+ All Categories
Home > Engineering > ZTE iRail Solution on HSR Yang jun zte corporation

ZTE iRail Solution on HSR Yang jun zte corporation

Date post: 20-Jun-2015
Category:
Upload: ibrahim-al-hudhaif
View: 267 times
Download: 2 times
Share this document with a friend
Description:
ZTE iRail Solution on HSR Yang jun zte corporation
Popular Tags:
19
ZTE iRail Solution on HSR Oct. 20 th , 2014 Yang Jun Vice President of ZTE
Transcript
Page 1: ZTE iRail Solution on HSR Yang jun   zte corporation

ZTE iRail Solution on HSR

• Oct. 20th , 2014

• Yang Jun

• Vice President of ZTE

Page 2: ZTE iRail Solution on HSR Yang jun   zte corporation

Agenda

Amazing Rail Development in China

16 Years Story of ZTE iRail

Vacation With Parents

Page 3: ZTE iRail Solution on HSR Yang jun   zte corporation

© ZTE Corporation. All rights reserved.

My work place

My hometown is here

1200km

Page 4: ZTE iRail Solution on HSR Yang jun   zte corporation

© ZTE Corporation. All rights reserved.

Car Speed :

Sometimes, I tried to drive.

Comfort :

12 Hrs to reach home

Page 5: ZTE iRail Solution on HSR Yang jun   zte corporation

© ZTE Corporation. All rights reserved.

Airplane Speed :

Sometimes, I chose to fly and then transfer to intercity bus line.

Comfort :

2Hrs Before Departure+2Hrs Travel+2 Hr Bus Transfer= 6Hrs

Page 6: ZTE iRail Solution on HSR Yang jun   zte corporation

© ZTE Corporation. All rights reserved.

Train Speed :

This used to be my last choice: • Only one train per day • Difficult to get a ticket • Too crowed inside coach

Comfort : 10+ Hrs Journey

Page 7: ZTE iRail Solution on HSR Yang jun   zte corporation

© ZTE Corporation. All rights reserved.

CRH Speed :

My first choice now:

It can take me home

within 3.5 hours.

It even allows me to

work during the trip. Comfort :

Page 8: ZTE iRail Solution on HSR Yang jun   zte corporation

Agenda

Amazing Rail Development in China

16 Years Story of ZTE iRail

Vacation With Parents

Page 9: ZTE iRail Solution on HSR Yang jun   zte corporation

© ZTE Corporation. All rights reserved.

Six Speed-up Campaign from 16 years ago

140 160 160 160

200

250

380

54.9 55.2 60.3 61.6 65.7 70.18 80

0

50

100

150

200

250

300

350

400

1997 1998 2000 2001 2004 2007 2014

Top operational train speed Average operational train speed

Sp

eed

(km

/s)

9

Page 10: ZTE iRail Solution on HSR Yang jun   zte corporation

© ZTE Corporation. All rights reserved.

6 hours

8 hours

12 hours

24 hours

1-8 Hours Economic Area via HSR

Beijing

Shanghai

Guangzhou

Hong Kong

Chengdu

Xi’an

Page 11: ZTE iRail Solution on HSR Yang jun   zte corporation

© ZTE Corporation. All rights reserved.

Unimaginable High-efficiency

10%

19% 8%

61%

CHN USA RUS Others

2,903 Bln Ton/km

1060 Bln Passenger/km

33%

27%

22%

18%

11

Operation Mileage Gross Turnover Volume

10% operation mileage bears 33%

gross turnover volume!

Page 12: ZTE iRail Solution on HSR Yang jun   zte corporation

© ZTE Corporation. All rights reserved.

Decisive Factors of Rail Transport Success

12

Enjoyable travelling experience is highly required.

The basic and the first requirement of rail transit.

Adjustable train operation timetable make profit.

First consideration for passengers travelling.

Page 13: ZTE iRail Solution on HSR Yang jun   zte corporation

Agenda

Amazing Rail Development in China

16 Years Story of ZTE iRail

Vacation With Parents

Page 14: ZTE iRail Solution on HSR Yang jun   zte corporation

© ZTE Corporation. All rights reserved.

iRail Solution Case Study

14

E-MSTP for CCTV

Qinghai-Tibet line, the

highest railway

Tianjin metro

Beijing, Guangzhou,

Shenzhen metro, support

for Beijing Olympic, Asian

Games, Universiade

Great Engineering

Integrated ICT

Vietnam railway 3

routes & 1 junction

Chongqing LRT

IP based telcomm: NGN, FTTx

Beijing–Kowloon railway

Haerbin-Dalian HSR

Zhengzhou, Suzhou metro

Shanghai-hangzhou HSR

Hanzhou metro

Wenzhou metro

LTE for HSR, metro

GSM-R for CTCS, ETCS

Nanning-Guangzhou HSR

Nigeria warri railway

2007 1999

2005 2009

2013

2014

Page 15: ZTE iRail Solution on HSR Yang jun   zte corporation

© ZTE Corporation. All rights reserved.

iRail – ICT Infrastructure of Intelligent Rail

CCTV with intelligent analysis

Smart maintenance

Man less Level crossing

Safety

Cloud-based architecture

Emergency coalition response

Trans-platform applications

Flexibility Enjoyable trip with ZIFI

Easy access from E-Ticket

Integrated PIS/DAS/PAS

Comfort

Fast developing GSM-R

Emerging LTE for Rail

High-speed mobility solution

Efficiency

ZTE iRail Solution

15

Page 16: ZTE iRail Solution on HSR Yang jun   zte corporation

© ZTE Corporation. All rights reserved.

ICT Infrastructure is Crucial to HSR

Communication and information service

•MSTP, video conference and surveillance.

•PIS, telephony, PA, Call center, online booking.

Signaling and Train Control system

•CTC, CBI, Point machine, signal…

•CTCS/ETCS

Track and Station Construction

•Rail, sleeper, overhead contact line, station…

•Bridge, culverts, tunnel…

Rolling Stock

•Train, carriage, metro, urban railway, Monorail..

•High speed train..

The cost of ICT system is little, but it’s very important.

Page 17: ZTE iRail Solution on HSR Yang jun   zte corporation

© ZTE Corporation. All rights reserved.

Looking Forward to the Future!

iRail V1.0

GSM-R MSTP FTTX NGN

iRail V2.0

Broadband TWC LTE for Rail Rail Ecosystem

Smart operation and maintenance

Page 18: ZTE iRail Solution on HSR Yang jun   zte corporation

© ZTE Corporation. All rights reserved.

Partner • Professional

• Trustworthy

• Cooperative

• Open Speed :

Comfort :

Page 19: ZTE iRail Solution on HSR Yang jun   zte corporation

Thank You

http://enterprise.zte.com.cn

www.zte.com.cn


Recommended