1 Wyndham Case Study Installation Details Water conditioner model HydroFLOW Custom 12”i Pipe Outer Diameter 10.8 inches Pipe Material Iron Installation location Cooling Tower Overview Limescale has accumulated on the cooling tower honeycombs, louvers and infratructure even though the water throughout the building is treated by a traditional salt softening system. And, at the tower, treated by chemicals under the supervision of an outside chemical company. Trial method: 1. Monitor the effect of Hydropath Technology to remove limescale accumulated on the cooling tower honeycombs, louvers and infrastructure. 2. Monitor the effect of Hydropath Technology on preventing the growth of new limescale. Expected results: 1. Limescale will be dissolved on the honeycombs, louvers and portions of the infrastucture where the treated water has consistent contact. 2. Limescale will not rematerialize on the above mentioned areas of the cooling tower. 3. Chemicals can be reduced or discontinued without any detrimental effects. Location: Wyndham Office Building Whippany, NJ - USA Date of First Inspection: April 6, 2012 Application: Install Custom 12”i Date of Second Inspection: April 26, 2012 Purpose of Installation: Removing and preventing limescale and kill bacteria and algae. Installation Date: March 14, 2012
Transcript
Page 1: Wyndham Case Study - info.hydrotech.solutions Studies/Segments/Cooling... · 14 Definitive results after 10 weeks * Existing Limescale was dissolved and eradicated.New limescale did

1

Wyndham Case Study

Installation Details Water conditioner model HydroFLOW Custom 12”i

Pipe Outer Diameter 10.8 inches

Pipe Material Iron

Installation location Cooling Tower

Overview

Limescale has accumulated on the cooling tower honeycombs, louvers and infratructure even though

the water throughout the building is treated by a traditional salt softening system. And, at the tower,

treated by chemicals under the supervision of an outside chemical company.

Trial method:

1. Monitor the effect of Hydropath Technology to remove limescale accumulated on the cooling tower

honeycombs, louvers and infrastructure.

2. Monitor the effect of Hydropath Technology on preventing the growth of new limescale.

Expected results:

1. Limescale will be dissolved on the honeycombs, louvers and portions of the infrastucture where the

treated water has consistent contact.

2. Limescale will not rematerialize on the above mentioned areas of the cooling tower.

3. Chemicals can be reduced or discontinued without any detrimental effects.

Location: Wyndham Office Building

Whippany, NJ - USA

Date of First Inspection:

April 6, 2012

Application: Install Custom 12”i Date of Second Inspection:

April 26, 2012

Purpose of Installation:

Removing and preventing limescale and kill bacteria and algae.

Installation Date: March 14, 2012

Page 2: Wyndham Case Study - info.hydrotech.solutions Studies/Segments/Cooling... · 14 Definitive results after 10 weeks * Existing Limescale was dissolved and eradicated.New limescale did

2

Picture of the 12”i

Installed Custom 12”i

Page 3: Wyndham Case Study - info.hydrotech.solutions Studies/Segments/Cooling... · 14 Definitive results after 10 weeks * Existing Limescale was dissolved and eradicated.New limescale did

3

Pre HydroFLOW

Page 4: Wyndham Case Study - info.hydrotech.solutions Studies/Segments/Cooling... · 14 Definitive results after 10 weeks * Existing Limescale was dissolved and eradicated.New limescale did

4

Page 5: Wyndham Case Study - info.hydrotech.solutions Studies/Segments/Cooling... · 14 Definitive results after 10 weeks * Existing Limescale was dissolved and eradicated.New limescale did

5

Page 6: Wyndham Case Study - info.hydrotech.solutions Studies/Segments/Cooling... · 14 Definitive results after 10 weeks * Existing Limescale was dissolved and eradicated.New limescale did

6

Post HydroFLOW

Pre-Clean

Cleaned

Page 7: Wyndham Case Study - info.hydrotech.solutions Studies/Segments/Cooling... · 14 Definitive results after 10 weeks * Existing Limescale was dissolved and eradicated.New limescale did

7

Pre-Clean

Cleaned

Page 8: Wyndham Case Study - info.hydrotech.solutions Studies/Segments/Cooling... · 14 Definitive results after 10 weeks * Existing Limescale was dissolved and eradicated.New limescale did

8

Pre-Clean

Cleaned

Page 9: Wyndham Case Study - info.hydrotech.solutions Studies/Segments/Cooling... · 14 Definitive results after 10 weeks * Existing Limescale was dissolved and eradicated.New limescale did

9

Pre-Clean

Cleaned

Page 10: Wyndham Case Study - info.hydrotech.solutions Studies/Segments/Cooling... · 14 Definitive results after 10 weeks * Existing Limescale was dissolved and eradicated.New limescale did

10

10 Weeks Post HydroFLOW

Cleaned

After 10 Weeks

Cleaned

Page 11: Wyndham Case Study - info.hydrotech.solutions Studies/Segments/Cooling... · 14 Definitive results after 10 weeks * Existing Limescale was dissolved and eradicated.New limescale did

11

After 10 Weeks

Cleaned

Page 12: Wyndham Case Study - info.hydrotech.solutions Studies/Segments/Cooling... · 14 Definitive results after 10 weeks * Existing Limescale was dissolved and eradicated.New limescale did

12

After 10 Weeks

Pre HydroFLOW

Page 13: Wyndham Case Study - info.hydrotech.solutions Studies/Segments/Cooling... · 14 Definitive results after 10 weeks * Existing Limescale was dissolved and eradicated.New limescale did

13

After 10 Weeks

Page 14: Wyndham Case Study - info.hydrotech.solutions Studies/Segments/Cooling... · 14 Definitive results after 10 weeks * Existing Limescale was dissolved and eradicated.New limescale did

14

Definitive results after 10 weeks

* Existing Limescale was dissolved and eradicated. New limescale did not reappear or accumulate on the

tower.

Conclusion

* Hydropath Technology can be recommended as a chemical-free method to remove

and prevent scaling on cooling towers.