Page 1 of 22 ZONE: NAME OF STATE: NAME OF UTILITIES: TPIEA-IT: TOWN:
Transcript

Page 1 of 22

ZONE:

NAME OF STATE:

NAME OF UTILITIES:

TPIEA-IT:

TOWN:

Page 2 of 22

Section-A

1.1) Background

About R-APDRP

The Ministry of Power, Government of India initiated Power Sector reforms in the 1990s to invite

private investments for setting up additional generating capacity to bridge the wide gap between

demand and supply. Numerous investors, both Indian and foreign, came forward to set up new

generating capacity but little progress could be achieved due to serious inefficiencies and losses in

the electricity distribution business in almost all states of the country.

Government of India (GOI) initiated reforms in the distribution sector in 2000. Distribution sector

provides the last mile connectivity for power supply and deals with large number of consumers. As a

part of distribution reforms, GOI launched APDP (Accelerated Power Development Program) in

2001 which was later rechristened as APDRP (Accelerated Power Development and Reforms

Program) during the 10th Five Year Plan.

To continue the support to distribution reforms during the 11th Five Tear Plan, GOI has reintroduced

R-APDRP (Restructured APDRP) with revised terms and conditions. The R-APDRP primarily aims

at reducing Aggregate Technical and Commercial (AT&C) losses & improving reliability in urban

areas in the project area by improving quality of power in terms by plugging pilferage points due to

poor profile unable to use available power due to latency in locating fault & restoring healthy

network, poorly maintained equipment’s , loosely coupled connections , Better conductors ,

Proper Metering covered in Part A IT implementation , strategic placement of cap bank & switches

and proper planning to design distribution network. All these answers can be addressed by having

proper real-time supervision & control system & management modules i.e. SCADA/DMS system

encompassing all distribution S/S & complete 11 KV network in urban area. For all towns those

qualifies for SCADA/DMS system in Part A of R-APDRP , upgradation of distribution S/S & 11KV

network to meet SCADA/DMS requirement is essential . The augmentation /upgradation of the

network for real time supervision & control mainly comprises of using network equipment viz circuit

breaker & switches compatible for SCADA /DMS . Bringing sufficient monitoring controllability in

the 11kV network by placing remote controllable switches, placement of RMUs ,FPIs suitable for

automation.. This augmentation /upgradation shall be considered for such towns in Part B of R-

APDRP scheme. However, the full fledged SCADA/DMS to meet the sizing requirement of the

network as well as future growth shall be considered for these towns in Part A of R-APDRP.

SCADA/DMS will provide Real time monitoring & control of loss areas & shifting to alternate path ,

improvement in voltage /VAR profiles by getting accurate solution from SCADA/DMS to curb losses

attributed due to poor power factor, faster & accurate fault location & restoration resulting decrease

in issues to the utility due to non utilisation of available power due the delay in fault restoration .

Proper handling of loads while load shedding & restoration ,efficient planning of network for future

growth by using proven planning tools. All software applications & RTUs/FRTUs including system

sizing requirement for the same shall be considered in the SCADA/DMS system being procured in

Part -A. It is a necessary condition of the scheme that the utilities would need to demonstrate

performance improvement for availing financial benefits provided under the scheme. This would

require collection of accurate data and measurement of loss reduction performance. Data integrity

and performance measurement pose many challenges for the state power utilities. This problem

Page 3 of 22

can be surmounted only by: (i) setting up Real time SCADA/DMS system (ii) setting up reliable and

“no manual touch” systems for data collection (iii) adoption of Information Technology in the areas

of energy accounting.

IT based systems and solutions that measure the loss levels reliably will be essential before regular

distribution strengthening projects are implemented under the next phase of R-APDRP. Once the

benefits of the investments can be measured, the investments would justify themselves.

Projects under the R-APDRP program shall be taken up in Two Parts. Part-A shall include the

projects for establishment of baseline data and IT applications for energy accounting/ auditing & IT

based consumer service centres. Part-B shall include regular distribution strengthening projects.

Under R-APDRP program , SCADA/DMS system will cover urban areas – towns and cities with

population of more than 4,00,000 & 350MUs annual input energy.MOP, GOI has appointed Power

Finance Corporation as the Nodal Agency for implementing this program.

In order to verify completion of the Part-A projects as per technical specifications provided by

MoP/PFC and awarded by States/Utilities, TPIEA-IT's are being engaged by R-APDRP nodal

agency viz. PFC. TPIEA-IT shall independently verify the completeness of installation, testing and

commissioning of hardware, software and related communication networks and integrated working

of such system installed under Part-A projects (IT System for Establishing Baseline Data System for

Revenue & Energy accounting and for SCADA/DMS System) of R-APDRP.

The prime reference document for TPIEA-IT shall be Letter of Award (LOA) along with subsequent amendments, if any placed by utility to ITIA/SIA, and to other agencies for energy meters & other equipments under R-APDRP/Agreements etc.

Approach

TPIEA-IT to share report on verification of completion of SCADA project with utility before

finalization. In case TPIEA-IT finds any deficiency/ gap in installed system, it will communicate the

same to PFC through the verification report. PFC shall communicate concerned Utility to attend/

address the deficiency/gap within 30 days. Post submission, TPIEA-IT shall revisit the Utility and re-

verify the items/ system and shall submit its final verification report along with compliance status of

earlier report to PFC.

TPIEA-IT shall verify capability of SCADA system. TPIEA-IT may check relevant reports based

on past data of any period since end to end test was done on any two sampled substations.

Appointment of TPIEA-IT

In order to ensure verification of completion of SCADA projects under R-APDRP Part-A, TPIEA-IT

have been appointed by Nodal Agency.

The main task of the TPIEA-IT shall be:

Verify completion of SCADA projects under R-APDRP Part-A for real time control and

monitoring of power distribution system

The TPIEA-IT shall be responsible for providing the above services as per the detailed scope of work in the LOA for each of the project areas covered under all the States in zone for which the project is awarded to them. There shall be four zones viz. North, East, South & West in entire country.

Page 4 of 22

1.2) Executive Summary

M/s ……………………………..……………………..appointed as the Third Party Independent

Evaluation Agency – IT (TPIEA-IT) for ……………….zone has completed the verification of

completion of RAPDRP, Part-A SCADA system established at …………… Town in the State of

…………………….……………..consisting of Power Distribution utilities namely

……………………………………………………………………………………………………….…………..

.………………………………………………………………as per the detailed scope of work of TPIEA-

IT, LOA.No……………………………………………………………………………………………………..

along with subsequent amendments, if any.

M/s ……………………………………………………as TPIEA-IT has verified the SCADA system

hardware, software, other equipments, services and integrated working of the system supplied

and installed by SIA/Utility against their respective LOA / Work Order* and final Certificate of

Verification of Completion along with following Annexure elaborating details of verification of

various sub-components/systems are enclosed-

For Control Centre -

Annexure-1: Hardware Supply and Installation Report

Annexure-2: Software Supply and Installation Report

Annexure-3: F.A.T , field Test Report and system availability test

Annexure-4: Report on System Documentation

For Substation and field (RTU/FRTU)-

Annexure-1: Hardware Supply, Installation and End to end test Report

Annexure-2: List of RTUs and FRTUs

TPIEA-IT to verify system on declaration of completion of SCADA /DMS system in the town. ( field test and system availability tests) Note: wherever the term 'LOA/Work order/Agreement' is written, it is to be treated and read as 'LOA and its subsequent amendments, if any'.

Page 5 of 22

Section-B

1.1) a) DECLARATION OF COMPLETION FOR PART-A (SCADA) PROJECT BY UTILITY

b) DECLARATION OF COMPLETION FOR PART-A (SCADA) PROJECT BY TPIEA-IT

Page 6 of 22

DECLARATION OF COMPLETION FOR PART-A (SCADA) PROJECT

It is certified that-

1) All the works under RAPDRP PART-A (SCADA) system for establishment of real time

supervision and control of power distribution network is completed and fully functional as on

…………………(date) as per Part-A (SCADA) LOA No. (and its amendment, if any)

………………………………………………….issued by State power utility in

…………………….………. town of ……………………………. (Discom/Utility/Power

Department).

2) All the works in the Control Center, Disaster Recovery Centre and in fields are fully

functional as per R-APDRP Part-A (SCADA) LOA No. (and its amendment, if any)

……………………………………………………………… issued by state power utility.

3) The above SCADA system has been installed under RAPDRP, Part-A as per sanctioned

DPRs, detailed letter of award (LOA) along with subsequent amendments, if any, issued to

SIA following RAPDRP guidelines issued by PFC/MOP from time to time. Any post award

change during implementation of the scheme has due approval of the utility.

4) The source codes for customized portion of software solutions have been received by utility

from SIA.

5) The security aspects as envisaged in LOA have been implemented and Cyber Security Plan

& Mitigation document for the system, for Public Networks, is utilized.

Authorized Signatory of Utility

Signature:

Name:

Designation:

Declaration by Utility to be provided on Utility Letter Head

Page 7 of 22

DECLARATION OF COMPLETION FOR PART-A (SCADA) PROJECT

It is certified that-

1) All the works under RAPDRP PART-A (SCADA) system for establishment of real time

supervision and control of power distribution network is completed and fully functional as

on …………………(date) as per Part-A (SCADA) LOA No. (and its amendment, if any)

………………………………………………….issued by State power utility in

…………………….………. town of ……………………………. (Discom/Utility/Power

Department).

2) All the works in the Control Center, Disaster Recovery Centre and in fields are fully

functional as per R-APDRP Part-A (SCADA) LOA No. (and its amendment, if any)

……………………………………………………………… issued by state power utility.

3) The above SCADA system has been installed under RAPDRP, Part-A as per sanctioned

DPRs, detailed letter of award (LOA) along with subsequent amendments, if any, issued

to SIA following RAPDRP guidelines issued by PFC/MOP from time to time. Any post

award change during implementation of the scheme has due approval of the utility.

4) The source codes for customized portion of software solutions have been received by

utility from SIA.

5) The security aspects as envisaged in LOA have been implemented and Cyber Security

Plan & Mitigation document for the system, for Public Networks, is utilized.

Authorized Signatory of TPIEA-IT(SCADA)

Signature:

Name:

Designation:

Certificate of Verification of Completion along with all Annexure to be provided on TPIEA Letter Head

Page 8 of 22

Section-C

Page 9 of 22

Hardware Supply and Installation Report (For Control centre /DR )

(To be submitted with Report for Control center /DR as applicable)

1.1) Name of State:

1.2) Utility Name:

1.3) Control Center/DR Center/ Location:

1.4) Scope and coverage: As indicated in TPIEA-IT LOA

1.5) Detailed Verification and Certification of System Hardware (For Control center and DR Center):

Sl No. Equipment/item Details (as per LOA/Work Order) Equipment/item Details (as

per verification) Overall

Compliance Status (Y/N) Item Description Make Model

No. Qty. Make Model No. Qty.

1 Server /Workstation/ console Hardware

2 Video Projection system 3 Switches /Routers 4 Storage & Backup Devices 5 Other Devices (Firewall /IPS,

GPS Time synch system , printers etc)

6 UPS & Battery System 7 Dispatcher Training Simulator

(DTS)

8 Misc. items, if any

Annexure-1

Page 10 of 22

1.6) Verification and Certification of Mandatory Technical Specifications for Hardware:

Hardware Technical Specifications Validation Through (Certificate/ Document/ Site testing)

Available / Not available

1 The hardware solution shall meet the performance criteria specified in the LOA and its amendment, if any.

In case the offered hardware does not meet the performance criteria, the supplier must provide additional equipments or upgrade the equipments without any additional cost to the utility.

Factory Acceptance Test and Site Acceptance Test reports, Data requirement sheets etc.

2 The hardware shall be scalable as per LOA and its amendment, if any

Discom/Utility approvals required for any change with respect to LOA/Work order

1.7) Certificate of Verification of Hardware System:

This is to certify that all the hardware/ equipment/ communication devices have been supplied, installed and commissioned in Control center / DR Center as per the Bill of Material (BOM) of LOA/ amendments issued to SIA.

* Non-compliances/ deficiencies to be addressed, if any , is enclosed

Authorized Signatory of TPIEA

Signature:

Name:

Designation:

Page 11 of 22

Software Supply and Installation Report (For CC / DR)

(To be submitted with Report for Control center/ DR center as applicable)

2.1) Name of State:

2.2) Utility Name:

2.3) Control Centre /DR Location:

2.4) Scope and coverage: As indicated in TPIEA-IT LOA

2.5) Detailed Verification and Certification of Software System/Applications Supplied, Developed and Installed (For Control Centre, DR Center):

S. No

Module Name Product Name Compliance to the features as per approved documents as per LoA (Y/N)

1. SCADA software

2. ISR Software

3. DMS software

4. DTS software

5. Developmental software

6. Network Management Software

7. RDBMS package

8. WEB /Network security software

9. GIS Adaptor/Engine for importing data from GIS system under IT system

1O. Any other item to meet specification requirements

Annexure-2

Page 12 of 22

2.6) Certificate of Verification of Software System:

a) This is to certify that SIA has supplied, installed and commissioned Operating System, Antivirus system, Databases, SCADA/DMS

system and other Misc. software solutions as per LOA. SIA has also supplied, developed, customized, installed and integrated all

the Applicable Application Software modules as per LOA requirements of utility. This is also to certify that system functionality and

security aspects as defined in the Technical specifications of LOA have been complied with, while designing the Control center and

developing the Application Software. The system software functionalities provided by the deployed Application Software System is

successfully running with actual live data at site without any major bugs (bugs which may stop mission critical function of the Utility

and/or affect SCADA security aspect).SCADA/DMS system functions/features have been verified through FAT & SAT reports.

b) This is to certify that all the licenses procured by SIA are as per the requirements mentioned in the LOA and all these licenses

along with source codes for customized portion of all the software solutions have been handed over to utility by SIA. It is also

certified that all the licenses are valid and all the software have adequate support coverage from SIA /OEMs in line with

requirements specified in the LOA.

c) This is to certify that data exchange and integration with R-APDRP IT system/ other centres as envisaged in LoA in line with

requirements has been done.

d) This is to certify that SCADA/DMS modules including DTS is functioning successfully and performance is as per SLA defined in the

LOA and its amendments, if any.

e)

Non-compliances/ deficiencies to be addressed, if any, is enclosed

Authorized Signatory of TPIEA

Signature:

Name:

Designation:

Certificate by TPIEA – IT to be provided on Letter Head

Page 13 of 22

F.A.T & Field TEST Report ( S.A.T) and system availability test

3.1) Name of State:

3.2) Utility Name:

3.3) Control centre /DR Location:

3.4) Scope and coverage: As indicated in TPIEA-IT LOA

3.5) Certificate of Verification of F.A.T & Field TEST Report:

a) This is to certify that, SYSTEM Availability test and F.A.T and Field Tests (Installation, end to end and performance) have been performed successfully as per LOA/agreed procedure between Utility and SIA as verified from the respective test reports.

b) This is to certify that entire system is running successfully with actual live data at site for 1 month without any major bugs (bugs which may stop mission critical function of the Utility and/or affect IT security aspect).

c) This is to certify that Design & performance criterion as defined in technical specification of LOA is fully met in line with LoA (Sec 8 of MTS).

If there is any change with respect to LOA then Discom/Utility approvals required

* Non-compliances/ deficiencies to be addressed, if any , is enclosed

Authorized Signatory of TPIEA

Signature:

Name:

Designation:

Certificate by TPIEA – IT to be provided on Letter Head

Annexure-3

Page 14 of 22

Report on System Documentation

4.1) Name of State:

4.2) Utility Name:

4.3) Control Center/DR Location:

4.4) Scope and coverage: As indicated in TPIEA-IT LOA

4.5) Detailed Verification and Certification of System Documentations as per LOA (sec 2 chapter 7 clause 7.5 of MTS) : (if utility approval not required (like published manuals, DVD etc.) then indicate in terms of “Not Required”):

S. No.

Document Name / title

Submitted & Accepted by Utility (Y/N)

TPIEA-IT Remarks, if

any

a) System overview document

b) Cross Reference Document

c) Functional design document

d) Standard design documents

e) Design document for customisation

f) System Administration documents- software utilities, diagnostic programs etc.

g) Software description documents

h) Bill of Quantity & List of software and hardware deliverable

i) Protocol implementation documents

j) Point address document

k) IP addressing plan document

l) Software User document for dispatchers

m) Software Maintenance document

m) Training documents

n) Real time & RDBMS documents

o) Database settings, Displays and Reports to be implemented in the system

p) Test procedures

q) Test reports

r) Hardware description documents

s) Hardware User documents

t) Hardware Maintenance documents

Certification by TPIEA – IT to be provided on Letter Head

Annexure-4

Page 15 of 22

u) Data Requirement Sheet (DRS) of all Hardware

v) Site specific Layout, Installation, GA, BOQ, schematics and cabling details drawings/documents

w) SCADA & IT Integration Plan Document using CIM/XML Adapters & Messaging Interfaces.

x) Cyber Security Plan & Mitigation document for the system if Public Networks are used.

y) Interoperability profiles/ Tables

4.6) Certification of TPIEA-IT

This is to certify that all documentation of the R-APDRP Part-A SCADA System related to the system hardware and software has been delivered to utility by SIA as per the requirements mentioned in the LOA and the requirements of the utility for day to day operation, maintenance, troubleshooting and end user training of the system.

*Non-compliances/ deficiencies to be addressed, if any, is enclosed

Authorized Signatory of TPIEA

Signature:

Name:

Designation:

Page 16 of 22

Page 17 of 22

Hardware Supply, Installation and End to End test Report

(To be submitted with Report for each Town)

1.1) Name of State:

1.2) Utility Name:

1.3) Name of Town:

1.4) Scope and coverage:

TPIEA-IT has to check whether the hardware/equipment/communication devices supplied, installed and commissioned are

as per the Bill of Material (BOM) of LOA issued to SIA.

This verification may include supply, installation & commissioning and end to end test reports of the RTU and FRTU

infrastructure in the scope of SIA, in the towns (project area) along with compliance with open protocols defined in LoA.

The coverage of RTU/FRTU system hardware and other associated equipments including connectivity shall be at least

10% each of LoA for RTU and FRTU in the town (project area). The verification is to be done using random sampling

method across the entire project area.

Annexure-1

Page 18 of 22

1.5) Detailed Verification and Certification of System Hardware and features, functionalities in RTU/FRTU

S.No.

Equipment/item details(as per LoA) Details( as verified on 10% each on random sampling basis for RTU & FRTU)

Item Description Make Model Total Qty

Location Make Model No.

Verified Qty

Overall Compliance

Status

TPIEA Remarks, if

any

1 RTUs

a)

RTU comprising panels, racks, sub-racks, Power Supply modules, CPU analog / digital input & control output module as per specification interfacing equipment, required converters & all other required items/accessories including complete wiring for all modules

b) Modem

c) Router

d) LDMS

e) 1 B/W laser printer

f) Any other hardware to meet functional /performance requirement of MTS

2 TEST EQUIPMENTS for RTU

a) RTU Database Configuration & Maintenance Software tool

b) Master Station cum RTU Simulator & Protocol analyser software tool

c)

Laptop PC for above software tools along with interfacing hardware including Hub

Page 19 of 22

S.No.

Equipment/item details(as per LoA) Details( as verified on 10% each on random sampling basis for RTU & FRTU)

Item Description Make Model Total Qty

Location Make Model No.

Verified Qty

Overall Compliance

Status

TPIEA Remarks, if

any

3 Communication

Choose applicable medium from sec 9 chapter Part E of BOQ in MTS of LOA (FO/Radio) (not applicable in case of leased line or GPRS)

4 Auxiliary power supply

a) DC Power Supply (DCPS) system based on SMPS

b) Battery bank for above DCPS (VRLA Type)

5 FRTUs

a)

Mini pole mounted FRTU base equipment along with enclosure suitable to work in open environment (Adequate protection from water & dust) , racks, sub-racks, Power Supply modules with power backup , I/o modules, CPU, interfacing equipment, required converters & all other required items/accessories including complete wiring for all modules

b) Modem

c) Router

d) LDMS

e) 1 B/W laser printer

f) Any other hardware to meet functional /performance requirement of MTS

Page 20 of 22

S.No.

Equipment/item details(as per LoA) Details( as verified on 10% each on random sampling basis for RTU & FRTU)

Item Description Make Model Total Qty

Location Make Model No.

Verified Qty

Overall Compliance

Status

TPIEA Remarks, if

any

6 TEST EQUIPMENTS for RTU

a) RTU Database Configuration & Maintenance Software tool

b) Master Station cum RTU Simulator & Protocol analyser software tool

c) Laptop PC for above software tools along with interfacing hardware including Hub

7 Communication

Choose applicable medium from sec 9 chapter Part E of BOQ in MTS of LOA (FO/Radio) (not applicable in case of leased line or GPRS)

8 Auxiliary power supply

a) DC Power Supply (DCPS) system based on SMPS

b) Battery bank for above DCPS (VRLA Type)

Page 21 of 22

Certification on Hardware / Equipment / Communication devices

This is to certify that SIA has supplied, installed and commissioned hardware / equipment/

communication devices in the town (project area) as per the Bill of Material (BOM) of LOA issued to

SIA.

*Non-compliances/ deficiencies to be addressed, if any, is enclosed

Authorized Signatory of TPIEA

Signature:

Name:

Designation:

Certification by TPIEA – IT to be provided on Letter Head

Page 22 of 22

RTU and FRTU list

Certificate of Verification of hardware / equipment / communication devices:

a) This is to certify that SIA has supplied, installed and commissioned

hardware/equipment/communication devices in the town (project area) as per the Bill of

Material (BOM) of LOA issued to SIA.

b) All the RTU/FRTUs procured and installed under RAPDRP are open protocol as specified in

the LoA issued to SIA.

c) All the RTU /FRTU are working as per LOA issued to SIA

d) The list of all RTUs and FRTUs as provided by utility is given below:

S. No Equipment/item Details

S/S Name Location name

Installation date End to End test date

1. RTU

2. FRTU

Non-compliances/ deficiencies to be addressed, if any, is enclosed

Authorized Signatory of Utility Authorized Signatory of TPIEA –IT (SCADA)

Signature: Signature:

Name: Name:

Designation: Designation:

Certification by TPIEA-IT to be provided on Letter Head

Annexure-2


Recommended