FORGING LOCATOR. WYMAN GORDON. DETAILED DESIGN REVIEW. ROCHESTER INSTITUTE OF TECHNOLOGY Multi-Disciplinary Senior Design Team 12556 KEVIN CONWAY (ME, Lead Engineer) MARK GONZALEZ (ME) ROBERT HAGEN (EE) JOE MAJKOWSKI (EE) JORGE VIANA (ISE, Project Manager). OUTLINE. - PowerPoint PPT Presentation
Popular Tags:
48
WYMAN GORDON ROCHESTER INSTITUTE OF TECHNOLOGY Multi-Disciplinary Senior Design Team 12556 KEVIN CONWAY (ME, Lead Engineer) MARK GONZALEZ (ME) ROBERT HAGEN (EE) JOE MAJKOWSKI (EE) JORGE VIANA (ISE, Project Manager) FORGING LOCATOR DETAILED DESIGN REVIEW
Transcript
Page 1: WYMAN GORDON

WYMANGORDON

ROCHESTER INSTITUTE OF TECHNOLOGYMulti-Disciplinary Senior Design Team 12556KEVIN CONWAY (ME, Lead Engineer)MARK GONZALEZ (ME)ROBERT HAGEN (EE)JOE MAJKOWSKI (EE)JORGE VIANA (ISE, Project Manager)

FORGING LOCATOR

DETAILED DESIGN REVIEW

Page 2: WYMAN GORDON

OUTLINEI. Introduction of Wyman-Gordon

i. Forging Processii. Manufacturing Environmentiii. Customer Necessity & Requirements

II. Detailed Design – Electrical Feasibilityi. Sensors and System Orientationii. Processing System Designiii. Data Logging System Designiv. Electrical Display Design

III. Detailed Design – Mechanical Feasibilityi. Sensor System Bracket Designii. Sensor Enclosure Designiii. Display Design

Page 3: WYMAN GORDON

OUTLINE (continued)IV. Bill of Materials

i. Mechanical Sub-Systemsa. Sensor System Bracketb. Sensor Enclosurec. Display Enclosure

ii. Electrical Sub-Systemsa. Sensorsb. Processing Systemc. Data Logging Systemd. Electrical Display

V. Risk AssessmentVI. Schedule

Page 4: WYMAN GORDON

WYMAN-GORDON•Global leader in manufacturing of titanium, steel and nickel–based forgings.

• 50,000 ton press National Historic Mechanical Landmark

• 3 Primary Markets Aerospace ( Landing Gear/ Airframe structures) Energy (Various Turbine Engines and components) Military (Airframe structures / Vehicle Armor)

Page 5: WYMAN GORDON

1. Billets are heated to 1700 F-2100 F⁰ ⁰ .2. Dyes are lubricated with graphite based lubricant

(sometimes a non-stick paper).3. Forklifts transfer the hot billets from the oven to the

dye.4. Workers with crowbars have roughly 60 seconds to

position the hot forging within the dye.5. The operator gets the go-ahead from the workers, the

press closes and the billet is forged.6. The press opens, workers blast the dye with

compressed air clearing the debris into the exhaust fans.

7. The forged billet is removed and the process starts all over again.

FORGING PROCESS

Page 6: WYMAN GORDON

Hot• Dyes < 900oF• Billets < 2100oF

Flames and Smoke• Graphite based lubricant ignites

Flying Debris• Debris is blown out of the dye using compressed air• Debris is sucked into the exhaust fans

Dirty and Dusty• Dust had encapsulated the entire forging building due to the

grinders High impact

• Large forklifts• Worker with crowbars

ENVIRONMENT

Page 7: WYMAN GORDON

• Problem:• Current Billet Positioning Technique:

• Visual Judgment = Art Form

• Majority of the workforce is getting ready to retire.• Lack of a medium for knowledge transfer• Process is currently less systematic

• Leads to $1M in scrap and rework

• Solution:• Sensor Positioning System

CUSTOMER NECESSITY

Page 8: WYMAN GORDON

Position the billet within + 0.25” of a predetermined position within the dye.

Communicate: Position relative to the ideal position Necessary corrections

Catalog position electronically in reference to the part and job number.

Withstand the harsh environment. Minimal physical and visual interference with

operators and forklift drivers Dynamic/real time feedback throughout process

CUSTOMER REQUIREMENTS

Page 9: WYMAN GORDON

SYSTEM LAYOUT

•3 Major Components Computer Lasers Display

•Computer will be used for data storage and laser interface•Laser will be used in order to interface with display

Page 10: WYMAN GORDON

Time of flight sensor

Data acquisition and interface software available

RS232 or RS422 serial interfaces

Has been utilized on measuring red hot materials.

Class 2 laser (No eye protection) Red 650 nm

output

Alarm function to supply up to half an amp

Can reference measurement from any point

Measuring Range Black Material .4m - 17m

Resolution .1mm

Repeatability less than .5 mm

Linearity ±2mm (+15°C … +30°C), ±5mm (+30°C

… +50°C)

OPTONCDT ILR1181 LASER DISTANCE SENSOR

Page 11: WYMAN GORDON

Sends out a laser pulse and measures time to receive the beam back.

Theoretically the infrared pulse will have more power than the noise floor making it visible to the sensor.

Word of mouth that this has worked on materials emitting infrared noise

Test plan has been produced to confirm accuracy of laser on heated pieces of material.

TIME OF FLIGHT SENSOR

Page 12: WYMAN GORDON

PROGRAM INTERFACE

Page 13: WYMAN GORDON

PROGRAM INTERFACE(CONTINUED)

Page 14: WYMAN GORDON

DATA ACQUISITION• Data exported into column format in

excel.

• File name/path specified in program

• 3 values exported Time Distance Error

Page 15: WYMAN GORDON

Set each alarm to trigger High when box is within spec or too close to the sensor

High = 24V Low = 16V

Alarm zones will intersect to within spec (Red zone)

When inside the tolerance zone all four alarms are logical high, triggering green light indication

When outside tolerance triggers respective arrow circuit with low signal

LOGIC SETUP

outside zonePiece

Logical high for each

High

Low

Page 16: WYMAN GORDON

When an alarm line is low, circuitry in respective arrow is triggered turning on red LEDs (indicating direction needed to move)

All alarms lines being high, triggers green LED circuitry to turn on center circle giving the go ahead to operators

2 different types of circuit boards needed

DISPLAY

Page 17: WYMAN GORDON

ARROW CIRCUIT SIMULATION Ground is the signal line

When high circuit essential an open(no current flow)

When low, voltage differential of 8V creates current flow of 8.546mA

LEDs have maximum rating of 10mA

LEDs will not be supplied to much current and will turn on

Page 18: WYMAN GORDON

CIRCLE CIRCUIT SIMULATION

All inputs high, no current to diodes, Power BJT is on which allows current to flow through the BJT and the LED's to draw power

9 Green Diodes, max rating of 20 mA

Resistors set to 330 ohms to limit current.

Page 19: WYMAN GORDON

CIRCLE CIRCUIT SIMULATION

All inputs are low. Current drawn for LEDs is minimal at 30pA.

Page 20: WYMAN GORDON

CIRCLE CIRCUIT SIMULATION

Worst case only one input is low.

Circuit still draws small current of 56.6pA

LEDs should not glow with this current.

Page 21: WYMAN GORDON

DISPLAY CIRCUIT PCB

Bottom TopSilk Screen

Page 22: WYMAN GORDON

WIRING HARNESS

RS-422 uses 24/4 shielded wireOther connections 244AWG

Page 23: WYMAN GORDON

MECHANICAL DESIGN

Page 24: WYMAN GORDON

• Protective housing for Sigma-Epsilon Sensors

• Thermal insulation is primary function• Die Temp 700-900 °F• High temperature insulation for use in fire

protection

• Aluminum Housing• 1/8” thick sheet top• ¼” Al Block bottom support• Weight: 9.5 lbs.

• External Port for Sensor Harness

• View hole for Sensor Optics

• Air Purge System• Increase visibility of line-of-sight to

environment• Additional cooling of sensor (secondary

function)

ENCLOSURE

Page 25: WYMAN GORDON

• Determine the necessary thermal conductivity (k-factor) of the insulation (0.875” thk) to provide acceptable operating temperatures for the sensor (50°C)

• Radiation dominated heat transfer problem• Assumptions:

• qrad = qconv

• The bulk temperature for convection was 900 °F (773 K)

• h = 15 W/m2*K (free convection of air)

• Excluded Forced convection within box

• Aluminum outer case • 0.125” thick (0.00317 m)

• ɛ = 0.18 , k = 218 W/m*K

• Area = 29.44 in2 (0.0189 m2)

• Results• @ 0.875” thk, k = 0.116 W/m*K (0.067 Btu/h-ft-F )

• Chosen Material: k @ 427 °C (900 °F) : 0.115 W/m*K

ENCLOSURE

Page 26: WYMAN GORDON
Page 27: WYMAN GORDON

• Provides Horizontal and Vertical Motion• Allows sensors to view distinct billet

geometries

• Aluminum/Steel Build• Al blocks, Al Square Tubing, Steel Blocks

• Weight: 24 lbs.

• Horizontal Travel• Steel Rail Guide (double track T-slot)

• Supports Enclosure & Vertical Adjustment

• Fixed w/ Set screw to Rail.

• Vertical Adjustment (Telescoping Bars)• 5” Adjustable Height

• Height Maintained w/ Set screw (0.375”)

• Die Measuring Configuration• Sensor w/o Telescoping feature

• Located lower (rests on Steel Rail Guide)

ENCLOSURE SUPPORT

Page 28: WYMAN GORDON

Exploded View Die Measuring Configuration

ENCLOSURE SUPPORT (CONTINUED)

Page 29: WYMAN GORDON

• Find necessary pressure applied from set screw to hold sensor up

• Basic Static Problem w/ friction

• Parameters • Weight: 14.24 lbs.• Friction coefficient (Al –Al dry): 1.05• Area of contact( minimal): 2.625 in2

• Results• The Set-screws require a maximum of

5.2 psi of pressure to maintain static equilibrium

SET SCREW ANALYSIS

Page 30: WYMAN GORDON

• Rests on Shoe of Die Press

• Provides horizontal motion to all sensors• Length: 4 ft.

• Aluminum/Steel Build• Al Sheet, Al Square Tubing, Steel Block

• Weight w/o sensors: 43lbs. ( 88 lbs. in configure shown)

• Magnetic Feet Attachment (not shown)• Prevents movement before/during/after press

processing

• Maintains location for accurate readings

RAIL SUPPORT SYSTEM

Page 31: WYMAN GORDON

MAGNET HOLD DOWN SUPPORT

Page 32: WYMAN GORDON

• Static Analysis• Determine if Rail system can support weight of sensors

• Results• Maximum Stress : 123 psi on guide rail (compressive yield stress = 36ksi)

• Maximum Strain: 9.1565 microns/in

STRUCTURE ANALYSIS

Page 33: WYMAN GORDON

DISPLAY ENCLOSURE

Page 34: WYMAN GORDON

DISPLAY ENCLOSURE

Page 35: WYMAN GORDON

AIR PURGE SYSTEM

Page 36: WYMAN GORDON

AIR PURGE SYSTEM

Page 37: WYMAN GORDON

AIR PURGE SYSTEM

Page 38: WYMAN GORDON

TEST AND ASSEMBLY PLANS

Page 39: WYMAN GORDON

OSHA REQUIREMENTS ILR-1181-30 Time of Flight Sensor manufactured by Mirco-

Epsilon Class II Laser: described as a low-power visible laser that emits

above Class I levels but at a radiant power not above 1 mW. Human aversion reaction to bright light will protect a person Accident data on laser usage have shown that Class II lasers

are normally not considered hazardous from a radiation standpoint unless illogically used.

Direct exposure on the eye by a beam of laser light should always be avoided with any laser, no matter how low the power.

Sensor will be enclosed, so no protection will be needed. More information:

http://www.osha.gov/dts/osta/otm/otm_iii/otm_iii_6.html

Page 40: WYMAN GORDON

SUMMARY OF HAZARDS

UV and Near-Infrared (NIR) wavelength ranges do not apply to Class II Lasers.

VIS (Visible) wavelength ranges do apply to Class II Lasers.

NO fire or diffuse ocular hazards. Direct ocular hazards will occur only after

0.25 seconds of being exposed.

Page 41: WYMAN GORDON

BILL OF MATERIAL (BOM) Divided in 3 sections: Electrical, Mechanical and

Supplementary Parts. Consists of Part Description, Part Number,

Manufacturer, Vendor, Unit Price, Quantity, Price, Lead Time, and Link.

Most vendors authorized by RIT. Biggest Expense: TOF Sensor by Micro-Epsilon at

$1,840 each ($11,040 total). Initial Budget of $15,000, flexible according to needs. Total expenses with a 5% Contingency on the Total

Price: $19,300

Page 42: WYMAN GORDON
Page 43: WYMAN GORDON
Page 44: WYMAN GORDON
Page 45: WYMAN GORDON

RISK ASSESSMENT

Page 46: WYMAN GORDON

MAJOR RISKS Lead Times Sensors not being adequate for

customer needs. Components not interfacing. Miscommunication with customer. Failures due to temperature or interference. Exposure to Water. Tolerances are not met. The equipment is not deployable at location.

Page 47: WYMAN GORDON
Page 48: WYMAN GORDON

MILESTONES-Senior Design Review (Week 5-MSD I)

-Detailed Design Review (Week 10-MSD I)

-Present BOM to Wyman Gordon (Week 10-MSD I)

-Testing TOF Sensor (Week 11-MSD I)

-Purchase Requisitions (Week 1-Week 3 MSD II) à Once Budget is approved.

-Building, Testing and Incorporation of System (Week 4 to Week 8-MSD II)

-Imagine RIT Presentation (Saturday May 5th, 2012)

-Project Review Presentation, Poster Session., and Technical Paper (Week 10-MSD II)

-Visit Wyman Gordon for Installation of System ( Week 10- MSD II)

-Final Project Management Review + Uploading of all documentation (Week 11-MSD II).