YEK/PORTArchitecture/Photography/Design/Building
May 2012R15Insistent Compulsive Queer
YR 2010 - 2012
2Yek.
Yek/Port
Richard
LuceroR
15
3Yek.
YEK/PORTArchitecture/Photography/Design/Building
May 2012R 15Insistent Compulsive Queer
YR 2010 - 2012
4Yek.
4aPr /Statement
P1\r-k -tek-ch r\.Art and science of buildingFormation or constructionresulting from a conscience act.
Creating structure that is appealing and performative. Using methods that are derivative of a life time of knowledge and experience. Pragmatic development at a component level to produce a cohesive unforeseen whole.
Designing from a pragmatic logical start to create intelligent solutions for specifi c programs/ problems/ structures. Working and attacking the design problem in similar manner so that the aggregation/ assembly of components work together to create a cohesive design solution that is comprehensive.
Architecture should effect and affect its inhabitants and on lookers. It should attempt to better the world through the built environment and be available to everyone. It should never only be superfi cial and post rationalized. It should never be faked in order to misrepresent its actually potential or lack there of.
Architecture is in the details as its the details that are at a human scale and its human interaction with the built environment that makes architecture.
ee
/Museo Soumaya Adjacent + Raymundo
5Yek.
4a /Table of Contents Pr
Contents4 P1
StatementArt of building defi ned
6 01Planet Fight Club
Film stills to planet to fi lm
8 03Hearst Tower
Sustainable systems analysis
9 05Farmers
Film stills to planet to fi lm
10 07Island of the Misanthropic
Alternative living test bed for new urban city typology
22 19Prada + Lomas
Tectonic expression
24 23Hoover Schemes
Initial concepts
26 25Speedway Foodie
Residential block + gastro pubtrain bridge
34 27Half Truss Table
Mode stand + cool table
36 35SCI-Arc Grad Pavilion
Fabrication + documentation
40 37JWRH
Installation proposal
42 39Union Station Master Plan
Initial schemes + models/ drawings
46 41Sky City Transit Master Plan
Skyways and vertical streetsUnion Station master plan
60 43M2CBWD
Sustainable living
62 45Mat Lab 2.0
COB + OWF + mock up + testing
70 57FReD
Solar Decathlon scheme
6Yek.
3aVs /Planet Fight Club
01Planet Fight ClubFilm Stills Transformed.
Using Rhino to map images, textures and displacement maps to create an abstraction of a planetary mass.
/Rhino V-Ray Render of Planet Fight Club
The ObserverModel Prep (1)
3D Prints are rarely printed atSCI-Arc and left usually as a modernist white object.. Taking this opportunity to give the painted object additional texture and elements through the use of color.
The ObserverInternal Physical + Animation (2)
Continuing the use of color was adapted and pushed further by using a fi lm as a visual collage of intense color and textures through motion. Using this to effectively paint the interior of the model through projection on to the unfi nished white interior surface.
7Yek.
/Planet Fight Club Vs3a
/Physical Model Photos
The ObserverPhysical Model
Planetary mass base powder print painted and featured in a short fi lm. The model started in Rhino and utilized Grasshopper to create texture on various surfaces. This was then exported to Maya to print and animate.
/Internal Physical + Animation
/Model Prep (1)
/Opening Sequence
/Abstract End Sequence (2)
/Sunrise
8Yek.
3aAp /Hearst Tower
03Hearst TowerSustainable Systems Analysis
First tower to receive LEED Gold Certifi cation for Core and Shell and Interiors in New York City
- Foreign Materials
9Yek.
3a /Farmers Ct
05FarmersUrban Systems Research Paper
Farmers Markets in California would have seemed to be a peace, love and hippies Shannon Reid sort of endeavor but it becomes apparent how arduous the task can be in starting one and even participating in one.
Certifi cation is done by the state and enforced by management organizations that are mostly non-profi ts. The largest non-profi t seem to fall under the for profi t category considering past and present incidents.
At the core of the farmers market is the local farmer selling directly to consumers and this has been a part of California since 1977. More recently the popularity of these markets is the result of an economy that is looking for quality and affordability.
Organizations like SEE-LA that help move this thinking forward with their markets and new cooking course. Better food, health, and overall quality of life. For most of the organizers there isnt much profi t after permitting, insurance and rent. Management and city only receive a small percentage of producers profi t.
Resulting from the surge of customers, organizations like Raw Inspiration set up farmer markets whenever possible in places like Glendales Americana; traditional bottom up to top down business strategy. Authenticity comes at the price of the producers that have to pay more for these more desirable new hip venues.
10Yek.
3aSt /Island of the Misanthropic
07Island of the MisanthropicA test bed for alternative living solutions for a new urban city typology. Proposing typical residential densities on a third of the land leaving the rest of grade as open space and the lower level as a public park.
The Island of the Misanthropic is a community that is centered on a central Greenhouse Coop. A resident of this island in the desert will be required to work a minimum set of hours during the day (additional hours reduce rent) to maintain the co-op greenhouse. In return the resident will be rationed a portion of the harvested goods that will meet average nutrition requirements for an average individual.The residences will be highly effi cient and comfortable with views looking out and away from the island as well as an entry from the inner green house atrium. Each resident will have their own private green space to produce herbs or other plant varieties. The resident is not obligated to stay with-in the walls of the island and is encouraged to explore other exploits. Affordable comfortable housing and guaranteed proper nutritious meals will enable individuals to have a successful less stressful life outside of the island on a daily basis. Encouraging their other pursuits within the city will produce productive members of both societies. It is through caring for the green house that a sense of place, pride and community can be established.Affordable housing and proper nutrition will only help ease the stress of living an inhospitable and competitive environment. It is through living in this environment and the associated Island culture that a new paradigm will emerge, where effi cient living develops into the realization that the need for excess is not necessary for happiness, and that material obsession and drive can be replaced with a fulfi llment that comes from the interpersonal relationships developed within and outside the community.
/Low Density Housing
/Resort Style Development
/High Density Tract Houses
/Site
/Town Home Development
/Miscellaneous Small Tract Developments
11Yek.
3a /Island of the Misanthropic St
Misanthropic Structure
The basic structural system in use is a modifi ed 3-pin arc truss. The primary structure (1) is constructed with a modifi ed wide fl ange with a rectangular tube welded to the outside. This acts as a rail to bolt various components. Primary structure has a hinge at its base and is held in place by a solid steel pin (2).Primary structure connects to a vertical vierendeel concrete truss (3). These are precast much like a large CMU and stacked. Their primary purpose is to act as an anchor to prevent the primary structure from moving on their pin connections,The concrete vierendeel trusses carry the residential units (4). The residential units are supported on a steel framed carriage (5) that also acts as a cross brace for the vierendeel trusses. All components are bolted/ pin together for ease of assembly.The primary and secondary structures are spanned by large rectangular wide fl ange steel trusses. These trusses range from a couple feet deep at the lowest level to 1-2 stories deep at occupied levels in the middle (6). A simplifi ed arc truss at the top (7) supports a circular welded tube frame for the PV fi lm glazing (8). Another simple steel frame and rails support standard frit glazing (9).Girders (10) that span between trusses are square steel tubes that get deeper toward the center reaching approximately 3 to span 45. Theyre minimum depth is 1 and are 14 spaced on center. Flat vertical steel is used to support an expandedmetal fl oor.Glazing is split between standard low-e frit glazing and a PV fi lm
glazing. Standard glazing is mounted on steel frames that run up and over the structure. Each rail is connected to a bracket that connects the glazing system to the a tertiary truss system that is attached to the primary structure.The system as a whole brings loads from glazing to a tertiary structural system that then transfers their load to the primary structure to either grow surfaces trusses or foundation. All
(1)
(2)
(3)
(4)
(6)
(7)
(8) (9)
(10)(5)
/Detail Transverse Section Drawing + Rendering
structural members are tied together in various manners to each other which in turn provides the structures stiffness
Growing surface is an aeroponic tray system that sits between fl oor support structure. All the weight is transferred to fl oor and in turn to the Trusses. From here both to primary and secondary structures then to the ground via the foundations.
+0-0
+ 22-0
+ 22-0
+ 22-0
+ 22-0
+ 11-0
+ 11-0
+ 11-0
+ 11-0
+ 22-0
+ 22-0
+ 22-0
+ 0-0
+ 0-0
+ 0-0
+ 0-0
+ 0-0
B
A
A
Typical Floor Plan
Typical plan displays units in relationship to the growing surface as well as the below grade park and its features. Floors are expanded metal to allow air and light into lower levels.
12Yek.
3aSt /Island of the Misanthropic
+ 22-0
+ 22-0
+ 22-0
BR
C
B
C
BB - BL
UE BER
RIES
BR - BR
OWN R
ICE
SB - SO
Y BEAN
S
SP - SW
EET PO
TATOSBR
BR
SPSP
SP
SPSP
BBBB
BB
BR
SBSB
SBSB
SB
UL
TYPE1 TYPE 3
TYPE 2
LL
LLUL
LLPA
UNIT TYPE/ PLANS
E - ENTRANCE
UL - UPPER LEVEL
LL - LOWER LEVEL
PA - PATIO
PA
E EE
PA
PAUL
+22-0
+22-0
+0-0
+22-0
+18-0
+0-0
BEDROOM
CATWALK
BATHROOM
MUSIC RM PATIO
KITCHEN
LIVING
KITCHEN
LIFT G
STAIR G
LIVING
FLOOR PLAN - TYPICAL UNITSSCALE: 1/8 = 1-0
UL
E
LLPA
PAUL
LL
E
LL
PA
UL PA
E
Unit Plans
Plans of typical unit confi gurations. Units in direct relationship to catwalk circulation, lift, stairs and growing surfaces.
Crop Diagram
Floor allocations fortypical crops to be grown.
Unit Diagram
Unit program organization as well as the various types and how they interlock with one another.
13Yek.
/Island of the Misanthropic St3a
/Unit Plans
/Typical Fl
oor Plan
Exterior Night
North side of the project. Rendered in Mental Ray with minimal photo manipulation. The yellow tint glazing is the same PV fi lm glazing. The blue glass is standard 4x 8 low-e glazing with frit. The glowing protrusions are vents for the below grade parking as well as exterior lighting for a park on the north side of the structure
14Yek.
3aSt /Island of the Misanthropic
/Island of the Misanthropic ST3a
15Yek.
/North Facade Night Rendering + Hobbes Ein Socks
Even though the it was decided to not cut through the fl oors there was still a quality to experiencing the spaces in this way that still held something quite unique and fascinating. It was also reminiscent of the movie Fight Clubs Opening Sequence.
Preliminary Animation
Initial thought was to go through each fl oor to allow both exterior and interior views. Problem was a limited viewing angle. Wider lenses caused too much distortion and transitions from fl oor to fl oor were awkward. This fi rst pass was also made to look drawn and impressionist. This was changed for clarity.
16Yek.
/Exterior Glazing + PV Glazing/Unit carriage _ Roof Glazing and Support
/Unit Interior Bath + Practice Space/Unit Interior Kitchen + Wine Bottle/Unit Interior Bedroom + Study
/Aeroponic Growing Surface/Evaporative Cooling Pond
3aSt /Island of the Misanthropic
Final Animation
Camera was moved adjacent to the units at a distance to enable views of the unit interiors as well as the rest of the structure. Nighttime was chosen to give a better idea of the project with lighting and it made for more dynamic images.
Overly saturated and lens fl ares abound the fi nished result was better then anticipated. Only issue was the animation of the fi sh and vehicles werent working correctly as they did in the test animation.
17Yek.
/Exterior Glazing + Adjacent Housing Tracts/Unit Bedroom + Exterior Patio
/Unit Kitchen + Living Area/Unit Bedroom + Practice Space
/First Unit Level/Parking Area + Evaporative Cooling Pond /First Level Open Grate
3a /Island of the Misanthropic St
)))
mo
A
mo
mo
mo
mo
mo
mo
mo
moD
E
Labor of love and would not been possible to produce without the diligent shared modeling and coordination with my partner. The arduous task of cleaning up vector layers was quite the ordeal and fi guring out the amount of peel and steps took a few iterations before coordinating line weights and labels.
Under grad Director of SCI-Arc. John Enright, stated Every student at some point while here I would hope be able to produce such a drawing.
18Yek.
3aSt /Island of the Misanthropic
FG
H
I
J
K
L
M
Axonometric
Peeling away the various systems that make up the enclosure and structural systems.
19Yek.
3a /Island of the Misanthropic St
/Axonometric
HVACAeroponics
Aeroponic FeedAeroponic PlantsAeroponic FabricAeroponic TrayAeroponic Drain
1
Unit ConnectorUnit FrameUnit PlatformUnit GlazingUnit Cabinate/ HVAC
A 14.3
Glazing Rain Gutter Pond / Water Basin
PV Film GlazingArticulated FrameFrame Supports
1
A 15.3
A 13.0
2
2
12
Central Primary Concrete Structure + FoundationExterior Primary Steel Structure + Foundation
Lift ConnectorLift CabLift PlatformLift Rails
Over FlowWater Storage
Irrigation Feed
GridersStringersFloor Truss
A 15.1
A 14.3
A 15.1
1
A 10.1 A 10.2
1
Support ColumnExterior Park SeatingExhaust Fan HousingExhaust FanRetaining WallParking Surface
A 10.3
Primary Surface Truss
A 13.1
1
1
Frit Low-E GlazingGlazing FrameGlazing MountGlazing Support FrameGlazing Gutter Support Frame Mount
CatwalkHand RailExpanded Metal
ADA + Chunk
ADA was already consider so only documentation needed to be produced for compliance. The Chunk shows all the building components and relevant details.
The chunk took many iterations in order to decide how it should be represented. This result is a composite of the many different portions of the entire structure exposing the various systems.
20Yek.
4aAp /Island of the Misanthropic
1'-
0"
8"
7"
A 10 2
1'-
1"
11"
1'-
3"
1'-2"
3'-
3"
0"
2
A 10.2
4"
A 10.22'-
1"
11"
1"
3"
8"
4"
S l 1" 3"
1 Upper + Lower Cabinet Detail
3"
5"
0"
1'-5"
9"
6"
3"
3
6"
4"
3
A 10.2
3"
Laminated GlassArgon CavitySiliconArgon SealExtruded Aluminum Frame
Treaded RodNutWasherRubber Gasket
Silicon SealSteel CapWood Cabinet
Moment Reinforcement PlatePrimary Truss Chrod Wide FlangeBoltsWasherNutSteel Plate FootingTeflon Coated Plate Welded
Teflon Coated Steel PlateMoment Framing Wide Flange Floor GirderFloor Joist Steel TubeSteel RibExpanded Metal
Steel TubeSteel Plate WeldedLaminated Point Supported GlassRecatngular Tapered Steel Post Welded
Steel Base PlateBoltWasherNutTop Truss Cord Wide Flange
Rectangular Steel TubeWelded Glass SupportRubber GrommitGlass Support Screw Cap
4"
1-1/2"
1/2"
3"
3'-
2"
1'-
8"
1-1/2"
3'-
0"
1"
1'-
2"
3'-
6"
4"
Details
Details were developed for the unit cabinets. They are hung on custom laminated glass using a custom cuff developed to support the cabinets as well as allowing utilities through the glass without compromising insulation.
The Guard/ Handrail was also developed and designed to be very minimal and transparent.
The entire building as a result of its sheer scale needed to be divided into four separated buildings as far as structure is concerned. Hence the need to develop a movement joint so that adjacent members are not physically connected welded or bolted but sit on a support so that the two buildings can move independent of one another.
21Yek.
4a /Island of the Misanthropic AP
/Cabinet Mounting Details
/Upper + Lower Cabinet Section Detail/Guard/ Handrail + Moment Detail
Tectonics Drawing
Showing components and assemblage including a section through the developed joint used to secure aperture system to the structure.
22Yek.
3bAp /Prada + Lomas
19Prada + LomasPrada Structural Components + Lomas Geometry
Diagrid structure of Prada Tokyo fl agship store was used as the framework. Expanded with a series of joint connectors that utilized the hyperbolic geometric. This enabled the ruled surface to develop and manipulated a surface with varied thickness and apertures.
23Yek.
/Component Parts to Whole Assembly
3b /Prada + Lomas Ap
/Finished Installed Exhibited Model
6WDFNHG9ROXPHVDUH6WDFNHGDQG$FFHVVHGE\/LIW7KH6WDFNHG9ROXPHVZLWK9DULDWLRQ&UHDWHVDQG,UUHJXODU(QYHORSHWKDW'LVSHUVHV6RXQG
6HFWLRQVDUH&RPELQHGDQG5HPRYHGWRFUHDWHD9DULDWLRQEHWZHHQ)ORRUVDQG2EWDLQ'LIIHUHQW6SDWLDO4XDOLWLHVDQG5HODWLRQVKLSV
6HFWLRQV5HPRYHG5LQJVDQG6HFWLRQVFDQEH3URJUDPHGIRU&LUFXODWLRQ5HVLGHQFHV3DWLRVDQG3DUNLQJ9RLG$FFRPLGDWHV9HKLFOH/LIWDQG3DUNLQJ
'LYLGHG9RLG&HQWUDO/LIW3URYLGHVWRDQ$UUD\RI3DUNLQJ6SDFHVDW(DFK/HYHO
&LUFXODU3DUNLQJ
%
%
6HFWLRQ%%
6HFWLRQ$$
$$
&2817(5%$/$1&(9
:HVWWK6WUHHW
6DQWD0RQLFD)UHHZD\:HVW%RXQG
0DJQROLD$YHQXH
&(175$/3$5.,1*/,)7,55(*8/$5)$&$'(0$;,0,=('*5281'3/$1(81,7$'-$&(173$5.,1*
%
%
$
:HVWWK6WUHHW0DJQROLD$YHQXH
The central hydraulic lift enables the structural footprint of the building to be fairly minimal. Central circulation and organization. The primary problem would be multiple cars leaving which could be remedied by having multiple platforms using one hydraulic piston.
Hoover Scheme Models
A central hydraulic lift schemes were favored but development took another direction for various factors.
24Yek.
3bSt /Hoover Schemes
23Hoover SchemesEmbracing parking by making it the departure point
A central hydraulic lift, habitable parking garage, elevated tree houses were initial schemes for developing a project based on a need for parking cars and embracing this rather then burying it.
/Center Lift /Center Lift
TERRACED BURM + HOBBIT GASTRO PUB
ONE WAY DOUBLE LOADED UNDERGROUND PARKING
CONCRETE + STEEL FLOOR SLAB
MODERNIST WHITE STRAWBOARD ENVELOPE
BRUTALIST GREEN/ ROCK WALK
VIEW TO DOWNTOWN LOS ANGELES
EFFICIENT UNI DIRECTIONAL + MECHANICS AND ELECTRICAL
PUBS + KITCHEN + STAGE = DAILY USE AND ENTERTAINMENT AND COMMUNITY INTERACTION
CONNECTS UNDERNEATH BRUSTALISM AND TOWERS BETWEN
STAGGERED FLOORS AND MULTIPLE STORY UNITS CONCENTRATE MASS
VIEW TO LAX
STEEL TRUSS PATIOS
VERTICAL CIRCULATION
VIEW TO HOLLYWOOD SIGN
USING VISUAL CONNECTS TO ORDER THE WALK
LOBBY OFFICES AND MISC PROG DISTRUBUTED THROUGHOUT
VIEW TO EXPOSITION PARK
VIEW TO SANTA MONICA MTNS
A LIGHT AND PORUS STRUCTURE THAT NAVIGATES BETWEEN BRUTALISM AND MODERNISM
INDUSTRIAL OCCUPIABLE WINDOW BOXES
CENTRAL LIFT AND FLANKING EGRESS
EXPANDED METAL CATWALK
64)7
/,)7
64)7
64)7
0(&+$1,&$/(/(&75,&$/
(*5(66 '5232))
64)7
/,)7
3$5.,1*(175$1&(
7:2
64)7
38%522)+$5'6&$3(7(55$&(6,77,1*
(*5(66
3$5.,1*
(*5(66
(*5(66
/,)7
3$5.,1*(;,7*5((163$&(
(*5(66
64)7
6(&7,21&87
(*5(66
&,5&8/$7,213$7+
81,7,17
3$5.,1*(;,7
64)7
38%3$7,2
3$5.,1*(175$1&(
68%21(
522)
21(
*5((1:$/.
/,)7
64)7
(*5(66
64)764)7
64)7
=(52
52&.:$/.
64)7
Crazy Scheme
A Zaha Hadid museum inspired residence. Using angular forms to develop the units and the structure as various tonic expressions of material with pragmatic functions. Units are nested within a green channel which have catwalks linking various levels and cantilevered truss patios. The whole structure fl oats above the ground plane touching down only at three points; the lift in the center and at each end.
Another viable scheme with great potential except for the complexity of the organization and structure. This was decided against because of complexity but one can argue that complexity is only in aggregation of the simplistic components and not in the actual organization which is very linear and layered.
25Yek.
3b /Hoover Schemes St
/Program Diagram /Plans
6LWH
6XSHU6LPSOH6SHHG%XPS*HQHUDWRU
6ZLWFK5HVHW6SULQJ$FWXDWHG&\OLQGHU6XVSHQVLRQ6SULQJV&RSSHU&RLO+RXVLQJ)RXQGDWLRQ5RDG0D]GD
6FDOH
0DJQROLD
$YH
7KH6SHHG%XPS0RUHRID6ZLWFKWKHQD%XPSGHSUHVVHVDVDFDUSDVVHVZKLFKLQWXUQKLWDF\OLQGHUWKDWFUDGGOHVDVXVSHQGHG0DJQHWWKDWWUDYHOVWKURXJKD&RSSHUFRLO7KLVSURGXFHVDFXUUHQWWKDWLV6WRUHG/DWHUIRU(OHFWULF9HKLFOH&KDUJLQJ6WDWLRQV2Q6LWH7KH0DJQHW:LOOFRQWLQXHWRPRYHXSDQGGRZQUHVXVSHQGHGE\VSULQVXQWLOONHQHWLFHQHUJ\LVGHSOHWHGHDFKVXFFHHGLQJFDUZLOOODGGDQRWKHUNLFNRINHQHWLFHQHUJ\WKH%XWWRQDQGF\OLQGHDUHUHFHWE\6SULQJV
:HVWWK6WUHHW
26Yek.
3bSt /Speedway Foodie
25Speedway FoodieElevated green walk with suspended residential units within a train bridge structure stemming from a gastro pub.
Primary objective of the project was to create use of the site that would benefi t the local community and neighborhood. Creating a new typology with a minimal footprint that can produce a new mix use building type. This could be deployed in similar freeway adjacent parcels.
Primary strategy was to use a steel truss structure to elevate residences off the ground to leave the quietest portion of the site for communal uses. Hence, the public and communal program is located here. The focal point is a gastro pub that opens to ground level for overfl ow. Full bar and kitchen with event space and stage to accommodate any local need from community meetings to local shows.
Structure is a simple open truss system that extends and wraps around its self to produce greater area to accommodate residences while creating a green walk that opens to the public and residences alike. Being the tallest structure in the immediate area allows for panoramic views of Downtown and Hollywood Hills.
Residential units are split level and sit at various heights within the structure. Units are accessed from both within the truss and the roof level of the truss. Constructed of steel rings, Insulated with an extruded translucent insulation and clad with a resin sheet. Internal dividers and panels are translucent as well so that the units glow with light at night and have plenty of day lighting.
3 br.
1 br.
%HGURRPVTIW 6WXGLRVTIW
%HGURRPVTIW %HGURRPVTIW
J
&OHDQ&RRN(DW
6FDOH
(QWHU
'UHVV
6LW
8QLWVDUH2UJDQL]HGZLWKWKH6,PSOH/RJLFWKDW(YHU\8QLWZLOOJDLQHQWU\IURPRQHVLGHDQG1DYLJDWLRQZLWKLQZLOOEHIURPWKHVDPHVLGH7KLVHQDEOHVDYHUVLWLOLW\ZLWKSODFHPHQWDORQJWKH3ULPDU\6WUXFWXUHDVZHOODVWKH$ELOLW\WRWRDOORZYDULRXVIORRUKHLJKWVZLWKLQDQLQGLYLGXDOXQLWDVZHOODVDOORZWKHDELOLW\WRXVHWKHURRIDVDSULYDWH([WHULRU6SDFH(QWU\/LYLQJ(DWLQJDQG6WDLUVDUH/RFDWHGZLWKLQWKH&HQWUDO6SDFHDQGWKH%HGURRPVDUH$GMDFHQWZLWKWKH5HVWURRPVXVLQJVFLUFXODWLRQVSDFHXQXVHG
6OHHS
6LW &RRN(DW6LW
(QWHU
6LW
(QWHU
3DWLR'UHVV
&OHDQ
6FDOH 6FDOH
6LW
'UHVV
&OHDQ
&OHDQ/LYH
'UHVV
6FDOH
3DWLR /LYH
3DWLR&RRN(DW /LYH
(QWHU
6OHHS
6OHHS'UHVV
6OHHS
&OHDQ&RRN(DW /LYH 'UHVV
(QWHU
3DWLR
6LW 6OHHS
6OHHS 6WRUH
&OHDQ'UHVV 6OHHS
6LW
Parking Layout
The underground parking solution meets all requirements as far as capacity, ADA, Turning radius, ramp slope, egress while still allowing two access points for stairs and lifts. Maintenance and trash facilities are located underground as well.
Unit Organization
Simple one side circulation and entry. This enables the versatility in placement within the structure as well as various fl oor heights
27Yek.
/Speedway Foodie St3b
/Underground Parking Level /Information + Site Board
/Studio 668 sqft/1 Bedroom 834 sqft
/2 Bedroom 1051 sqft/3 Bedroom 1216 sqft
/Unit Floor Plans
7UDVK5HF\FOH6XSHU3RZHUV(QWHU3DUNLQJ/HDYH3DUNLQJ/LIW(VFDSH3UHS&RRN'LQH'ULQN0RS/DXQGHU:RUN/REE\(QWU\'URS2II6WXGLR2QH%HGURRP7ZR%HGURRP7KUHH%HGURRP6WDJH&RPPRQ3DWLR
3
3 3
3
3
33
6FDOH
3
3 3 333
3 3 3
+&3
6FDOH
33
3
3
%
:
$
:
$%
:LHUG/RQJ6HFWLRQ
7UDVK5HF\FOH6XSHU3RZHUV(QWHU3DUNLQJ/HDYH3DUNLQJ/LIW(VFDSH3UHS&RRN'LQH'ULQN0RS/DXQGHU:RUN/REE\(QWU\'URS2II6WXGLR2QH%HGURRP7ZR%HGURRP7KUHH%HGURRP6WDJH&RPPRQ3DWLR
6FDOH
Plans + Weird Section
Plans are cut as various heights in order to best describe the ramping surface that with in the tube steel truss structure.
The section was cut weird in order to show all the major components. This was also done to show the various conditions of the project by peeling away components.
28Yek.
3bSt /Speedway Foodie
/Weird Section
/-5
/+5
2 br.
*UDGH
2 br.
*UDGH
*UDGH
*UDGH
*UDGH
*UDGH
*UDGH
*UDGH
*UDGH
*UDGH
*UDGH*UDGH
*UDGH
*UDGH
*UDGH
*UDGH
*UDGH
*UDGH
*UDGH
7UDVK5HF\FOH6XSHU3RZHUV(QWHU3DUNLQJ/HDYH3DUNLQJ/LIW(VFDSH3UHS&RRN'LQH'ULQN0RS/DXQGHU:RUN/REE\(QWU\'URS2II6WXGLR2QH%HGURRP7ZR%HGURRP7KUHH%HGURRP6WDJH&RPPRQ3DWLR
*UDGH
*UDGH
*UDGH
*UDGH
&OHDQ
3DWLR
6LW'UHVV
/LYH
&OHDQ
&OHDQ
6LW
(QWHU
(QWHU7R5RRI
3DWLR
&OHDQ
'UHVV
3DWLR
3DWLR
6LW6OHHS
6OHHS
6LW
6OHHS'UHVV
&OHDQ
'UHVV
&OHDQ
&OHDQ
3DWLR
'UHVV
&RRN(DW
(QWHU
6OHHS'UHVV
6OHHS
&RRN(DW
/LYH
6FDOH
6OHHS
6LW
'UHVV
(QWHU
&OHDQ
'UHVV
&OHDQ
&OHDQ
6LW
&OHDQ
(QWHU
'UHVV
6LW
6LW
6OHHS
3DWLR
6WRUH
6WRUH
6LW
3DWLR
6OHHS
&RRN(DW
(QWHU
6WRUH
(QWHU
&OHDQ
3DWLR
(QWHU
&RRN(DW
&RRN(DW
/LYH/LYH
/LYH
/LYH
6WRUH
6LW
6LW
(QWHU
6OHHS
&RRN(DW
'UHVV
'UHVV
(QWHU
/LYH
/LYH
6LW
(QWHU
&OHDQ
'UHVV
/LYH
&OHDQ
&OHDQ
3DWLR
'UHVV
6LW
3DWLR
6OHHS
6OHHS
6OHHS
'UHVV
'UHVV
'UHVV
6LW
6LW
&RRN(DW
'UHVV
&OHDQ
&OHDQ
6LW
6OHHS
'UHVV
6OHHS
&RRN(DW
6OHHS
6OHHS
&RRN(DW
&OHDQ
/LYH
'UHVV
6LW
3DWLR
6OHHS
&RRN(DW
&OHDQ
6OHHS
6OHHS
(QWHU
6LW
3DWLR
&RRN(DW
6LW
3DWLR
6OHHS
'UHVV
6OHHS
6LW
(QWHU
6OHHS
&OHDQ
/LYH
'UHVV
6LW
'UHVV
6LW
'UHVV
6FDOH
6WRUH
&RRN(DW
/LYH
6OHHS
Yek.29
3b /Speedway Foodie St
/-25
/+35
/+45
+1
01 - Roof Green Space02 - Private Garden Space03 - Public Walk04 - Bar Roof Terrace05 - Bar Exterior Patio06 - Entry Road07 - Clean08 - Sleep09 - Book Reading Seat10 - Dress11 - Store12 - Enter13 - Cook + Eat14 - Live15 - Lobby16 - Grassy Knoll - Decking - Grass - Wood Flooring - Pavers - Insulation
01
06
03
B
01 - Roof Green Space02 - Private Garden Space03 - Public Walk04 - Bar Roof Terrace05 - Bar Exterior Patio06 - Entry Road07 - Clean08 - Sleep09 - Book Reading Seat10 - Dress11 - Store12 - Enter13 - Cook + Eat14 - Live15 - Lobby16 - Grassy Knoll - Decking - Grass - Wood Flooring - Pavers - Insulation
Unit Plan + Wall Section
Enlarged unit plan describing the organization at a larger scale as well as how the unit interfaces with the structure. The Enlarge wall section shows the material and construction methods used.
Created and envisioned so that the overall fi gure would be fi lled with and emit light. Translucent enclosure, insulation, dividers would produce the desired effect.
30Yek.
3bSt /Speedway Foodie
Created and envisiothe overall fi gure wwith and emit light. enclosure, insulatiowould produce the desired effect.
Cook
Watch/Converse
Store
Translucent Divider
InsulationPillow
Climb
Store
Read
Clean
Sleep
Store
Meditate
Dress
LoungeEat
/1 Bedroom Unit Plan + Layout
/1 Bedroom Unit Perspective
+28
+19
Wall Detail
+28
+24
+13
+35
+5
+25
Plan Detail
+1
+27
12
08
Scale: 1/2" = 1'-0" Scale: 1" = 1'-0"
05
04
02
16
15
14
13
11
10
09
07
A
B
A
31Yek.
/Speedway Foodie St3b
/Plan Detail /Wall Detail
Unit Structure
Four partial units and one complete unit was construction for the structural model. These consisted of the primary bent wide fl ange structure as well as the secondary wood framing members, sub fl oor and cantilevered stairs.
3bSt /Speedway Foodie
Yek.32
/Interior Perspective
Completed Structure Model
Assembled structure model with units in place and the model mounted on a cantilevered base and the wall.
33Yek.
3b /Speedway Foodie St
34Yek.
Cn /Half Truss Table 3b
/Finished Table in Metal Shop
28'-3
"25
'-6"
E
36'-6 3/4"
38'-1
1 15/1
6"
33'-6"
A
G
F
H
41'-4 11/16"
35'-3
7/8"
24'-0
"
32'-0"
D
C
B
28'-3
"
35Yek.
/Half Truss Table Cn3b
/Site Mounting Pin/Corner Condition/Second Perspective
/Construction Drawing
/First Perspective
27Half Truss TableWelded steel model base
Great effort was made in trying to create a model base that refl ected an aspect of the project. Hence, a truss derived confi guration that takes the structure of a truss and splits it. What looks very unstable is actually quite stable as a direct result of the construction welds.
36Yek.
SuCn /SCI-Arc Grad Pavilion
35SCI-Arc Grad PavilionSteel Fabrication + Rope KnittingRope Installation and Documentationfor Oyler Wu Collaborative(Adj. Photos Courtesy of Dwayne Oyler)
Participated in modeling, building, steel fabrication, rope knitting, planning, installation, welding, and process documentation via photo and video. Project was fabricated over the course of two months. The fi nished pavilion housed the graduation ceremony for SCI-Arc.
/Footing + Rope Tie Off
37Yek.
Su /SCI-Arc Grad Pavilion Cn
/Stage /SCI-Arc Graduation
38Yek.
SuCn /SCI-Arc Grad Pavilion
/Foundation cage Drawing /Rebar Bending Rod
/Rebar Cutting /Cut + Bent Rebar
Foundation Cage
Foundation cage fabrication consisted of creating a bending jig for the rebar as well as assembly and welding of the cages within a high tolerance.
39Yek.
Su /SCI-Arc Grad Pavilion Cn
/Rebar Welding
/Finished Cage
The Maya modeled volume was printed to scale and mounted on 1/4 steel plate, the same as the proposal. This volume was used to trim the construction to give it the desired form and spatial qualities.
40Yek.
4aAp /JWRH
37JWRHJulienned White Rabbit Heart
Developing a fi gure that stems from 3 points to one off center to 4 point to support a load was the primary problem. The second part to the problem was doing this with 1/4 plate steel. As a design problem the initial approach was to design a volume that would hit the required points and create an interior space with certain effects like hunching under and being able to see up and through the structure.
/Model Front + Scale Figure
/Model Perspective
Final design renderings of the proposed steel plate structure. It would be placed within SCI-Arc and support a weight of approximately 4 000 lbs.
41Yek.
4a /JWRH Ap
/Render in SCI-Arc North Gallery
/Interior Render in SCI-Arc North Gallery
42Yek.
4aSt /Union Station
39Union StationMaster plan for new developments
The studio design problem is the addition of three million sqft in mix use residence programing added to the existing Union Station site. There is also the addition of tracks and a high speed rail station.
The second challenge in addition to the program is the goal of maintaining as much of the existing without disruption.
In addition to the above there is the larger question of transit and Union Stations role in the larger picture of the Los Angeles transit system.
/Split
(1)
(2)
(3)
(4)
(5)
(6)
Split vs Joint Drop Off
First scheme splits bus departures and vehicular drop off/ pick up. Bus Departures (6) come off of Caesar Chavez Tunnel (1)and leave the same way. Other vehicle traffi c drop off (5) comes from Vignes (2)and the freeway (3) and leave either back on the freeway or exit onto Alameda (4).
The other scheme uses the Chavez tunnel as entry and departure for all vehicle types but still keeps a drop off area (5) adjacent to the freeway and separate.
An important part of the architectural practice should be models and drawings done manually/ physically. The aesthetic quality and invaluable development of the process is invaluable.
43Yek.
4a /Union Station St
/Joint
(1)
(2)
(3)(4)
(5)
(6)
Circulation Paths
Model exhibiting various transit, pedestrian and vehicular access routes.
Yek.44
4aSt /Union Station
/Circulation Model of Transit Modes
Multi Level Platforms
One solution for adding more tracks and increase pedestrian fl ows is to separate tracks to various levels and use the levels to separate pedestrian traffi c. In this way you can allow unidirectional fl ows in and out of trains, which has in and of itself greater effi ciencies. Moving tracks vertically also allows larger wider platforms to accommodate more people.
Suspended Program
Distribution of program in suspended volumes clears the track level and enables new program not to interfere with existing. This also allows all the program to be relatively dense making the distance to and from various tracks and transportation quicker. The eight program volumes are hung and/ or cantilevered from six structural circulation cores. This system relies heavily on the volumes being counter balanced with one another.
45Yek.
/Multi Level Platform Model
4a /Union Station St
/Suspended Program Model
LOM N
KJ
H
I V
U
ZY
54
1 2
3
A
D E
C
GF
Q
Q
P
R
T
16
1213
7
X
14
8 9
6
10
18
C
19
11
W
Vermont / Beverly Station
Wilshire / Vermont Station
Wilshire / Normandie Station
Wilshire / Western Station
Westlake / MacArthur Park Station
A
D E
C
GF
CWilshire / WesteW slshire / Wes
46Yek.
4aSt /Sky City Transit
41Sky City TransitEncouraging public/ shared transit through elevated means.
Los Angeles is a city that has been developed over the past century around the personal automobile. In the beginning it was based on rail car stations. The fi rst freeway was a converted bike way from Los Angeles to Pasadena
The City for a brief moment was organized and developed around Public transit and non motorized forms of transit. Allowing the majority to navigate a decentralized city. A new network typology and infrastructure is required to transition the transit back to Public and non motorized forms of transport. Functions at the various levels of incoming transit.
Union Station will be the start and Major hub of this new Transit Network Typology. This new network forms that of an elevated bike/ walk way will encouragement motorized forms of transport and free streets of cars to enable the transition to dedicated lanes for public and shared transit. At the hub is an network of structures used to elevated program structures.
/Vicinity Transit Map
XY
Z
4
T
5
N
P
Q
R
S
NI
ZT
J
A
G
F
H
D
XW
B
O
Q
V
Y
S U
R
W
V
A
B
A
12
3
67
8
M
LD
F
A
E
I
U
G
P
C
M
L
K
H
J
O
C
J
E
Little Tokyo Station
Chinatown Station
Pershing Square Station
Civic Center Station
Vicinity / Transit20001000 5000
Bus StopMetro Station
FreewayBike RouteRapid Transit Line
Gold LineRed LinePurple LineHigh Speed Rail
Vicinity Transit Map
Initial research drawing on the existing transit systems and conditions. Indicating major lines and stops.
47Yek.
4a /Sky City Transit St
Union Station Context
The proposed structure sitting within the existing context of the surrounding area and Union Station. Sited just above the tracks.
48Yek.
4aSt /Sky City Transit
49Yek.
/Sky City Transit St4a
/Isometric of Union Station Proposal
Kiosk
Translucent Canopy
Elevated Train
Structure
Sky Light/ Ventilation
Stairs/ Escalator
Program
High Speed Rail
4 Platform Levels and 4 Tracks. Long Wide with Uni-Directional Circulation to help with crowds
Grade Level Vehicle Drop-Off
Structure
Parking Structure
Placed adjacent to East Portal entrance and freeway this would be the major entrance for pedestrian vehicles through Vignes or 101 Freeway. 11 story primary structure for long term and temporary parking. extens at grade under existing tracks to create vehical drop-off that connects to both Cores and existing track tunnel. This level also exits to Alameda and 101 Freeway
Primary Parking
Employee Parking
Void for Core
Open Courtyard
Ramp Opening
Balcony
Support Column Residences
Cutting at the exterior to create private and public balconies. internal open court yards allow ramp circulation access. Partial suspended and column supported.
Program Articulation
Similar to before but articulated in a similar way to one another so that it all reads as the same language. This is done to create a more cohesive environment.
50Yek.
4aSt /Sky City Transit
Exterior Store Front
Green Walk
Exterior Circulation/ Open Program
Offices
Exterior Patio/Open Program
Mezzanine
Retail
Slabs use flowingMulti Level Planes to Createan Exterior Terrain that AllowsExterior Park Like Store Fronts
Office
Using Channels to cut through the floors allow a narrow office space fo better light and natural ventilation while also creating exterior spaces for Eating/ Smoking.
Performace Area
Entertainment
Maximizing floor area and ceiling height to create large open volumes with mezzanine/ balcony areas to acomodate various types of events.
Large Private Office Suites
Exterior Courtyard
Exterior Open Program
Support Structure
Flat Circulation
Used to traverse the site from east to west. 3 sets exist, one coming from Metro HQ, the second from East Portal and the third from the Parking Structure. is open program which can be planted allow for kiosk. Lower levels are used to navigated laterially between platorms and types of transport.
Stairs
Open Program/ Planted Area
Primary Navigation Levels
Courtyard/ Attrium
Concrete Structure
Open Program
Kiosk
Lift
Pedestrian Walk
Ramp Circulation
1:15 Ramps are used to traverse program and other cicrculation, bridging between via truss structure and suspension cables. Lower level are uni directional bike paths and above is open pedestrian walk with open program spaces and space allocation for kiosks. Major Connectors have two pedestrian levels
Structural Core
Primary Structural Support for programatic spaces as well as Ramp Circulation. Support via Suppension or Catalevers. A double walled ribben like tube carriers all load to the ground keeping the track level mostly open as well as connecting various levels and program through out. Ramps in opposing directions are 1:15 with at minimum 2 lifts at most 4 lifts. stairs run from below to top levels. Ment to create a vertical pedestrian walk.
Stair
Ramp
Truss
Bike Path
Kiosk
51Yek.
4a /Sky City Transit St
Plans
Plans at various levels representing the over all site, track levels and tunnel levels.
52Yek.
4aSt /Sky City Transit
Metro HQ
Union Station
Amtrak Maintenance
Metro District Water
First 5
Existing Apartments
East Portal
El Monte Bus Way
Bus Roundabout
/Site Plan
East Portal Parking
Metro HQ Parking
Caesar Chavez Tunnel
Existing Train Tunnel
Union Station
Existing Apartments
East Portal
Bus Drop Off
New Parking Structure
Personal VehicleDrop Off / Pick up
El Monte Bus Way
/Plan at Existing Tunnel Level
Plan at Height
Plan cutting through the upper oor of program. Color volumes are program. Five of seven residential block are cut through and exhibits the roof condition of the other two. Also shown is an of ce and entertainment theatre with a balcony condition . Retail is also shown cut.
53Yek.
/Sky City Transit St4a
Metro HQ
Union Station
Amtrak Maintenance
Metro District Water
Existing Apartments
East PortalExisting Tracks
HighSpeedStation
New Parking Structure
El Monte Bus Way
Bus Roundabout
/Plan at Existing Track Level
Metro HQ
East Portal
Metro District Water
Residential Block
Theatre
Of ce
Retail
Mix Use Block
Residential Block
High Speed RailCanopy
Ramp
Parking Structure
/Plan at Height
High Speed Rail StCore RampsSubway LiftEast Portal/ TunnelCeasar Chavez Tunnel Bus Drop-Off Entrance/ Exit Metro HQ ParkingMetro HQ Major Ramp Circulation Kiosk
St /Sky City Transit 4a
Yek.54
A-A / C-C SectionsBus RoundaboutFlat Circulation High Speed Rail East Portal
FreewayResidencesProgram Blocks El Monte BuswaygnikraPffO-porD elciheVtairs
2409648
TunnelSubway
Sections
The sections are essentially the same cuts as before but with increased development and articulation in all aspects.
/Sky City Transit St4a
Yek.55
/Longitudinal + Transverse Section
Renderings
Taken from the pedestrian ramp above to the subway below looking through the towering structure to the sky. The interstitial middle at section exhibits the largest tower, high speed rail station and the various program types including the suspended ramps.
Yek.56
4aSt /Sky City Transit
/Elevated Pedestrian + Cycling Ramp
/Subway Intersection Open to Sky /Flat Transition Adjacent to High Speed Rail
Below Grade Physical Model
The model construction started from below grade and worked its way up. The subway was built rst which includes the track level, platform, mezzanine and entrance from East Portal. Also below grade is a core that intersects the subway and provides access to parking and the above levels.
4a /Sky City Transit St
57Yek.
/Cable Suspended Model
/Parking Level + Core
/Core + Existing Red/ Purple Line Subway
58Yek.
4aSt /Sky City Transit
/Core + Elevated Rail + High Speed Station /Core + High Speed Rail
/Core + Elevated Rail + High Speed Station
Above Grade Physical Model
A sectional that is cut on three sides contains the SE corner of the station. It cuts the East Portal building in half. Above grade features include the tracks, elevated rail, high speed rail station, a whole core as well as a partial core. Ground condition for the East portal is evident as well as the subway entrance.
Model Stand + Mover
Steel Stand is a derivative of the suspended structural system in the project. Three legs similar to the core and the model is an example of the suspended residences.
59Yek.
4a /Sky City Transit St
/Cables and Mounting Points/Tensioned Cables Clamp to Base/Suspended Model in Stand + Moving Cart
Bubble WrappedEnclosures
Dwelling Two
Dwelling One
4.5 KW Sterling Engines
sRetention Ponds
Shared Deck
Expanded Metal Decks + CCar Park
Sloped Concrete Grade
Typical Water Mid Water Level Max Water Level Tank Orentation
5570 Gallon Tank (12x)Each Person is Allocated ~15 gallons of water a day
Water
Water Levels can vary depending on Tank Capacity or through the use of closing tanks and plumbing in order to achieve a typical water level or full retention.
60Yek.
4bCs /M2CBWD
43M2CBWDMicro Multi CoupleBubble Wrapped Dwelling
A critical component to stainability is doing more with less. It is important that architecture encourages greater effi ciencies in living, e.g. higher population densities on a lot. Also to encourage more common open shared space resulting in a greener cityscape.
Water in Los Angeles is an expensive commodity. Three quarters of the cost of water is related to energy required to pump water from various locations to Los Angeles. It is important to retain as much rain water as possible to cut dependency on pumping. The amount of rainfall that falls on a standard lot is enough water to sustain 12 people for a year.
Materials used should be easily reusable and recyclable by avoiding the use of plastics and adhesives. Minimizing hardware enables recycling and reusing materials far easier . This all results in building components having a longer succeeding lives in other buildings.
/Aerial Perspective
/Water Level + Storage Tank Diagram
Living
Private
Common
Private
Car Parking
Car Parking
Car Parking
Shared DeckKitchen
BedroomBedroom
Bedroom Bedroom
Bedroom
Bedroom
TurntableSink
Closet
Storage
Seat
+H
idd
en B
ath
Seat
+H
idd
en B
ath
Seat
+H
idd
en B
ath
Seat
+H
idd
en B
ath
Seat
+H
idd
en B
ath
Bed
Bench
Table
Sink
Toilet
Tub
Built-in Bench
Dining LivingKitchen Dining
Retention Tanks
Shared Deck
Sterling Engine
Car Parking
Living Bed Dining
Retention Tanks
Living Kitchen Dining
Private + Common
Each dwelling is organized into three sections. Two of which are private and the other common. The privates space consist of bedrooms that have their own baths.
The common space consist of the living, kitchen and Dining Spaces. The and dining make use of moveable furniture in order to make use of as little or as much space as possible.
Interior
Interior private spaces are separated by a common space that can serve multiple functions. All the furnishings are design to be nested and compact when unused.
61Yek.
4b /M2CBWD Cs
/Plan
/Section A
/Interior Open Space Perspective /Cantilevered Private Areas Exterior Perspective/Interior In Use Perspective
De Constructed Wide Flange
Initial concept was de constructing the wide ange by separating the ange from the web and re purposing these components into a new from with multiple purposes.
Re Constructed Wide Flange
Second version of this was to look at various types of steel sections and how they might transition into one another and how this might occur for structure or programmatic reasons.
Hanging Cantilevered Beam
The last variation of this was reproposing the beam into a hanging cantilevered element that could possibly support a weight as a heuristic exercise or a program space.
62Yek.
4bAp /Mat Lab 2.0
45Mat Lab 2.0COB + OWF + Mock Up + Testing
The last material lab without anything being built this time around it was super exciting with the possibility of the project becoming a permanent structure in SCI-Arc.
The semester started with a simple idea of taking a standard wide fl ange and de constructing it. It evolved to a reconstructed wide fl ange that would become a beam that would transition from various standard steel sections into one another and this would compliment its movement and load.
Chill Out Beam was a heuristic project that used a concrete mass, doubling as an chill out space, would demonstrate visual its weight and the forces it exerts on the beam as it hangs acting as a cantilever.
For many reasons nothing will be built permanently. A piece of the beam was fabricated in aluminum and tested to failure. The beam was incredibly strong and as a cantilever its webbing deformed until it fell out of the rig.
New Beam
Alternate Transitions
CBA A
BC
Section C-C
Section B-B
Section A-A
Top
Original Beam
Transitions
The beam transitions take a natural progression of sections moving the web between anges to create the variation.
Each regular section of steel extends 8 before it transitions to the next pro le.
Each transition is 24 in length generally.
The production of the Beam would be done by cutting and bending at steel plate.
63Yek.
4b /Mat Lab 2.0 Ap
/Beam Elevations + Sections
Data:
Total # of 4 x 8 sheets: 5Total # of pieces: 95Total linear feet of welds: 189total weight of pieces: 1632 lbs.Total linear feet of cutting: 249Misc. Data: concrete weight equates to 183.6 Cubic feet of concrete and weighs 27,540 lbs.
Chill Out Beam
The primary premise of this scheme is to use a single pice of steel that will morph into a variety of sections to cantilever a concrete mass that will act as a chill out spot for students.
The Concrete is formed to create the platform, stair, guard rail and seating. Current it is approximately 183 cubic ft of concrete which equates to 27 540 lbs.
The Beam transitions from various types of standard extruded steel sections using the wide ange as the initial and last state.
64Yek.
4bAp /Mat Lab 2.0
/COB Perspective
Juror
ExistingStudio
MezzanineStudio
65Yek.
4b /Mat Lab 2.0 Ap
/COB Transitions Exploded Isometric
/Low Wide Perspective
/At Stair Perspective
/Sitting in Chaise Perspective/Plan
GROUP 3 Richard Lucero, Kevin Chen, Joseph Chiafari AS MATERIAL LAB SEMINAR - SPRING 2012 1
TOTAL # OF 4' x 8' SHEETS: 1TOTAL # OF PIECES: 6TOTAL LINEAR FEET OF WELDS: 24TOTAL WEIGHT OF PIECES: 1632 lbs.TOTAL LINEAR FEET OF CUTTING: 105
The primary premise of this scheme is to use a single pice of steel that will morph into a va-riety of sections to cantilever a concrete mass that will act as a chill out spot for students.
The Concrete is formed to create the plat-form, stair, guard rail and seating. Current it is approximately 183 cubic ft of concrete which equates to 27 540 lbs.
The Beam transitions from various types of standard extruded steel sections using the wide flange as the initial and last state.
Beam PrototypeChannel to Triangle Beam
Wide Flange to Triangle Cantilever
COVER SHEETDATE: 2012-02-27
DATA:
66Yek.
4bAp /Mat Lab 2.0
GROUP 3 Richard Lucero, Kevin Chen, Joseph Chiafari AS MATERIAL LAB SEMINAR - SPRING 2012
Plasma cut sheets are prepped by grinding to finish the edges. Pieces are twisted to form and placed in their correct location and clamped into place.
Welds are cleaned up where necessary. Testing Supports are cut and con-structed from thicker steel to ensure it does not fail before the piece.
Angled Supports are made for the other end of the Beam which will then be attached to a column.
PROTOTYPE FABRICATION PROCESS
67Yek.
4b /Mat Lab 2.0 Ap
GROUP 3 Richard Lucero, Kevin Chen, Joseph Chiafari AS MATERIAL LAB SEMINAR - SPRING 2012 14
1/2 Thick Steel Base - Piece not Attached, Only Friction Held.
3/16 Wire Rope
Shackle
Pulley to Redirect Force
1/2 Plate to Distribute Load
Pulley to Redirect Force
Wire Rope to Winch
Steel Bracket to Secure Guide Wire to insure vertical loading
1 Deep Concrete Anchors (6x)
CANTILEVER TESTING RIG
68Yek.
4bAp /Mat Lab 2.0
GROUP 3 Richard Lucero, Kevin Chen, Joseph Chiafari AS MATERIAL LAB SEMINAR - SPRING 2012 15
Cantilevered Beam Failed as a result of de-formation of the web un-der load until the pieced fell out of the base.
CANTILEVER TESTING RESULT
69Yek.
4b /Mat Lab 2.0 Ap
70Yek.
4bSt /FReD
57FReDFolding Residential DwellingSolar Decathlon Schematic Design
The primary driver for this scheme was to create an easily transportable and deployable . The project developed from a fairly complex design with multiple moving parts and portions that slide vs fold.
Eventually the scheme would be simplifi ed in order to bring the probably cost to something more reasonable and went with a version that was all folding in order to strengthen the design.
/FReD V27 - Midterm Presentation Rendering
FReD V47
Easily transportable exhibition educational demonstration home. Utilizing integrated PV glazing and MEP systems, natural ventilation, natural materials and nishes.
71Yek.
/FReD St4b
/FReD V47 - Post Final Exterior
/FReD V47 - Post Final Interior
Folding Residential Education DeploymentSCI-Arc Solar Decathlon 2013A Leodan Castillo & Richard Lucero Colaboration
Transition
The program was broken by programmatic function and level of privacy. Transition from most public to most private in a linear fashion.
Public / LiveMost Public / Greet Common / Work Private / Rest Most Private / Clean
175 sqft
29 sqft35 sqft
59 sqft
34 sqft
129 sqft
(71 sqft Open Kitchen) 156 sqft 29 sqft
12676 90 26 116 33
10
65
120
69
The Private portions of the home are also at a higher elevation and make use of a translucent divider
4911 cuft
1810 cuft
1555 cuft
1546 cuft
689 sqft
(157 sqft Deck)
Area + Volume
Enclosed Square Footage of the home is minimal but utilizes built-ins and exible furniture to enable variation in use of space. Exterior decks link the home to the exterior environment as well as increase living areas.
Volume is used as a way of both creating an easier conditioned space and a space that could be cozy without feeling closed and short and con ned.
72Yek.
4bSt /FReD
/Public to Private Program Transition/Area vs Volume
11.8 Insulation
4.4x8x9Water Tank
Floor17 Insulation
Floor14 Insulation
Floor9.5 Insulation
Floor9.5 Insulation
Ceiling 10 Insulation Typ.
Floor9.5 Insulation
6.5x7x9Water Tank
Skylight
6.5x7x9Water Tank
4 Insulation
7.75 Insulation
Removable Window Insulating Panels
A 2 semi rigid panel would be used when need to cover and seal glazing. These would be cellulose filled with a rating of 3.1/ IN. They would be stored in Cabinets and most likely portions of the floor.Total R value of 7.6
Windows
All glazing shall be double pane low-e glass with a 1/2 airspace. Aluminum frame with a thermal break equals a Total R Value of 2.04
Insulation Goal
The primary goal would be to get the need of insulation down to a level where the use of cotton batts be eligible.
13.6 Insulation 13.6 Insulation
11.3 Insulation
4 Insulation
13 Insulation5 Insulation
12.8 Insulation
4 Insulation
4 Insulation 4 Insulation
5.3 Insulation3 Water Tubes
Insulation
Typical Wall Construction:Primary Steel FrameType 5 In ll FramingTypical Batt Insulation (4.3R/ IN)1 Min. Ply SheathingWood Finish on Int. & Ext. (2.521R/ IN)
The Thinnest Walls on North have a minimum of 4 of batt insulation rated @ 4.3 = 17.2R with the addition of 1 osb /wood nish on both sides with an R Value of 2.521 = 5.042R. Total minimum R value of 22.242
The Thickest Walls on South are minimum of 11 insulation not counting any insulating value of garments or other items stored in these walls and the bed when folded up. This equates to a rating of 47.3 with the addition of 1 osb and nishing value of 5.042. Total maximum R Value of 52.342
Floor Thickness is at a minimum of 9.6 batt insulation with a rating of 41.28 plus the typical 5.042 rated osb and wood nish. Total R value of 46.32
Ceiling is a Minimum of 10 batt insulation with a R Value of 43 plus typical 5.042 rated osb/ wood nish. Total R value 48.042
73Yek.
4b /FReD St
/Wall Thickness
Onyx SolarCrystalline Glazing16 Watts / Square foot
@ 0 100 SQFT (16.7W/SQFT) = 1670W
Onyx SolarCrystalline Glazing16 Watts / Square foot
@ 0 110.6 SQFT (16.7W/SQFT) = 1847W
Onyx SolarCrystalline Glazing16 Watts / Square foot
@ 11.5 54.5 SQFT (16.7W/SQFT) = 910.1W
Onyx SolarCrystalline Glazing16 Watts / Square foot
@ 11.5 59.3 SQFT (16.7W/SQFT) = 990.3W
Onyx SolarCIGS Glazing11 Watts / Square foot
@ 90 115 SQFT (12W/SQFT) = 1380W
Solar Thermal Tubes34 9.4 Tubes @ 0
Solar Thermal Tubes34 6.75 Tubes @ -15
Onyx Solar CIGS Glazing11 Watts / Square foot
@ 90 83.5 SQFT (12W/SQFT) = 1002W
West Elevation
15 11.5
90
0Solar Thermal Tubes PV Glazing
West Elevation
15 11.5
90
0Solar Thermal Tubes PV Glazing
Solar Thermal
These tubes wrap the Dining area and used for pre heating water. They are also used for insulating the skylight. The idea is that some of the tubes would be evacuated while others maybe just water tubes for insulating or aesthetic. .
Onyx Solar PV Glazing
This con guration uses opaque panels gaining the highest ef ciency for PV Glazing. The goal would be to reduce the PV need so that the use of translucent and color glass PV could be use to have a more versatile design. Already there is a 23% performance buffer that could be used for design.
74Yek.
4bSt /FReD
/East Elevation - Solar + Thermal Angles
/Solar Thermal + PV Glazing Speci cations
Air Purge Blower
Heat + Cool Unit
Washer / Dryer
Bath Exhaust
ToiletShower Shower Head
EVR
Kitchen Sink
Stove Exhaust
Condenser
Mech Room
Heated Water Tank
Water Heater Unit
Water Line
Water Feed Line
Coolant Lines
Mech Room Exhaust
Junction Boxes
Sink
275 Gal.Gray Water Tank
275 Gal.Gray Water Tank
Heat + Cool Unit
195 Gal.Pre Heated Water Tank
MEP
Mechanical Room is situated just off the front porch and hidden behind a couple of doors.Condenser is open to above while the junction boxes and water heater sit below.
Water storage tanks and grey water tanks sit in the oor.
Heating and cooling units sit high and across the living and bedroom spaces. Air purge blower is situated at the highest point exhaust out the east side.
75Yek.
4b /FReD St
/MEP Systems Layout
Secondary Steel
Folder Pivot (FO): Tube 12x4Dim: 4x12x1/4
Floor Girder (FL): Tube 8x3Dim: 3x8x1/4
Pivot Support (PI): Tube 4x3Dim: 4x3x1/4
Post (PO): Tube 3x3Dim: 3x3x1/4
Hinge (HI): FlushDim: 1-1/2 Dia. 1/4 Plate
Buffer (BU): RubberDim: 1/2
Tertiary Timber
Ceiling Joist (CE): 2x8Dim: 1.5x7.5
Wall Stud (WA): 2x6Dim: 1.5x5.5
Floor Joist (FJ): 2x18Dim: 1.5x17.5
Sheathing (SH): OSB PlyDim: 4x8x5/8
Interior FInish (IF): Marine PlyDim: 4x8x3/8
Finish Floor (FF): BambooDim: 3-3/4x5/8
Exterior Finish (EF): ReclaimedDim: 6x5/8
(CJ)
(WS)
(FJ)
(FO)(FL)
(PS)
(SH)(SH)
(IF)(FF)
(PS)
(HI)
(HI)
(HI)
(PS)
Secondary Steel
Folder Pivot (FO): TuDim: 4x12x1/4
Tertiary Timber
Ceiling Joist (CE): 2x8Dim: 1.5x7.5
Wall Stud (WA): 2x6Dim: 1.5x5.5
Floor Joist (FJ): 2x18Dim: 1.5x17.5
Sheathing (SH): OSB PlyDim: 4x8x5/8
Interior FInish (IF): Marine Dim: 4x8x3/8
Finish Floor (FF): BambooDim: 3-3/4x5/8
Exterior Finish (EF): ReclaiDim: 6x5/8
(CJ)(SH)
(IF)(FF)
Folder
(HI)
r
Structure
The goal is to create as light and as strong a structural system as possible in order to minimize weight.
Therefore the approach was to use a 3 types of structures:
Primary wide ange for the CoreSecondary tube structure for the foldersTertiary type 5 for in ll.
76Yek.
St /FReD 4b
Primary Steel
Floor Girder (F): W12x16Dim: 4x12x1/4
Beam (B): W8x13Dim: 4x8x1/4
Post (P): Tube 4x4Dim: 4x4x1/4
Spacer (S): Custom W7Dim: 4x7x1/4
l
ube 12x4
Ply
o
med
(B)(PS)
(P)
(S)
Moveable Built-ins
Storage Built-ins
Finish Marine Ply
Built-in Bracing
Aluminum Frame Openings
Hatch
Sky Light
Pushup Closure
(HI)
(F)
Pushup Closure
77Yek.
4b /FReD St
78Yek.
4bSt /FReD
/Mexico City Museo de Soumaya Adjacent Mall Roof Top Exhibition
79Yek.
4b /FReD St
/Mexico City Vogue Photo Shoot
Yek/Port R
15Y
R. 10-12
MA
Y 2012R
ichard Lucero
80Yek.
2012-05-29 Yek Port R15 Both 12012-05-29 Yek Port R15 Both 22012-05-29 Yek Port R15 Both 3