6
r.lRtIT~:H.:: f'F:.O'-'~:'_ E':. t FH. I I!'::i. O~'':·3 ::;Cl.r=: 1::=:;' '-' 13 2011 03:19F~ p '" 1 F. No. J-11011/705/2008- IA II (1,\ Government of India Ministry of Environment and Forests (LA. Division) Paryavaran Bhawan eGO Complex, Lodhl Road New Delhi - 110003 E-mail: [email protected] Telefax: 011: 24367668 Dated 5 lh October, 2010 To, The General Manager Mis 8hairavnath Sugar Works Ltd Sonari, Taluka Paranda, District Osrnanabad Mahar ashtra .~. E-mail: tgmore2003(U2yahoo.co.in; danish [email protected],in; Fax:020-24378702; Ref. Molasses Based Distillery Unit (30 KLPD) located at Viliage Sonari, Taluka Paranda, District Osmanabad, Maharashtra by MIs. Bhairavnath Sugar Works Limited. - Environmental Clearance reg. Your letter no. nil dated za" April. 2010. Subject: Sir, Kindly refer your letter no nil dated 28:~ April. 2010 aiongwith project documents including Form I Terrr s of RE!fsrences. PrE!-feasibllity Report ELl>./EMP Reporl and subsequent clarification/additional information submitted vide letter dated 2~"~ /\ugust, 20i 0 regarding above mentioned project 20 The Ministry of Env!ronment and Forests has examined the application It is noted that proposal is for setting up of molasses based distillery (30 KLPD) to manufacture Rectified Spirit Ethanol and Extra Neutral Alcohol based on continuous fermentation technology at Village Sana", Taluka Paranda, District Osrnanabad, Maharashtra The total land area availab!e is 130 acres and the distillery olant is proposed to be set up withm the 2500 TeD sugar factory premises in an area of 25 acres. No forest I~r~d arid R&R is involved The unit will run for 270 days. Tota! cost of the project is Rs 22.00 Crores .~ 3.0 MUiti-cyclone fallowed by bag fiiter alonqwith adequate stack height will be provided to boiler to control particulate emissions. The total water requirement (500 m5/day) will be met from the Kolcgaon dam and exi:>tillg bore weli wirrdn sugar factory ore-ruses. Spent w8sh generation will be @ 8klikl of alcohol produced and treated in bio-rneihanation plant followed by oio- composting with press mud to achieve zero discharge. The power requirement (08 MW) will be met from the Co-generation power plant (15 MW). Yeast siudge will be used as manure and fly ash as per Fly Ash Notification, 1999 and subsequent amendments time to time 4Q Public Hearirig / Public Consultation meeting held on 28;" August. 2009. 5.0 All molasses based distilleries are listed at S N 5(9) (i) under categoryA' and appraised at Central level. (L_- \1 ,/ .... )--··/1 Y .\,(',:~. C"'~"''-' ,., '" ., {!!,-~. . ..... ~\-x\(J
Transcript
Page 1: zaenvironmentclearance.nic.in/writereaddata/modification/... · 2015-12-21 · FH:: t'IO, Apr_ 13 201: 03:24PM P2 I 2 6.0 The proposal was considered by the Expert Appraise: Comnutte

r.lRtIT~:H.:: f'F:.O'-'~:'_ E':.t

FH. I I!'::i. O~'':·3::;Cl.r=: 1::=:;''-'

13 2011 03:19F~ p

'"1

F. No. J-11011/705/2008- IA II (1,\Government of India

Ministry of Environment and Forests(LA. Division)

Paryavaran BhawaneGO Complex, Lodhl Road

New Delhi - 110003

E-mail: [email protected]: 011: 24367668

Dated 5lh October, 2010To,

The General ManagerMis 8hairavnath Sugar Works LtdSonari, Taluka Paranda,District Osrnanabad Mahar ashtra

.~.E-mail: tgmore2003(U2yahoo.co.in; danish [email protected],in; Fax:020-24378702;

Ref.

Molasses Based Distillery Unit (30 KLPD) located at Viliage Sonari, TalukaParanda, District Osmanabad, Maharashtra by MIs. Bhairavnath Sugar WorksLimited. - Environmental Clearance reg.Your letter no. nil dated za" April. 2010.

Subject:

Sir,Kindly refer your letter no nil dated 28:~ April. 2010 aiongwith project documents

including Form I Terrr s of RE!fsrences. PrE!-feasibllity Report ELl>./EMP Reporl and subsequentclarification/additional information submitted vide letter dated 2~"~/\ugust, 20i 0 regarding abovementioned project

20 The Ministry of Env!ronment and Forests has examined the application It is noted thatproposal is for setting up of molasses based distillery (30 KLPD) to manufacture Rectified SpiritEthanol and Extra Neutral Alcohol based on continuous fermentation technology at VillageSana", Taluka Paranda, District Osrnanabad, Maharashtra The total land area availab!e is 130acres and the distillery olant is proposed to be set up withm the 2500 TeD sugar factorypremises in an area of 25 acres. No forest I~r~d arid R&R is involved The unit will run for 270days. Tota! cost of the project is Rs 22.00 Crores.~

3.0 MUiti-cyclone fallowed by bag fiiter alonqwith adequate stack height will be provided toboiler to control particulate emissions. The total water requirement (500 m5/day) will be met fromthe Kolcgaon dam and exi:>tillg bore weli wirrdn sugar factory ore-ruses. Spent w8sh generationwill be @ 8klikl of alcohol produced and treated in bio-rneihanation plant followed by oio-composting with press mud to achieve zero discharge. The power requirement (08 MW) will bemet from the Co-generation power plant (15 MW). Yeast siudge will be used as manure and flyash as per Fly Ash Notification, 1999 and subsequent amendments time to time

4Q Public Hearirig / Public Consultation meeting held on 28;" August. 2009.

5.0 All molasses based distilleries are listed at S N 5(9) (i) under categoryA' and appraisedat Central level. (L_-

\1 ,/

....)--··/1 Y .\,(',:~.C"'~"''-' ,., '".,

{!!,-~. ...... ~\-x\(J

Page 2: zaenvironmentclearance.nic.in/writereaddata/modification/... · 2015-12-21 · FH:: t'IO, Apr_ 13 201: 03:24PM P2 I 2 6.0 The proposal was considered by the Expert Appraise: Comnutte

FH:: t'IO, Apr_ 13 201: 03:24PM P2

I

2

6.0 The proposal was considered by the Expert Appraise: Comnutte e (lnoustry-z) in its 10:"meeting held during 29\"-30:1' April, 2010 and 13th E,L\C (1-2) meeting held during 19:~-20tr,August. 2010 The Committee recommended the proposal for envrronrnentai clearance.

7.0 Based on the information submitted by the project proponent. the Ministry ofEnvironment and Forests hereby accords environmental clearance to above project under the

?--.. provisions of EIA Notification dated 14:' September 2UUb_ subject to the compliance of thefollowing Specific and General Condrtons:

A. SPECiFIC CONOITION$:

I) Environment clearance :s accorded only for 1-'-;0:855e5 based cnsutlery urut (30KLPD) As proposed, biornethanauon followed :J',' o.ccomcostinq metnod shan beadopted. No grain based distillery unit shan be set up without prior perrmss.on fromtile Ministry

ii) Efforts shall be made to reduce RSPM levels in the ambienl air and a time boundaction plan shall be submitted Multi-cyclone tollowed by bag filters shali be providedto the boiler to centro! particulate emissions' within 1GO mg/Nrn:} At no time, theemission levels shal: go beyond the prescribed standards. In the event of failure ofany pollution control system adopted by the unit. the respective unit shail not berestarted until the control measures are rectified to achieve the desired eiiiciency

iii) The National Ambient Air Ouality Emission Standards Issued by the Ministry videG S. R No 826(E) dated 16!::November. 2009 shali be followed

ivy ln-plant control measures for checking fugitive emissions from al' the vulnerablesources shan be prov.ce o Fugitive emissions shail be controlled by providing closedstorage,' closed handling & conveyance of '~hernica!s!materjais. multi cycloneseparator and water sprinkling system Dust suppression system including watersprinkling system shal' be provided at loading and unloading areas to control dustemisstons Fugitive ern.sslons in the work zone environment. product raw materiatsstorage area etc shali be r-egularly monitored and records ShClIi be maintained Theemissrons shal' conform to th~ limits imposed by MPC8.

v) .The gaseous emissions from DG set sbalt be dispersed through adequate stackheight as per CPCB guidelines Acoustic enclosure shall be provided to the DG setsto mitigate the noise pollution.,

vi) The company shall upload the status of cornptiance of t!"\e stipulated environmentalclearance conditions, including results of monitored data on its website and shallupdate the same periodically. !t shall sirnuttaneously be sent to the Reqional office ofMOEF, the respective Zonal office of epe8 and the Maharashtra Pollution ControlBoard. Theievels ofPM1,:, PMZ5, SO", NOx and He (Metharle and Non-methane) inambient air shall be monitored and dispiayed at a convenient location near the maingate of the c·ornpany and at important public places.-~-------

..»

Page 3: zaenvironmentclearance.nic.in/writereaddata/modification/... · 2015-12-21 · FH:: t'IO, Apr_ 13 201: 03:24PM P2 I 2 6.0 The proposal was considered by the Expert Appraise: Comnutte

••• ·r~~····:~3.~.:':~:i

r..

viii)

ix)

x)

xi)

- -- n

3

:;;llbmiHed to the Mini:;;try':;; Regional Office at Bhopal wittun 3 months of Issue ofenvrronmental clearance lei:1er

As proposed spent wash genel'ation shall not exceed e kl/k] of alcohol produced andtreated In bio-methanation olant followed by oio-compostmq with press mud toachieve 'Zero' cischarqe No effluent shall be discharged outside the premises and'Zero' discharge shal! be rnamtained

The spent wash shall be stored In .mpervrous pUCC8 lagoons TI-'e spent washlagoons shall have proper lining with HCPE and shall be kept III propel' condition toprevent ground water oouut.on As per the CPCB rec:on;mer'ldatio!l. storaqe shall notexceed 5 days capacity

Adequate numbers of ground water quality monitoring stations shaf be set up byproviding piezometers around the project area Sampling and trend analysismonitoring must be made On monthly a basis and report submitted to MPCB and thisMinistry .

Company sha!1adopt rainwater harvesting rnaasur as to recharge the ground water.

xii) Fire fighting system shall be as per the OISO 1 j 7 norms and cover ail areas wherealcohol is produced, handled and stored. Provision of foam system for fire fightingshall be made to control fire from the alcohol storage tank,

xiii) Risk assessment shall be carried to assess tne fire 8(id explosion risk due to storageof alcohol and report submitted to the Ministry and its Regional Office at Bhopalwithin SIX months

xiv) As proposed. green belt shall be developed in 40 acres cut of total 130 acres tomitigate the effects of fugitive emissions all around the plant as per CPCB guidelinesin consultation with the local OFO

. xv) Occupational health survs iuance pr-ogrdmr,'1? shau b8 unoertakeri as regular exercisefor all the employees The first aid taclllties in the occupational ,health centre shall bestrengthened and the medical records of each employee should be maintainedseparately

xvi) All the commitments made during the Public Hearing I Pubhc Consultation meetingheld on zs" August, 2009 shall be satisfactorily implementeo and adequate budgetprovision shall be made accordingly.· .

,xvli) Provision shail be made for the housing for the construction labour within the site

with all necessary infrastructure and facilities such as fuel for cooking, mobile toilets,mobile sewage treatment plant, safe drinking water, medical rlealth care, creche etc.The housing may be in the form of temporary structure to be removed after thecompletion of the project All the construction wastes shall be managed so that thereis no impact on the surrounding snvironms-tt {L--'.--

_1 __ . _ -~--~-

Page 4: zaenvironmentclearance.nic.in/writereaddata/modification/... · 2015-12-21 · FH:: t'IO, Apr_ 13 201: 03:24PM P2 I 2 6.0 The proposal was considered by the Expert Appraise: Comnutte

Fri:-: 1--,0.

. ..l

4

B. GENERAL CONDITIONS:

I. The project authonues shall strictly adhere k') the suouiat.ons made by theMaharashtra Pollution Control Board

ii. No further expansion or modifications in the piaiil sr.al: te carried out wnhout priorapproval of the M'nist:y of Environment and Forests in case of deviations oralterations In the project proposal from :hcse submitted to trus Ministry forclearance a fresh reference shall be made to the Mini~try to assess the adequacy of

-~ conditions imoosed and to add additional eovr onmental protection measuresrequired. if any

III The locations of ambient air quality monitoring stations shall be decided In

consultation with the Maharashtr a Pollution Control BOard :.MPCB) and it shall beensured that at least one station is mstalled in the upwind and downwind directionas wel! 8S where; maximum ground level concent.aticns are anticipated

IV • _ 1 .' i • ~ :.;;, r' ; \

S\aflC81(;~ :Ji' p:J':dlng rl01"e ~Qn:r'..;;;1,C:~':.,I,t.:·;· ,-" .•.... , ~J j'_'J"":'" ;--,;,,;.; .. ),,'~I_._·.'

enclosures etc on ail sources of noise generation. ,-r-Ie ambient noise levels shallconform to the standards prescribed under Environment (Protection) Act, 1986Ru!es. 1989 viz 75 d8A (day time) and 70 dBi~ ,night time)

v. The Company shall obtain Authorization for collection, storage and disposal ofhazardous waste under the Hazardous vvsste (Management, Handling and Trans-boundary Movement) Rules, 2008 and its amendment t.me to time and priorpermission from fJiahaf'ashtra Pollution Ccntrot Board shall be obtained for disposalof solid .: hazardous waste including boner ash

vi During transfer Of materials spiltaqes shall be avoided and gar!{3nd drains beconstructed to avoid mixing of accidental spillages with domestic wastewater andstorm water drains

vii. Usaqe of Personnel Protection Equipments (PPEs} by all employees.workers shall$

be ensured _\

viii, Training shall be imparted to all ernplcyees on safety and healt!: aspects ofchemica's handling. Pre-employment and routine periodical medical examinationsfor ail employees shal! be undertaken on reguldr basis. Tr8ining to all employees onhandling of Chemicals shall be imparted,

ix. The company shali also comply with all Hie environmental protection measures andsafeguards proposed in ihe project report submitted to the Ministry All therecommendations made in the EIAIEMP in respect of environmental management.risk mitigation measures and public neari";,) relating to the project shall beimplemented _

~-----...,

x. The company Sh:3!! undertake CSR acb/if.Tes and ~r-e-tfJv:;:J'lt rneasOl'@'S.......fefimproving the socro-econorntc conditions of U:E:surroundmo area. :._-:

Page 5: zaenvironmentclearance.nic.in/writereaddata/modification/... · 2015-12-21 · FH:: t'IO, Apr_ 13 201: 03:24PM P2 I 2 6.0 The proposal was considered by the Expert Appraise: Comnutte

.,,'

--~---------F'l

s

XI The company shall undertake eco-developmental measures including communitywelfare measures In the project area for the overall Improvement of theenvironment.

xii, A separate Environmental Management Cell equipped with full fledged laboratoryfacilities shall be set up to carry out the Environmental Management and Monitonnqfunctions.

xiii. As proposed, the company shall earmark Rs. 2.43 crores and Rs. 2995 lakhstowards capita: cost and recurring .cost per annum to implement tile conditionsstipuiated by th~ Ministry of Environment and Forests as wetl as the StateGovernnlent alone With the Implementation schedule For an the conditions stipulatedherein The funds so earmarked for environment rnanaqernent/ pollution controlmeasures shall not be diverted for any other purpose

XIV. A copy of the clearance letter shall be sent by the project proponent to concernedPanchayat Zila Parisad/Murucioal Corporation Urban roca: Body and the localNGO, If any, from who suggest/oils! representations If CJIl',;, \'\.'er6 received whileprocessing the proposal

xv. The project proponent stlall also submit six monthly reports on the status ofcompliance of the stipulated Environmental Clearance conditions rncluding resultsof morutorcd data (both in hard copies as we!! as by e·::iai!) to the respectiveRegional Office of MoEF, the respective Zonal Office ot CPC8 and the MaharashtraPollution Control Board A copy of Environmental Clearance and six rnouthlycompliance status report shan be posted on the website of the.company

xvi. The environmental statement for each financial vear ending 3P: fv1arch in Forrn-Vas is mandated shal' be submitted to the Mahar asbtra Pollution Control Board asprescribed under the Ei1\jironrnent (Protection) R.ules, 1986 as amendedsubseouer-tly. shall also be put on the website of the company along with the statusof compliance of environmental dea'ance conditions and Sh8i! also be sent to theRegional Offices of MoEF at Bhopal by e-mai'

XVII. The project proponent sha;! .nform the public that the project has bec:m accordedenvironmental clearance by the Ministry and copies of the clearance letter areavailable with the MPC8/Con·iillit!ee and may also be seen at Website of theMinistry at httD:/!envfornicln Thrs sh<:l!l be acJ\)e1ised 'Nithin seven davs from thedate of issue ~f the clearance letter, at least in two local newspapers that are \Nidelycirculated !n the region of wr!lch one shall be Jr, the vernacular !;:mguage of thelocality concer-ned and 8 copy of the same shall GO:: forwarded to the concernedRegional Office of the r\j~jf'iist,y

xviii The project authorities shall inform the Regional Office as well as the Ministry, thedate of financial closure and final approval of the project by the concernedauthorities and the date of start of the project

,8_0 The Ministry may revoke or suspend the clearance, if implernerrtation of any of the aboveconditions is not satisfactory i'L// ..

._-------_ .._------_. -------.------------_ ....-.....--.----_._-----_ ...._--------_ ...

- j

Page 6: zaenvironmentclearance.nic.in/writereaddata/modification/... · 2015-12-21 · FH:: t'IO, Apr_ 13 201: 03:24PM P2 I 2 6.0 The proposal was considered by the Expert Appraise: Comnutte

s..!--o:'.'".l.""'!"',

'.-'.' .,.-::.a.,~~.. -- -

6

gO The Ministry reserves 1M nght to stipul.te addittonal condrtions. rf found necessary. The

company in a time bound manner will implement these conditions

10.0 Any appeal against this en'Jironmental clearance shall Ire wrth tne National AppellateAuthority. if preferred. wrlhin a period of 30 days as preswbed under seclion 11 of the National

E.nvironment Appellate AuthOl'ity Act, 1997,

11.0 The above condrtions wr!! be enforced. Inter-alia under the proviSions of the Water(Prevention & Control of Pollution) Act. 1974. Air (Prevention &. control of WaW pollution) Act.1981. the Environ ment (protection) Act. 1986 Haza rdeus Wasles (Me nage

ment and Handling)

Rules. 200312008 and tile Public Liability 'nsurance Ac!1991 along witb Iheir amendments andrUles'--\ 'i -r'"" r';i i-" ), ,"'J-t 't '-I 1_/ . ~~...--.( ~-

"

~o(Or, p, B, Rastogi)

Scientist 'F'

Copy to ' .The Principal Secretary. E0vironnient Department Government of tv1aharashtra, 15th Floor,

New Administrative Building, Mantralaya, MUlllbal

- 400 0322 . The Chief Conservator of Forests (Central). Regional Office (Northern Zone). Bay No 24-25.

Sector 31-A. Dskshirn Marg, Chandigarh.160030.3 The Chairman Cen'''! pollution ConVol Board Parivesh Bhavan. CBD-cum-Office Complex,

East Aljun Nagar. t'Jew Delhi -1 '10 0324. Tne Chairman, Ma~af;?srltra Pollution Control Board Kalpataru POint. :tl and 4:" floor, Opp.

Cine Planet Sion Circle, Mun1bai-400 0225 Saentrst G. IA II(!) M:nistn} cf Envrronrnent and Foresls. Paryav.ran Bhavan. eGO

Complex, New Delhi6 Monitoring Cell. Ministry of Environment and Fare.sts, Pary;:l'Jaran Bhav31i, eGO complex,

New Delhi7 Guard Fi!e/Morlitonng File/Record File,