+ All Categories
Home > Documents > WULAN DEV PROJECT_COMBINED DRG

WULAN DEV PROJECT_COMBINED DRG

Date post: 23-Feb-2017
Category:
Upload: kabir-mustapha
View: 96 times
Download: 3 times
Share this document with a friend
8
www.autodesk.com/revit Scale Checked by Drawn by Date Project number Consultant: DONPRES NIGERIA LTD Address: No 30, Boundary Lane, Rupakwolusi, PH Phone: +23465601623 Fax e-mail: [email protected] Consultant: KABIR MUSTAPHA Address: No14 Gbei Road, Nkpolu Rumuigbo, PH. Phone: +2348037142597 Fax e-mail: [email protected] Consultant: WULAN ENGINEERING LTD Address: 4 Trans Amadi Road, Oginigba, Port harcourt Phone: +2348038378481 e-mail: [email protected] 30/04/2016 13:15:25 HVAC SYSTEM_COMPLETE SYSTEM _3D HVAC_REVIT_001 PROJECT: WULAN DEVELOPMENT PROJECT CLIENT: EMMANUEL UYAELUMOE 05/02/2016 KABIR O. M. EMMANUEL U. M001 No. Description Date 3D_Realistic 1
Transcript
Page 1: WULAN DEV PROJECT_COMBINED DRG

www.autodesk.com/revit

Scale

Checked by

Drawn by

Date

Project number

Consultant: DONPRES NIGERIA LTDAddress: No 30, Boundary Lane,

Rupakwolusi, PHPhone: +23465601623Faxe-mail: [email protected]

Consultant: KABIR MUSTAPHAAddress: No14 Gbei Road,

Nkpolu Rumuigbo, PH.Phone: +2348037142597Faxe-mail: [email protected]

Consultant: WULAN ENGINEERING LTDAddress: 4 Trans Amadi Road,

Oginigba, Port harcourtPhone: +2348038378481e-mail:

[email protected]

30/0

4/2

016

13

:15

:25

HVAC SYSTEM_COMPLETESYSTEM _3D

HVAC_REVIT_001

PROJECT:WULAN DEVELOPMENT PROJECT

CLIENT:EMMANUEL UYAELUMOE

05/02/2016

KABIR O. M.

EMMANUEL U.

M001

No. Description Date

3D_Realistic1

Page 2: WULAN DEV PROJECT_COMBINED DRG

GROUND FLOOR

FIRST FLOOR

SECOND FLOOR

ROOF BASE

COOLING TOWERCOLD WATER RETURN PIPECOLD WATER SUPPLY PIPECONDENSER PUMP

AIR HANDLING UNIT

DRAIN PIPE

CHILLED WATER RETURN PIPE

CHILLED WATER SUPPLY PIPE

CHILLER

CHILLER PRIMARY PUMP

DUCT BRANCH SUPPLYING LOWER FLOOR

MAIN SUPPLY DUCT

CEILLING FOR FIRST FLOOR

BYPASS CONTROL VALVE

www.autodesk.com/revit

Scale

Checked by

Drawn by

Date

Project number

Consultant: DONPRES NIGERIA LTDAddress: No 30, Boundary Lane,

Rupakwolusi, PHPhone: +23465601623Faxe-mail: [email protected]

Consultant: KABIR MUSTAPHAAddress: No14 Gbei Road,

Nkpolu Rumuigbo, PH.Phone: +2348037142597Faxe-mail: [email protected]

Consultant: WULAN ENGINEERING LTDAddress: 4 Trans Amadi Road,

Oginigba, Port harcourtPhone: +2348038378481e-mail:

[email protected]

3/16" = 1'-0"

30/0

4/2

016

13

:15

:26

HVAC SYSTEM_TRANSVERSESECTION

HVAC_REVIT_001

PROJECT:WULAN DEVELOPMENT PROJECT

CLIENT:EMMANUEL UYAELUMOE

05/02/2016

KABIR O.M.

EMMANUEL U.

M002

No. Description Date

3/16" = 1'-0"

Section_Transverse1

Page 3: WULAN DEV PROJECT_COMBINED DRG

FLOOR SLAB

CEILING

VAV SYSTEM

FAN COIL SYSTEM

GROUND FLOOR

FIRST FLOOR

SECOND FLOOR

www.autodesk.com/revit

Scale

Checked by

Drawn by

Date

Project number

Consultant: DONPRES NIGERIA LTDAddress: No 30, Boundary Lane,

Rupakwolusi, PHPhone: +23465601623Faxe-mail: [email protected]

Consultant: KABIR MUSTAPHAAddress: No14 Gbei Road,

Nkpolu Rumuigbo, PH.Phone: +2348037142597Faxe-mail: [email protected]

Consultant: WULAN ENGINEERING LTDAddress: 4 Trans Amadi Road,

Oginigba, Port harcourtPhone: +2348038378481e-mail:

[email protected]

1 : 95

30/0

4/2

016

13

:15

:27

HVAC SYSTEM_LONGITUDINALSECTION

HVAC_REVIT_001

PROJECT:WULAN DEVELOPMENT PROJECT

CLIENT:EMMANUEL UYAELUMOE

05/02/2016

KABIR O. M.

EMMANUEL U.

M003

No. Description Date

1 : 95

Section_Longitudinal1

Page 4: WULAN DEV PROJECT_COMBINED DRG

228

400.0 CFM

249

1200.0 CFM

210

400.0 CFM

SIDEWALL DIFFUSER

RETURN DIFFUSER

SUPPLY DIFFUSER

FAN COIL UNIT

DRAINAGE PIPE

www.autodesk.com/revit

Scale

Checked by

Drawn by

Date

Project number

Consultant: DONPRES NIGERIA LTDAddress: No 30, Boundary Lane,

Rupakwolusi, PHPhone: +23465601623Faxe-mail: [email protected]

Consultant: KABIR MUSTAPHAAddress: No14 Gbei Road,

Nkpolu Rumuigbo, PH.Phone: +2348037142597Faxe-mail: [email protected]

Consultant: WULAN ENGINEERING LTDAddress: 4 Trans Amadi Road,

Oginigba, Port harcourtPhone: +2348038378481e-mail:

[email protected]

1" = 1'-0"

30/0

4/2

016

13

:15

:30

HVAC SYSTEM_FAN COIL UNIT

HVAC_REVIT_001

PROJECT:WULAN DEVELOPMENT PROJECT

CLIENT:EMMANUEL UYAELUMOE

05/02/2016

KABIR O. M

EMMANUEL U.

M004

No. Description Date

1" = 1'-0"

Section_FC Unit1

3D_FC Unit2

Page 5: WULAN DEV PROJECT_COMBINED DRG

154

200.0 CFM

269

1200.0 CFM

x 17"14"12"ø-8"ø-8"ø

VAV BOX

8" FLEX

RETURN DIFFUSER

SUPPLY DIFFUSER

CEILLING

FLOOR

www.autodesk.com/revit

Scale

Checked by

Drawn by

Date

Project number

Consultant: DONPRES NIGERIA LTDAddress: No 30, Boundary Lane,

Rupakwolusi, PHPhone: +23465601623Faxe-mail: [email protected]

Consultant: KABIR MUSTAPHAAddress: No14 Gbei Road,

Nkpolu Rumuigbo, PH.Phone: +2348037142597Faxe-mail: [email protected]

Consultant: WULAN ENGINEERING LTDAddress: 4 Trans Amadi Road,

Oginigba, Port harcourtPhone: +2348038378481e-mail:

[email protected]

1" = 1'-0"

30/0

4/2

016

13

:15

:31

HVAC SYSTEM_VAV UNIT DETAIL

HVAC_REVIT_001

PROJECT:WULAN DEVELOPMENT PROJECT

CLIENT:EMMANUEL UYAELUMOE

05/02/2016

KABIR O.M.

EMMANUEL U.

M005

No. Description Date

1" = 1'-0"

Section_VAV Unit1

3D_VAV Unit2

Page 6: WULAN DEV PROJECT_COMBINED DRG

--

x 36"84"

x71"

24"

x55"

24"

x55"

24"

x 55"24"x 55"24"x 28"24"x 28"24"x 17"24"x 14"24"x 14"24"

x12"

12"

x17"

14"

x

x

x

12"ø

-8"ø

-8"ø

x 28"24"x 14"24"x 14"24"

x 40"24"x 30"24"x 24"24"x 14"24"

x17"

14"

260

1200.0

CF

M

63

200.0

CF

M

151

200.0

CF

M

275

1200.0

CF

M

12"ø

-12"ø

12"ø

-8"ø

-8"ø

www.autodesk.com/revit

Scale

Checked by

Drawn by

Date

Project number

Consultant: DONPRES NIGERIA LTDAddress: No 30, Boundary Lane,

Rupakwolusi, PHPhone: +23465601623Faxe-mail: [email protected]

Consultant: KABIR MUSTAPHAAddress: No14 Gbei Road,

Nkpolu Rumuigbo, PH.Phone: +2348037142597Faxe-mail: [email protected]

Consultant: WULAN ENGINEERING LTDAddress: 4 Trans Amadi Road,

Oginigba, Port harcourtPhone: +2348038378481e-mail:

[email protected]

1 : 90

30/0

4/2

016

13

:15

:33

HVAC SYSTEM_FIRST FLOORLAYOUT

HVAC_REVIT_001

PROJECT:WULAN DEVELOPMENT PROJECT

CLIENT:EMMANUEL UYAELUMOE

05/02/2016

KABIR O. M.

EMMANUEL U.

M006

No. Description Date

1 : 9

0

F.F

loor L

ayo

ut

1

Page 7: WULAN DEV PROJECT_COMBINED DRG

--

www.autodesk.com/revit

Scale

Checked by

Drawn by

Date

Project number

Consultant: DONPRES NIGERIA LTDAddress: No 30, Boundary Lane,

Rupakwolusi, PHPhone: +23465601623Faxe-mail: [email protected]

Consultant: KABIR MUSTAPHAAddress: No14 Gbei Road,

Nkpolu Rumuigbo, PH.Phone: +2348037142597Faxe-mail: [email protected]

Consultant: WULAN ENGINEERING LTDAddress: 4 Trans Amadi Road,

Oginigba, Port harcourtPhone: +2348038378481e-mail:

[email protected]

1 : 85

30/0

4/2

016

13

:15

:34

HVAC SYSTEM_GROUND FLOORLAYOUT

HVAC_REVIT_001

PROJECT:WULAN DEVELOPMENT PROJECT

CLIENT:EMMANUEL UYAELUMOE

05/02/2016

KABIR O. M.

EMMANUEL U.

M007

No. Description Date

1 : 8

5

G.F

loor L

ayo

ut

1

Page 8: WULAN DEV PROJECT_COMBINED DRG

www.autodesk.com/revit

Scale

Checked by

Drawn by

Date

Project number

Consultant: DONPRES NIGERIA LTDAddress: No 30, Boundary Lane,

Rupakwolusi, PHPhone: +23465601623Faxe-mail: [email protected]

Consultant: KABIR MUSTAPHAAddress: No14 Gbei Road,

Nkpolu Rumuigbo, PH.Phone: +2348037142597Faxe-mail: [email protected]

Consultant: WULAN ENGINEERING LTDAddress: 4 Trans Amadi Road,

Oginigba, Port harcourtPhone: +2348038378481e-mail:

[email protected]

30/0

4/2

016

13

:15

:36

HVAC SYSTEM_MACHINEARRANGEMENT

HVAC_REVIT_001

PROJECT:WULAN DEVELOPMENT PROJECT

CLIENT:EMMANUEL UYAELUMOE

05/02/2016

KABIR O. M.

EMMANUEL U.

M008

No. Description Date

3D_Machine Room1


Recommended