+ All Categories
Home > Documents > xCAT Moab Tech Review+Demo v6user.xmission.com/.../xCAT_Moab_Tech_Review+Demo_v6.ppt.pdfxCAT-Moab...

xCAT Moab Tech Review+Demo v6user.xmission.com/.../xCAT_Moab_Tech_Review+Demo_v6.ppt.pdfxCAT-Moab...

Date post: 27-Apr-2020
Category:
Upload: others
View: 4 times
Download: 0 times
Share this document with a friend
47
© 2012 IBM Corporation xCAT/Moab Technology Review & Demo Egan Ford IBM Distinguished Engineer [email protected]
Transcript
Page 1: xCAT Moab Tech Review+Demo v6user.xmission.com/.../xCAT_Moab_Tech_Review+Demo_v6.ppt.pdfxCAT-Moab Key Benefits • Reduce IT resource delivery time from weeks to minutes • Mitigate

© 2012 IBM Corporation

xCAT/Moab Technology Review & Demo Egan Ford IBM Distinguished Engineer [email protected]

Page 2: xCAT Moab Tech Review+Demo v6user.xmission.com/.../xCAT_Moab_Tech_Review+Demo_v6.ppt.pdfxCAT-Moab Key Benefits • Reduce IT resource delivery time from weeks to minutes • Mitigate

© 2012 IBM Corporation 2

PPT’s and Videos: http://xmission.com/~egan/cloud/!

Page 3: xCAT Moab Tech Review+Demo v6user.xmission.com/.../xCAT_Moab_Tech_Review+Demo_v6.ppt.pdfxCAT-Moab Key Benefits • Reduce IT resource delivery time from weeks to minutes • Mitigate

© 2012 IBM Corporation 3

Agenda

•  IBM SmartCloud and xCAT/Moab •  Cloud Taxonomy •  Financial Services Customer Results •  What is xCAT/Moab •  xCAT/Moab Demo

Page 4: xCAT Moab Tech Review+Demo v6user.xmission.com/.../xCAT_Moab_Tech_Review+Demo_v6.ppt.pdfxCAT-Moab Key Benefits • Reduce IT resource delivery time from weeks to minutes • Mitigate

© 2012 IBM Corporation 4

Cloud capabilities that are built upon a common platform, with a commitment to open standards

Commitment to open standards and a broad ecosystem

Private & Hybrid Clouds Cloud Enablement Technologies

Managed Cloud Services Infrastructure and Platform as a Service

Cloud Business Solutions Software and Business Process as a Service

Foundation Services Solutions

Business Process as a Service Software as a Service

Platform as a Service

Infrastructure as a Service

Design Deploy Consume

Page 5: xCAT Moab Tech Review+Demo v6user.xmission.com/.../xCAT_Moab_Tech_Review+Demo_v6.ppt.pdfxCAT-Moab Key Benefits • Reduce IT resource delivery time from weeks to minutes • Mitigate

© 2012 IBM Corporation 5

Managed with cloud technologies

How to manage inflexible, siloed systems and business processes to improve business agility

Deliver IT without boundaries

Orchestrate 3

Communications client reduced datacenters

from 200 to 5

System z Solution Edition for Cloud

IBM SONAS & Storwize V7000 with Active Cloud

Engine

Tivoli Service Automation Manager IBM Service Delivery Manager

Improve speed and dexterity

Automate 2IBM SmartCloud Provisioning

IBM SmartCloud

Entry

Telecom client brought new applications to market

35x faster

Build an efficient IT infrastructure

Integrate 1

Technology client reduced rack space by 94%

and energy costs by 97%

IBM SAN Volume Controller

IBM Systems Director, VMControl

BladeCenter Foundation for Cloud

zEnterprise Starter Edition for Cloud

Page 6: xCAT Moab Tech Review+Demo v6user.xmission.com/.../xCAT_Moab_Tech_Review+Demo_v6.ppt.pdfxCAT-Moab Key Benefits • Reduce IT resource delivery time from weeks to minutes • Mitigate

© 2012 IBM Corporation 6

Cloud Taxonomy

Source: http://it20.info/2012/02/the-cloud-magic-rectangle-tm/

Page 7: xCAT Moab Tech Review+Demo v6user.xmission.com/.../xCAT_Moab_Tech_Review+Demo_v6.ppt.pdfxCAT-Moab Key Benefits • Reduce IT resource delivery time from weeks to minutes • Mitigate

© 2012 IBM Corporation 7

Cloud Value Proposition and Positioning

Source: http://it20.info/2012/02/the-cloud-magic-rectangle-tm/

Page 8: xCAT Moab Tech Review+Demo v6user.xmission.com/.../xCAT_Moab_Tech_Review+Demo_v6.ppt.pdfxCAT-Moab Key Benefits • Reduce IT resource delivery time from weeks to minutes • Mitigate

© 2012 IBM Corporation 8

How You (Provider) Build These Clouds

Source: http://it20.info/2012/02/the-cloud-magic-rectangle-tm/

Page 9: xCAT Moab Tech Review+Demo v6user.xmission.com/.../xCAT_Moab_Tech_Review+Demo_v6.ppt.pdfxCAT-Moab Key Benefits • Reduce IT resource delivery time from weeks to minutes • Mitigate

© 2012 IBM Corporation 9

What You (Consumer) Get with These Clouds

Source: http://it20.info/2012/02/the-cloud-magic-rectangle-tm/

Page 10: xCAT Moab Tech Review+Demo v6user.xmission.com/.../xCAT_Moab_Tech_Review+Demo_v6.ppt.pdfxCAT-Moab Key Benefits • Reduce IT resource delivery time from weeks to minutes • Mitigate

© 2012 IBM Corporation 10

Financial Services Customer Results

•  2011 Size: 12,000 VMs •  2011 Savings:

• $20,000,000+ in Personnel Savings (Storage Side in 2011) • 50% Reduction in Maintenance Costs

•  2012 Projection: Convert 20,000 Servers (~$250,000,000 Infrastructure Value)

•  2013 Projection: Convert 20,000 Servers (~$250,000,000 Infrastructure Value)

•  2012 Savings: • ~$225,000,000+ in Server Infrastructure (10 to 1 Conversion Ratio) • $XX,000,000+ in Storage Infrastructure (4 to 1 Conversion Ratio

•  $500,000,000 in savings in just two years

10  

Page 11: xCAT Moab Tech Review+Demo v6user.xmission.com/.../xCAT_Moab_Tech_Review+Demo_v6.ppt.pdfxCAT-Moab Key Benefits • Reduce IT resource delivery time from weeks to minutes • Mitigate

© 2012 IBM Corporation 11

Platform Alignment of Moab + xCAT Strengths: Dynamic Cloud

Service Management, Scalable and Low Cost Delivery, Rich Policy Flexibility

Weaknesses: Multi-tenancy subscription management, account and contract management

Aligned: Moab+ xCAT is best aligned to a private cloud delivery that focuses on efficiency of use, SLA management between departments and core showback/chargeback scenarios

Mid Low High

Level of Focus/Capability

Page 12: xCAT Moab Tech Review+Demo v6user.xmission.com/.../xCAT_Moab_Tech_Review+Demo_v6.ppt.pdfxCAT-Moab Key Benefits • Reduce IT resource delivery time from weeks to minutes • Mitigate

© 2012 IBM Corporation 12

Big Picture

x,p,z node … HD

node

HD

node

HD Optional Local Storage

Network

xCAT Platform Management (Network, Storage, Server, VM, OS, IaaS Services) •  Highly

standardized infrastructure

•  Virtualization •  Image

Catalog •  Multi-tenancy

•  Dynamic resource scalability

•  Automated provisioning of IT resources

•  User-based self-service

•  Usage-based cost accounting

•  Service Catalog

Moab with View Point Portal

Centralized Storage Cloud (NAS or GPFS)

Page 13: xCAT Moab Tech Review+Demo v6user.xmission.com/.../xCAT_Moab_Tech_Review+Demo_v6.ppt.pdfxCAT-Moab Key Benefits • Reduce IT resource delivery time from weeks to minutes • Mitigate

© 2012 IBM Corporation 13

xCAT: Extreme Cloud Administration Toolkit

Scalable Platform Management •  Distributed Management and Provisioning

10’s of 1000’s of machines supported •  Unified Interface for

Hardware Discovery and Control •  System x, p, and z

Stateful and Stateless OS and Hypervisor Deployment Bare-metal and VM OS Deployment Virtualization Automation Network and Storage Provisioning Energy Management

Open Source Project originated at IBM •  Actively developed since 1999 •  Support and Service contracts available

Page 14: xCAT Moab Tech Review+Demo v6user.xmission.com/.../xCAT_Moab_Tech_Review+Demo_v6.ppt.pdfxCAT-Moab Key Benefits • Reduce IT resource delivery time from weeks to minutes • Mitigate

© 2012 IBM Corporation 14

What does xCAT do?

•  Remote Hardware Control (x, p, z) •  Power, Reset, Vitals, Inventory, Event Logs, Energy Capping, SNMP alert processing,

remote LED status •  Remote Console Management

•  Serial Console, SOL, Logging, Video Console (no logging) •  Remote Target Control

•  Local/SAN Boot, Network Boot, iSCSI Boot •  Remote Automated Unattended Network Installation

•  Auto-Discovery (Zero-Day) •  MAC Address Collection •  Service Processor Programming •  Remote Flashing

•  Kickstart, Autoyast, Imaging, Stateless/Diskless, Statelite/Diskelsewhere, iSCSI, Windows Installer, Windows ImageX, COW, Cloning

•  Infrastructure Service Management •  DHCP (IPv4 & IPv6), DNS, NTP, TFTP, iSCSI, NFS, Active Directory

•  VM Management and Provisioning •  Scales! Think 100,000 nodes. •  xCAT will make you lazy. No need to walk to datacenter again.

Page 15: xCAT Moab Tech Review+Demo v6user.xmission.com/.../xCAT_Moab_Tech_Review+Demo_v6.ppt.pdfxCAT-Moab Key Benefits • Reduce IT resource delivery time from weeks to minutes • Mitigate

© 2012 IBM Corporation 15

xCAT 2.5 Virtualization Support

KVM and Xen (Paravirtualization and Classic) (libvirt driven) •  Allocate on Demand, Provision Linux/Windows Guest •  Live Migration •  Serial and VGA console

ESXi (VMware API driven via Vcenter) •  Allocate on Demand, Provision Linux/Windows Guest •  Live VM and Storage Migration (Vcenter required) •  No console access (WIP, xCAT 2.5)

ScaleMP •  Allocate on Demand, Provision Linux/Windows Guest

PowerVM •  Allocate on Demand, Provision Linux/AIX Guest •  Live Migration •  Serial console

zVM •  Allocate on Demand, Provision Linux Guest •  Serial console

Linux Containers, WPARs (p), and Hyper V on roadmap

Page 16: xCAT Moab Tech Review+Demo v6user.xmission.com/.../xCAT_Moab_Tech_Review+Demo_v6.ppt.pdfxCAT-Moab Key Benefits • Reduce IT resource delivery time from weeks to minutes • Mitigate

© 2012 IBM Corporation 16

Moab Adaptive Computing Suite

•  Intelligent decision-automation system •  Self-service portal for user access •  Integrated accounting •  Static and elastic service models •  Provides data-center governance

• Balances IT service demands • Organizational policy and business priorities (SLAs) • Unified view of current and future data-center resource availability

•  xCAT Automation via xCAT XML/SSL API

Page 17: xCAT Moab Tech Review+Demo v6user.xmission.com/.../xCAT_Moab_Tech_Review+Demo_v6.ppt.pdfxCAT-Moab Key Benefits • Reduce IT resource delivery time from weeks to minutes • Mitigate

© 2012 IBM Corporation 17

xCAT-Moab Key Benefits

•  Reduce IT resource delivery time from weeks to minutes •  Mitigate risk through consistency, repeatability, and enforcement of site-

specific rules •  Respond to dynamically changing circumstances according to

organizational priorities and adjusting workload allocation and modifying infrastructure profiles to optimize service delivery

•  Self-service provisioning of physical or virtual infrastructure, including servers, memory, storage, network, software, and licenses

•  Implement allocation and billing systems to charge for costs and regulate user demand

Page 18: xCAT Moab Tech Review+Demo v6user.xmission.com/.../xCAT_Moab_Tech_Review+Demo_v6.ppt.pdfxCAT-Moab Key Benefits • Reduce IT resource delivery time from weeks to minutes • Mitigate

© 2012 IBM Corporation 18

xCAT-Moab

•  Intelligently automate extreme-scale, heterogeneous data centers with tens of thousands of applications and servers

•  Monitor the state of the entire data-center infrastructure and dynamically allocate resources to applications as needed

•  Provision stateful and stateless systems with multi-OS software stacks on demand, reducing deployment time to minutes or seconds

•  Use application profiles to intelligently place workloads on both physical and virtual resources •  Enforce service-level agreements (SLAs) and ensure acceptable quality of service (QoS) for all

users and applications •  Anticipate surges in application workload and provision additional resources on demand so that

peak workloads can be accommodated without delay or interruption of services •  Identify underutilized resources and pack workloads more tightly to enable existing

servers to complete more workload in less time •  Automate system health checks, detect amber light and failure conditions, and

automatically provision replacement servers so that applications finish on schedule without the need for manual intervention

•  Monitor power usage, identify underutilized resources, redistribute workloads, and power down idle servers until required

•  Provide centralized management across multiple geographically dispersed installations

Page 19: xCAT Moab Tech Review+Demo v6user.xmission.com/.../xCAT_Moab_Tech_Review+Demo_v6.ppt.pdfxCAT-Moab Key Benefits • Reduce IT resource delivery time from weeks to minutes • Mitigate

© 2012 IBM Corporation 19

xCAT + Moab Suite

Viewpoint •  GUI

Moab Workload Manager •  Scheduler

The Brain

Moab Accounting Module (optional) •  Pay to play

Moab Service Manager •  Queue •  Lock Management •  Universal Translator

xCAT

•  Actions The Muscle

•  The Senses

IBM-HW

MSM

xCAT

VMs

MWM

Viewpoint

MAM

Page 20: xCAT Moab Tech Review+Demo v6user.xmission.com/.../xCAT_Moab_Tech_Review+Demo_v6.ppt.pdfxCAT-Moab Key Benefits • Reduce IT resource delivery time from weeks to minutes • Mitigate

© 2012 IBM Corporation 20

Linux

Moab Dynamic Hybrid

Windows

•  Uni!ed System •  Dynamic Resources •  Management •  Ease of Use •  Increased Utilization

Windows Linux

Moab

xCAT

Page 21: xCAT Moab Tech Review+Demo v6user.xmission.com/.../xCAT_Moab_Tech_Review+Demo_v6.ppt.pdfxCAT-Moab Key Benefits • Reduce IT resource delivery time from weeks to minutes • Mitigate

© 2012 IBM Corporation 21

Idle Node Management

MOAB

xCAT Moab: •  Workload Prediction •  Power Control •  Energy Savings

Page 22: xCAT Moab Tech Review+Demo v6user.xmission.com/.../xCAT_Moab_Tech_Review+Demo_v6.ppt.pdfxCAT-Moab Key Benefits • Reduce IT resource delivery time from weeks to minutes • Mitigate

© 2012 IBM Corporation 22

Obstacle Avoidance

MOAB

xCAT Moab: •  Workload Prediction •  LED Reporting •  Higher Job Throughput •  Energy Savings

Page 23: xCAT Moab Tech Review+Demo v6user.xmission.com/.../xCAT_Moab_Tech_Review+Demo_v6.ppt.pdfxCAT-Moab Key Benefits • Reduce IT resource delivery time from weeks to minutes • Mitigate

© 2012 IBM Corporation 23

Consolidate/Pack

0 1 2 3 4 5 6 7 8 9 Hypervisors

VMs

Load Threshold

Page 24: xCAT Moab Tech Review+Demo v6user.xmission.com/.../xCAT_Moab_Tech_Review+Demo_v6.ppt.pdfxCAT-Moab Key Benefits • Reduce IT resource delivery time from weeks to minutes • Mitigate

© 2012 IBM Corporation 24

Consolidation and Load Balancing

0 1 2 3 4 5 6 7 8 9 Hypervisors

VMs

Load Threshold

Page 25: xCAT Moab Tech Review+Demo v6user.xmission.com/.../xCAT_Moab_Tech_Review+Demo_v6.ppt.pdfxCAT-Moab Key Benefits • Reduce IT resource delivery time from weeks to minutes • Mitigate

© 2012 IBM Corporation 25

Green with xCAT+Moab

Reduce your overall power and cooling costs and decrease your organization’s carbon footprint

Moab automatically and seamlessly . . . Places idle servers in power-saving modes (power capping or power down) via xCAT. Schedules nodes based on node temperatures and cost per watt. Maximizes utilization of all CPU cores by orchestrating virtual environments (such as Xen, KVM, ESXi). Reports on energy used by user, project, or resource to give you greater control of energy consumption and accountability.

6/6/2008 25

Page 26: xCAT Moab Tech Review+Demo v6user.xmission.com/.../xCAT_Moab_Tech_Review+Demo_v6.ppt.pdfxCAT-Moab Key Benefits • Reduce IT resource delivery time from weeks to minutes • Mitigate

© 2012 IBM Corporation 26

APPLICATION PUBLISHING SCREEN SHOTS

Page 27: xCAT Moab Tech Review+Demo v6user.xmission.com/.../xCAT_Moab_Tech_Review+Demo_v6.ppt.pdfxCAT-Moab Key Benefits • Reduce IT resource delivery time from weeks to minutes • Mitigate

© 2012 IBM Corporation 27

Page 28: xCAT Moab Tech Review+Demo v6user.xmission.com/.../xCAT_Moab_Tech_Review+Demo_v6.ppt.pdfxCAT-Moab Key Benefits • Reduce IT resource delivery time from weeks to minutes • Mitigate

© 2012 IBM Corporation 28

Page 29: xCAT Moab Tech Review+Demo v6user.xmission.com/.../xCAT_Moab_Tech_Review+Demo_v6.ppt.pdfxCAT-Moab Key Benefits • Reduce IT resource delivery time from weeks to minutes • Mitigate

© 2012 IBM Corporation 29

Page 30: xCAT Moab Tech Review+Demo v6user.xmission.com/.../xCAT_Moab_Tech_Review+Demo_v6.ppt.pdfxCAT-Moab Key Benefits • Reduce IT resource delivery time from weeks to minutes • Mitigate

© 2012 IBM Corporation 30

Page 31: xCAT Moab Tech Review+Demo v6user.xmission.com/.../xCAT_Moab_Tech_Review+Demo_v6.ppt.pdfxCAT-Moab Key Benefits • Reduce IT resource delivery time from weeks to minutes • Mitigate

© 2012 IBM Corporation 31

Page 32: xCAT Moab Tech Review+Demo v6user.xmission.com/.../xCAT_Moab_Tech_Review+Demo_v6.ppt.pdfxCAT-Moab Key Benefits • Reduce IT resource delivery time from weeks to minutes • Mitigate

© 2012 IBM Corporation 32

Page 33: xCAT Moab Tech Review+Demo v6user.xmission.com/.../xCAT_Moab_Tech_Review+Demo_v6.ppt.pdfxCAT-Moab Key Benefits • Reduce IT resource delivery time from weeks to minutes • Mitigate

© 2012 IBM Corporation 33 33  

Page 34: xCAT Moab Tech Review+Demo v6user.xmission.com/.../xCAT_Moab_Tech_Review+Demo_v6.ppt.pdfxCAT-Moab Key Benefits • Reduce IT resource delivery time from weeks to minutes • Mitigate

© 2012 IBM Corporation 34 34  

Page 35: xCAT Moab Tech Review+Demo v6user.xmission.com/.../xCAT_Moab_Tech_Review+Demo_v6.ppt.pdfxCAT-Moab Key Benefits • Reduce IT resource delivery time from weeks to minutes • Mitigate

© 2012 IBM Corporation 35 35  

Page 36: xCAT Moab Tech Review+Demo v6user.xmission.com/.../xCAT_Moab_Tech_Review+Demo_v6.ppt.pdfxCAT-Moab Key Benefits • Reduce IT resource delivery time from weeks to minutes • Mitigate

© 2012 IBM Corporation 36 36  

Page 37: xCAT Moab Tech Review+Demo v6user.xmission.com/.../xCAT_Moab_Tech_Review+Demo_v6.ppt.pdfxCAT-Moab Key Benefits • Reduce IT resource delivery time from weeks to minutes • Mitigate

© 2012 IBM Corporation 37 37  

Page 38: xCAT Moab Tech Review+Demo v6user.xmission.com/.../xCAT_Moab_Tech_Review+Demo_v6.ppt.pdfxCAT-Moab Key Benefits • Reduce IT resource delivery time from weeks to minutes • Mitigate

© 2012 IBM Corporation 38

Page 39: xCAT Moab Tech Review+Demo v6user.xmission.com/.../xCAT_Moab_Tech_Review+Demo_v6.ppt.pdfxCAT-Moab Key Benefits • Reduce IT resource delivery time from weeks to minutes • Mitigate

© 2012 IBM Corporation 39

Page 40: xCAT Moab Tech Review+Demo v6user.xmission.com/.../xCAT_Moab_Tech_Review+Demo_v6.ppt.pdfxCAT-Moab Key Benefits • Reduce IT resource delivery time from weeks to minutes • Mitigate

© 2012 IBM Corporation 40

Page 41: xCAT Moab Tech Review+Demo v6user.xmission.com/.../xCAT_Moab_Tech_Review+Demo_v6.ppt.pdfxCAT-Moab Key Benefits • Reduce IT resource delivery time from weeks to minutes • Mitigate

© 2012 IBM Corporation 41

Page 42: xCAT Moab Tech Review+Demo v6user.xmission.com/.../xCAT_Moab_Tech_Review+Demo_v6.ppt.pdfxCAT-Moab Key Benefits • Reduce IT resource delivery time from weeks to minutes • Mitigate

© 2012 IBM Corporation 42

Page 43: xCAT Moab Tech Review+Demo v6user.xmission.com/.../xCAT_Moab_Tech_Review+Demo_v6.ppt.pdfxCAT-Moab Key Benefits • Reduce IT resource delivery time from weeks to minutes • Mitigate

© 2012 IBM Corporation 43

IBM support for xCAT

Selected Support Offerings

IBM Enhanced Support

IBM Elite Support

Electronic Problem Submission

Yes Yes Voice Problem

Submission Yes Yes

Number of Electronic or Voice problems

Unlimited Unlimited Support Hours 8am - 5pm

Mon-Fri 8am - 5pm

Mon-Fri (24x7x365 for severity 1)

Response Target 4 business hours

2 business hours

Technical Contacts 2 Unlimited Developer Assistance

Incidents Variable Variable

Availability Worldwide Worldwide

IBM Support for xCAT offers two tiers of IBM support: •  IBM Enhanced Support for xCAT •  IBM Elite Support for xCAT

Page 44: xCAT Moab Tech Review+Demo v6user.xmission.com/.../xCAT_Moab_Tech_Review+Demo_v6.ppt.pdfxCAT-Moab Key Benefits • Reduce IT resource delivery time from weeks to minutes • Mitigate

© 2012 IBM Corporation 44

Adap-ve  Compu-ng  Support  Support  Offering   Basic  

4  3ckets  up  to  4  hours  each.  Addi3onal  3ckets,  

$500  each  

Standard    

Premium  Special  package  

pricing  available*  

Technical  Account  Manager  (TAM)  

Only  available  in  addi3on  to  Standard  or  Premium  offering  

Electronic  support  resources  including  web,  email,  documenta-on  and  online  knowledge  base  

✔   ✔   ✔   ✔  

Access  to  technical  resources  via  phone   ✔   ✔   ✔   ✔  

Technical  support  9  hours  a  day,  5  days  a  week   ✔   ✔   ✔   ✔  

SoFware  product  and  documenta-on  support   ✔   ✔   ✔   ✔  

Cri-cal  patch  no-fica-on   ✔    ✔  

✔   ✔  

Technical  support  24  hours  a  day,  7  days  a  week  for  priority  1  issues      

✔   ✔  With  Premium  Only  

1  hour  ini-al  response  on  priority  1  issues   ✔   ✔  With  Premium  Only  

On-­‐site  visits  (customer  pays  travel  and  expenses)   ✔   ✔  

Priority  rou-ng  of  cri-cal  issues   ✔   ✔  With  Premium  Only  

Up  to  80  hours  of  configura-on/consulta-on  -me  per  year   ✔  

Personalized  escala-on  management     ✔  

Case  history  monitoring  and  analysis     ✔  

Dedicated  support  resource   ✔  

*Special  package  pricing  is  available  with  both  the  purchase  of  a  Premium  and  Technical  Account  Manager  offering.  

Page 45: xCAT Moab Tech Review+Demo v6user.xmission.com/.../xCAT_Moab_Tech_Review+Demo_v6.ppt.pdfxCAT-Moab Key Benefits • Reduce IT resource delivery time from weeks to minutes • Mitigate

© 2012 IBM Corporation 45

Adap-ve  Compu-ng  Support  

Ini3al  Response  Time  Goals  

Priority  Level  1  -­‐  Cri3cal  

Priority  Level  2  –    High  

Priority  Level  3  -­‐  Medium  

Priority  Level  4  -­‐    Low  

8x5:  Mountain  Time  –  regular  business  

days  

2  business  hours   4  business  hours   8  business  hours   8  business  hours  

24x7x365  days   1  hour   4  hours   8  business  hours   8  business  hours  

Defini-on   Produc3on  system  is  down  

System  cri-cally  affected  or  

unresponsive.  A  vital  business  

process  is  severely  affected,  and  there  is  no  procedure  or  viable  workaround  

Major  feature/  func3on  failure  System  s-ll  

func-onal,  but  performance  is  substandard.  Possible  

workaround  available  

Minor  feature/  func3on  failure  

Moderate  business  impact.  Product  

does  not  operate  as  designed,  minor  impact  to  usage  

   

Minor  problem    

Documenta-on  errors,  general  

informa-on,  how-­‐to  ques-ons  and  enhancement  

requests  

Page 46: xCAT Moab Tech Review+Demo v6user.xmission.com/.../xCAT_Moab_Tech_Review+Demo_v6.ppt.pdfxCAT-Moab Key Benefits • Reduce IT resource delivery time from weeks to minutes • Mitigate

© 2012 IBM Corporation 46

Adap-ve  Compu-ng  Support  

Support  Hours:  Monday  through  Friday,  excluding  holidays    North  America:  8:00am  –  6:00pm  Mountain  Time        

 Support  line:  +1-­‐801-­‐717-­‐3710  or  888-­‐221-­‐2008    EMEA:  9:00am  –  5:00pm  GMT  

 Support  line:  +44  (0)  1483  243  578    Asia  Pacific:  Email  and  on-­‐line  services  only    Online  and  Email  Support  go  to:  www.support.adap-vecompu-ng.com          

Page 47: xCAT Moab Tech Review+Demo v6user.xmission.com/.../xCAT_Moab_Tech_Review+Demo_v6.ppt.pdfxCAT-Moab Key Benefits • Reduce IT resource delivery time from weeks to minutes • Mitigate

© 2012 IBM Corporation 47

Who’s responsible for this stuff?

Blame me: •  Egan Ford •  [email protected]


Recommended