2005 November (one week)– Team from Yazaki Japan visit first time to know Cliptech. Ask some improvement.
2006 July (two weeks) – Yazaki Audit and Kaizen Projects together (98 points). Talks about TPS, Japanese Quality Philosophy, 5S, Kaizen, Yazaki’s Procedures Training.
2006 December (one week) – Team from Yazaki Japan visit. Kaizen & 5S follow up and new talks and training.
2007 January (one week) – Team from Yazaki Japan visit new building. Kaizen & 5S follow up, Factory layout, Toyota’s requiremets.
2007 February (two weeks) - Team from Yazaki Japan visit. Design and Product features, Process Flow Chart, Kaizen & 5S follow up, new talks and training, Toyota’s audit preparation. SMT’s Training and First Tryout Run.
2007 May (two weeks) - Team from Yazaki Japan visit. Kaizen & 5S follow up. Toyota’s audit preparation. SMT’s Training and Second Tryout Run.
Yazaki Partner History
2007 May (one week) – Toyota Argentina audit and approval Cliptech. Team from Yazaki Japan & Argentina.
2007 June (one week) – Team from Yazaki Argentina visit. Kaizen & 5S follow up, HVPT (pilot Run), samplesa and reports for TASA.
2007 July (two weeks) - Team from Yazaki Japan visit. Kaizen & 5S follow up. Toyota’s audit preparation. New Trial Run for training SMT people.
2007 August – TASA approved HVPT, release production and supply from Cliptech IMV. Team from Yazaki Argentina visit. Kaizen & 5S follow up, preparing for mass production.
2007 September (one week) - Team from Yazaki Japan visit. Kaizen & 5S follow up. Toyota’s audit preparation (final steps).
2007 October – TMC Japan audit and approval Cliptech. Team from Yazaki Japan & Argentina showed all the project steps.
2007 November – Start the supply
Yazaki Partner History
More than 300 Kaizen & 5S Projects during the project
More than 1.000 hs in training
Yazaki prepared Cliptech for:
The same concept from Yazaki around the world
Japanase Quality Model (culture, philosophy, thinking, cleaning)
Kaizen and 5S Philosophy every time, every place, every people, every mind
Zero defects
TPS System
To be Cliptech a Yazaki extension
Permanet Learning and continues helping Cliptech in others Kaizen Projects
SMT Line 09 – Yazaki Products
SMT Line 9 Machines
Juki KE 2010
Year: 2000
Series: 210-K1034
Juki KE 2010
Year: 2000
Series: 210-K1036
Juki KE 2020L
Year: 2001
Series: 221-B1288
SMT Line 9 Products
Products: Hilux IMV Client: Yazaki/Toyota Segment: Automotive
SMT Line 9 Products
Products: Zafira Ultra Sonic Client: Continental/GM Segment: Automotive
SMT Line 9 Products
Products: Sensor Client: Ford Segment: Automotive