+ All Categories
Home > Documents > xxxxxxxxxxxxxxxxxxxx

xxxxxxxxxxxxxxxxxxxx

Date post: 31-Dec-2015
Category:
Upload: leilani-hopkins
View: 18 times
Download: 4 times
Share this document with a friend
Description:
xxxxxxxxxxxxxxxxxxxx. TXD. TXD Design Goals. Alternative to a “Big-Rig” Shallow oil/gas and CBM applications Handle range 3 casing Quick and easy set-up and breakdown High performance in compact package Low axle weights Automated pipe handling Hands free breakout (hydraulic roughneck) - PowerPoint PPT Presentation
Popular Tags:
40
•xxxxxxx xxxxxxxx xxxxx TXD
Transcript
Page 1: xxxxxxxxxxxxxxxxxxxx

•xxxxxxxxxxxxxxxxxxxx

TXD

Page 2: xxxxxxxxxxxxxxxxxxxx

TXD Design Goals• Alternative to a “Big-Rig”• Shallow oil/gas and CBM applications• Handle range 3 casing • Quick and easy set-up and breakdown• High performance in compact package• Low axle weights• Automated pipe handling • Hands free breakout (hydraulic roughneck)• Powerful tophead rotation system

Page 3: xxxxxxxxxxxxxxxxxxxx

Telemast Concept•Innovative design offers 2:1 cylinder/head travel

•Head fully retracted for short transport length

•Mast fully extended as required for setting casing

•Construction locates cylinder rods out of harms way

•Mast slides so loads are transmitted to the ground

•Mast mounted hydraulic outriggers support loads

•High tophead travel speeds

Page 4: xxxxxxxxxxxxxxxxxxxx

Basic Specifications•Mounting: Custom tri-axle trailer with tag dolly

•Deck Engine: MTU 12V-2000, 760 hp, air starter

•Tophead: 4 3/4” ID (120.6 mm) spindle, 4 x two speed motors, 0-90 rpm @ 17,750 ft-lb, 0-180 rpm @ 7,670 ft-lbs

•Mast: 50’ top head travel, 30 1/4” table, power holding slips

•Fluid Lines: 3” ID, 3000 psi WP

•Feed System: 200,000 lb (actual) hoist, 32,000 lb. down

•Pipe Handling Winch: 9,600 lb with hydraulic jib boom

•Automated Pipe Handling System: Custom tandem axle trailer powered by rig hydraulics, up to 47’ long x 30” OD tubulars

•Power Breakout: Hands free, 4½” to 8” OD, 53,000 ft-lb

Page 5: xxxxxxxxxxxxxxxxxxxx

Basic Dimensions

• Minimum Overall Length: 50’ (15.2 m)

• Front Overhang: negligible

• Width: 9’ 6” (2.9 m)

• Height: 13’ 6” (4.1 m)

• Weight: 95,000 lb (43,181 kg)

• Distribution: 20,000 lb/axle (9,072 kg), 17,000 lb/axle (7,711 kg) with tag dolly

Page 6: xxxxxxxxxxxxxxxxxxxx
Page 7: xxxxxxxxxxxxxxxxxxxx
Page 8: xxxxxxxxxxxxxxxxxxxx

Tilt-out Top Head0-90 rpm @ 17,750 ft-lb, 0-180 rpm @ 7,670 ft-lb

•Single reduction spur gear drive

•Large tapered roller bearings, no pinion bearings required

•Four, 2 speed, high torque hydraulic motors

•4 ¾” ID thru shaft

•Floating sub

•Casing lifting eyes

Page 9: xxxxxxxxxxxxxxxxxxxx

Top Head & 3” ID 3000 PSI Fluid Lines

Page 10: xxxxxxxxxxxxxxxxxxxx

Rotation BrakeFor Directional

Applications

Page 11: xxxxxxxxxxxxxxxxxxxx

Top Head & Work Platform

Page 12: xxxxxxxxxxxxxxxxxxxx

Power Breakout4” – 8” OD”

4” Drill Pipe 8” Collars

Page 13: xxxxxxxxxxxxxxxxxxxx

DDC/MTU 12V-2000TA DDEC, 760 bhp @ 1,800 rpm

Page 14: xxxxxxxxxxxxxxxxxxxx

TXD Rig Transport

Page 15: xxxxxxxxxxxxxxxxxxxx

Pipe Loader Transport

Page 16: xxxxxxxxxxxxxxxxxxxx

Transport

Page 17: xxxxxxxxxxxxxxxxxxxx

Positioning Rig

Page 18: xxxxxxxxxxxxxxxxxxxx

Erecting Mast

Page 19: xxxxxxxxxxxxxxxxxxxx

Pipe Handling Trailer Connected to Rig

Page 20: xxxxxxxxxxxxxxxxxxxx

Rig & Automated Pipe Handling Trailer

Page 21: xxxxxxxxxxxxxxxxxxxx

Automated Pipe Handling Trailer

Page 22: xxxxxxxxxxxxxxxxxxxx

Automated Pipe Handling System

Page 23: xxxxxxxxxxxxxxxxxxxx

Pipe Stop

Adjustable Pipe Stop

Page 24: xxxxxxxxxxxxxxxxxxxx

Pipe Handler Jaws

Page 25: xxxxxxxxxxxxxxxxxxxx

Pipe Handling

Adjustable Pipe Stop

Page 26: xxxxxxxxxxxxxxxxxxxx

Pipe Handling

Page 27: xxxxxxxxxxxxxxxxxxxx

Pipe Handling

Adjustable Pipe Stop

Page 28: xxxxxxxxxxxxxxxxxxxx

Pipe Handling

Page 29: xxxxxxxxxxxxxxxxxxxx

Pipe Handling

Page 30: xxxxxxxxxxxxxxxxxxxx

Pipe Handling

Page 31: xxxxxxxxxxxxxxxxxxxx

Pipe Handling

Page 32: xxxxxxxxxxxxxxxxxxxx

Pipe Handling

Page 33: xxxxxxxxxxxxxxxxxxxx

Pipe Handling

Page 34: xxxxxxxxxxxxxxxxxxxx

Pipe Handling

Page 35: xxxxxxxxxxxxxxxxxxxx

Schramm Engineering

•Over 50 years of drill rig design experience

•Utilizing the latest CAD systems

•Finite Element Analysis insures dependability

•Dynamic field testing - Installed Strain Gauges

Page 36: xxxxxxxxxxxxxxxxxxxx

TXD

Page 37: xxxxxxxxxxxxxxxxxxxx

TXD ROTADRILL

Page 38: xxxxxxxxxxxxxxxxxxxx

TXD ROTADRILL

Page 39: xxxxxxxxxxxxxxxxxxxx

TXD ROTADRILL

Page 40: xxxxxxxxxxxxxxxxxxxx

ROTADRILLS

WWW.SCHRAMMINC.COM


Recommended