+ All Categories
Home > Documents > Www.em.doe.gov 1 EM Recovery Act Lessons Learned Presenter John Lee EM Recovery Act Program...

Www.em.doe.gov 1 EM Recovery Act Lessons Learned Presenter John Lee EM Recovery Act Program...

Date post: 01-Apr-2015
Category:
Upload: glen-hemsley
View: 213 times
Download: 0 times
Share this document with a friend
Popular Tags:
13
www.em.doe.gov 1 EM Recovery Act Lessons Learned Presenter John Lee EM Recovery Act Program Presented to: DOE Corporate Operating Experience Committee Spring Webinar May 14, 2013
Transcript
Page 1: Www.em.doe.gov 1 EM Recovery Act Lessons Learned Presenter John Lee EM Recovery Act Program Presented to: DOE Corporate Operating Experience Committee.

www.em.doe.gov 1

EM Recovery Act Lessons Learned

PresenterJohn Lee

EM Recovery Act Program

Presented to: DOE Corporate Operating Experience

Committee Spring Webinar

May 14, 2013

Page 2: Www.em.doe.gov 1 EM Recovery Act Lessons Learned Presenter John Lee EM Recovery Act Program Presented to: DOE Corporate Operating Experience Committee.

www.em.doe.gov 2

ARRA Program

The American Recovery and Reinvestment Act of 2009 (ARRA) was an economic stimulus package – Feb 2009 by President Barack Obama.

DOE’s Office of Environmental Management (EM) has demonstrated tremendous success in accelerating the environmental cleanup of contaminated facilities and lands across its complex utilizing the nearly $6B in ARRA funds.

The primary objective for ARRA was to save and create jobs almost immediately – EM: Over 11,000 highly-skilled, paid technical jobs in 12 states.

Secondary objectives were to provide temporary relief programs for those most impacted by the recession and invest in infrastructure, education, health, and 'green' energy – EM: Nearly $6 billion dollars in 12 states.

134 specific cleanup projects/activities initiated at 17 sites across 12 states.

Reduced the footprint of its cleanup operations by 74 percent, exceeding original goal of 40 percent footprint reduction.

Exceeded All of EM ARRA’s Key Performance Metrics (Footprint Reduction, Mill Tailings Disposed, Transuranic/Low Level Waste Disposed, etc.)

Page 3: Www.em.doe.gov 1 EM Recovery Act Lessons Learned Presenter John Lee EM Recovery Act Program Presented to: DOE Corporate Operating Experience Committee.

www.em.doe.gov 3

ARRA Lessons Learned Background

Partially in response to IG investigations and GAO reports, EM reviewed/recommended expansion of its Project Management Lessons Learned (PMLL) Program to capture Lessons Learned (LL) earlier in project life-cycle rather than only at the end.

Initial documents reviewed included Recovery Act Readiness Evaluation (RARE) checklists, formal Project Reviews, Monthly Reports and Information Exchange briefings.

HSS Database architecture and previous work with NNSA and OECM supported use of the database as a corporate system.

EM approved use of Project Management module in HSS database for the entire EM Portfolio, regardless of funding source.

Page 4: Www.em.doe.gov 1 EM Recovery Act Lessons Learned Presenter John Lee EM Recovery Act Program Presented to: DOE Corporate Operating Experience Committee.

www.em.doe.gov 4

In 2010, EM-ARRA Program started collecting LL and using PMLL, which resulted in a EM PMLL Guide for all of EM in May/June 2011.

EM-ARRA Program developed user friendly templates (fillable PDF) for the Sites to enter project LL into the HSS database.

EM-ARRA Program proactively collected project LL during the project life-cycle rather than just at closeout.

EM-ARRA Program shared LL during MPRs and collected them in the HSS Database.

All of these actions fostered better communications of LL across the EM Complex.

Implementing Lessons Learned Program

Page 5: Www.em.doe.gov 1 EM Recovery Act Lessons Learned Presenter John Lee EM Recovery Act Program Presented to: DOE Corporate Operating Experience Committee.

www.em.doe.gov 5

Lessons Learned Information Exchange

In March 2012, EM-ARRA Program conducted, EM ARRA Best Practices and Lessons Learned Workshop at the Waste Management Symposium in Phoenix, AR. The Objectives were to:

Share LL among participants.

Review LL that could be incorporated into the EM Base Program.

Develop a path forward to incorporate the LL gathered.

Gather LL to be incorporated into Congressional Report on EM ARRA LL.

Page 6: Www.em.doe.gov 1 EM Recovery Act Lessons Learned Presenter John Lee EM Recovery Act Program Presented to: DOE Corporate Operating Experience Committee.

www.em.doe.gov 6

Lessons Learned Information Exchange

66 LL gathered were grouped into the following Categories:

Stakeholders/Regulators (8) Implementation (37) Employees (9) Contracts (12)

EM-ARRA prepared the Report to Congress,Environmental Management Recovery ActProgram Lessons Learned on November 2012based on the 66 LL collected at theInformation Exchange and the HSS PMLLDatabase.

Page 7: Www.em.doe.gov 1 EM Recovery Act Lessons Learned Presenter John Lee EM Recovery Act Program Presented to: DOE Corporate Operating Experience Committee.

www.em.doe.gov 7

January 2013 – Formed EM ARRA LL Team composed of EM, NNSA, HSS.

Make it as simple/easy as possible for Sites to met DOE-EM LL reporting requirements.

Eliminate duplication of effort as much as practical – enter data once.

Develop LL models/templates and improve LL process.

Provide draft update to ARRA LL Report to Congress by September 2013.

Answer GAO/IG ARRA recommendations/concerns.

Analyze/Trend/Report Recently Submitted EM LL

Follow-Up EM ARRA Lessons Learned Objectives

Page 8: Www.em.doe.gov 1 EM Recovery Act Lessons Learned Presenter John Lee EM Recovery Act Program Presented to: DOE Corporate Operating Experience Committee.

www.em.doe.gov 8

In March 2013, EM-ARRA developed a Comprehensive Questionnaire that was sent to all EM Sites.

The Questionnaire allowed the EM Sites to:

Assess their Understanding of the PMLL Requirements and Process.

Evaluate the Overall ARRA Experience.

Provide Programmatic Recommendations.

Rate Recently Submitted PMLL.

Site Lessons Learned Questionnaire

Page 9: Www.em.doe.gov 1 EM Recovery Act Lessons Learned Presenter John Lee EM Recovery Act Program Presented to: DOE Corporate Operating Experience Committee.

www.em.doe.gov 9

Lessons Learned Questionnaire

Page 10: Www.em.doe.gov 1 EM Recovery Act Lessons Learned Presenter John Lee EM Recovery Act Program Presented to: DOE Corporate Operating Experience Committee.

www.em.doe.gov 10

Lessons Learned Questionnaire - Analysis

0

2

4

6

8

10

12

YOUR UNDERSTANDING OF THE EM PMLL PROCESS FOR REPORTING ARRA LESSONS LEARNED

1

2

3

4

5

Average

DRAFTLow

High

Page 11: Www.em.doe.gov 1 EM Recovery Act Lessons Learned Presenter John Lee EM Recovery Act Program Presented to: DOE Corporate Operating Experience Committee.

www.em.doe.gov 11

Lessons Learned Questionnaire – Analysis (continued)

DRAFTa.

Fail

ure

of th

e pr

oject

/act

ivitie

s

b. A

dditio

nal ju

stific

ation

or r

eview

c. I

ncre

ased

cos

t in

proje

ct/c

ontra

ct m

anag

emen

t res

ourc

es

d. I

ncre

ased

pro

ject/a

ctivi

ty c

ost

02468

1012141618

3. Project ChunkingDid chunking contribute to:

Yes

No

Do Not Know

Page 12: Www.em.doe.gov 1 EM Recovery Act Lessons Learned Presenter John Lee EM Recovery Act Program Presented to: DOE Corporate Operating Experience Committee.

www.em.doe.gov 12

Lessons Learned Questionnaire – Analysis (continued)

DRAFT1030 4 7 1924 3 13323941 2 1121252240 8 121417335045 9 18202343283548 5 2731 6 42164446 1 262934153849364737

0

5

10

15

20

25 50 Site-Experienced PM LL’s Rated Highly Importantto Project Success

(Displayed in Order of Rated Importance)

Highly Important to P...

Project Management Lessons Learned 2,3

# of Highly

ImportantResponses1

80% response rate

1Received 26 responses from 19 of 19 DOE EM Sites2Data Source: PARS II Databae as of January 20133 Description of each PM LL are on 2nd page

ID Highest Rated (80% or More): Project Management LL Description (PARS II Database)10 Adequate Project Management resources must be available.30 Weekly DOE/Contractor status meetings facilitated timely resolution of potential issues.4 The project must ensure that the vendors and contractors understand the quality-level expectations at the beginning of the work.7 The relationship between the FPD and the Contractor Project Director must be positive. 19 The project must provide adequate field inspectors and adequate oversight staff.24 Conduct daily pre-job briefings with all applicable oversight, subcontractors, and vendors.

Page 13: Www.em.doe.gov 1 EM Recovery Act Lessons Learned Presenter John Lee EM Recovery Act Program Presented to: DOE Corporate Operating Experience Committee.

www.em.doe.gov 13

Summary

HSS Database, PM and H&S Modules have successfully enabled sharing of LL across the EM Complex.

LL can and should be captured/shared throughout the project Life Cycle, not just at project conclusion.

EM Base Program has benefited from EM-ARRA LL.

LL is an Interactive Process and Should be Made Easier to Report, Analyze/Trend, and Share/Implement.

Questionnaire format can be used as a method to obtain and validate LL or Lessons-to-be-Learned.


Recommended