the school premises• Location of big trees, green fence• School Campus Surrounding• Level at 5 mtr. Grid Interval of School campus
– Four photographs of school taken from different
angles– Three hard copy and Softcopy in AutoCAD format– Survey done by Agency
Plan
Photographs of school taken from different angles
WSDP: Implementation Process
Online Software development– Web based application developed– DISE data used as source for School Master– Different level users created
• State (1)• District (26)• Block (224)
– Status Reports created– School level information available at all level
users for monitoring– Data Entry done by Engineers
Screen Shot
WSDP: Implementation ProcessAnalysis of Data
– Requirement of • ACR / HM Room• Primary/Upper Primary School• Toilet Block (Boys/Girls)• Compound Wall (Actual RMT)• MDM Kitchen Shed (Area Base)• Water Facility• Ramp and Railing• Electricity
– Condition of Existing infrastructure• Usable• Repairable (Major / Minor)• Damage
Excel File