TM Following the challenge by the Health and Safety Executive to substantially improve performance regarding hydrocarbon releases, The UK Offshore Operators Association (UKOOA) established the Hydrocarbon Release Reduction Work Group in 2000. Its aim was to focus industry efforts not just in making a step reduction over a three-year target period but to promote a ‘no leak culture’ which would be sustainable for the long-term future of the industry. Over a 3-year period this Work Group helped develop and collate a collection of good practice techniques and best practice guidelines aimed at assisting operators in their efforts to reduce releases. This 'Toolkit' is a collection of these good practices, and provides a central reference to Managers, Supervisors and the Workforce. HYDROCARBON RELEASE REDUCTION TOOLKIT
Transcript
Page 1: Zulu Engineering Toolkit

TM

Following the challenge by the Health and Safety Executive to substantially improve performance regarding hydrocarbon releases, The UK Offshore Operators Association (UKOOA) established the Hydrocarbon Release Reduction Work Group in 2000. Its aim was to focus industry efforts not just in making a step reduction over a three-year target period but to promote a ‘no leak culture’ which would be sustainable for the long-term future of the industry.

Over a 3-year period this Work Group helped develop and collate a collection of good practice techniques and best practice guidelines aimed at assisting operators in their efforts to reduce releases.

This 'Toolkit' is a collection of these good practices, and provides a central reference to Managers, Supervisors and the Workforce.

HYDROCARBON RELEASE REDUCTION

TOOLKIT

Page 2: Zulu Engineering Toolkit

www.zuluengineering.co.uk

Page 3: Zulu Engineering Toolkit

www.zuluengineering.co.uk

Page 4: Zulu Engineering Toolkit

www.zuluengineering.co.uk

Page 5: Zulu Engineering Toolkit

www.zuluengineering.co.uk

Page 6: Zulu Engineering Toolkit

www.zuluengineering.co.uk

Page 7: Zulu Engineering Toolkit

www.zuluengineering.co.uk

Page 8: Zulu Engineering Toolkit

www.zuluengineering.co.uk

Page 9: Zulu Engineering Toolkit

www.zuluengineering.co.uk

Page 10: Zulu Engineering Toolkit

www.zuluengineering.co.uk

Page 11: Zulu Engineering Toolkit

www.zuluengineering.co.uk

Page 12: Zulu Engineering Toolkit

www.zuluengineering.co.uk

Page 13: Zulu Engineering Toolkit

www.zuluengineering.co.uk

Page 14: Zulu Engineering Toolkit

Telephone: + 44 (0)1639 798799

Mobile: + 44 (0)7724 201238

Email: [email protected]

Web: www.zuluengineering.co.uk

Zulu Engineering Services LtdOwens@SA12

Christchurch road

Baglan Industrial Park,

Port Talbot,

United Kingdom

SA12 7BZ

Zulu Engineering was formed in 2009 and offers services to the oil & gas, chemical, petrochemical, power and process industries with particular emphasis on joint integrity management implementation and execution.

Our services are predominantly for plant shutdowns and turnarounds. However they can be applied to daily maintenance programmes and project specific requirements.

From initial discussion, survey and consultation through to execution of work, Zulu Engineering offers a professional, bespoke service.

HYDROCARBON RELEASE REDUCTION

TOOLKIT


Recommended