1
X W k " 3 E X W Sources: Esri, DeLorme, NAVTEQ, USGS, Intermap, iPC, NRCAN, Esri Japan, METI, Esri China (Hong Kong), Esri (Thailand), TomTom, 2013 MANITOBA NORTH DAKOTA MINNESOTA ONTARIO Proposed Riel Converter Station Blackberry Station Glenboro South Station Dorsey Converter Station Duluth Manitoba-Minnesota Transmission Project Regional Overview 1:1,600,000 ± Coordinate System: UTM Zone 14N NAD83 Data Source: MB Hydro Date Created: Oct, 2013 0 30 60 Kilometers 0 20 40 Miles " 3 E Glenboro South Station k Blackberry Station X W Proposed Riel Converter Station X W Dorsey Converter Station Electoral Boundary Potential Border Crossing Area
Transcript
Page 1: XW Proposed Riel MANITOBA XW - Manitoba Hydro Electric ...

XW

k

"3E

XW

Sources: Esri, DeLorme, NAVTEQ, USGS, Intermap, iPC, NRCAN, Esri Japan, METI, Esri China (Hong Kong), Esri (Thailand), TomTom, 2013

MANITOBA

NORTHDAKOTA

MINNESOTA

ONTARIO

Proposed RielConverter Station

BlackberryStation

Glenboro South Station

Dorsey ConverterStation

Duluth

Manitoba-Minnesota Transmission Project

Regional Overview1:1,600,000±

Coordinate System: UTM Zone 14N NAD83Data Source: MB HydroDate Created: Oct, 20130 30 60 Kilometers

0 20 40 Miles

"3E Glenboro South Stationk Blackberry StationXW Proposed Riel Converter Station

XW Dorsey Converter StationElectoral BoundaryPotential Border Crossing Area